Partial roof replacement and application of RTT Sealant Ultimate Dual Layer Solar Reflective Waterproof Membrane (including removal of walkways, preparation and priming) Area: Brisbane QLD Size: 2,000+m 2 www.rttsealant.com BEFORE AFTER PRIMED AFTER Department of Education QLD: Roof Restore Project Hi RTT Sealant, please pass on to your team that we are very pleased with the product. As you may remember the roof at Coorparoo Education Precinct was in need of replacement but due to the cost of removing and replacing the aged roof mounted air conditioning units it was not possible with the limited budget available. Your roof coating solution eliminated the need for removal. All roof leaks were fixed after the product was installed. The team that attended to carry out the work were a pleasure to deal with always acting in a professional and safe manner. Aaron Butteriss Principal Facilities Services Officer UV PROTECTIVE HEAT REFLECTIVE POWER SAVING COST EFFECTIVE

Upload: others

Post on 23-Aug-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Department of Education QLD: Roof Restore Project of Education... · QLD: Roof Restore Project Hi RTT Sealant, please pass on to your team that we are very pleased with the product

Partial roof replacement and application of RTT Sealant Ultimate Dual Layer Solar Reflective Waterproof Membrane (including removal of walkways, preparation and priming)

Area: Brisbane QLD

Size: 2,000+m2

www.rttsealant.com

BEFORE

AFTER

PRIMED AFTER

Department of Education

QLD: Roof Restore Project

Hi RTT Sealant, please pass on to your team that we are very pleased with the product. As you may remember the roof at Coorparoo Education Precinct was in need of replacement but due to the cost of removing and replacing the aged roof mounted air conditioning units it was not possible with the limited budget available. Your roof coating solution eliminated the need for removal. All roof leaks were fixed after the product was installed. The team that attended to carry out the work were a pleasure to deal with always acting in a professional and safe manner.