DESIGN PRINCIPLES OF BRIDGES
By J. Gunakar Rao, M.E.
Dy. E.E. CENTRAL DESIGNS ORGANISATION,
I&CAD Dept., HYDERABAD.
![Page 2: DESIGN PRINCIPLES OF BRIDGES - aphrdi.ap.gov.inAPHRDI/AEEs/syllabus... · vertical clearences (cl 106.2.1 0f irc: 5-1998) discharge in cumecs min. vertical clearence upto 0.30 150](https://reader031.vdocuments.us/reader031/viewer/2022021521/5b55faf67f8b9ac31e8bd45d/html5/thumbnails/2.jpg)
BRIDGE DEFINITION
A BRIDGE IS A STRUCTURE THAT IS BUILT OVER A
CANAL, DRAIN, RIVER, VALLEY, ROAD, RAILWAY/
RAIL ROAD TRAFFIC ETC SO THAT PEOPLE OR
VEHICLES CAN CROSS FROM ONE SIDE TO THE
OTHER SIDE.
![Page 3: DESIGN PRINCIPLES OF BRIDGES - aphrdi.ap.gov.inAPHRDI/AEEs/syllabus... · vertical clearences (cl 106.2.1 0f irc: 5-1998) discharge in cumecs min. vertical clearence upto 0.30 150](https://reader031.vdocuments.us/reader031/viewer/2022021521/5b55faf67f8b9ac31e8bd45d/html5/thumbnails/3.jpg)
CARRIAGE WAY WIDTHS
![Page 4: DESIGN PRINCIPLES OF BRIDGES - aphrdi.ap.gov.inAPHRDI/AEEs/syllabus... · vertical clearences (cl 106.2.1 0f irc: 5-1998) discharge in cumecs min. vertical clearence upto 0.30 150](https://reader031.vdocuments.us/reader031/viewer/2022021521/5b55faf67f8b9ac31e8bd45d/html5/thumbnails/4.jpg)
![Page 5: DESIGN PRINCIPLES OF BRIDGES - aphrdi.ap.gov.inAPHRDI/AEEs/syllabus... · vertical clearences (cl 106.2.1 0f irc: 5-1998) discharge in cumecs min. vertical clearence upto 0.30 150](https://reader031.vdocuments.us/reader031/viewer/2022021521/5b55faf67f8b9ac31e8bd45d/html5/thumbnails/5.jpg)
VERTICAL CLEARENCES (Cl 106.2.1 0F IRC: 5-1998)DISCHARGE IN CUMECS MIN. VERTICAL CLEARENCE
UPTO 0.30 150 MM> 0.30 AND < 3.00 450 MM> 3.00 AND < 30 600 MM> 30 AND < 300 900 MM> 300 AND < 3000 1200 MM > 3000 1500 MM
![Page 6: DESIGN PRINCIPLES OF BRIDGES - aphrdi.ap.gov.inAPHRDI/AEEs/syllabus... · vertical clearences (cl 106.2.1 0f irc: 5-1998) discharge in cumecs min. vertical clearence upto 0.30 150](https://reader031.vdocuments.us/reader031/viewer/2022021521/5b55faf67f8b9ac31e8bd45d/html5/thumbnails/6.jpg)
SCOUR DEPTH CALCULATIONSNORMAL SCOUR DEPTH = dsm = 1.34 { q2 / f }1/3
where f = silt factor = 1.76 ( m ) ½
m = weighted mean diameter in mm MAXIMUM DEPTH OF SCOUR Near Piers = 2.00 dsm
Near Abutments = 1.27 dsm (when approaches retained )
= 2.00 dsm (when scouring allround ) For Rafts/ shallow footings = 1.27 dsm (In straight reach )
= 1.50 dsm (At moderate bend )= 1.75 dsm (At severe bend)= 2.00 dsm (At right angled bend)
![Page 7: DESIGN PRINCIPLES OF BRIDGES - aphrdi.ap.gov.inAPHRDI/AEEs/syllabus... · vertical clearences (cl 106.2.1 0f irc: 5-1998) discharge in cumecs min. vertical clearence upto 0.30 150](https://reader031.vdocuments.us/reader031/viewer/2022021521/5b55faf67f8b9ac31e8bd45d/html5/thumbnails/7.jpg)
Open Foundations as per cl. 705.2 IRC:78-2000➢ In soil
The minimum depth of open foundations shall be uptostratum having safe bearing capacity but not less than 2.0 mbelow the scour level or the protected bed level.
➢ On rocks
(a) For hard rocks, with an ultimate crushing strengthof 1.0 MPa or above arrived at after consideringthe overall characteristics of the rock, such as,fissures, bedding planes, etc. : 0.6 m(b) All other cases : 1.5 m
![Page 8: DESIGN PRINCIPLES OF BRIDGES - aphrdi.ap.gov.inAPHRDI/AEEs/syllabus... · vertical clearences (cl 106.2.1 0f irc: 5-1998) discharge in cumecs min. vertical clearence upto 0.30 150](https://reader031.vdocuments.us/reader031/viewer/2022021521/5b55faf67f8b9ac31e8bd45d/html5/thumbnails/8.jpg)
AFFLUXAfflux is the rise/ heading up of water over the normal water level on u/s of a bridge caused by constriction of water way at the bridge site. Afflux as per Molesworth formula:
h = { (V2 / 17.85 ) + 0.015 } { ( A2 / a2) - 1 }Where
V = Average velocity prior to obstruction in m/sec
A =Un obstructed sectional area of canal/ drain in Sq.m
a = sectional area of canal/ drain at obstruction in Sq.m
![Page 9: DESIGN PRINCIPLES OF BRIDGES - aphrdi.ap.gov.inAPHRDI/AEEs/syllabus... · vertical clearences (cl 106.2.1 0f irc: 5-1998) discharge in cumecs min. vertical clearence upto 0.30 150](https://reader031.vdocuments.us/reader031/viewer/2022021521/5b55faf67f8b9ac31e8bd45d/html5/thumbnails/9.jpg)
![Page 10: DESIGN PRINCIPLES OF BRIDGES - aphrdi.ap.gov.inAPHRDI/AEEs/syllabus... · vertical clearences (cl 106.2.1 0f irc: 5-1998) discharge in cumecs min. vertical clearence upto 0.30 150](https://reader031.vdocuments.us/reader031/viewer/2022021521/5b55faf67f8b9ac31e8bd45d/html5/thumbnails/10.jpg)
![Page 11: DESIGN PRINCIPLES OF BRIDGES - aphrdi.ap.gov.inAPHRDI/AEEs/syllabus... · vertical clearences (cl 106.2.1 0f irc: 5-1998) discharge in cumecs min. vertical clearence upto 0.30 150](https://reader031.vdocuments.us/reader031/viewer/2022021521/5b55faf67f8b9ac31e8bd45d/html5/thumbnails/11.jpg)
LIMITATIONS OF SPAN LENGTH
![Page 12: DESIGN PRINCIPLES OF BRIDGES - aphrdi.ap.gov.inAPHRDI/AEEs/syllabus... · vertical clearences (cl 106.2.1 0f irc: 5-1998) discharge in cumecs min. vertical clearence upto 0.30 150](https://reader031.vdocuments.us/reader031/viewer/2022021521/5b55faf67f8b9ac31e8bd45d/html5/thumbnails/12.jpg)
Loads, Forces and Stresses to be considered in the design
➢ 1. Dead Load➢ 2. Live Load➢ 3. Impact of Live load➢ 4. Water currents➢ 5. Longitudinal forces:➢ a. Tractive or Braking
force➢ b. frictional resistance to ➢ bearings➢ 6. Centrifugal forces➢ 7. Buoyancy
➢ 8. Earth pressure incl. Live load surcharge
➢ 9. Temperature effects➢ 10. Deformation effects➢ 11. Secondary effects➢ 12. Wind loads➢ 13. Wave pressures➢ 14. Impact due to floating
bodies➢ 15. Errection effects➢ 16. Sesmic forces
![Page 13: DESIGN PRINCIPLES OF BRIDGES - aphrdi.ap.gov.inAPHRDI/AEEs/syllabus... · vertical clearences (cl 106.2.1 0f irc: 5-1998) discharge in cumecs min. vertical clearence upto 0.30 150](https://reader031.vdocuments.us/reader031/viewer/2022021521/5b55faf67f8b9ac31e8bd45d/html5/thumbnails/13.jpg)
DEAD LOADDEAD LOAD CONSISTS OF LOADS OF ALL COMPONENTS OF SUPER
STRUCTURE:
➢ DECK SLAB AND GIRDERS
➢ FOOT PATHS
➢ WEARING COAT
➢ KERB
➢ HAND RAILING
![Page 14: DESIGN PRINCIPLES OF BRIDGES - aphrdi.ap.gov.inAPHRDI/AEEs/syllabus... · vertical clearences (cl 106.2.1 0f irc: 5-1998) discharge in cumecs min. vertical clearence upto 0.30 150](https://reader031.vdocuments.us/reader031/viewer/2022021521/5b55faf67f8b9ac31e8bd45d/html5/thumbnails/14.jpg)
LIVE LOADALL BRIDGES SHALL BE DESIGNED AS PER THE
FOLLOWING INDIAN ROAD CONGRESS LOADINGS:
![Page 15: DESIGN PRINCIPLES OF BRIDGES - aphrdi.ap.gov.inAPHRDI/AEEs/syllabus... · vertical clearences (cl 106.2.1 0f irc: 5-1998) discharge in cumecs min. vertical clearence upto 0.30 150](https://reader031.vdocuments.us/reader031/viewer/2022021521/5b55faf67f8b9ac31e8bd45d/html5/thumbnails/15.jpg)
IRC CLASS A
![Page 16: DESIGN PRINCIPLES OF BRIDGES - aphrdi.ap.gov.inAPHRDI/AEEs/syllabus... · vertical clearences (cl 106.2.1 0f irc: 5-1998) discharge in cumecs min. vertical clearence upto 0.30 150](https://reader031.vdocuments.us/reader031/viewer/2022021521/5b55faf67f8b9ac31e8bd45d/html5/thumbnails/16.jpg)
IRC 70 R LOADING
![Page 17: DESIGN PRINCIPLES OF BRIDGES - aphrdi.ap.gov.inAPHRDI/AEEs/syllabus... · vertical clearences (cl 106.2.1 0f irc: 5-1998) discharge in cumecs min. vertical clearence upto 0.30 150](https://reader031.vdocuments.us/reader031/viewer/2022021521/5b55faf67f8b9ac31e8bd45d/html5/thumbnails/17.jpg)
IMPACT
![Page 18: DESIGN PRINCIPLES OF BRIDGES - aphrdi.ap.gov.inAPHRDI/AEEs/syllabus... · vertical clearences (cl 106.2.1 0f irc: 5-1998) discharge in cumecs min. vertical clearence upto 0.30 150](https://reader031.vdocuments.us/reader031/viewer/2022021521/5b55faf67f8b9ac31e8bd45d/html5/thumbnails/18.jpg)
![Page 19: DESIGN PRINCIPLES OF BRIDGES - aphrdi.ap.gov.inAPHRDI/AEEs/syllabus... · vertical clearences (cl 106.2.1 0f irc: 5-1998) discharge in cumecs min. vertical clearence upto 0.30 150](https://reader031.vdocuments.us/reader031/viewer/2022021521/5b55faf67f8b9ac31e8bd45d/html5/thumbnails/19.jpg)
19
WIND LOAD
![Page 20: DESIGN PRINCIPLES OF BRIDGES - aphrdi.ap.gov.inAPHRDI/AEEs/syllabus... · vertical clearences (cl 106.2.1 0f irc: 5-1998) discharge in cumecs min. vertical clearence upto 0.30 150](https://reader031.vdocuments.us/reader031/viewer/2022021521/5b55faf67f8b9ac31e8bd45d/html5/thumbnails/20.jpg)
![Page 21: DESIGN PRINCIPLES OF BRIDGES - aphrdi.ap.gov.inAPHRDI/AEEs/syllabus... · vertical clearences (cl 106.2.1 0f irc: 5-1998) discharge in cumecs min. vertical clearence upto 0.30 150](https://reader031.vdocuments.us/reader031/viewer/2022021521/5b55faf67f8b9ac31e8bd45d/html5/thumbnails/21.jpg)
21
![Page 22: DESIGN PRINCIPLES OF BRIDGES - aphrdi.ap.gov.inAPHRDI/AEEs/syllabus... · vertical clearences (cl 106.2.1 0f irc: 5-1998) discharge in cumecs min. vertical clearence upto 0.30 150](https://reader031.vdocuments.us/reader031/viewer/2022021521/5b55faf67f8b9ac31e8bd45d/html5/thumbnails/22.jpg)
![Page 23: DESIGN PRINCIPLES OF BRIDGES - aphrdi.ap.gov.inAPHRDI/AEEs/syllabus... · vertical clearences (cl 106.2.1 0f irc: 5-1998) discharge in cumecs min. vertical clearence upto 0.30 150](https://reader031.vdocuments.us/reader031/viewer/2022021521/5b55faf67f8b9ac31e8bd45d/html5/thumbnails/23.jpg)
![Page 24: DESIGN PRINCIPLES OF BRIDGES - aphrdi.ap.gov.inAPHRDI/AEEs/syllabus... · vertical clearences (cl 106.2.1 0f irc: 5-1998) discharge in cumecs min. vertical clearence upto 0.30 150](https://reader031.vdocuments.us/reader031/viewer/2022021521/5b55faf67f8b9ac31e8bd45d/html5/thumbnails/24.jpg)
![Page 25: DESIGN PRINCIPLES OF BRIDGES - aphrdi.ap.gov.inAPHRDI/AEEs/syllabus... · vertical clearences (cl 106.2.1 0f irc: 5-1998) discharge in cumecs min. vertical clearence upto 0.30 150](https://reader031.vdocuments.us/reader031/viewer/2022021521/5b55faf67f8b9ac31e8bd45d/html5/thumbnails/25.jpg)
![Page 26: DESIGN PRINCIPLES OF BRIDGES - aphrdi.ap.gov.inAPHRDI/AEEs/syllabus... · vertical clearences (cl 106.2.1 0f irc: 5-1998) discharge in cumecs min. vertical clearence upto 0.30 150](https://reader031.vdocuments.us/reader031/viewer/2022021521/5b55faf67f8b9ac31e8bd45d/html5/thumbnails/26.jpg)
![Page 27: DESIGN PRINCIPLES OF BRIDGES - aphrdi.ap.gov.inAPHRDI/AEEs/syllabus... · vertical clearences (cl 106.2.1 0f irc: 5-1998) discharge in cumecs min. vertical clearence upto 0.30 150](https://reader031.vdocuments.us/reader031/viewer/2022021521/5b55faf67f8b9ac31e8bd45d/html5/thumbnails/27.jpg)
![Page 28: DESIGN PRINCIPLES OF BRIDGES - aphrdi.ap.gov.inAPHRDI/AEEs/syllabus... · vertical clearences (cl 106.2.1 0f irc: 5-1998) discharge in cumecs min. vertical clearence upto 0.30 150](https://reader031.vdocuments.us/reader031/viewer/2022021521/5b55faf67f8b9ac31e8bd45d/html5/thumbnails/28.jpg)
![Page 29: DESIGN PRINCIPLES OF BRIDGES - aphrdi.ap.gov.inAPHRDI/AEEs/syllabus... · vertical clearences (cl 106.2.1 0f irc: 5-1998) discharge in cumecs min. vertical clearence upto 0.30 150](https://reader031.vdocuments.us/reader031/viewer/2022021521/5b55faf67f8b9ac31e8bd45d/html5/thumbnails/29.jpg)
![Page 30: DESIGN PRINCIPLES OF BRIDGES - aphrdi.ap.gov.inAPHRDI/AEEs/syllabus... · vertical clearences (cl 106.2.1 0f irc: 5-1998) discharge in cumecs min. vertical clearence upto 0.30 150](https://reader031.vdocuments.us/reader031/viewer/2022021521/5b55faf67f8b9ac31e8bd45d/html5/thumbnails/30.jpg)
![Page 31: DESIGN PRINCIPLES OF BRIDGES - aphrdi.ap.gov.inAPHRDI/AEEs/syllabus... · vertical clearences (cl 106.2.1 0f irc: 5-1998) discharge in cumecs min. vertical clearence upto 0.30 150](https://reader031.vdocuments.us/reader031/viewer/2022021521/5b55faf67f8b9ac31e8bd45d/html5/thumbnails/31.jpg)
![Page 32: DESIGN PRINCIPLES OF BRIDGES - aphrdi.ap.gov.inAPHRDI/AEEs/syllabus... · vertical clearences (cl 106.2.1 0f irc: 5-1998) discharge in cumecs min. vertical clearence upto 0.30 150](https://reader031.vdocuments.us/reader031/viewer/2022021521/5b55faf67f8b9ac31e8bd45d/html5/thumbnails/32.jpg)
![Page 33: DESIGN PRINCIPLES OF BRIDGES - aphrdi.ap.gov.inAPHRDI/AEEs/syllabus... · vertical clearences (cl 106.2.1 0f irc: 5-1998) discharge in cumecs min. vertical clearence upto 0.30 150](https://reader031.vdocuments.us/reader031/viewer/2022021521/5b55faf67f8b9ac31e8bd45d/html5/thumbnails/33.jpg)
![Page 34: DESIGN PRINCIPLES OF BRIDGES - aphrdi.ap.gov.inAPHRDI/AEEs/syllabus... · vertical clearences (cl 106.2.1 0f irc: 5-1998) discharge in cumecs min. vertical clearence upto 0.30 150](https://reader031.vdocuments.us/reader031/viewer/2022021521/5b55faf67f8b9ac31e8bd45d/html5/thumbnails/34.jpg)
![Page 35: DESIGN PRINCIPLES OF BRIDGES - aphrdi.ap.gov.inAPHRDI/AEEs/syllabus... · vertical clearences (cl 106.2.1 0f irc: 5-1998) discharge in cumecs min. vertical clearence upto 0.30 150](https://reader031.vdocuments.us/reader031/viewer/2022021521/5b55faf67f8b9ac31e8bd45d/html5/thumbnails/35.jpg)
![Page 36: DESIGN PRINCIPLES OF BRIDGES - aphrdi.ap.gov.inAPHRDI/AEEs/syllabus... · vertical clearences (cl 106.2.1 0f irc: 5-1998) discharge in cumecs min. vertical clearence upto 0.30 150](https://reader031.vdocuments.us/reader031/viewer/2022021521/5b55faf67f8b9ac31e8bd45d/html5/thumbnails/36.jpg)
![Page 37: DESIGN PRINCIPLES OF BRIDGES - aphrdi.ap.gov.inAPHRDI/AEEs/syllabus... · vertical clearences (cl 106.2.1 0f irc: 5-1998) discharge in cumecs min. vertical clearence upto 0.30 150](https://reader031.vdocuments.us/reader031/viewer/2022021521/5b55faf67f8b9ac31e8bd45d/html5/thumbnails/37.jpg)
![Page 38: DESIGN PRINCIPLES OF BRIDGES - aphrdi.ap.gov.inAPHRDI/AEEs/syllabus... · vertical clearences (cl 106.2.1 0f irc: 5-1998) discharge in cumecs min. vertical clearence upto 0.30 150](https://reader031.vdocuments.us/reader031/viewer/2022021521/5b55faf67f8b9ac31e8bd45d/html5/thumbnails/38.jpg)
![Page 39: DESIGN PRINCIPLES OF BRIDGES - aphrdi.ap.gov.inAPHRDI/AEEs/syllabus... · vertical clearences (cl 106.2.1 0f irc: 5-1998) discharge in cumecs min. vertical clearence upto 0.30 150](https://reader031.vdocuments.us/reader031/viewer/2022021521/5b55faf67f8b9ac31e8bd45d/html5/thumbnails/39.jpg)
![Page 40: DESIGN PRINCIPLES OF BRIDGES - aphrdi.ap.gov.inAPHRDI/AEEs/syllabus... · vertical clearences (cl 106.2.1 0f irc: 5-1998) discharge in cumecs min. vertical clearence upto 0.30 150](https://reader031.vdocuments.us/reader031/viewer/2022021521/5b55faf67f8b9ac31e8bd45d/html5/thumbnails/40.jpg)
![Page 41: DESIGN PRINCIPLES OF BRIDGES - aphrdi.ap.gov.inAPHRDI/AEEs/syllabus... · vertical clearences (cl 106.2.1 0f irc: 5-1998) discharge in cumecs min. vertical clearence upto 0.30 150](https://reader031.vdocuments.us/reader031/viewer/2022021521/5b55faf67f8b9ac31e8bd45d/html5/thumbnails/41.jpg)
![Page 42: DESIGN PRINCIPLES OF BRIDGES - aphrdi.ap.gov.inAPHRDI/AEEs/syllabus... · vertical clearences (cl 106.2.1 0f irc: 5-1998) discharge in cumecs min. vertical clearence upto 0.30 150](https://reader031.vdocuments.us/reader031/viewer/2022021521/5b55faf67f8b9ac31e8bd45d/html5/thumbnails/42.jpg)
![Page 43: DESIGN PRINCIPLES OF BRIDGES - aphrdi.ap.gov.inAPHRDI/AEEs/syllabus... · vertical clearences (cl 106.2.1 0f irc: 5-1998) discharge in cumecs min. vertical clearence upto 0.30 150](https://reader031.vdocuments.us/reader031/viewer/2022021521/5b55faf67f8b9ac31e8bd45d/html5/thumbnails/43.jpg)
![Page 44: DESIGN PRINCIPLES OF BRIDGES - aphrdi.ap.gov.inAPHRDI/AEEs/syllabus... · vertical clearences (cl 106.2.1 0f irc: 5-1998) discharge in cumecs min. vertical clearence upto 0.30 150](https://reader031.vdocuments.us/reader031/viewer/2022021521/5b55faf67f8b9ac31e8bd45d/html5/thumbnails/44.jpg)
![Page 45: DESIGN PRINCIPLES OF BRIDGES - aphrdi.ap.gov.inAPHRDI/AEEs/syllabus... · vertical clearences (cl 106.2.1 0f irc: 5-1998) discharge in cumecs min. vertical clearence upto 0.30 150](https://reader031.vdocuments.us/reader031/viewer/2022021521/5b55faf67f8b9ac31e8bd45d/html5/thumbnails/45.jpg)
![Page 46: DESIGN PRINCIPLES OF BRIDGES - aphrdi.ap.gov.inAPHRDI/AEEs/syllabus... · vertical clearences (cl 106.2.1 0f irc: 5-1998) discharge in cumecs min. vertical clearence upto 0.30 150](https://reader031.vdocuments.us/reader031/viewer/2022021521/5b55faf67f8b9ac31e8bd45d/html5/thumbnails/46.jpg)
![Page 47: DESIGN PRINCIPLES OF BRIDGES - aphrdi.ap.gov.inAPHRDI/AEEs/syllabus... · vertical clearences (cl 106.2.1 0f irc: 5-1998) discharge in cumecs min. vertical clearence upto 0.30 150](https://reader031.vdocuments.us/reader031/viewer/2022021521/5b55faf67f8b9ac31e8bd45d/html5/thumbnails/47.jpg)
![Page 48: DESIGN PRINCIPLES OF BRIDGES - aphrdi.ap.gov.inAPHRDI/AEEs/syllabus... · vertical clearences (cl 106.2.1 0f irc: 5-1998) discharge in cumecs min. vertical clearence upto 0.30 150](https://reader031.vdocuments.us/reader031/viewer/2022021521/5b55faf67f8b9ac31e8bd45d/html5/thumbnails/48.jpg)
![Page 49: DESIGN PRINCIPLES OF BRIDGES - aphrdi.ap.gov.inAPHRDI/AEEs/syllabus... · vertical clearences (cl 106.2.1 0f irc: 5-1998) discharge in cumecs min. vertical clearence upto 0.30 150](https://reader031.vdocuments.us/reader031/viewer/2022021521/5b55faf67f8b9ac31e8bd45d/html5/thumbnails/49.jpg)
![Page 50: DESIGN PRINCIPLES OF BRIDGES - aphrdi.ap.gov.inAPHRDI/AEEs/syllabus... · vertical clearences (cl 106.2.1 0f irc: 5-1998) discharge in cumecs min. vertical clearence upto 0.30 150](https://reader031.vdocuments.us/reader031/viewer/2022021521/5b55faf67f8b9ac31e8bd45d/html5/thumbnails/50.jpg)
![Page 51: DESIGN PRINCIPLES OF BRIDGES - aphrdi.ap.gov.inAPHRDI/AEEs/syllabus... · vertical clearences (cl 106.2.1 0f irc: 5-1998) discharge in cumecs min. vertical clearence upto 0.30 150](https://reader031.vdocuments.us/reader031/viewer/2022021521/5b55faf67f8b9ac31e8bd45d/html5/thumbnails/51.jpg)
![Page 52: DESIGN PRINCIPLES OF BRIDGES - aphrdi.ap.gov.inAPHRDI/AEEs/syllabus... · vertical clearences (cl 106.2.1 0f irc: 5-1998) discharge in cumecs min. vertical clearence upto 0.30 150](https://reader031.vdocuments.us/reader031/viewer/2022021521/5b55faf67f8b9ac31e8bd45d/html5/thumbnails/52.jpg)
![Page 53: DESIGN PRINCIPLES OF BRIDGES - aphrdi.ap.gov.inAPHRDI/AEEs/syllabus... · vertical clearences (cl 106.2.1 0f irc: 5-1998) discharge in cumecs min. vertical clearence upto 0.30 150](https://reader031.vdocuments.us/reader031/viewer/2022021521/5b55faf67f8b9ac31e8bd45d/html5/thumbnails/53.jpg)
![Page 54: DESIGN PRINCIPLES OF BRIDGES - aphrdi.ap.gov.inAPHRDI/AEEs/syllabus... · vertical clearences (cl 106.2.1 0f irc: 5-1998) discharge in cumecs min. vertical clearence upto 0.30 150](https://reader031.vdocuments.us/reader031/viewer/2022021521/5b55faf67f8b9ac31e8bd45d/html5/thumbnails/54.jpg)
![Page 55: DESIGN PRINCIPLES OF BRIDGES - aphrdi.ap.gov.inAPHRDI/AEEs/syllabus... · vertical clearences (cl 106.2.1 0f irc: 5-1998) discharge in cumecs min. vertical clearence upto 0.30 150](https://reader031.vdocuments.us/reader031/viewer/2022021521/5b55faf67f8b9ac31e8bd45d/html5/thumbnails/55.jpg)
![Page 56: DESIGN PRINCIPLES OF BRIDGES - aphrdi.ap.gov.inAPHRDI/AEEs/syllabus... · vertical clearences (cl 106.2.1 0f irc: 5-1998) discharge in cumecs min. vertical clearence upto 0.30 150](https://reader031.vdocuments.us/reader031/viewer/2022021521/5b55faf67f8b9ac31e8bd45d/html5/thumbnails/56.jpg)
![Page 57: DESIGN PRINCIPLES OF BRIDGES - aphrdi.ap.gov.inAPHRDI/AEEs/syllabus... · vertical clearences (cl 106.2.1 0f irc: 5-1998) discharge in cumecs min. vertical clearence upto 0.30 150](https://reader031.vdocuments.us/reader031/viewer/2022021521/5b55faf67f8b9ac31e8bd45d/html5/thumbnails/57.jpg)
![Page 58: DESIGN PRINCIPLES OF BRIDGES - aphrdi.ap.gov.inAPHRDI/AEEs/syllabus... · vertical clearences (cl 106.2.1 0f irc: 5-1998) discharge in cumecs min. vertical clearence upto 0.30 150](https://reader031.vdocuments.us/reader031/viewer/2022021521/5b55faf67f8b9ac31e8bd45d/html5/thumbnails/58.jpg)
![Page 59: DESIGN PRINCIPLES OF BRIDGES - aphrdi.ap.gov.inAPHRDI/AEEs/syllabus... · vertical clearences (cl 106.2.1 0f irc: 5-1998) discharge in cumecs min. vertical clearence upto 0.30 150](https://reader031.vdocuments.us/reader031/viewer/2022021521/5b55faf67f8b9ac31e8bd45d/html5/thumbnails/59.jpg)
![Page 60: DESIGN PRINCIPLES OF BRIDGES - aphrdi.ap.gov.inAPHRDI/AEEs/syllabus... · vertical clearences (cl 106.2.1 0f irc: 5-1998) discharge in cumecs min. vertical clearence upto 0.30 150](https://reader031.vdocuments.us/reader031/viewer/2022021521/5b55faf67f8b9ac31e8bd45d/html5/thumbnails/60.jpg)
![Page 61: DESIGN PRINCIPLES OF BRIDGES - aphrdi.ap.gov.inAPHRDI/AEEs/syllabus... · vertical clearences (cl 106.2.1 0f irc: 5-1998) discharge in cumecs min. vertical clearence upto 0.30 150](https://reader031.vdocuments.us/reader031/viewer/2022021521/5b55faf67f8b9ac31e8bd45d/html5/thumbnails/61.jpg)
![Page 62: DESIGN PRINCIPLES OF BRIDGES - aphrdi.ap.gov.inAPHRDI/AEEs/syllabus... · vertical clearences (cl 106.2.1 0f irc: 5-1998) discharge in cumecs min. vertical clearence upto 0.30 150](https://reader031.vdocuments.us/reader031/viewer/2022021521/5b55faf67f8b9ac31e8bd45d/html5/thumbnails/62.jpg)
![Page 63: DESIGN PRINCIPLES OF BRIDGES - aphrdi.ap.gov.inAPHRDI/AEEs/syllabus... · vertical clearences (cl 106.2.1 0f irc: 5-1998) discharge in cumecs min. vertical clearence upto 0.30 150](https://reader031.vdocuments.us/reader031/viewer/2022021521/5b55faf67f8b9ac31e8bd45d/html5/thumbnails/63.jpg)
![Page 64: DESIGN PRINCIPLES OF BRIDGES - aphrdi.ap.gov.inAPHRDI/AEEs/syllabus... · vertical clearences (cl 106.2.1 0f irc: 5-1998) discharge in cumecs min. vertical clearence upto 0.30 150](https://reader031.vdocuments.us/reader031/viewer/2022021521/5b55faf67f8b9ac31e8bd45d/html5/thumbnails/64.jpg)
![Page 65: DESIGN PRINCIPLES OF BRIDGES - aphrdi.ap.gov.inAPHRDI/AEEs/syllabus... · vertical clearences (cl 106.2.1 0f irc: 5-1998) discharge in cumecs min. vertical clearence upto 0.30 150](https://reader031.vdocuments.us/reader031/viewer/2022021521/5b55faf67f8b9ac31e8bd45d/html5/thumbnails/65.jpg)
![Page 66: DESIGN PRINCIPLES OF BRIDGES - aphrdi.ap.gov.inAPHRDI/AEEs/syllabus... · vertical clearences (cl 106.2.1 0f irc: 5-1998) discharge in cumecs min. vertical clearence upto 0.30 150](https://reader031.vdocuments.us/reader031/viewer/2022021521/5b55faf67f8b9ac31e8bd45d/html5/thumbnails/66.jpg)
![Page 67: DESIGN PRINCIPLES OF BRIDGES - aphrdi.ap.gov.inAPHRDI/AEEs/syllabus... · vertical clearences (cl 106.2.1 0f irc: 5-1998) discharge in cumecs min. vertical clearence upto 0.30 150](https://reader031.vdocuments.us/reader031/viewer/2022021521/5b55faf67f8b9ac31e8bd45d/html5/thumbnails/67.jpg)
![Page 68: DESIGN PRINCIPLES OF BRIDGES - aphrdi.ap.gov.inAPHRDI/AEEs/syllabus... · vertical clearences (cl 106.2.1 0f irc: 5-1998) discharge in cumecs min. vertical clearence upto 0.30 150](https://reader031.vdocuments.us/reader031/viewer/2022021521/5b55faf67f8b9ac31e8bd45d/html5/thumbnails/68.jpg)
![Page 69: DESIGN PRINCIPLES OF BRIDGES - aphrdi.ap.gov.inAPHRDI/AEEs/syllabus... · vertical clearences (cl 106.2.1 0f irc: 5-1998) discharge in cumecs min. vertical clearence upto 0.30 150](https://reader031.vdocuments.us/reader031/viewer/2022021521/5b55faf67f8b9ac31e8bd45d/html5/thumbnails/69.jpg)
![Page 70: DESIGN PRINCIPLES OF BRIDGES - aphrdi.ap.gov.inAPHRDI/AEEs/syllabus... · vertical clearences (cl 106.2.1 0f irc: 5-1998) discharge in cumecs min. vertical clearence upto 0.30 150](https://reader031.vdocuments.us/reader031/viewer/2022021521/5b55faf67f8b9ac31e8bd45d/html5/thumbnails/70.jpg)
![Page 71: DESIGN PRINCIPLES OF BRIDGES - aphrdi.ap.gov.inAPHRDI/AEEs/syllabus... · vertical clearences (cl 106.2.1 0f irc: 5-1998) discharge in cumecs min. vertical clearence upto 0.30 150](https://reader031.vdocuments.us/reader031/viewer/2022021521/5b55faf67f8b9ac31e8bd45d/html5/thumbnails/71.jpg)