DESIGN AND CONSTRUCTIONat GSANATALIE HUBER, PE, PMPCHIEF ENGINEERPUBLIC BUILDINGS SERVICE

Page 2: DESIGN AND CONSTRUCTION at GSADESIGN AND CONSTRUCTION at GSA NATALIE HUBER, PE, PMP CHIEF ENGINEER PUBLIC BUILDINGS SERVICE. AGENDA ... • Los Angeles, CA Federal Build ing - 11000

AGENDA

■ PUBLIC BUILDINGS SERVICE

■ PORTFOLIO FEATURES

■ DESIGN PROGRAMS

■ PROJECT DELIVERY

Page 3: DESIGN AND CONSTRUCTION at GSADESIGN AND CONSTRUCTION at GSA NATALIE HUBER, PE, PMP CHIEF ENGINEER PUBLIC BUILDINGS SERVICE. AGENDA ... • Los Angeles, CA Federal Build ing - 11000

U.S. GENERAL SERVICES ADMINISTRATION

■ FEDERAL ACQUISTION SERVICES

■ PUBLIC BUILDINGS SERVICE

Page 4: DESIGN AND CONSTRUCTION at GSADESIGN AND CONSTRUCTION at GSA NATALIE HUBER, PE, PMP CHIEF ENGINEER PUBLIC BUILDINGS SERVICE. AGENDA ... • Los Angeles, CA Federal Build ing - 11000

PUBLIC BUILDINGS SERVICE PORTFOLIO

8,700 owned or leased buildings +375 million rentable square feet 500+ historic buildings

Page 5: DESIGN AND CONSTRUCTION at GSADESIGN AND CONSTRUCTION at GSA NATALIE HUBER, PE, PMP CHIEF ENGINEER PUBLIC BUILDINGS SERVICE. AGENDA ... • Los Angeles, CA Federal Build ing - 11000

GSA’S 11 REGIONS

Page 6: DESIGN AND CONSTRUCTION at GSADESIGN AND CONSTRUCTION at GSA NATALIE HUBER, PE, PMP CHIEF ENGINEER PUBLIC BUILDINGS SERVICE. AGENDA ... • Los Angeles, CA Federal Build ing - 11000

US COURTHOUSES

• Unique Requirements (US Courts Design Guide)– Security

– Adjacency and Circulation

– Barrier-Free Access

– Mechanical/ Electrical Systems

– Automation

– Acoustics

– Interior Finishes

• Administrative Office of the US Courts and GSA Collaboration

Page 7: DESIGN AND CONSTRUCTION at GSADESIGN AND CONSTRUCTION at GSA NATALIE HUBER, PE, PMP CHIEF ENGINEER PUBLIC BUILDINGS SERVICE. AGENDA ... • Los Angeles, CA Federal Build ing - 11000

JOHN JOSEPH MOAKLEY UNITED STATES COURTHOUSE, PEI COBB FREED & PARTNERS

Page 8: DESIGN AND CONSTRUCTION at GSADESIGN AND CONSTRUCTION at GSA NATALIE HUBER, PE, PMP CHIEF ENGINEER PUBLIC BUILDINGS SERVICE. AGENDA ... • Los Angeles, CA Federal Build ing - 11000

JOHN JOSEPH MOAKLEY UNITED STATES COURTHOUSE, PEI COBB FREED & PARTNERS

Page 9: DESIGN AND CONSTRUCTION at GSADESIGN AND CONSTRUCTION at GSA NATALIE HUBER, PE, PMP CHIEF ENGINEER PUBLIC BUILDINGS SERVICE. AGENDA ... • Los Angeles, CA Federal Build ing - 11000

UNITED STATES COURTHOUSE, LOS ANGELES, CALIFORNIA, SOM

Page 10: DESIGN AND CONSTRUCTION at GSADESIGN AND CONSTRUCTION at GSA NATALIE HUBER, PE, PMP CHIEF ENGINEER PUBLIC BUILDINGS SERVICE. AGENDA ... • Los Angeles, CA Federal Build ing - 11000

UNITED STATES COURTHOUSE, LOS ANGELES, CALIFORNIA, SOM

Page 11: DESIGN AND CONSTRUCTION at GSADESIGN AND CONSTRUCTION at GSA NATALIE HUBER, PE, PMP CHIEF ENGINEER PUBLIC BUILDINGS SERVICE. AGENDA ... • Los Angeles, CA Federal Build ing - 11000

LAND PORTS OF ENTRY

• 168 Land Ports of Entry

• 1,952 miles of border with Mexico, 47 ports

• 5,525 miles of border with Canada, 121 ports

• Design and Construction Challenges– Aging land port inventory (average age of ports is 42 years)

– Geographic limitations

– Short construction season (northern border)

– Limited labor market in remote areas

– Evolving security programs

– Securing the border without impeding commerce and trade

– Diverse stakeholders

• CBP and GSA Collaboration

Page 12: DESIGN AND CONSTRUCTION at GSADESIGN AND CONSTRUCTION at GSA NATALIE HUBER, PE, PMP CHIEF ENGINEER PUBLIC BUILDINGS SERVICE. AGENDA ... • Los Angeles, CA Federal Build ing - 11000

SAN YSIDRO LAND PORT OF ENTRY, MILLER HULL

Page 13: DESIGN AND CONSTRUCTION at GSADESIGN AND CONSTRUCTION at GSA NATALIE HUBER, PE, PMP CHIEF ENGINEER PUBLIC BUILDINGS SERVICE. AGENDA ... • Los Angeles, CA Federal Build ing - 11000

SAN YSIDRO LAND PORT OF ENTRY, MILLER HULL

Page 14: DESIGN AND CONSTRUCTION at GSADESIGN AND CONSTRUCTION at GSA NATALIE HUBER, PE, PMP CHIEF ENGINEER PUBLIC BUILDINGS SERVICE. AGENDA ... • Los Angeles, CA Federal Build ing - 11000

U.S. LAND PORT OF ENTRY, WARROAD, MINNESOTA, JULIE SNOW ARCHITECTS

Page 15: DESIGN AND CONSTRUCTION at GSADESIGN AND CONSTRUCTION at GSA NATALIE HUBER, PE, PMP CHIEF ENGINEER PUBLIC BUILDINGS SERVICE. AGENDA ... • Los Angeles, CA Federal Build ing - 11000

U.S. LAND PORT OF ENTRY, WARROAD, MINNESOTA, JULIE SNOW ARCHITECTS

Page 16: DESIGN AND CONSTRUCTION at GSADESIGN AND CONSTRUCTION at GSA NATALIE HUBER, PE, PMP CHIEF ENGINEER PUBLIC BUILDINGS SERVICE. AGENDA ... • Los Angeles, CA Federal Build ing - 11000

FEDERAL OFFICE BUILDINGS AND WORKPLACE SOLUTIONS

• Cost savings– Reduce the Footprint

– Energy Savings

• Sustainability– Sustainable Materials

– Daylighting Strategies

– Water Conservation

– Green Standards

• Productivity

• Technology– Cloud computing

– Telework

– Hoteling

Page 17: DESIGN AND CONSTRUCTION at GSADESIGN AND CONSTRUCTION at GSA NATALIE HUBER, PE, PMP CHIEF ENGINEER PUBLIC BUILDINGS SERVICE. AGENDA ... • Los Angeles, CA Federal Build ing - 11000

GSA REGION 2 HEADQUARTERS, GKV ARCHITECTS

Page 18: DESIGN AND CONSTRUCTION at GSADESIGN AND CONSTRUCTION at GSA NATALIE HUBER, PE, PMP CHIEF ENGINEER PUBLIC BUILDINGS SERVICE. AGENDA ... • Los Angeles, CA Federal Build ing - 11000

UNITED STATES PROBATION OFFICE, CHICAGO, GSA WITH MEKUS STUDIOS

Page 19: DESIGN AND CONSTRUCTION at GSADESIGN AND CONSTRUCTION at GSA NATALIE HUBER, PE, PMP CHIEF ENGINEER PUBLIC BUILDINGS SERVICE. AGENDA ... • Los Angeles, CA Federal Build ing - 11000

GSA REGION 6 HEADQUARTERS, GASTINGERWALKER&

Page 20: DESIGN AND CONSTRUCTION at GSADESIGN AND CONSTRUCTION at GSA NATALIE HUBER, PE, PMP CHIEF ENGINEER PUBLIC BUILDINGS SERVICE. AGENDA ... • Los Angeles, CA Federal Build ing - 11000

ENGINEERING AND TECHNICAL SUPPORT

Page 21: DESIGN AND CONSTRUCTION at GSADESIGN AND CONSTRUCTION at GSA NATALIE HUBER, PE, PMP CHIEF ENGINEER PUBLIC BUILDINGS SERVICE. AGENDA ... • Los Angeles, CA Federal Build ing - 11000

P100: GSA’S PERFORMANCE BASED FACILITIES STANDARDS

• Establishes design standards and criteria for new buildings, repair and alterations, modernizations, and work in historic structures

• Both performance based and prescriptive requirements

• Performance criteria– Four levels of performance: Base + three tiers

• Means to verify performance– Measuring and verifying

– Commissioning

• LEED Gold Certification

Page 22: DESIGN AND CONSTRUCTION at GSADESIGN AND CONSTRUCTION at GSA NATALIE HUBER, PE, PMP CHIEF ENGINEER PUBLIC BUILDINGS SERVICE. AGENDA ... • Los Angeles, CA Federal Build ing - 11000

SEISMIC PROGRAM

• Improve Seismic Resilience

• Seismic Risk Rating Database– Used to prioritize seismic

improvements

• Non-structural Seismic Improvements

• Seismic Event Preparedness and Response

Page 23: DESIGN AND CONSTRUCTION at GSADESIGN AND CONSTRUCTION at GSA NATALIE HUBER, PE, PMP CHIEF ENGINEER PUBLIC BUILDINGS SERVICE. AGENDA ... • Los Angeles, CA Federal Build ing - 11000

HIGH SEISMIC AREAS

Page 24: DESIGN AND CONSTRUCTION at GSADESIGN AND CONSTRUCTION at GSA NATALIE HUBER, PE, PMP CHIEF ENGINEER PUBLIC BUILDINGS SERVICE. AGENDA ... • Los Angeles, CA Federal Build ing - 11000

50 UNITED NATIONS PLAZA FEDERAL OFFICE BUILDING, HKS ARCHITECTS

Page 25: DESIGN AND CONSTRUCTION at GSADESIGN AND CONSTRUCTION at GSA NATALIE HUBER, PE, PMP CHIEF ENGINEER PUBLIC BUILDINGS SERVICE. AGENDA ... • Los Angeles, CA Federal Build ing - 11000

50 UNITED NATIONS PLAZA FEDERAL OFFICE BUILDING

BASEMENT SHEAR WALL FOUNDATION

Page 26: DESIGN AND CONSTRUCTION at GSADESIGN AND CONSTRUCTION at GSA NATALIE HUBER, PE, PMP CHIEF ENGINEER PUBLIC BUILDINGS SERVICE. AGENDA ... • Los Angeles, CA Federal Build ing - 11000

PIONEER COURTHOUSE, PORTLAND, OR

BASE ISOLATION SEISMIC UPGRADE

Page 27: DESIGN AND CONSTRUCTION at GSADESIGN AND CONSTRUCTION at GSA NATALIE HUBER, PE, PMP CHIEF ENGINEER PUBLIC BUILDINGS SERVICE. AGENDA ... • Los Angeles, CA Federal Build ing - 11000

BUILDING ENCLOSURES

• 2007 ASHRAE Study– 17,000 construction defect claims, of which

69% were due to moisture-related defects in building enclosures

• ASTM Study– $9 Billion annually spent in North America on

repairing and litigating damages from moisture intrusion

• Costs 3X more to correct a problem once it’s built

• Integrated Design approach to building enclosures and HVAC systems to meet energy targets

• Building Enclosure Commissioning

Page 28: DESIGN AND CONSTRUCTION at GSADESIGN AND CONSTRUCTION at GSA NATALIE HUBER, PE, PMP CHIEF ENGINEER PUBLIC BUILDINGS SERVICE. AGENDA ... • Los Angeles, CA Federal Build ing - 11000

ANTHONY J. CELEBREZZE FEDERAL BUILDING FACADE RENOVATION, THORNTON TOMASETTI

Page 29: DESIGN AND CONSTRUCTION at GSADESIGN AND CONSTRUCTION at GSA NATALIE HUBER, PE, PMP CHIEF ENGINEER PUBLIC BUILDINGS SERVICE. AGENDA ... • Los Angeles, CA Federal Build ing - 11000

GSA’S DESIGN EXCELLENCE PROGRAMPLANNING FOR QUALITY

Established in 1994 to enhance the quality of public architecture and encourage new approaches through:

■ Simplifying the evaluation process

■ Engaging private-sector design professionals (peers) with no vested interest in the process in the evaluation of proposals

■ Holding Peer Reviews of proposed design concepts

■ First Peer Review – From 3 Concepts to 1

■ Second Peer Review – Refinement of the Concept

Design Excellence Policies and Procedures: https://www.gsa.gov/designexcellence

Page 30: DESIGN AND CONSTRUCTION at GSADESIGN AND CONSTRUCTION at GSA NATALIE HUBER, PE, PMP CHIEF ENGINEER PUBLIC BUILDINGS SERVICE. AGENDA ... • Los Angeles, CA Federal Build ing - 11000

PROJECT DELIVERY METHOD TOOL

• Focus on 7 primary risk categories– Site and Project Startup Considerations

– Schedule Management

– Cost Management

– Control of Design Quality

– Integrated Design

– Green Management

– Project Management

• Delivery Methods– Traditional Design Bid Build

– Construction Manager as Constructor

– Design Build

– Design Build Bridging

Page 31: DESIGN AND CONSTRUCTION at GSADESIGN AND CONSTRUCTION at GSA NATALIE HUBER, PE, PMP CHIEF ENGINEER PUBLIC BUILDINGS SERVICE. AGENDA ... • Los Angeles, CA Federal Build ing - 11000

CONSTRUCTION EXCELLENCE

• Project Delivery Method Tool

• PDRI (Project Definition Rating Index)

• Construction Peer Review– 15%, 60%

– Private Sector Construction Expert Peers

• Formal Lessons Learned Session

Page 32: DESIGN AND CONSTRUCTION at GSADESIGN AND CONSTRUCTION at GSA NATALIE HUBER, PE, PMP CHIEF ENGINEER PUBLIC BUILDINGS SERVICE. AGENDA ... • Los Angeles, CA Federal Build ing - 11000

FY21 Budget Request: Construction and Acquisition of Facilities Program

– $459 million for Washington, DC DHS Consolidation at St. Elizabeth’s

– $80 million for Cleveland, OH FBI Field Office

– $85 million for Oklahoma City, OK FBI Field Office

– $99 million for Calexico West, CA U.S. Land Port of Entry Phase II B

– $28 million for Kansas City, MO Hardesty Federal Complex Remediation

– $9 million for Washington, DC Southeast Federal Center Remediation

Page 33: DESIGN AND CONSTRUCTION at GSADESIGN AND CONSTRUCTION at GSA NATALIE HUBER, PE, PMP CHIEF ENGINEER PUBLIC BUILDINGS SERVICE. AGENDA ... • Los Angeles, CA Federal Build ing - 11000

FY21 Budget Request: Major Repairs and Alterations Program

• New York, NY 201 Varick Street Federal Office Building $66M• New York, NY Jacob K. Javits Federal Office Building $10M• Chicago, IL Ralph H. Metcalfe Federal Building $124M• Philadelphia, PA Philadelphia U.S. Custom House $91M• Woodlawn, MD West High Low Rise $208M• Tacoma, WA Tacoma Union Station $46M• Cincinnati, OH Potter Stewart U.S. Courthouse $37M• Indianapolis, IN Major General Emmett J. Bean Federal Center $42M• Kansas City, MO Charles E. Whittaker U.S. Courthouse $57M• Indianapolis, IN Minton-Capehart Federal Building $18M• Washington, DC William Jefferson Clinton Complex $48M• Los Angeles, CA Federal Building - 11000 Wilshire Boulevard $26M• Kansas City, MO 8930 Ward Parkway Federal Building $22M• Austin, TX Austin Finance Center $36M• Cleveland, OH Carl B. Stokes U.S. Courthouse $28M• Various Locations, Southern Border LPOE Infrastructure Paving Program $11MSubtotal, Major Repair and Alterations Program $878M

Page 34: DESIGN AND CONSTRUCTION at GSADESIGN AND CONSTRUCTION at GSA NATALIE HUBER, PE, PMP CHIEF ENGINEER PUBLIC BUILDINGS SERVICE. AGENDA ... • Los Angeles, CA Federal Build ing - 11000

U.S. GENERAL SERVICES ADMINISTRATION

DESIGN AND CONSTRUCTION at GSANATALIE HUBER, PE, PMPCHIEF ENGINEERPUBLIC BUILDINGS SERVICE


Top Related