development regulations.pdf
TRANSCRIPT
-
7/25/2019 Development Regulations.pdf
1/21
1
2 3
4
5
116
65
10
Entrance Gate
Ra
ilC
orr
idor
Ra
ilC
orr
idor
Ra
ilC
orr
idor
150m0 50m
0 150m 450m
x
Plot Boundary
Minimum Setback Lines
Entry Zone (Max. 7m entry)
Landscape Strip
Northing Easting Point
Recomended Parking Zone
Point Marker
Maximum Ground Coverage (60%)
Jery Al Samur Northern Logistics Park- PLOT REGULATIONS SHEETPlot ID
Building MassingPlot Guidelines
Key Plan
Illustrative - Section A
32mWideRoad
32m
WideRoad
40m Wide Road
PLOT 1
1. Plan for illustration only - do not scale
2. All coordinates are related to Qatar National Grid 95 (QNG 95)
3. Any portion of the building within 3m of a plot boundary will be
required to be fully fire rated in accordance with Civil Defense,
National Fire Protection Agency (NFPA) and Qatar Construction
Standards (QCS) requirements
4. This Plot Regulations Sheet is to be read in conjunction Development
Regulation and along with the Design Guidelines stated under the Key
Planning Regulations table on this sheet.
5. Development should be in compliance with all Authority requirements
including MOI, Civil Defense, MMUP, Kahramaa, etc
EastNorthPoint
Rev:Date: 03. Feb. 2015
Notes
Key Planning Regulations
Parcel Coordinates
Legend
Allowable building envelope
213360.4168407225.49044
213335.1856407238.14123
213122.671407167.0712
213112.572407146.8231
213398.7931407110.7385
213236.3051407056.398410
213152.2166407028.27716
213320.3939407084.519611
16.016.0
Distan
cefrom
Entran
ceGate
6.0
6.0
6.0
15.0
50
.0
260.0
141.0 PLOT 1
-
7/25/2019 Development Regulations.pdf
2/21
3
4
5
6665
67
62
63
Entrance Gate
Ra
ilC
orr
idor
Ra
ilC
orr
idor
Ra
ilC
orr
idor
150m0 50m
0 150m 450m
x
Plot Boundary
Minimum Setback Lines
Entry Zone (Max. 7m entry)
Landscape Strip
Northing Easting Point
Recomended Parking Zone
Point Marker
Maximum Ground Coverage (60%)
Jery Al Samur Northern Logistics Park- PLOT REGULATIONS SHEETPlot ID
Building MassingPlot Guidelines
Key Plan
Illustrative - Section A
32mWideRoad
40m Wide Road
PLOT 2
EastNorthPoint
Rev:Date: 03. Feb. 2015
Notes
Key Planning Regulations
Parcel Coordinates
Legend
Allowable building envelop e
213390.7652407235.639765
213429.141407120.887164
213521.1331407151.651263
213618.8153407184.318362
213398.3397407250.826166
213576.6331407310.451867
1. Plan for illustration only - do not scale
2. All coordinates are related to Qatar National Grid 95 (QNG 95)
3. Any portion of the building within 3m of a plot boundary will be
required to be fully fire rated in accordance with Civil Defense,
National Fire Protection Agency (NFPA) and Qatar Construction
Standards (QCS) requirements
4. This Plot Regulations Sheet is to be read in conjunction Development
Regulation and along with the Design Guidelines stated under the Key
Planning Regulations table on this sheet.
5. Development should be in compliance with all Authority requirements
including MOI, Civil Defense, MMUP, Kahramaa, etc
Distancefrom
EntranceGate
6.0
12.012.0
15.0
6.0
6.0
133.0
200.0
50
.0
PLOT 2
-
7/25/2019 Development Regulations.pdf
3/21
38
39
48
29
30
50
5155
6.0
Ra
ilC
orr
idor
Ra
ilC
orr
idor
Ra
ilC
orr
idor
150m0 50m
0 150m 450m
x
Plot Boundary
Minimum Setback Lines
Entry Zone (Max. 7m entry)
Landscape Strip
Northing Easting Point
Recomended Parking Zone
Point Marker
Maximum Ground Coverage (60%)
Plot ID
Building MassingPlot Guidelines
Key Plan
Illustrative - Section A
20mWideRoad
PLOT 3
EastNorthPoint
Rev:Date: 03. Feb. 2015
Notes
Key Planning Regulations
Parcel Coordinates
Legend
213708.2544406916.877451
213752.9739406783.156950
213576.5751406724.164749
213551.2654406736.788548
213610.5713406884.2154
213514.7858406852.177255
Allowable building envelop e
1. Plan for illustration only - do not scale
2. All coordinates are related to Qatar National Grid 95 (QNG 95)
3. Any portion of the building within 3m of a plot boundary will be
required to be fully fire rated in accordance with Civil Defense,
National Fire Protection Agency (NFPA) and Qatar Construction
Standards (QCS) requirements
4. This Plot Regulations Sheet is to be read in conjunction Development
Regulation and along with the Design Guidelines stated under the KeyPlanning Regulations table on this sheet.
5. Development should be in compliance with all Authority requirements
including MOI, Civil Defense, MMUP, Kahramaa, etc
6.0
6.0
20.0
20.0 5
0.0
15.0
206.0
6.0
141.0
PLOT 3
Jery Al Samur Northern Logistics Park- PLOT REGULATIONS SHEET
-
7/25/2019 Development Regulations.pdf
4/21
34
24
31
43
32
Ra
ilC
orr
idor
Ra
ilC
orr
idor
Ra
ilC
orr
idor
0 25m 75m
0 150m 450m
x
Plot Boundary
Minimum Setback Lines
Entry Zone (Max. 7m entry)
Landscape Strip
Northing Easting Point
Recomended Parking Zone
Point Marker
Maximum Ground Coverage (60%)
Jery Al Samur Northern Logistics Park- PLOT REGULATIONS SHEET
Building MassingPlot Guidelines
Key Plan
Illustrative - Section A
32mWideRoad
20m Wide Road
Plot ID
PLOT 4A
EastNorthPoint
Rev:Date: 03. Feb. 2015
Notes
Key Planning Regulations
Parcel Coordinates
Legend
213421.5263406502.547234
213376.8068406636.268333
213311.6855406614.490232
213299.0614406589.179931
213337.4379406474.425943
Allowable building envelope
1. Plan for illustration only - do not scale
2. All coordinates are related to Qatar National Grid 95 (QNG 95)
3. Any portion of the building within 3m of a plot boundary will be
required to be fully fire rated in accordance with Civil Defense,
National Fire Protection Agency (NFPA) and Qatar Construction
Standards (QCS) requirements
4. This Plot Regulations Sheet is to be read in conjunction Development
Regulation and along with the Design Guidelines stated under the Key
Planning Regulations table on this sheet.
5. Development should be in compliance with all Authority requirements
including MOI, Civil Defense, MMUP, Kahramaa, etc
6.0
6.06.0
15.0
50.0
20.0
20.0
141.0
88.7
PLOT 4A
-
7/25/2019 Development Regulations.pdf
5/21
34
36
3732
Ra
ilC
orr
idor
Ra
ilC
orr
idor
Ra
ilC
orr
idor
0 25m 75m
0 150m 450m
x
Plot Boundary
Minimum Setback Lines
Entry Zone (Max. 7m entry)
Landscape Strip
Northing Easting Point
Recomended Parking Zone
Point Marker
Maximum Ground Coverage (60%)
Building MassingPlot Guidelines
Key Plan
Illustrative - Section A
20m Wide Road
20m Wide
Road
Plot ID
PLOT 4B
EastNorthPoint
Rev:Date: 03. Feb. 2015
Notes
Key Planning Regulations
Parcel Coordinates
Legend
213505.615406530.668636
213463.5707406516.607935
213421.5263406502.547234
33
213460.8955406664.389737
213376.8068406636.2683
Allowable building envelope
1. Plan for illustration only - do not scale
2. All coordinates are related to Qatar National Grid 95 (QNG 95)
3. Any portion of the building within 3m of a plot boundary will be
required to be fully fire rated in accordance with Civil Defense,
National Fire Protection Agency (NFPA) and Qatar Construction
Standards (QCS) requirements
4. This Plot Regulations Sheet is to be read in conjunction Development
Regulation and along with the Design Guidelines stated under the Key
Planning Regulations table on this sheet.
5. Development should be in compliance with all Authority requirements
including MOI, Civil Defense, MMUP, Kahramaa, etc
45.0
15.0
6.0 6.0
6.0
141.0
88.7
PLOT 4B
Jery Al Samur Northern Logistics Park- PLOT REGULATIONS SHEET
-
7/25/2019 Development Regulations.pdf
6/21
38
39
34
36
40
42
41
48
37
Ra
ilC
orr
idor
Ra
ilC
orr
idor
Ra
ilC
orr
idor
0 25m 75m
0 150m 450m
x
Plot Boundary
Minimum Setback Lines
Entry Zone (Max. 7m entry)
Landscape Strip
Northing Easting Point
Recomended Parking Zone
Point Marker
Maximum Ground Coverage (60%)
Building MassingPlot Guidelines
Key Plan
Illustrative - Section A
20mWideRoad
20m Wide Road
20m Wide Road
Plot ID
PLOT 4C
EastNorthPoint
Rev:Date: 03. Feb. 2015
Notes
Key Planning Regulations
Parcel Coordinates
Legend
213551.3273406673.543739
213526.0167406686.167938
213589.7038406558.790140
213505.615406530.668636
213460.8955406664.389737
Allowable building envelope
1. Plan for illustration only - do not scale
2. All coordinates are related to Qatar National Grid 95 (QNG 95)
3. Any portion of the building within 3m of a plot boundary will be
required to be fully fire rated in accordance with Civil Defense,
National Fire Protection Agency (NFPA) and Qatar Construction
Standards (QCS) requirements
4. This Plot Regulations Sheet is to be read in conjunction Development
Regulation and along with the Design Guidelines stated under the Key
Planning Regulations table on this sheet.
5. Development should be in compliance with all Authority requirements
including MOI, Civil Defense, MMUP, Kahramaa, etc
PLOT 4C6.0
141.0
88.7
50.015.0
20.0
20.0
15.0
50.0
Jery Al Samur Northern Logistics Park- PLOT REGULATIONS SHEET
-
7/25/2019 Development Regulations.pdf
7/21
36
42
44
Ra
ilC
orr
idor
Ra
ilC
orr
idor
Ra
ilC
orr
idor
0 25m 75m
0 150m 450m
x
Plot Boundary
Minimum Setback Lines
Entry Zone (Max. 7m entry)
Landscape Strip
Northing Easting Point
Recomended Parking Zone
Point Marker
Maximum Ground Coverage (60%)
Jery Al Samur Northern Logistics Park-PLOT REGULATIONS SHEET
Building MassingPlot Guidelines
Key Plan
Illustrative - Section A
32mWideRoad
20m Wide
Road
PLOT 4D
Plot ID
PLOT 4D
EastNorthPoint
Rev:Date: 03. Feb. 2015
Notes
Key Planning Regulations
Parcel Coordinates
Legend
213337.4379406474.425943
213469.9139406497.640542
35
34
213376.499406357.62544
213520.5659406346.180446
213392.305406346.23745
213463.5707406516.607935
213421.5263406502.5472
Allowable building envelope
1. Plan for illustration only - do not scale
2. All coordinates are related to Qatar National Grid 95 (QNG 95)
3. Any portion of the building within 3m of a plot boundary will be
required to be fully fire rated in accordance with Civil Defense,
National Fire Protection Agency (NFPA) and Qatar Construction
Standards (QCS) requirements
4. This Plot Regulations Sheet is to be read in conjunction Development
Regulation and along with the Design Guidelines stated under the Key
Planning Regulations table on this sheet.
5. Development should be in compliance with all Authority requirements
including MOI, Civil Defense, MMUP, Kahramaa, etc
15.0
6.0
6.0
40.7
159.71
79.7
123.2
15.0
15.8
11.3
-
7/25/2019 Development Regulations.pdf
8/21
Ra
ilC
orr
idor
Ra
ilC
orr
idor
Ra
ilC
orr
idor
0 150m 450m
34
36
40
42
41
47
150m0 50m
x
Plot Boundary
Minimum Setback Lines
Entry Zone (Max. 7m entry)
Landscape Strip
Northing Easting Point
Recomended Parking Zone
Point Marker
Maximum Ground Coverage (60%)
Jery Al Samur Northern Logistics Park- PLOT REGULATIONS SHEET
Building MassingPlot Guidelines
Key Plan
Illustrative - Section A
20m WideRoad
Plot ID
PLOT 4E
EastNorthPoint
Rev:Date: 03. Feb. 2015
Notes
Key Planning Regulations
Parcel Coordinates
Legend
213469.9139406497.640542
213615.0141406546.165241
35
213520.5659406346.180446
213681.9178406346.109347
213463.5707406516.607935
Allowable building envelop e
1. Plan for illustration only - do not scale
2. All coordinates are related to Qatar National Grid 95 (QNG 95)
3. Any portion of the building within 3m of a plot boundary will be
required to be fully fire rated in accordance with Civil Defense,
National Fire Protection Agency (NFPA) and Qatar Construction
Standards (QCS) requirements
4. This Plot Regulations Sheet is to be read in conjunction Development
Regulation and along with the Design Guidelines stated under the KeyPlanning Regulations table on this sheet.
5. Development should be in compliance with all Authority requirements
including MOI, Civil Defense, MMUP, Kahramaa, etc
6.0
51.2
210.9
6.0159.7
6.0
50.045.0
15.0
153.0
PLOT 4E
-
7/25/2019 Development Regulations.pdf
9/21
24
31
26
32
Ra
ilC
orr
idor
Ra
ilC
orr
idor
Ra
ilC
orr
idor
0 25m 75m
0 150m 450m
x
Plot Boundary
Minimum Setback Lines
Entry Zone (Max. 7m entry)
Landscape Strip
Northing Easting Point
Recomended Parking Zone
Point Marker
Maximum Ground Coverage (60%)
Jery Al Samur Northern Logistics Park- PLOT REGULATIONS SHEET
Building MassingPlot Guidelines
Key Plan
Illustrative - Section A
32mWideRoad PLOT
5A
20m Wide Road
Plot ID
PLOT 5A
EastNorthPoint
Rev:Date: 03. Feb. 2015
Notes
Key Planning Regulations
Parcel Coordinates
Legend
213305.3423406633.457525
213280.0321406646.081724
213241.6555406760.835923
213325.744406788.957119
213370.4637406655.235626
Allowable building envelope
1. Plan for illustration only - do not scale
2. All coordinates are related to Qatar National Grid 95 (QNG 95)
3. Any portion of the building within 3m of a plot boundary will be
required to be fully fire rated in accordance with Civil Defense,
National Fire Protection Agency (NFPA) and Qatar Construction
Standards (QCS) requirements
4. This Plot Regulations Sheet is to be read in conjunction Development
Regulation and along with the Design Guidelines stated under the KeyPlanning Regulations table on this sheet.
5. Development should be in compliance with all Authority requirements
including MOI, Civil Defense, MMUP, Kahramaa, etc
6.0
6.06.0
15.0
20.0
20.0
50.0
141.0
88.7
-
7/25/2019 Development Regulations.pdf
10/21
30
26
3732
Ra
ilC
orr
idor
Ra
ilC
orr
idor
Ra
ilC
orr
idor
0 25m 75m
0 150m 450m
x
Plot Boundary
Minimum Setback Lines
Entry Zone (Max. 7m entry)
Landscape Strip
Northing Easting Point
Recomended Parking Zone
Point Marker
Maximum Ground Coverage (60%)
Jery Al Samur Northern Logistics Park- PLOT REGULATIONS SHEET
Building MassingPlot Guidelines
Key Plan
Illustrative - Section A
PLOT
5B
20m Wide Road
Plot ID
PLOT 5B
EastNorthPoint
Rev:Date: 03. Feb. 2015
Notes
Key Planning Regulations
Parcel Coordinates
Legend
213454.5525406683.356727
213370.4637406655.235626
213325.744406788.957119
213409.8327406817.078418
Allowable building envelope
1. Plan for illustration only - do not scale
2. All coordinates are related to Qatar National Grid 95 (QNG 95)
3. Any portion of the building within 3m of a plot boundary will be
required to be fully fire rated in accordance with Civil Defense,
National Fire Protection Agency (NFPA) and Qatar Construction
Standards (QCS) requirements
4. This Plot Regulations Sheet is to be read in conjunction Development
Regulation and along with the Design Guidelines stated under the Key
Planning Regulations table on this sheet.
5. Development should be in compliance with all Authority requirements
including MOI, Civil Defense, MMUP, Kahramaa, etc
6.0
6.0 6.0
15.0
45.0
88.7
141.0
-
7/25/2019 Development Regulations.pdf
11/21
38
39
48
29
30
26
37
55
Ra
ilC
orr
idor
Ra
ilC
orr
idor
Ra
ilC
orr
idor
0 25m 75m
0 150m 450m
x
Plot Boundary
Minimum Setback Lines
Entry Zone (Max. 7m entry)
Landscape Strip
Northing Easting Point
Recomended Parking Zone
Point Marker
Maximum Ground Coverage (60%)
Jery Al Samur Northern Logistics Park- PLOT REGULATIONS SHEET
Building MassingPlot Guidelines
Key Plan
Illustrative - Section A
20mWideRoadPLOT
5C
20m Wide Road
Plot ID
PLOT 5C
EastNorthPoint
Rev:Date: 03. Feb. 2015
Notes
Key Planning Regulations
Parcel Coordinates
Legend
213532.298406730.445329
213519.6737406705.134728
213454.5525406683.356727
213409.8327406817.078418
213493.9215406845.199730
Allowable building envelope
1. Plan for illustration only - do not scale
2. All coordinates are related to Qatar National Grid 95 (QNG 95)
3. Any portion of the building within 3m of a plot boundary will be
required to be fully fire rated in accordance with Civil Defense,
National Fire Protection Agency (NFPA) and Qatar Construction
Standards (QCS) requirements
4. This Plot Regulations Sheet is to be read in conjunction Development
Regulation and along with the Design Guidelines stated under the Key
Planning Regulations table on this sheet.
5. Development should be in compliance with all Authority requirements
including MOI, Civil Defense, MMUP, Kahramaa, etc
6.0
6.0
15.0
15.0
50.0
20.0
20.0
5
0.0
88.7
141.0
-
7/25/2019 Development Regulations.pdf
12/21
6
9
21
10
7
22
20
Ra
ilC
orr
idor
Ra
ilC
orr
idor
Ra
ilC
orr
idor
0 25m 75m
0 150m 450m
x
Plot Boundary
Minimum Setback Lines
Entry Zone (Max. 7m entry)
Landscape Strip
Northing Easting Point
Recomended Parking Zone
Point Marker
Maximum Ground Coverage (60%)
Jery Al Samur Northern Logistics Park- PLOT REGULATIONS SHEET
Building MassingPlot Guidelines
Key Plan
Illustrative - Section A
32mWideRoad
PLOT
6A
20m Wide Road
Plot ID
PLOT 6A
EastNorthPoint
Rev:Date: 03. Feb. 2015
Notes
Key Planning Regulations
Parcel Coordinates
Legend
213277.8529406932.16179
213212.7315406910.38378
213187.4212406923.00787
213152.2166407028.27716
213236.3051407056.398410
Allowable building envelope
1. Plan for illustration only - do not scale
2. All coordinates are related to Qatar National Grid 95 (QNG 95)
3. Any portion of the building within 3m of a plot boundary will be
required to be fully fire rated in accordance with Civil Defense,
National Fire Protection Agency (NFPA) and Qatar Construction
Standards (QCS) requirements
4. This Plot Regulations Sheet is to be read in conjunction Development
Regulation and along with the Design Guidelines stated under the Key
Planning Regulations table on this sheet.
5. Development should be in compliance with all Authority requirements
including MOI, Civil Defense, MMUP, Kahramaa, etc
6.0
88.7
6.0
131.0
50.0
15.0
6.0
20.0
20.0
-
7/25/2019 Development Regulations.pdf
13/21
5
11
9
21
10
20 17
Ra
ilC
orr
idor
Ra
ilC
orr
idor
Ra
ilC
orr
idor
0 25m 75m
0 150m 450m
x
Plot Boundary
Minimum Setback Lines
Entry Zone (Max. 7m entry)
Landscape Strip
Northing Easting Point
Recomended Parking Zone
Point Marker
Maximum Ground Coverage (60%)
Jery Al Samur Northern Logistics Park- PLOT REGULATIONS SHEET
Building MassingPlot Guidelines
Key Plan
Illustrative - Section A
PLOT
6B
20m Wide Road
Plot ID
PLOT 6B
EastNorthPoint
Rev:Date: 03. Feb. 2015
Notes
Key Planning Regulations
Parcel Coordinates
Legend
213361.9417406960.282812
213320.3939407084.519611
213236.3051407056.398410
213277.8529406932.16179
Allowable building envelope
1. Plan for illustration only - do not scale
2. All coordinates are related to Qatar National Grid 95 (QNG 95)
3. Any portion of the building within 3m of a plot boundary will be
required to be fully fire rated in accordance with Civil Defense,
National Fire Protection Agency (NFPA) and Qatar Construction
Standards (QCS) requirements
4. This Plot Regulations Sheet is to be read in conjunction Development
Regulation and along with the Design Guidelines stated under the Key
Planning Regulations table on this sheet.
5. Development should be in compliance with all Authority requirements
including MOI, Civil Defense, MMUP, Kahramaa, etc
131.0
88.7
15.0
6.0
6.0
6.0
-
7/25/2019 Development Regulations.pdf
14/21
5
11
9
14
56
10
20 17 16 57
58
Ra
ilC
orr
idor
Ra
ilC
orr
idor
Ra
ilC
orr
idor
0 25m 75m
0 150m 450m
x
Plot Boundary
Minimum Setback Lines
Entry Zone (Max. 7m entry)
Landscape Strip
Northing Easting Point
Recomended Parking Zone
Point Marker
Maximum Ground Coverage (60%)
Jery Al Samur Northern Logistics Park- PLOT REGULATIONS SHEET
Building MassingPlot Guidelines
Key Plan
Illustrative - Section A
20mWideRoad
PLOT
6C
20m Wide Road
Plot ID
PLOT 6C
EastNorthPoint
Rev:Date: 03. Feb. 2015
Notes
Key Planning Regulations
Parcel Coordinates
Legend
213421.3736406980.158213
213361.9417406960.282812
213320.3939407084.519611
213398.7931407110.7385
213433.9979407005.468814
Allowable building envelop e
1. Plan for illustration only - do not scale
2. All coordinates are related to Qatar National Grid 95 (QNG 95)
3. Any portion of the building within 3m of a plot boundary will be
required to be fully fire rated in accordance with Civil Defense,
National Fire Protection Agency (NFPA) and Qatar Construction
Standards (QCS) requirements
4. This Plot Regulations Sheet is to be read in conjunction Development
Regulation and along with the Design Guidelines stated under the Key
Planning Regulations table on this sheet.
5. Development should be in compliance with all Authority requirements
including MOI, Civil Defense, MMUP, Kahramaa, etc
82.7
131.0
50.0
6.0
20.0
20.0
15.0
6.0
15.0
-
7/25/2019 Development Regulations.pdf
15/21
5620 17 16
30 55
57
Ra
ilC
orr
idor
Ra
ilC
orr
idor
Ra
ilC
orr
idor
0 25m 75m
0 150m 450m
x
Plot Boundary
Minimum Setback Lines
Entry Zone (Max. 7m entry)
Landscape Strip
Northing Easting Point
Recomended Parking Zone
Point Marker
Maximum Ground Coverage (60%)
Jery Al Samur Northern Logistics Park- PLOT REGULATIONS SHEET
Building MassingPlot Guidelines
Key Plan
Illustrative - Section A
20mWideRoad
20m Wide Road
PLOT
6D
Plot ID
PLOT 6D
EastNorthPoint
Rev:Date: 03. Feb. 2015
Notes
Key Planning Regulations
Parcel Coordinates
Legend
213409.8327406817.078418
213368.2848406941.315417
213427.7175406961.190916
213460.6207406944.778115
213493.9215406845.199730
Allowable building envelope
1. Plan for illustration only - do not scale
2. All coordinates are related to Qatar National Grid 95 (QNG 95)
3. Any portion of the building within 3m of a plot boundary will be
required to be fully fire rated in accordance with Civil Defense,
National Fire Protection Agency (NFPA) and Qatar Construction
Standards (QCS) requirements
4. This Plot Regulations Sheet is to be read in conjunction Development
Regulation and along with the Design Guidelines stated under the Key
Planning Regulations table on this sheet.
5. Development should be in compliance with all Authority requirements
including MOI, Civil Defense, MMUP, Kahramaa, etc
6.0
15.0
15.0
6.0
26.0
26.0
50.0
88.7
131.0
50.0
-
7/25/2019 Development Regulations.pdf
16/21
21 20 17
30
Ra
ilC
orr
idor
Ra
ilC
orr
idor
Ra
ilC
orr
idor
0 25m 75m
0 150m 450m
x
Plot Boundary
Minimum Setback Lines
Entry Zone (Max. 7m entry)
Landscape Strip
Northing Easting Point
Recomended Parking Zone
Point Marker
Maximum Ground Coverage (60%)
Jery Al Samur Northern Logistics Park- PLOT REGULATIONS SHEET
Building MassingPlot Guidelines
Key Plan
Illustrative - Section A
20m Wide Road
PLOT
6E
Plot ID
PLOT 6E
EastNorthPoint
Rev:Date: 03. Feb. 2015
Notes
Key Planning Regulations
Parcel Coordinates
Legend
213284.196406913.194320
213325.744406788.957119
213409.8327406817.078418
213368.2848406941.315417
Allowable building envelop e
1. Plan for illustration only - do not scale
2. All coordinates are related to Qatar National Grid 95 (QNG 95)
3. Any portion of the building within 3m of a plot boundary will be
required to be fully fire rated in accordance with Civil Defense,
National Fire Protection Agency (NFPA) and Qatar Construction
Standards (QCS) requirements
4. This Plot Regulations Sheet is to be read in conjunction Development
Regulation and along with the Design Guidelines stated under the KeyPlanning Regulations table on this sheet.
5. Development should be in compliance with all Authority requirements
including MOI, Civil Defense, MMUP, Kahramaa, etc
6.0
6.0
6.0
15.0 45.0
131.0
88.7
-
7/25/2019 Development Regulations.pdf
17/21
9
21
7
2220
Ra
ilC
orr
idor
Ra
ilC
orr
idor
Ra
ilC
orr
idor
0 25m 75m
0 150m 450m
x
Plot Boundary
Minimum Setback Lines
Entry Zone (Max. 7m entry)
Landscape Strip
Northing Easting Point
Recomended Parking Zone
Point Marker
Maximum Ground Coverage (60%)
Jery Al Samur Northern Logistics Park- PLOT REGULATIONS SHEET
Building MassingPlot Guidelines
Key Plan
Illustrative - Section A
3
2mWideRoad
20m Wide Road
PLOT
6F
Plot ID
PLOT 6F
EastNorthPoint
Rev:Date: 03. Feb. 2015
Notes
Key Planning Regulations
Parcel Coordinates
Legend
213206.4506406866.10622
213219.0747406891.416221
213284.196406913.194320
213325.744406788.957119
213241.6555406760.835923
Allowable building envelope
1. Plan for illustration only - do not scale
2. All coordinates are related to Qatar National Grid 95 (QNG 95)
3. Any portion of the building within 3m of a plot boundary will be
required to be fully fire rated in accordance with Civil Defense,
National Fire Protection Agency (NFPA) and Qatar Construction
Standards (QCS) requirements
4. This Plot Regulations Sheet is to be read in conjunction Development
Regulation and along with the Design Guidelines stated under the Key
Planning Regulations table on this sheet.
5. Development should be in compliance with all Authority requirements
including MOI, Civil Defense, MMUP, Kahramaa, etc
6.0
6.0
6.0
20.0
20.0
15.0
50.0
131.0
88.7
-
7/25/2019 Development Regulations.pdf
18/21
5
14
5616 57
58
53
63
Ra
ilC
orr
idor
Ra
ilC
orr
idor
Ra
ilC
orr
idor
0 25m 75m
0 150m 450m
x
Plot Boundary
Minimum Setback Lines
Entry Zone (Max. 7m entry)
Landscape Strip
Northing Easting Point
Recomended Parking Zone
Point Marker
Maximum Ground Coverage (60%)
Jery Al Samur Northern Logistics Park- PLOT REGULATIONS SHEET
Building MassingPlot Guidelines
Key Plan
Illustrative - Section A
32mWideRoad
PLOT
7A
20m Wide Road
Plot ID
PLOT 7A
EastNorthPoint
Rev:Date: 03. Feb. 2015
Notes
Key Planning Regulations
Parcel Coordinates
Legend
213521.1331407151.651263
213562.6807407027.414460
213489.6564407002.993959
213464.3457407015.617858
213429.141407120.887164
Allowable building envelope
1. Plan for illustration only - do not scale
2. All coordinates are related to Qatar National Grid 95 (QNG 95)
3. Any portion of the building within 3m of a plot boundary will be
required to be fully fire rated in accordance with Civil Defense,
National Fire Protection Agency (NFPA) and Qatar Construction
Standards (QCS) requirements
4. This Plot Regulations Sheet is to be read in conjunction Development
Regulation and along with the Design Guidelines stated under the KeyPlanning Regulations table on this sheet.
5. Development should be in compliance with all Authority requirements
including MOI, Civil Defense, MMUP, Kahramaa, etc
6.0
6.0
15.050.0
131.0
97.0
50.0
20.0
20.0
15.0
-
7/25/2019 Development Regulations.pdf
19/21
57 53
52
62
63
Ra
ilC
orr
idor
Ra
ilC
orr
idor
Ra
ilC
orr
idor
0 25m 75m
0 150m 450m
x
Plot Boundary
Minimum Setback Lines
Entry Zone (Max. 7m entry)
Landscape Strip
Northing Easting Point
Recomended Parking Zone
Point Marker
Maximum Ground Coverage (60%)
Jery Al Samur Northern Logistics Park- PLOT REGULATIONS SHEET
Building MassingPlot Guidelines
Key Plan
Illustrative - Section A
PLOT 7B
20m Wide Road
Plot ID
PLOT 7B
EastNorthPoint
Rev:Date: 03. Feb. 2015
Notes
Key Planning Regulations
Parcel Coordinates
Legend
213521.1331407151.651263
213618.8153407184.318362
213660.3633407060.081661
213562.6807407027.414460
Allowable building envelop e
1. Plan for illustration only - do not scale
2. All coordinates are related to Qatar National Grid 95 (QNG 95)
3. Any portion of the building within 3m of a plot boundary will be
required to be fully fire rated in accordance with Civil Defense,
National Fire Protection Agency (NFPA) and Qatar Construction
Standards (QCS) requirements
4. This Plot Regulations Sheet is to be read in conjunction Development
Regulation and along with the Design Guidelines stated under the Key
Planning Regulations table on this sheet.
5. Development should be in compliance with all Authority requirements
including MOI, Civil Defense, MMUP, Kahramaa, etc
6.0
6.0
15.0 50.0
6.0
131.0
103.0
-
7/25/2019 Development Regulations.pdf
20/21
5155
57 53
52
6.0
Ra
ilC
orr
idor
Ra
ilC
orr
idor
Ra
ilC
orr
idor
0 25m 75m
0 150m 450m
x
Plot Boundary
Minimum Setback Lines
Entry Zone (Max. 7m entry)
Landscape Strip
Northing Easting Point
Recomended Parking Zone
Point Marker
Maximum Ground Coverage (60%)
Jery Al Samur Northern Logistics Park- PLOT REGULATIONS SHEET
Building MassingPlot Guidelines
Key Plan
Illustrative - Section A
20m Wide Road
PLOT
7C
Plot ID
PLOT 7C
EastNorthPoint
Rev:Date: 03. Feb. 2015
Notes
Key Planning Regulations
Parcel Coordinates
Legend
213610.5713406884.2154
213569.0238407008.446953
213666.7065407041.114152
213708.2544406916.877451
Allowable building envelop e
1. Plan for illustration only - do not scale
2. All coordinates are related to Qatar National Grid 95 (QNG 95)
3. Any portion of the building within 3m of a plot boundary will be
required to be fully fire rated in accordance with Civil Defense,
National Fire Protection Agency (NFPA) and Qatar Construction
Standards (QCS) requirements
4. This Plot Regulations Sheet is to be read in conjunction Development
Regulation and along with the Design Guidelines stated under the Key
Planning Regulations table on this sheet.
5. Development should be in compliance with all Authority requirements
including MOI, Civil Defense, MMUP, Kahramaa, etc
6.0
6.0
6.0
15.0
131.0
103.0
50.0
-
7/25/2019 Development Regulations.pdf
21/21
5616
30 55
57 53
6.0
Ra
ilC
orr
idor
Ra
ilC
orr
idor
Ra
ilC
orr
idor
0 25m 75m
0 150m 450m
x
Plot Boundary
Minimum Setback Lines
Entry Zone (Max. 7m entry)
Landscape Strip
Northing Easting Point
Recomended Parking Zone
Point Marker
Maximum Ground Coverage (60%)
Jery Al Samur Northern Logistics Park- PLOT REGULATIONS SHEET
Building MassingPlot Guidelines
Key Plan
Illustrative - Section A
20
mWideRoad
20m Wide Road
PLOT
7D
Plot ID
PLOT 7D
EastNorthPoint
Rev:Date: 03. Feb. 2015
Notes
Key Planning Regulations
Parcel Coordinates
Legend
213479.5878406951.121256
213514.7858406852.177255
213610.5713406884.2154
213569.0238407008.446953
213495.9999406984.025657
Allowable building envelop e
1. Plan for illustration only - do not scale
2. All coordinates are related to Qatar National Grid 95 (QNG 95)
3. Any portion of the building within 3m of a plot boundary will be
required to be fully fire rated in accordance with Civil Defense,
National Fire Protection Agency (NFPA) and Qatar Construction
Standards (QCS) requirements
4. This Plot Regulations Sheet is to be read in conjunction Development
Regulation and along with the Design Guidelines stated under the Key
Planning Regulations table on this sheet.
5. Development should be in compliance with all Authority requirements
including MOI, Civil Defense, MMUP, Kahramaa, etc
50.015.0
26.0
26.0
15.0
50.0
6.0
131.0
103.0