![Page 1: DESIGN AND CONSTRUCTION at GSADESIGN AND CONSTRUCTION at GSA NATALIE HUBER, PE, PMP CHIEF ENGINEER PUBLIC BUILDINGS SERVICE. AGENDA ... • Los Angeles, CA Federal Build ing - 11000](https://reader034.vdocuments.us/reader034/viewer/2022050714/5f0808ff7e708231d4200124/html5/thumbnails/1.jpg)
U.S. GENERAL SERVICES ADMINISTRATION
DESIGN AND CONSTRUCTIONat GSANATALIE HUBER, PE, PMPCHIEF ENGINEERPUBLIC BUILDINGS SERVICE
![Page 2: DESIGN AND CONSTRUCTION at GSADESIGN AND CONSTRUCTION at GSA NATALIE HUBER, PE, PMP CHIEF ENGINEER PUBLIC BUILDINGS SERVICE. AGENDA ... • Los Angeles, CA Federal Build ing - 11000](https://reader034.vdocuments.us/reader034/viewer/2022050714/5f0808ff7e708231d4200124/html5/thumbnails/2.jpg)
AGENDA
■ PUBLIC BUILDINGS SERVICE
■ PORTFOLIO FEATURES
■ DESIGN PROGRAMS
■ PROJECT DELIVERY
![Page 3: DESIGN AND CONSTRUCTION at GSADESIGN AND CONSTRUCTION at GSA NATALIE HUBER, PE, PMP CHIEF ENGINEER PUBLIC BUILDINGS SERVICE. AGENDA ... • Los Angeles, CA Federal Build ing - 11000](https://reader034.vdocuments.us/reader034/viewer/2022050714/5f0808ff7e708231d4200124/html5/thumbnails/3.jpg)
U.S. GENERAL SERVICES ADMINISTRATION
■ FEDERAL ACQUISTION SERVICES
■ PUBLIC BUILDINGS SERVICE
![Page 4: DESIGN AND CONSTRUCTION at GSADESIGN AND CONSTRUCTION at GSA NATALIE HUBER, PE, PMP CHIEF ENGINEER PUBLIC BUILDINGS SERVICE. AGENDA ... • Los Angeles, CA Federal Build ing - 11000](https://reader034.vdocuments.us/reader034/viewer/2022050714/5f0808ff7e708231d4200124/html5/thumbnails/4.jpg)
PUBLIC BUILDINGS SERVICE PORTFOLIO
8,700 owned or leased buildings +375 million rentable square feet 500+ historic buildings
![Page 5: DESIGN AND CONSTRUCTION at GSADESIGN AND CONSTRUCTION at GSA NATALIE HUBER, PE, PMP CHIEF ENGINEER PUBLIC BUILDINGS SERVICE. AGENDA ... • Los Angeles, CA Federal Build ing - 11000](https://reader034.vdocuments.us/reader034/viewer/2022050714/5f0808ff7e708231d4200124/html5/thumbnails/5.jpg)
GSA’S 11 REGIONS
![Page 6: DESIGN AND CONSTRUCTION at GSADESIGN AND CONSTRUCTION at GSA NATALIE HUBER, PE, PMP CHIEF ENGINEER PUBLIC BUILDINGS SERVICE. AGENDA ... • Los Angeles, CA Federal Build ing - 11000](https://reader034.vdocuments.us/reader034/viewer/2022050714/5f0808ff7e708231d4200124/html5/thumbnails/6.jpg)
US COURTHOUSES
• Unique Requirements (US Courts Design Guide)– Security
– Adjacency and Circulation
– Barrier-Free Access
– Mechanical/ Electrical Systems
– Automation
– Acoustics
– Interior Finishes
• Administrative Office of the US Courts and GSA Collaboration
![Page 7: DESIGN AND CONSTRUCTION at GSADESIGN AND CONSTRUCTION at GSA NATALIE HUBER, PE, PMP CHIEF ENGINEER PUBLIC BUILDINGS SERVICE. AGENDA ... • Los Angeles, CA Federal Build ing - 11000](https://reader034.vdocuments.us/reader034/viewer/2022050714/5f0808ff7e708231d4200124/html5/thumbnails/7.jpg)
JOHN JOSEPH MOAKLEY UNITED STATES COURTHOUSE, PEI COBB FREED & PARTNERS
![Page 8: DESIGN AND CONSTRUCTION at GSADESIGN AND CONSTRUCTION at GSA NATALIE HUBER, PE, PMP CHIEF ENGINEER PUBLIC BUILDINGS SERVICE. AGENDA ... • Los Angeles, CA Federal Build ing - 11000](https://reader034.vdocuments.us/reader034/viewer/2022050714/5f0808ff7e708231d4200124/html5/thumbnails/8.jpg)
JOHN JOSEPH MOAKLEY UNITED STATES COURTHOUSE, PEI COBB FREED & PARTNERS
![Page 9: DESIGN AND CONSTRUCTION at GSADESIGN AND CONSTRUCTION at GSA NATALIE HUBER, PE, PMP CHIEF ENGINEER PUBLIC BUILDINGS SERVICE. AGENDA ... • Los Angeles, CA Federal Build ing - 11000](https://reader034.vdocuments.us/reader034/viewer/2022050714/5f0808ff7e708231d4200124/html5/thumbnails/9.jpg)
UNITED STATES COURTHOUSE, LOS ANGELES, CALIFORNIA, SOM
![Page 10: DESIGN AND CONSTRUCTION at GSADESIGN AND CONSTRUCTION at GSA NATALIE HUBER, PE, PMP CHIEF ENGINEER PUBLIC BUILDINGS SERVICE. AGENDA ... • Los Angeles, CA Federal Build ing - 11000](https://reader034.vdocuments.us/reader034/viewer/2022050714/5f0808ff7e708231d4200124/html5/thumbnails/10.jpg)
UNITED STATES COURTHOUSE, LOS ANGELES, CALIFORNIA, SOM
![Page 11: DESIGN AND CONSTRUCTION at GSADESIGN AND CONSTRUCTION at GSA NATALIE HUBER, PE, PMP CHIEF ENGINEER PUBLIC BUILDINGS SERVICE. AGENDA ... • Los Angeles, CA Federal Build ing - 11000](https://reader034.vdocuments.us/reader034/viewer/2022050714/5f0808ff7e708231d4200124/html5/thumbnails/11.jpg)
LAND PORTS OF ENTRY
• 168 Land Ports of Entry
• 1,952 miles of border with Mexico, 47 ports
• 5,525 miles of border with Canada, 121 ports
• Design and Construction Challenges– Aging land port inventory (average age of ports is 42 years)
– Geographic limitations
– Short construction season (northern border)
– Limited labor market in remote areas
– Evolving security programs
– Securing the border without impeding commerce and trade
– Diverse stakeholders
• CBP and GSA Collaboration
![Page 12: DESIGN AND CONSTRUCTION at GSADESIGN AND CONSTRUCTION at GSA NATALIE HUBER, PE, PMP CHIEF ENGINEER PUBLIC BUILDINGS SERVICE. AGENDA ... • Los Angeles, CA Federal Build ing - 11000](https://reader034.vdocuments.us/reader034/viewer/2022050714/5f0808ff7e708231d4200124/html5/thumbnails/12.jpg)
SAN YSIDRO LAND PORT OF ENTRY, MILLER HULL
![Page 13: DESIGN AND CONSTRUCTION at GSADESIGN AND CONSTRUCTION at GSA NATALIE HUBER, PE, PMP CHIEF ENGINEER PUBLIC BUILDINGS SERVICE. AGENDA ... • Los Angeles, CA Federal Build ing - 11000](https://reader034.vdocuments.us/reader034/viewer/2022050714/5f0808ff7e708231d4200124/html5/thumbnails/13.jpg)
SAN YSIDRO LAND PORT OF ENTRY, MILLER HULL
![Page 14: DESIGN AND CONSTRUCTION at GSADESIGN AND CONSTRUCTION at GSA NATALIE HUBER, PE, PMP CHIEF ENGINEER PUBLIC BUILDINGS SERVICE. AGENDA ... • Los Angeles, CA Federal Build ing - 11000](https://reader034.vdocuments.us/reader034/viewer/2022050714/5f0808ff7e708231d4200124/html5/thumbnails/14.jpg)
U.S. LAND PORT OF ENTRY, WARROAD, MINNESOTA, JULIE SNOW ARCHITECTS
![Page 15: DESIGN AND CONSTRUCTION at GSADESIGN AND CONSTRUCTION at GSA NATALIE HUBER, PE, PMP CHIEF ENGINEER PUBLIC BUILDINGS SERVICE. AGENDA ... • Los Angeles, CA Federal Build ing - 11000](https://reader034.vdocuments.us/reader034/viewer/2022050714/5f0808ff7e708231d4200124/html5/thumbnails/15.jpg)
U.S. LAND PORT OF ENTRY, WARROAD, MINNESOTA, JULIE SNOW ARCHITECTS
![Page 16: DESIGN AND CONSTRUCTION at GSADESIGN AND CONSTRUCTION at GSA NATALIE HUBER, PE, PMP CHIEF ENGINEER PUBLIC BUILDINGS SERVICE. AGENDA ... • Los Angeles, CA Federal Build ing - 11000](https://reader034.vdocuments.us/reader034/viewer/2022050714/5f0808ff7e708231d4200124/html5/thumbnails/16.jpg)
FEDERAL OFFICE BUILDINGS AND WORKPLACE SOLUTIONS
• Cost savings– Reduce the Footprint
– Energy Savings
• Sustainability– Sustainable Materials
– Daylighting Strategies
– Water Conservation
– Green Standards
• Productivity
• Technology– Cloud computing
– Telework
– Hoteling
![Page 17: DESIGN AND CONSTRUCTION at GSADESIGN AND CONSTRUCTION at GSA NATALIE HUBER, PE, PMP CHIEF ENGINEER PUBLIC BUILDINGS SERVICE. AGENDA ... • Los Angeles, CA Federal Build ing - 11000](https://reader034.vdocuments.us/reader034/viewer/2022050714/5f0808ff7e708231d4200124/html5/thumbnails/17.jpg)
GSA REGION 2 HEADQUARTERS, GKV ARCHITECTS
![Page 18: DESIGN AND CONSTRUCTION at GSADESIGN AND CONSTRUCTION at GSA NATALIE HUBER, PE, PMP CHIEF ENGINEER PUBLIC BUILDINGS SERVICE. AGENDA ... • Los Angeles, CA Federal Build ing - 11000](https://reader034.vdocuments.us/reader034/viewer/2022050714/5f0808ff7e708231d4200124/html5/thumbnails/18.jpg)
UNITED STATES PROBATION OFFICE, CHICAGO, GSA WITH MEKUS STUDIOS
![Page 19: DESIGN AND CONSTRUCTION at GSADESIGN AND CONSTRUCTION at GSA NATALIE HUBER, PE, PMP CHIEF ENGINEER PUBLIC BUILDINGS SERVICE. AGENDA ... • Los Angeles, CA Federal Build ing - 11000](https://reader034.vdocuments.us/reader034/viewer/2022050714/5f0808ff7e708231d4200124/html5/thumbnails/19.jpg)
GSA REGION 6 HEADQUARTERS, GASTINGERWALKER&
![Page 20: DESIGN AND CONSTRUCTION at GSADESIGN AND CONSTRUCTION at GSA NATALIE HUBER, PE, PMP CHIEF ENGINEER PUBLIC BUILDINGS SERVICE. AGENDA ... • Los Angeles, CA Federal Build ing - 11000](https://reader034.vdocuments.us/reader034/viewer/2022050714/5f0808ff7e708231d4200124/html5/thumbnails/20.jpg)
ENGINEERING AND TECHNICAL SUPPORT
![Page 21: DESIGN AND CONSTRUCTION at GSADESIGN AND CONSTRUCTION at GSA NATALIE HUBER, PE, PMP CHIEF ENGINEER PUBLIC BUILDINGS SERVICE. AGENDA ... • Los Angeles, CA Federal Build ing - 11000](https://reader034.vdocuments.us/reader034/viewer/2022050714/5f0808ff7e708231d4200124/html5/thumbnails/21.jpg)
P100: GSA’S PERFORMANCE BASED FACILITIES STANDARDS
• Establishes design standards and criteria for new buildings, repair and alterations, modernizations, and work in historic structures
• Both performance based and prescriptive requirements
• Performance criteria– Four levels of performance: Base + three tiers
• Means to verify performance– Measuring and verifying
– Commissioning
• LEED Gold Certification
![Page 22: DESIGN AND CONSTRUCTION at GSADESIGN AND CONSTRUCTION at GSA NATALIE HUBER, PE, PMP CHIEF ENGINEER PUBLIC BUILDINGS SERVICE. AGENDA ... • Los Angeles, CA Federal Build ing - 11000](https://reader034.vdocuments.us/reader034/viewer/2022050714/5f0808ff7e708231d4200124/html5/thumbnails/22.jpg)
SEISMIC PROGRAM
• Improve Seismic Resilience
• Seismic Risk Rating Database– Used to prioritize seismic
improvements
• Non-structural Seismic Improvements
• Seismic Event Preparedness and Response
![Page 23: DESIGN AND CONSTRUCTION at GSADESIGN AND CONSTRUCTION at GSA NATALIE HUBER, PE, PMP CHIEF ENGINEER PUBLIC BUILDINGS SERVICE. AGENDA ... • Los Angeles, CA Federal Build ing - 11000](https://reader034.vdocuments.us/reader034/viewer/2022050714/5f0808ff7e708231d4200124/html5/thumbnails/23.jpg)
HIGH SEISMIC AREAS
![Page 24: DESIGN AND CONSTRUCTION at GSADESIGN AND CONSTRUCTION at GSA NATALIE HUBER, PE, PMP CHIEF ENGINEER PUBLIC BUILDINGS SERVICE. AGENDA ... • Los Angeles, CA Federal Build ing - 11000](https://reader034.vdocuments.us/reader034/viewer/2022050714/5f0808ff7e708231d4200124/html5/thumbnails/24.jpg)
50 UNITED NATIONS PLAZA FEDERAL OFFICE BUILDING, HKS ARCHITECTS
![Page 25: DESIGN AND CONSTRUCTION at GSADESIGN AND CONSTRUCTION at GSA NATALIE HUBER, PE, PMP CHIEF ENGINEER PUBLIC BUILDINGS SERVICE. AGENDA ... • Los Angeles, CA Federal Build ing - 11000](https://reader034.vdocuments.us/reader034/viewer/2022050714/5f0808ff7e708231d4200124/html5/thumbnails/25.jpg)
50 UNITED NATIONS PLAZA FEDERAL OFFICE BUILDING
BASEMENT SHEAR WALL FOUNDATION
![Page 26: DESIGN AND CONSTRUCTION at GSADESIGN AND CONSTRUCTION at GSA NATALIE HUBER, PE, PMP CHIEF ENGINEER PUBLIC BUILDINGS SERVICE. AGENDA ... • Los Angeles, CA Federal Build ing - 11000](https://reader034.vdocuments.us/reader034/viewer/2022050714/5f0808ff7e708231d4200124/html5/thumbnails/26.jpg)
PIONEER COURTHOUSE, PORTLAND, OR
BASE ISOLATION SEISMIC UPGRADE
![Page 27: DESIGN AND CONSTRUCTION at GSADESIGN AND CONSTRUCTION at GSA NATALIE HUBER, PE, PMP CHIEF ENGINEER PUBLIC BUILDINGS SERVICE. AGENDA ... • Los Angeles, CA Federal Build ing - 11000](https://reader034.vdocuments.us/reader034/viewer/2022050714/5f0808ff7e708231d4200124/html5/thumbnails/27.jpg)
BUILDING ENCLOSURES
• 2007 ASHRAE Study– 17,000 construction defect claims, of which
69% were due to moisture-related defects in building enclosures
• ASTM Study– $9 Billion annually spent in North America on
repairing and litigating damages from moisture intrusion
• Costs 3X more to correct a problem once it’s built
• Integrated Design approach to building enclosures and HVAC systems to meet energy targets
• Building Enclosure Commissioning
![Page 28: DESIGN AND CONSTRUCTION at GSADESIGN AND CONSTRUCTION at GSA NATALIE HUBER, PE, PMP CHIEF ENGINEER PUBLIC BUILDINGS SERVICE. AGENDA ... • Los Angeles, CA Federal Build ing - 11000](https://reader034.vdocuments.us/reader034/viewer/2022050714/5f0808ff7e708231d4200124/html5/thumbnails/28.jpg)
ANTHONY J. CELEBREZZE FEDERAL BUILDING FACADE RENOVATION, THORNTON TOMASETTI
![Page 29: DESIGN AND CONSTRUCTION at GSADESIGN AND CONSTRUCTION at GSA NATALIE HUBER, PE, PMP CHIEF ENGINEER PUBLIC BUILDINGS SERVICE. AGENDA ... • Los Angeles, CA Federal Build ing - 11000](https://reader034.vdocuments.us/reader034/viewer/2022050714/5f0808ff7e708231d4200124/html5/thumbnails/29.jpg)
GSA’S DESIGN EXCELLENCE PROGRAMPLANNING FOR QUALITY
Established in 1994 to enhance the quality of public architecture and encourage new approaches through:
■ Simplifying the evaluation process
■ Engaging private-sector design professionals (peers) with no vested interest in the process in the evaluation of proposals
■ Holding Peer Reviews of proposed design concepts
■ First Peer Review – From 3 Concepts to 1
■ Second Peer Review – Refinement of the Concept
Design Excellence Policies and Procedures: https://www.gsa.gov/designexcellence
![Page 30: DESIGN AND CONSTRUCTION at GSADESIGN AND CONSTRUCTION at GSA NATALIE HUBER, PE, PMP CHIEF ENGINEER PUBLIC BUILDINGS SERVICE. AGENDA ... • Los Angeles, CA Federal Build ing - 11000](https://reader034.vdocuments.us/reader034/viewer/2022050714/5f0808ff7e708231d4200124/html5/thumbnails/30.jpg)
PROJECT DELIVERY METHOD TOOL
• Focus on 7 primary risk categories– Site and Project Startup Considerations
– Schedule Management
– Cost Management
– Control of Design Quality
– Integrated Design
– Green Management
– Project Management
• Delivery Methods– Traditional Design Bid Build
– Construction Manager as Constructor
– Design Build
– Design Build Bridging
![Page 31: DESIGN AND CONSTRUCTION at GSADESIGN AND CONSTRUCTION at GSA NATALIE HUBER, PE, PMP CHIEF ENGINEER PUBLIC BUILDINGS SERVICE. AGENDA ... • Los Angeles, CA Federal Build ing - 11000](https://reader034.vdocuments.us/reader034/viewer/2022050714/5f0808ff7e708231d4200124/html5/thumbnails/31.jpg)
CONSTRUCTION EXCELLENCE
• Project Delivery Method Tool
• PDRI (Project Definition Rating Index)
• Construction Peer Review– 15%, 60%
– Private Sector Construction Expert Peers
• Formal Lessons Learned Session
![Page 32: DESIGN AND CONSTRUCTION at GSADESIGN AND CONSTRUCTION at GSA NATALIE HUBER, PE, PMP CHIEF ENGINEER PUBLIC BUILDINGS SERVICE. AGENDA ... • Los Angeles, CA Federal Build ing - 11000](https://reader034.vdocuments.us/reader034/viewer/2022050714/5f0808ff7e708231d4200124/html5/thumbnails/32.jpg)
FY21 Budget Request: Construction and Acquisition of Facilities Program
– $459 million for Washington, DC DHS Consolidation at St. Elizabeth’s
– $80 million for Cleveland, OH FBI Field Office
– $85 million for Oklahoma City, OK FBI Field Office
– $99 million for Calexico West, CA U.S. Land Port of Entry Phase II B
– $28 million for Kansas City, MO Hardesty Federal Complex Remediation
– $9 million for Washington, DC Southeast Federal Center Remediation
![Page 33: DESIGN AND CONSTRUCTION at GSADESIGN AND CONSTRUCTION at GSA NATALIE HUBER, PE, PMP CHIEF ENGINEER PUBLIC BUILDINGS SERVICE. AGENDA ... • Los Angeles, CA Federal Build ing - 11000](https://reader034.vdocuments.us/reader034/viewer/2022050714/5f0808ff7e708231d4200124/html5/thumbnails/33.jpg)
FY21 Budget Request: Major Repairs and Alterations Program
• New York, NY 201 Varick Street Federal Office Building $66M• New York, NY Jacob K. Javits Federal Office Building $10M• Chicago, IL Ralph H. Metcalfe Federal Building $124M• Philadelphia, PA Philadelphia U.S. Custom House $91M• Woodlawn, MD West High Low Rise $208M• Tacoma, WA Tacoma Union Station $46M• Cincinnati, OH Potter Stewart U.S. Courthouse $37M• Indianapolis, IN Major General Emmett J. Bean Federal Center $42M• Kansas City, MO Charles E. Whittaker U.S. Courthouse $57M• Indianapolis, IN Minton-Capehart Federal Building $18M• Washington, DC William Jefferson Clinton Complex $48M• Los Angeles, CA Federal Building - 11000 Wilshire Boulevard $26M• Kansas City, MO 8930 Ward Parkway Federal Building $22M• Austin, TX Austin Finance Center $36M• Cleveland, OH Carl B. Stokes U.S. Courthouse $28M• Various Locations, Southern Border LPOE Infrastructure Paving Program $11MSubtotal, Major Repair and Alterations Program $878M
![Page 34: DESIGN AND CONSTRUCTION at GSADESIGN AND CONSTRUCTION at GSA NATALIE HUBER, PE, PMP CHIEF ENGINEER PUBLIC BUILDINGS SERVICE. AGENDA ... • Los Angeles, CA Federal Build ing - 11000](https://reader034.vdocuments.us/reader034/viewer/2022050714/5f0808ff7e708231d4200124/html5/thumbnails/34.jpg)
U.S. GENERAL SERVICES ADMINISTRATION
DESIGN AND CONSTRUCTION at GSANATALIE HUBER, PE, PMPCHIEF ENGINEERPUBLIC BUILDINGS SERVICE