18.05.2018 1 1 DESIGN AND IMPLEMENTATION OF A HYBRID POWER PLANT CONTROLLER George Alin Raducu 09.05.2018 Content 2 Vattenfall at a Glance Motivation for the Hybrid Power Plant Controller Controller Design Simulation Test Cases and Results Field Implementation Conclusions and Outlook

Upload: others

Post on 21-Jun-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

18.05.2018

1

1

DESIGN AND IMPLEMENTATION OF A HYBRID POWER PLANT

CONTROLLERGeorge Alin Raducu

09.05.2018

Content

2

Vattenfall at a Glance

Motivation for the Hybrid Power Plant Controller

Controller Design

Simulation Test Cases and Results

Field Implementation

Conclusions and Outlook

18.05.2018

2

3

4

18.05.2018

3

Motivation

5

Today‘s onshore wind farms layout

6

Point of Common

Connection

Wind Farm Controller

Measurements

Operation Set-Points

TSO Commands

18.05.2018

4

7

Wind Farm Controller

Solar Park Controller

Battery Controller

Point of Common

Connection

Renewable Power Plants

SCADA

Energy

Signals

8

Wind Farm Controller

Solar Park Controller

Battery Controller

Point of Common

Connection

Solution: Renewable Park Controller

Renewable Park Controller

SCADA Markets / Grid

Energy

Signals

Vattenfall’s Renewable Park Controller - Enhanced optimization functions based on Energy market spot prices, Weather Forecast & Grid demands

18.05.2018

5

Challenges and potential with Renewable Power Plants

• Challenges• Power Limitations in the Point of Common Connection

• Increase the utilization of the grid connection point whilesecuring against overloading

• Synchronization of the Ancillary Services provided bydifferent generation sources

• Flexibility in operating different generation and/or storageunits

• Multiple systems from various suppliers to service andmaintain

9

Potential LCoE Reduction: Increased utilization of the shared grid

connection or agreements

LRoE Improvement: Approaching subsidy-free marketenables participation in different grid services markets toenhance additional revenues

Hybrid Power Plants: Wind+Solar+Storage connected ona common Point of Common Connection, increasedpower generation flexibility

Vattenfall in control with different smart optimizationalgorithms based on the market related functions,weather conditions and spot price forecast

Maximize yield (revenue) while providing grid supportfunction and minimizing fatigue loads

Easier Operation

Increased Flexibility

Controller Design

10

18.05.2018

6

Renewable Park Controller

Renewable Park Controller – Architectural Diagram

11

Active Power Control

Reactive Power Control

Setpointdispatch

SCADA&

Measurements

Wind Farm,

PV Farm,

BESS

&

Grid

Plant design-WPP&SPP

12

• Only main dynamics of the WPP and SPP included, i.e. first order transferfunctions plus delays introduced by the grid meters.

• Possibility to have different ramp rate limitations

18.05.2018

7

Plant Design - BESS

13

• Similar to WPP and SPP in terms of dynamic behaviour.

• Contains additional information regarding SOC and conversion efficiency.

RPC Simulations Test Cases

14

18.05.2018

8

Simulated Hybrid Power Plant• Wind Power Plant : 122.4 MW

• Solar Power Plant : 40 MW

• Battery : 12 MW(h)

• Total Capacity (Base Power) : 174.4 MW

• Grid Connection Point Capacity: 130MW

15

Case 1: Step Changes in Setpoint

16

18.05.2018

9

Case 2: Varying Possible Power

17

18

Case 2a: Without battery support

Case 2b: With battery support

18.05.2018

10

Field Implementation

19

The Field version

SCADAPLC Real plant

Generated code from Matlab/Simulink

20

18.05.2018

11

Conclusions and Outlook

21

Conclusions

22

The solution for steering and optimization of a Hybrid Power Plant was presented

Main challenges and potential were highlighted

The Renewable Park Controller design was shown

For validating the controller design simulations results have been introduced

18.05.2018

12

Outlook

23

Verification of the Renewable Park Controller prior to the field implementation in aHardware in the Loop test setup

Field Implementation

Field Test and Verification

Continue the initial development with Enhanced Optimization Solutions based onEnergy market spot price, Weather Forecast, Ancillary Services and grid demands

24

THANK YOU!!