Attached is the Equipment Assignment Report (4-12 Report) for the December 14, 2008 bus shakeup. This report summarizes the maximum number of in-service buses assigned to the bus divisions, spare buses, non-service buses, and division storage capacities. Vehicle requirements outlined in this report reflect schedule changes made by the Service Performance Analysis Department. This report also lists seasonal services for Santa Anita Race Track and Santa Anita Off-track wagering for Hollywood Park. In addition, this report addresses:
• Two (2) new hybrid-electric buses deployed to Division 6 • One (1) additional Express bus put in service at Division 18 • Five (5) additional TMC diesel buses removed from service
In addition, the fifty (50) TMC diesel buses remaining at Division 6 will be replaced by fifty (50) new composite buses; furthermore, four (4) of the fifty (50) new composite buses are expected to be in service as of December 14, 2008. The transition between the TMC diesel buses and the new composite buses will occur on a rolling basis throughout the shake-up period upon receiving the new buses. The peak service pullout for December 2008 is 2,083 buses and total assigned with spares is 2,460. The contract services buses of 181 bring the total active fleet assigned to 2,641.
Date December 4, 2008
To Distribution
From Matthew Dake
Subject Equipment Assignment Report (4-12 Report)
I. Equipment Assignment Summary
Daily Bus Requirements 3Division Equipment Assignment - Total 4Division Equipment Assignment for Scheduled Service (Peak) 5Special Events Equipment Requirements 6
II. Division Line Assignment Report
Weekday 7Saturday 19Sunday 31
III. Appendix
Line Assignments Sorted by Division 44Line Assignments Sorted by Line Number 45Lines Assigned Out of More Than One Division 46Rapid Lines 47Division Capacities 48Fleet Definitions 49Equipment Series Designation Summary 50
EQUIPMENT ASSIGNMENT (4-12) REPORT
December 14, 2008
TABLE OF CONTENTS
LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITY
LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITY
ALT FUEL DIESEL TOTAL
1 SCHEDULED SERVICE
TOTAL SCHEDULED PEAK SERVICE 2025 58 2083
2 SPARES
PEAK SCHEDULED 366 11 377
3 TOTAL DIVISION ASSIGNMENTS
TOTAL SCHEDULED PEAK SERVICES & SPARES 2391 69 2460
4 CONTRACT & LEASED SERVICES 24 157 181
5 TOTAL ACTIVE FLEET ASSIGNED 2415 226 2641
6 INACTIVE FLEET
PENDING EVALUATION FOR SALE 7 123 130TRAINING BUSES 26 3 29NOT YET ASSIGNED 0 0 0CONTINGENCY 0 0 0APPROVED FOR SALE 0 0 0
TOTAL INACTIVE 33 126 159
*******************************************************************************TOTAL FLEET** 2448 352 2800
December 14, 2008
DAILY BUS REQUIREMENTS
DAILY ONLY
Page 3 of 50
Page 4 of 50
LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITYDIVISION EQUIPMENT ASSIGNMENT - TOTAL
12/14/2008
DIVISION 1200 1245 1900 2000 3000 4200 4400 4500 4600 5000 5300 6300 6700 7000 7300 7500 7600 7980 8000 8100 9200 9400 9500 *9800 *9900 *11000 Total1 10 129 34 26 26 18 2432 74 2 55 15 60 2063 10 99 36 13 24 22 2045 142 45 34 2216 46 15 2 4 677 79 21 42 46 15 6 8 31 2488 97 46 7 18 32 2009 41 40 18 160 259
10 6 85 40 5 14 60 33 5 24815 81 16 17 34 15 61 13 25 25 28718 17 170 8 12 15 5 50 277
SUB-TOTAL 52 15 2 178 72 221 220 288 99 184 214 75 347 8 96 4 198 92 95 2460169 3 1 20 5 196 86 223 222 298 100 180 215 75 347 20 98 200 94 17 2569169 -52 3 1 5 5 18 14 2 2 10 1 -4 1 12 2 2 2 -78 109
CONTRACT/LEASED 1 24 63 26 67 181TOTAL ACTIVE FLEET 53 15 2 178 72 221 220 288 99 208 214 75 347 8 96 198 92 95 63 26 67 2641
PENDING EVALUATION D12 17 98 3 3 2 1 6 130TRAINING BUSES D278 2 1 12 2 2 4 2 3 1 29
NOT YET ASSIGNED D311CONTINGENCY
APPROVED FOR SALETOTAL NON-ACTIVE 17 100 3 3 1 2 12 2 3 4 2 3 1 6 159
GRAND TOTAL 17 153 3 3 16 2 2 190 72 223 223 288 99 208 218 75 349 8 99 198 93 95 69 26 67 2800
* 9800 = ELDORADO BUSES* 9900 = ELD/THMS/GIL/BB BUSES* 11000 = ORION BUSES
5 of 50
DIVISION EQUIPMENT ASSIGNMENT FOR SCHEDULED SERVICE (PEAK), INCLUDING SPECIAL SERVICES PROJECTED THROUGH JUNE 2009.
Effective:
DAILY EXCEPT SATURDAY & SUNDAY
DIV NO AM BASE PM OWLPEAK REQ.
1200 1245 1900 2000 3000 4200 4400 4500 4600 5000 5300 6300 6700 7000 7300 7500 7600 7980 8000 8100 9200 9400 9500 *9800 *9900 *11000SUB
TOTALTotal Spares
Required%
DIV. TOTAL
1* 203 104 206 6 206 9 109 29 22 22 15 206 37 18.0% 243
2 175 88 175 5 175 63 2 47 13 50 175 31 17.7% 206
3* 159 117 173 7 173 9 84 30 11 20 19 173 31 17.9% 204
5* 175 90 185 4 185 121 38 26 185 36 19.5% 221
6 56 3 56 0 56 39 13 1 3 56 11 19.6% 67
7* 195 124 210 10 210 67 18 36 39 13 5 6 26 210 38 18.1% 248
8* 169 74 170 2 170 83 39 6 15 27 170 30 17.6% 200
9 201 135 220 4 220 35 34 15 136 220 39 17.7% 259
10* 186 120 210 15 210 5 74 34 4 12 51 26 4 210 38 18.1% 248
15* 234 130 242 4 242 69 14 15 29 13 51 11 21 19 242 45 18.6% 287
18* 229 135 236 5 236 14 147 7 9 12 4 43 236 41 17.4% 277
Total 1982 1120 2083 62 2083 44 13 1 152 62 188 186 250 84 157 182 63 293 6 80 3 167 71 81 2,083 377 18.1% 2,460
* PEAK ADJUSTMENT AND FLEET REQUIREMENT ADJUSTED FOR RAPID REGULAR SERVICE (see DAILY for Actual)
SCHEDULE
December 14, 2008
LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITY
12/14/2008 Division Equipment Assignment - Special Events Equipment Requirements
Weekly Seasonal Assignments
Div. No. AM Base PM OWL Notes
1
2
3
5
6
7
8
9
10
15
18
Div. No.1 *** NO SEASONAL ASSIGNMENTS FOR THIS PERIOD 2 *** NO SEASONAL ASSIGNMENTS FOR THIS PERIOD 3 *** NO SEASONAL ASSIGNMENTS FOR THIS PERIOD 56 *** NO SEASONAL ASSIGNMENTS FOR THIS PERIOD 78 *** NO SEASONAL ASSIGNMENTS FOR THIS PERIOD 9 *** NO SEASONAL ASSIGNMENTS FOR THIS PERIOD 10 *** NO SEASONAL ASSIGNMENTS FOR THIS PERIOD 15 *** NO SEASONAL ASSIGNMENTS FOR THIS PERIOD 18 *** NO SEASONAL ASSIGNMENTS FOR THIS PERIOD
*** NO SEASONAL ASSIGNMENTS FOR THIS PERIOD
Notes
*** NO SEASONAL ASSIGNMENTS FOR THIS PERIOD
Page 6 of 50
DIVISION LINE ASSIGNMENT REPORT
December 14, 2008
WEEKDAY
LINE ASSIGNMENT OF BUSESDAILY EXCEPT SATURDAY AND SUNDAY
DIVISION 1-1 -1
SUPPLEMENT TO REPORT 4-12 10 98 34 26 168
LINE NO. AM BASE PM OWL 1200 4600 5000 5300 7000 7300 7500 7600 7980 8000 9400 9500 Total
18 35 18 32 1 24 8 3226 0 0 0 1 045 28 15 25 2 2 22 3 2753 17 7 19 3 14 2 1960 25 11 28 2 4 24 2862 12 7 10 11 1166 7 1 5 7 7265 5 3 5 5 5460 12 12 20 15 15
0
SUBTOTAL 141 74 144 6 9 84 29 22 144SPARE 28 95 25 1 15 5 4 25TOTAL 169 169 169 10 99 34 26 169
OPERATING SPARES AS % OF SCH. 17.4%
DIVISION 1 SEASONAL SERVICE
1 1DIVISION 1 RAPID SERVICE 31 26 18 75
LINE NO. AM BASE PM OWL 1200 4600 5000 5300 7000 7300 7500 7600 7980 8000 9400 9500 Total
705 14 8 16 15 15753 10 6 10 10 10745 23 7 21 22 22760 15 9 15 15 15
SUBTOTAL 62 30 62 25 22 15 62SPARE 12 44 12 5 4 3 12TOTAL 74 74 74 30 26 18 74
OPERATING SPARES AS % OF SCH. 19.4%
DIVISION 1 COMBINED REGULAR AND RAPID SERVICE
AM BASE PM OWL 1200 4600 5000 5300 7000 7300 7500 7600 7980 8000 9400 9500 Total
SUBTOTAL 203 104 206 6 9 109 29 22 22 15 206SPARE 40 139 37 1 20 5 4 4 3 37TOTAL 243 243 243 10 129 34 26 26 18 243
OPERATING SPARES AS % OF SCH. 18.0%
& - Santa Anita Race Track from 9-29-04 through 10-31-04
EQUIPMENTSCHEDULE
*** NO SEASONAL ASSIGNMENTS FOR THIS PERIOD
EQUIPMENT
EQUIPMENTSCHEDULE
COMBINED SCHEDULE
12/4/2008 Page 8 of 50
LINE ASSIGNMENT OF BUSESDAILY EXCEPT SATURDAY AND SUNDAY
DIVISION 21 -1
SUPPLEMENT TO REPORT 4-12 74 2 1 54 15 60 206
LINE NO. AM BASE PM OWL 1200 4500 4600 5000 5300 6300 7000 7300 7500 7600 9400 9500 Total
26 45 21 45 34 11 4555 30 11 23 2 11 15 2660 0 0 0 2 2 266 44 14 38 13 23 2 2 40102 5 3 5 5 5105 13 12 16 1 16 16120 4 3 4 1 2 3121 5 4 6 1 5 6124 3 2 3 2 2127 1 1 1 0200 15 9 21 3 5 6 5 19611 6 4 6 5 5612 4 4 7 6 6
00
SUBTOTAL 175 88 175 5 63 2 47 13 50 175SPARE 31 118 31 11 8 2 10 31TOTAL 206 206 206 74 2 55 15 60 206
OPERATING SPARES AS % OF SCH. 17.7%
EQUIPMENTSCHEDULE
12/4/2008 Page 9 of 50
LINE ASSIGNMENT OF BUSESDAILY EXCEPT SATURDAY AND SUNDAY
DIVISION 3
SUPPLEMENT TO REPORT 4-12 10 99 36 145
LINE NO. AM BASE PM OWL 1200 6300 6700 7000 7300 7500 7600 8000 8100 9200 9400 9500 Total
81 28 20 30 30 3083 13 10 15 2 15 1584 17 12 16 1 16 16175 4 1 2 2180 11 11 11 2 1 10 11201 3 3 3 3 3206 12 8 20 6 14 20251 13 11 13 2 13 13252 5 4 6 5 5485 6 4 6 6 6685 2 2 2 2 2
SUBTOTAL 114 85 123 7 9 84 30 123SPARE 31 60 22 1 15 6 22TOTAL 145 145 145 10 99 36 145
OPERATING SPARES AS % OF SCH. 17.9%
DIVISION 3 SEASONAL SERVICE
DIVISION 3 RAPID SERVICE 13 24 22 59
LINE NO. AM BASE PM OWL 1200 6300 6700 7000 7300 7500 7600 8000 9200 9400 9500 Total
728 16 9 19 19 19751 10 8 11 11 11780 19 15 20 20 20
0
SUBTOTAL 45 32 50 11 20 19 50SPARE 14 27 9 2 4 3 9TOTAL 59 59 59 13 24 22 59
OPERATING SPARES AS % OF SCH. 18.0%
DIVISION 3 COMBINED REGULAR AND RAPID SERVICE
AM BASE PM OWL 1200 6300 6700 7000 7300 7500 7600 8000 9200 9400 9500 Total
SUBTOTAL 159 117 173 7 9 84 30 11 20 19 173SPARE 45 87 31 1 15 6 2 4 3 31TOTAL 204 204 204 10 99 36 13 24 22 204
OPERATING SPARES AS % OF SCH. 17.9%
& Santa Anita Race Track from 9-26-07 through 11-04-07 and 12-26-07 through 4-22-08
EQUIPMENT
*** MAXIMUM SEASONAL ASSIGNMENTS INCLUDED IN SUBTOTALS
SCHEDULE
EQUIPMENT
EQUIPMENTSCHEDULE
COMBINED SCHEDULE
12/4/2008 Page 10 of 50
LINE ASSIGNMENT OF BUSESDAILY EXCEPT SATURDAY AND SUNDAY
DIVISION 5
SUPPLEMENT TO REPORT 4-12 142 34 176
LINE NO. AM BASE PM OWL 1200 4600 5000 5300 6300 6700 7980 8000 8100 9200 9400 9500 Total
108 32 14 31 31 31110 18 12 22 22 22115 18 5 14 14 2 16204 21 14 24 4 24 24206 5 2 5 5 5207 20 11 23 23 23209 5 3 3 4 4212 17 5 21 18 18305 4 3 4 4 4
00
SUBTOTAL 140 69 147 4 121 26 147SPARE 36 107 29 21 8 29TOTAL 176 176 176 142 34 176
OPERATING SPARES AS % OF SCH. 19.7%
DIVISION 5 SEASONAL SERVICE
DIVISION 5 RAPID SERVICE 45 45
LINE NO. AM BASE PM OWL 1200 4600 5000 5300 6300 6700 7980 8000 9200 9400 9500 Total
754 21 11 24 24 24757 14 10 14 14 14
00
SUBTOTAL 35 21 38 38 38SPARE 10 24 7 7 7TOTAL 45 45 45 45 45
OPERATING SPARES AS % OF SCH. 18.4%
DIVISION 5 COMBINED REGULAR AND RAPID SERVICE
AM BASE PM OWL 1200 4600 5000 5300 6300 6700 7980 8000 9200 9400 9500 Total
SUBTOTAL 175 90 185 4 121 38 26 185SPARE 46 131 36 21 7 8 36TOTAL 221 221 221 142 45 34 221
OPERATING SPARES AS % OF SCH. 19.5%
EQUIPMENT
EQUIPMENTSCHEDULE
COMBINED SCHEDULE
EQUIPMENTSCHEDULE
*** NO SEASONAL ASSIGNMENTS FOR THIS PERIOD
12/4/2008 Page 11 of 50
LINE ASSIGNMENT OF BUSESDAILY EXCEPT SATURDAY AND SUNDAY
DIVISION 615 4 -2 -4 13
SUPPLEMENT TO REPORT 4-12 61 19 80
LINE NO. AM BASE PM OWL 1200 1245 1900 2000 2300 3000 4200 4400 7980 8100 9200 9500 Total
2 11 13 11 1 12 -120 4 2 6 5 5 -128 2 7 6 6 -130 4 1 3 3 -133 19 1 19 3 13 16 -335 3 4 3 3 -1217 3 2 2 2 -1534 10 4 9 9 -1
000000
SUBTOTAL 56 3 56 39 13 1 3 56SPARE 11 64 11 7 2 1 1 11TOTAL 67 67 67 46 15 2 4 67
OPERATING SPARES AS % OF SCH. 19.6%
DIVISION 6 SEASONAL SERVICE
EQUIPMENTSCHEDULE
*** NO SEASONAL ASSIGNMENTS FOR THIS PERIOD
12/4/2008 Page 12 of 50
LINE ASSIGNMENT OF BUSESDAILY EXCEPT SATURDAY AND SUNDAY
DIVISION 7-8 -8
SUPPLEMENT TO REPORT 4-12 79 21 29 46 15 2 192
LINE NO. AM BASE PM OWL 1245 4600 5000 5300 6300 7000 7300 7500 7600 7980 9200 9400 Total
2 32 18 26 10 9 8 2 29 -310 25 13 26 1 24 1 25 -114 22 13 25 2 17 7 24 -116 32 18 31 3 4 20 3 30 -220 3 2 2 -128 10 9 16 9 7 1630 2 0 -235 8 7 9 9 938 6 3 5 3 3 6217 9 9 15 2 10 5 15220 2 2 2 2 2305 4 3 4 4 4534 10 8 11 8 8 -3
00
SUBTOTAL 160 103 170 10 67 18 25 39 13 2 6 170SPARE 40 97 30 12 3 4 7 2 2 30TOTAL 200 200 200 79 21 29 46 15 2 8 200
OPERATING SPARES AS % OF SCH. 17.6%
DIVISION 7 SEASONAL SERVICE
DIVISION 7 RAPID SERVICE 13 4 31 48
LINE NO. AM BASE PM OWL 1245 4600 5000 5300 6300 7000 7300 7500 7600 7980 9200 9400 Total
704 22 15 26 26 26714 13 6 14 11 3 14
0
0
SUBTOTAL 35 21 40 11 3 26 40SPARE 13 27 8 2 1 5 8TOTAL 48 48 48 13 4 31 48
OPERATING SPARES AS % OF SCH. 20.0%
DIVISION 7 COMBINED REGULAR AND RAPID SERVICE
AM BASE PM OWL 1245 4600 5000 5300 6300 7000 7300 7500 7600 7980 9200 9400 Total
SUBTOTAL 195 124 210 10 67 18 36 39 13 5 6 26 210SPARE 53 124 38 12 3 6 7 2 1 2 5 38TOTAL 248 248 248 79 21 42 46 15 6 8 31 248
OPERATING SPARES AS % OF SCH. 18.1%
EQUIPMENT
EQUIPMENTSCHEDULE
COMBINED SCHEDULE
EQUIPMENTSCHEDULE
*** NO SEASONAL ASSIGNMENTS FOR THIS PERIOD
Page 13 of 50
LINE ASSIGNMENT OF BUSESDAILY EXCEPT SATURDAY AND SUNDAY
DIVISION 8-1 -1
SUPPLEMENT TO REPORT 4-12 96 46 142
LINE NO. AM BASE PM OWL 1200 4500 4600 7500 7600 7980 8000 8100 9200 9400 9500 Total
150 20 12 20 2 11 9 20152 23 8 24 23 23 -1154 3 3 3 3 3158 8 2 6 7 7 -1161 8 3 6 7 7 -1163 6 4 6 6 6164 7 5 12 12 12165 6 1 8 8 8166 14 5 13 6 7 13 -1168 2 2 2 2169 6 5 7 6 6 -1236 1 1 2 2 2243 8 3 6 2 5 7 -1245 8 2 7 6 6 -2645 1 0 -1
00
SUBTOTAL 121 54 122 2 83 39 122SPARE 22 89 21 14 7 21TOTAL 143 143 143 97 46 143
OPERATING SPARES AS % OF SCH. 17.2%
DIVISION 8 SEASONAL SERVICE
1 1DIVISION 18 RAPID SERVICE 8 18 26
LINE NO. AM BASE PM OWL 1200 4500 4600 7500 7600 7980 8000 9200 9400 9500 Total
741 6 3 6 6 6750 15 5 15 15 15
0
0
SUBTOTAL 21 8 21 6 15 21SPARE 4 17 4 1 3 4TOTAL 25 25 25 7 18 25
OPERATING SPARES AS % OF SCH. 19.0%32
DIVISION 8 METRO LINER 32 32
LINE NO. AM BASE PM OWL 1200 4500 4600 7500 7600 7980 8000 9200 9400 9500 Total
901 27 12 27 27 27
SUBTOTAL 27 12 27 27 27SPARE 5 20 5 5 5TOTAL 32 32 32 32 32
OPERATING SPARES AS % OF SCH. 18.5%
DIVISION 8 COMBINED REGULAR AND RAPID SERVICE
AM BASE PM OWL 1200 4500 4600 7500 7600 7980 8000 8100 9200 9400 9500 Total
SUBTOTAL 169 74 170 2 83 39 6 15 27 170SPARE 31 126 30 14 7 1 3 5 30TOTAL 200 200 200 97 46 7 18 32 200
OPERATING SPARES AS % OF SCH. 17.6%
EQUIPMENT
SCHEDULE EQUIPMENT
SCHEDULE
*** NO SEASONAL ASSIGNMENTS FOR THIS PERIOD
EQUIPMENT
EQUIPMENTSCHEDULE
COMBINED SCHEDULE
12/4/2008 Page 14 of 50
LINE ASSIGNMENT OF BUSESDAILY EXCEPT SATURDAY AND SUNDAY
DIVISION 9
SUPPLEMENT TO REPORT 4-12 20 40 18 139 217
LINE NO. AM BASE PM OWL 1200 1245 1900 2000 7000 7300 7500 7600 7980 8000 8100 9500 Total
70 19 15 18 2 6 12 1876 17 12 22 2 16 4 2 2278 22 13 24 1 4 19 24176 3 2 3 3 3180 4 4 6 6 6258 6 4 6 6 6260 18 13 20 20 20267 8 8 9 9 9268 6 3 7 7 7287 6 4 8 8 8484 16 10 19 19 19485 3 2 3 3 3487 11 4 11 2 9 11490 17 6 16 10 6 16620 3 3 3 3 3665 3 1 3 3 3687 7 5 7 7 7
0
0
SUBTOTAL 169 109 185 4 17 34 15 119 185SPARE 48 108 32 3 6 3 20 32TOTAL 217 217 217 20 40 18 139 217
OPERATING SPARES AS % OF SCH. 17.3%
DIVISION 9 SEASONAL SERVICE
DIVISION 9 RAPID SERVICE 21 21 42
LINE NO. AM BASE PM OWL 1200 1245 1900 2000 7000 7300 7500 7600 7980 8000 9500 Total
762 14 10 17 17 17770 18 16 18 18 18
0
0
SUBTOTAL 32 26 35 18 17 35SPARE 10 16 7 3 4 7TOTAL 42 42 42 21 21 42
OPERATING SPARES AS % OF SCH. 20.0%
DIVISION 9 COMBINED REGULAR AND RAPID SERVICE
AM BASE PM OWL 1200 1245 1900 2000 7000 7300 7500 7600 7980 8000 9500 Total
SUBTOTAL 201 135 220 4 35 34 15 136 220SPARE 58 124 39 6 6 3 24 39TOTAL 259 259 259 41 40 18 160 259
OPERATING SPARES AS % OF SCH. 17.7%
& - Santa Anita Race Track from 9-26-07 through 11-04-07 and 12-26-07 through 4-22-08.
EQUIPMENTSCHEDULE
*** NO SEASONAL ASSIGNMENTS FOR THIS PERIOD
EQUIPMENT
EQUIPMENTSCHEDULE
COMBINED SCHEDULE
12/4/2008 Page 15 of 50
LINE ASSIGNMENT OF BUSESDAILY EXCEPT SATURDAY AND SUNDAY
DIVISION 10-6 -6
SUPPLEMENT TO REPORT 4-12 85 8 5 9 33 5 145
LINE NO. AM BASE PM OWL 1200 1245 5300 6300 6700 7000 7300 7600 7980 9200 9400 9500 Total
2 10 8 11 7 4 114 26 17 30 7 26 4 3016 5 5 12 7 5 1220 21 15 20 2 2 18 2030 22 15 26 16 2 8 2633 23 18 29 6 3 26 29
00
SUBTOTAL 107 78 128 15 5 74 7 4 8 26 4 128SPARE 44 73 23 1 11 1 1 1 7 1 23TOTAL 151 151 151 6 85 8 5 9 33 5 151
OPERATING SPARES AS % OF SCH. 18.0%
DIVISION 10 SEASONAL SERVICE
1 -1DIVISION 10 RAPID SERVICE 33 4 60 97
LINE NO. AM BASE PM OWL 1200 1245 5300 6300 6700 7000 7300 7600 7980 9200 9400 9500 Total
720 49 36 51 51 51730 11 6 12 12 12920 19 19 15 4 19
0
SUBTOTAL 79 42 82 27 4 51 82SPARE 18 55 15 5 1 9 15TOTAL 97 97 97 32 5 60 97
OPERATING SPARES AS % OF SCH. 18.3%
DIVISION 10 COMBINED REGULAR AND RAPID SERVICE
AM BASE PM OWL 1200 1245 5300 6300 6700 7000 7300 7600 7980 9200 9400 9500 Total
SUBTOTAL 186 120 210 15 5 74 34 4 12 51 26 4 210SPARE 62 128 38 1 11 6 1 2 9 7 1 38TOTAL 248 248 248 6 85 40 5 14 60 33 5 248
OPERATING SPARES AS % OF SCH. 18.1%
EQUIPMENTSCHEDULE
*** NO SEASONAL ASSIGNMENTS FOR THIS PERIOD
EQUIPMENT
EQUIPMENTSCHEDULE
COMBINED SCHEDULE
12/4/2008 Page 16 of 50
LINE ASSIGNMENT OF BUSESDAILY EXCEPT SATURDAY AND SUNDAY
DIVISION 15
SUPPLEMENT TO REPORT 4-12 81 16 15 28 15 32 25 212
LINE NO. AM BASE PM OWL 1245 1900 4500 4600 5300 7000 7300 7500 7600 8000 9200 9400 Total
90 17 8 14 14 14 -392 7 7 15 2 13 13 -294 25 9 17 17 5 22 -3152 4 1 5 4 4 -1154 1 0 0 1 1156 6 4 6 2 5 5 -1158 1 1 1 1 1163 11 8 15 12 12 -3164 10 5 7 7 7 -3165 20 9 11 14 3 17 -3166 7 3 8 8 8169 1 0 0 1 1183 7 4 6 4 1 5 -2222 4 3 5 2 3 5224 10 5 11 11 11230 10 7 14 8 4 12 -2233 16 12 19 19 19234 7 5 13 9 2 11 -2236 5 4 7 5 5 -2290 2 2 2 2 2292 5 3 3 4 4 -1
0
SUBTOTAL 176 100 179 4 69 14 13 24 13 27 19 179SPARE 36 112 33 12 2 2 4 2 5 6 33TOTAL 212 212 212 81 16 15 28 15 32 25 212
OPERATING SPARES AS % OF SCH. 18.4%
DIVISION 15 SEASONAL SERVICE
DIVISION 15 RAPID SERVICE 2 6 29 13 25 75
LINE NO. AM BASE PM OWL 1245 1900 4500 4600 5300 7000 7300 7500 7600 8000 9200 9400 Total
724 9 5 9 2 2 5 9734 8 4 10 5 5 10750 6 2 6 6 6761 20 11 21 21 21794 15 8 17 17 17
SUBTOTAL 58 30 63 2 5 24 11 21 63SPARE 17 45 12 1 5 2 4 12TOTAL 75 75 75 2 6 29 13 25 75
OPERATING SPARES AS % OF SCH. 19.0%
DIVISION 15 COMBINED REGULAR AND RAPID SERVICE
AM BASE PM OWL 1245 1900 4500 4600 5300 7000 7300 7500 7600 8000 9200 9400 Total
SUBTOTAL 234 130 242 4 69 14 15 29 13 51 11 21 19 242SPARE 53 157 45 12 2 2 5 2 10 2 4 6 45TOTAL 287 287 287 81 16 17 34 15 61 13 25 25 287
OPERATING SPARES AS % OF SCH. 18.6%
EQUIPMENT
EQUIPMENTSCHEDULE
COMBINED SCHEDULE
EQUIPMENTSCHEDULE
*** NO SEASONAL ASSIGNMENTS FOR THIS PERIOD
12/4/2008 Page 17 of 50
LINE ASSIGNMENT OF BUSESDAILY EXCEPT SATURDAY AND SUNDAY
DIVISION 18-2 1 1
SUPPLEMENT TO REPORT 4-12 11 170 6 1 12 1 201
LINE NO. AM BASE PM OWL 1200 1245 5300 6300 7000 7300 7500 7600 7980 8000 8100 9200 9500 Total
40 28 16 26 2 25 1 2642 12 7 10 1 9 10111 21 17 24 1 22 22115 7 6 7 7 7117 12 11 14 13 13126 2 1 2 2202 4 4 4 4207 5 5 9 2 7 7210 17 13 22 20 20211 5 0 3 4 4212 8 7 8 8 8439 6 3 6 6 6442 2 2 2444 13 4 9 12 12445 4 3 4 4 4446 12 6 13 9 4 13550 10 5 12 7 5 12
000000
SUBTOTAL 168 103 172 5 9 147 7 9 172SPARE 33 98 29 2 23 1 3 29TOTAL 201 201 201 11 170 8 12 201
OPERATING SPARES AS % OF SCH. 16.9%
DIVISION 18 SEASONAL SERVICE
DIVISION 18 RAPID SERVICE 15 5 50 70
LINE NO. AM BASE PM OWL 1200 1245 5300 6300 7000 7300 7500 7600 7980 8000 9200 9500 Total
710 15 8 16 4 12 16711 10 7 12 12 12715 12 7 12 11 11740 19 10 19 20 20
SUBTOTAL 56 32 59 12 4 43 59SPARE 14 38 11 3 1 7 11TOTAL 70 70 70 15 5 50 70
OPERATING SPARES AS % OF SCH. 18.6%6
DIVISION 18 EXPRESS SERVICE 6 6
LINE NO. AM BASE PM OWL 1200 1245 5300 6300 7000 7300 7500 7600 7980 8000 9200 9500 Total
450X 5 0 5 5 5
SUBTOTAL 5 0 5 5 5SPARE 1 6 1 1 1TOTAL 6 6 6 6 6
OPERATING SPARES AS % OF SCH. 20.0%
DIVISION 18 COMBINED REGULAR AND RAPID SERVICE
AM BASE PM OWL 1200 1245 5300 6300 7000 7300 7500 7600 7980 8000 9200 9500 Total
SUBTOTAL 229 135 236 5 14 147 7 9 12 4 43 236SPARE 48 142 41 3 23 1 3 3 1 7 41TOTAL 277 277 277 17 170 8 12 15 5 50 277
OPERATING SPARES AS % OF SCH. 17.4%
EQUIPMENT
EQUIPMENTSCHEDULE
COMBINED SCHEDULE
EQUIPMENT
SCHEDULE EQUIPMENT
SCHEDULE
*** NO SEASONAL ASSIGNMENTS FOR THIS PERIOD
12/4/2008 Page 18 of 50
DIVISION LINE ASSIGNMENT REPORT
December 14, 2008
SATURDAY
LINE ASSIGNMENT OF BUSESSATURDAY SCHEDULE
DIVISION 112 23 14 24 295
SUPPLEMENT TO REPORT 4-12 12 23 14 24 295
LINE NO. AM BASE PM OWL 1245 1900 2000 7500 7600 7980 8000 8100 9200 9400 9500 Total
18 15 19 24 1 026 1 045 15 19 20 2 053 10 14 14 060 14 20 22 2 062 4 4 4 066 1 1 1 0265 3 3 3 0460 10 11 11 0
0
SUBTOTAL 72 91 99 6SPARE 45 26 18TOTAL 117 117 117
OPERATING SPARES AS % OF SCH. #DIV/0!
DIVISION 1 SEASONAL SERVICE
DIVISION 1 RAPID SERVICE
LINE NO. AM BASE PM OWL 1245 1900 2000 7500 7600 7980 8000 9200 9400 9500 Total
705 0 0 0753 0 0 0745 10 8 8760 7 9 9
SUBTOTAL 17 17 17SPARE 3 3 3TOTAL 20 20 20
OPERATING SPARES AS % OF SCH. #DIV/0!DIVISION 1 COMBINED REGULAR AND RAPID SERVICE
AM BASE PM OWL 1245 1900 2000 7500 7600 7980 8000 9200 9400 9500 Total
SUBTOTAL 89 108 116 6SPARE 48 29 21TOTAL 137 137 137
OPERATING SPARES AS % OF SCH. #DIV/0!
& - Santa Anita Race Track from 9-29-04 through 10-31-04
EQUIPMENT
EQUIPMENTSCHEDULE
COMBINED SCHEDULE
EQUIPMENTSCHEDULE
*** NO SEASONAL ASSIGNMENTS FOR THIS PERIOD
12/4/2008 Page 20 of 50
LINE ASSIGNMENT OF BUSESSATURDAY SCHEDULE
DIVISION 212 23 14 24 295
SUPPLEMENT TO REPORT 4-12 12 23 14 24 295
LINE NO. AM BASE PM OWL 1200 1245 1900 2000 7500 7600 7980 8000 8100 9200 9400 9500 Total
26 26 30 29 055 10 12 11 2 060 2 2 2 2 066 21 21 24 0102 3 3 3 0105 12 15 15 1 0120 3 3 3 0121 4 4 4 0124 0 0 0 0127 0 0 0 0200 10 11 12 0611 4 4 4 0612 4 4 4 0
00
SUBTOTAL 99 109 111 5SPARE 33 23 21TOTAL 132 132 132
OPERATING SPARES AS % OF SCH. #DIV/0!
DIVISION 2 SEASONAL SERVICE
DIVISION 2 SEASONAL SERVICE
LINE NO. AM BASE PM OWL 1200 1245 1900 2000 7500 7600 7980 8000 9200 9400 9500 Total
0
TOTAL = (Total Already Calculated Above)
DIVISION 2 RAPID SERVICE 44
LINE NO. AM BASE PM OWL 1200 1245 1900 2000 7500 7600 7980 8000 9200 9400 9500 Total
00
00
SUBTOTALSPARETOTAL
OPERATING SPARES AS % OF SCH. #DIV/0!
DIVISION 2 OTHER SERVICE 3
LINE NO. AM BASE PM OWL 1200 1245 1900 2000 7500 7600 7980 8000 9200 9400 9500 Total
SUBTOTALSPARETOTAL
OPERATING SPARES AS % OF SCH. #DIV/0!
DIVISION 2 COMBINED REGULAR AND RAPID SERVICE
AM BASE PM OWL 1200 1245 1900 2000 7500 7600 7980 8000 9200 9400 9500 Total
SUBTOTAL 99 109 111 5SPARE 33 23 21TOTAL 132 132 132
OPERATING SPARES AS % OF SCH. #DIV/0!
EQUIPMENT
*** MAXIMUM SEASONAL ASSIGNMENTS INCLUDED IN SUBTOTALS
SCHEDULE EQUIPMENT
SCHEDULE
*** NO SEASONAL ASSIGNMENTS FOR THIS PERIOD
EQUIPMENT
EQUIPMENT
EQUIPMENT
SCHEDULE
SCHEDULE
COMBINED SCHEDULE
12/4/2008 Page 21 of 50
LINE ASSIGNMENT OF BUSESSATURDAY SCHEDULE
DIVISION 312 10 14 -2 -25 231
SUPPLEMENT TO REPORT 4-12 12 23 14 24 295
LINE NO. AM BASE PM OWL 1200 1245 1900 2000 7500 7600 7980 8000 8100 9200 9400 9500 Total
81 17 18 1883 7 9 9 284 11 12 12 1175 --- --- --- ---180 9 10 11 2201 2 2 2206 5 5 5251 9 9 9 2252 3 3 3485 5 5 5685 --- --- --- ---
SUBTOTAL 68 73 74 7SPARE 20 15 14TOTAL 88 88 88
OPERATING SPARES AS % OF SCH. #DIV/0!
DIVISION 3 SEASONAL SERVICE
LINE NO. AM BASE PM OWL 1200 1245 1900 2000 7500 7600 7980 8000 9200 9400 9500 Total
79X * 0 0 0 0 0TOTAL = (Total Already Calculated Above) 0 0 0 0
DIVISION 3 RAPID SERVICE 44
LINE NO. AM BASE PM OWL 1200 1245 1900 2000 7500 7600 7980 8000 9200 9400 9500 Total
728 --- --- --- --- 21 21751 5 6 6 11 11780 9 11 11 22 22
0
SUBTOTAL 14 17 17 11 22 21 54SPARE 6 3 3 2 4 4 10TOTAL 20 20 20 13 26 25 64
OPERATING SPARES AS % OF SCH. 18.5%
DIVISION 3 COMBINED REGULAR AND RAPID SERVICE
AM BASE PM OWL 1200 1245 1900 2000 7500 7600 7980 8000 9200 9400 9500 Total
SUBTOTAL 82 90 91 7 11 22 21 54SPARE 26 18 17 2 4 4 10TOTAL 108 108 108 13 26 25 64
OPERATING SPARES AS % OF SCH. 18.5%
EQUIPMENT
EQUIPMENT
EQUIPMENT
SCHEDULE
SCHEDULE
COMBINED SCHEDULE
EQUIPMENT
*** MAXIMUM SEASONAL ASSIGNMENTS INCLUDED IN SUBTOTALS
SCHEDULE
12/4/2008 Page 22 of 50
LINE ASSIGNMENT OF BUSESSATURDAY SCHEDULE
DIVISION 512 23 14 24 77
SUPPLEMENT TO REPORT 4-12 12 23 14 24 295
LINE NO. AM BASE PM OWL 1200 1245 1900 2000 7500 7600 7980 8000 8100 9200 9400 9500 Total
108 11 13 14 30110 9 9 9 25115 7 9 10 2 19204 9 11 13 4 24 24206 3 3 3 17207 15 15 17 15209 2212 7 9 9 13305 2 2 2 0
00000000000000
SUBTOTAL 63 71 77 4 26 145SPARE 28 20 14 5 27TOTAL 91 91 91 31 172
OPERATING SPARES AS % OF SCH. 18.6%
DIVISION 5 SEASONAL SERVICE
DIVISION 5 RAPID SERVICE 44
LINE NO. AM BASE PM OWL 1200 1245 1900 2000 7500 7600 7980 8000 9200 9400 9500 Total
754 11 12 12 24 24757 7 7 7 14 14
0
0
SUBTOTAL 18 19 19 38 38SPARE 5 4 4 8 8TOTAL 23 23 23 46 46
OPERATING SPARES AS % OF SCH. 21.1%
DIVISION 5 COMBINED REGULAR AND RAPID SERVICE
AM BASE PM OWL 1200 1245 1900 2000 7500 7600 7980 8000 9200 9400 9500 Total
SUBTOTAL 81 90 96 4 38 26 183SPARE 33 24 18 8 5 35TOTAL 114 114 114 46 31 218
OPERATING SPARES AS % OF SCH. 19.1%
EQUIPMENTSCHEDULE
*** NO SEASONAL ASSIGNMENTS FOR THIS PERIOD
EQUIPMENT
EQUIPMENTSCHEDULE
COMBINED SCHEDULE
12/4/2008 Page 23 of 50
LINE ASSIGNMENT OF BUSESSATURDAY SCHEDULE
DIVISION 612 23 14 24 214
SUPPLEMENT TO REPORT 4-12 12 23 14 24 295
LINE NO. AM BASE PM OWL 1200 1245 1900 2000 7500 7600 7980 8000 8100 9200 9400 9500 Total
2 --- --- --- --- 4 1 2220 --- --- --- --- 11 1128 22 2230 --- --- --- --- 13 1333 --- --- --- --- 035 0217 0534 0
000000
SUBTOTAL 50 1 68SPARE 10 13TOTAL 60 1 81
OPERATING SPARES AS % OF SCH. 19.1%
DIVISION 6 SEASONAL SERVICE
* Hollywood Bowl (Seasonal service operated only 06-XX-04 through 09-XX-04)** Hollywood Bowl Extra Service (Seasonal service operated only 06-XX-04 through 09-XX-04)++ BDOF LINE
EQUIPMENTSCHEDULE
*** NO SEASONAL ASSIGNMENTS FOR THIS PERIOD
12/4/2008 Page 24 of 50
LINE ASSIGNMENT OF BUSESSATURDAY SCHEDULE
DIVISION 7-3 18 -1 24 53
SUPPLEMENT TO REPORT 4-12 12 23 14 24 295
LINE NO. AM BASE PM OWL 1245 1900 2000 7500 7600 7980 8000 8100 9200 9400 9500 Total
2 10 11 10 5 1 6 2110 13 15 16 1 1314 17 17 16 2 2 3116 13 14 16 2320 3 828 13 14 16 030 2 1135 4 6 8 738 3 3 4 6 16217 9 13 14 2 2220 2 2 2 3305 2 2 2 2 10534 6 6 6 5 5
00
SUBTOTAL 92 103 110 10 13 1 13 150SPARE 38 27 20 2 2 27TOTAL 130 130 130 15 1 15 177
OPERATING SPARES AS % OF SCH. 18.0%
DIVISION 7 SEASONAL SERVICE
DIVISION 7 RAPID SERVICE 44
LINE NO. AM BASE PM OWL 1245 1900 2000 7500 7600 7980 8000 9200 9400 9500 Total
704 13 13 14 25 25714 0 3 7
0 220
SUBTOTAL 13 13 14 3 25 54SPARE 4 4 3 1 5 11TOTAL 17 17 17 4 30 65
OPERATING SPARES AS % OF SCH. 20.4%
DIVISION 7 COMBINED REGULAR AND RAPID SERVICE
AM BASE PM OWL 1245 1900 2000 7500 7600 7980 8000 9200 9400 9500 Total
SUBTOTAL 105 116 124 10 13 4 13 25 204SPARE 42 31 23 2 1 2 5 38TOTAL 147 147 147 15 5 15 30 242
OPERATING SPARES AS % OF SCH. 18.6%
EQUIPMENTSCHEDULE
*** NO SEASONAL ASSIGNMENTS FOR THIS PERIOD
EQUIPMENT
EQUIPMENTSCHEDULE
COMBINED SCHEDULE
12/4/2008 Page 25 of 50
LINE ASSIGNMENT OF BUSESDAILY EXCEPT SATURDAY AND SUNDAY
DIVISION 812 13 14 5 88
SUPPLEMENT TO REPORT 4-12 12 23 14 24 295
LINE NO. AM BASE PM OWL 1200 1245 1900 2000 7500 7600 7980 8000 8100 9200 9400 9500 Total
150 11 11 12 2 23152 5 5 5 18154 --- --- --- --- 3158 1 1 1 4161 3 3 4 10163 5 4 4 8164 3 4 4 0165 4 4 5 21166 6 6 6 7168 --- --- --- --- 2169 --- --- --- --- 6236 2 2 2 3243 3 3 3 6245 3 3 3 12645 --- --- --- --- 0
00
SUBTOTAL 46 46 49 2 123SPARE 12 12 9 23TOTAL 58 58 58 146
OPERATING SPARES AS % OF SCH. 18.7%
DIVISION 8 SEASONAL SERVICE
DIVISION 18 RAPID SERVICE 44
LINE NO. AM BASE PM OWL 1200 1245 1900 2000 7500 7600 7980 8000 9200 9400 9500 Total
741 --- --- --- --- 8 8750 12 8 9 16 16
0
SUBTOTAL 12 8 9 8 16 24SPARE 2 6 5 2 3 5TOTAL 14 14 14 10 19 29
OPERATING SPARES AS % OF SCH. 20.8%
DIVISION 8 METRO LINER 3
LINE NO. AM BASE PM OWL 1200 1245 1900 2000 7500 7600 7980 8000 9200 9400 9500 Total
901 11 11 12 27 27
SUBTOTAL 11 11 12 27 27SPARE 3 3 2 5 5TOTAL 14 14 14 32 32
OPERATING SPARES AS % OF SCH. 18.5%
DIVISION 8 COMBINED REGULAR AND RAPID SERVICE
AM BASE PM OWL 1200 1245 1900 2000 7500 7600 7980 8000 9200 9400 9500 Total
SUBTOTAL 69 65 70 2 8 16 27 174SPARE 17 21 16 2 3 5 33TOTAL 86 86 86 10 19 32 207
OPERATING SPARES AS % OF SCH. 19.0%
EQUIPMENT
EQUIPMENTSCHEDULE
COMBINED SCHEDULE
EQUIPMENT
SCHEDULE EQUIPMENT
SCHEDULE
*** NO SEASONAL ASSIGNMENTS FOR THIS PERIOD
12/4/2008 Page 26 of 50
LINE ASSIGNMENT OF BUSESSATURDAY SCHEDULE
DIVISION 9-6 -124 14 24 58
SUPPLEMENT TO REPORT 4-12 12 23 14 24 295
LINE NO. AM BASE PM OWL 1200 1245 1900 2000 7500 7600 7980 8000 8100 9200 9400 9500 Total
70 14 14 14 2 10 1476 12 12 12 2 2 15 2178 12 13 13 18176 --- --- --- --- 3180 4 5 5 2258 --- --- --- --- 7 7260 12 13 13 3 5267 4 4 4 27 27268 3 3 3 7 7287 --- --- --- --- 12 12484 11 11 13 5485 --- --- --- --- 18 19487 4 4 4 5 5490 3 3 3 3620 --- --- --- --- 3 12665 1 1 1 4687 4 4 4 12 12
50
0
SUBTOTAL 84 87 89 4 15 110 185SPARE 21 18 16 3 21 36TOTAL 105 105 105 18 131 221
OPERATING SPARES AS % OF SCH. 19.5%
DIVISION 9 SEASONAL SERVICE
LINE NO. AM BASE PM OWL 1200 1245 1900 2000 7500 7600 7980 8000 9200 9400 9500 Total
79X 0 4 40
TOTAL = (Total Already Calculated Above) 0 4 4
DIVISION 9 RAPID SERVICE 44
LINE NO. AM BASE PM OWL 1200 1245 1900 2000 7500 7600 7980 8000 9200 9400 9500 Total
762 9 9 9 13 13770 11 11 11 0
00
SUBTOTAL 20 20 20 13 13SPARE 4 4 4 3 3TOTAL 24 24 24 16 16
OPERATING SPARES AS % OF SCH. 23.1%
DIVISION 9 COMBINED REGULAR AND RAPID SERVICE
AM BASE PM OWL 1200 1245 1900 2000 7500 7600 7980 8000 9200 9400 9500 Total
SUBTOTAL 104 107 109 4 15 123 198SPARE 25 22 20 3 24 39TOTAL 129 129 129 18 147 237
OPERATING SPARES AS % OF SCH. 19.7%
EQUIPMENT
EQUIPMENT
EQUIPMENT
SCHEDULE
SCHEDULE
COMBINED SCHEDULE
EQUIPMENT
*** MAXIMUM SEASONAL ASSIGNMENTS INCLUDED IN SUBTOTALS
SCHEDULE
12/4/2008 Page 27 of 50
LINE ASSIGNMENT OF BUSESSATURDAY SCHEDULE
DIVISION 1012 14 9 24 -8 61
SUPPLEMENT TO REPORT 4-12 12 23 14 24 295
LINE NO. AM BASE PM OWL 1200 1245 1900 2000 7500 7600 7980 8000 8100 9200 9400 9500 Total
2 7 8 10 314 17 19 22 7 32 4 3616 4 5 9 1820 15 16 16 2 5 530 15 19 23 1133 21 24 26 6 29
3 3 8000
SUBTOTAL 79 91 106 15 8 3 32 4 138SPARE 47 35 20 1 2 6 1 28TOTAL 126 126 126 9 5 38 5 166
OPERATING SPARES AS % OF SCH. 20.3%
DIVISION 10 SEASONAL SERVICE
DIVISION 10 RAPID SERVICE 44
LINE NO. AM BASE PM OWL 1200 1245 1900 2000 7500 7600 7980 8000 9200 9400 9500 Total
720 27 32 32 3 3730 0 0 0 54 54920 0 0
SUBTOTAL 27 32 32 54 3 57SPARE 11 6 6 11 11TOTAL 38 38 38 65 3 68
OPERATING SPARES AS % OF SCH. 19.3%
DIVISION 10 COMBINED REGULAR AND RAPID SERVICE
AM BASE PM OWL 1200 1245 1900 2000 7500 7600 7980 8000 9200 9400 9500 Total
SUBTOTAL 106 123 138 15 8 3 54 32 7 195SPARE 58 41 26 1 2 11 6 1 39TOTAL 164 164 164 9 5 65 38 8 234
OPERATING SPARES AS % OF SCH. 20.0%
EQUIPMENT
EQUIPMENTSCHEDULE
COMBINED SCHEDULE
EQUIPMENTSCHEDULE
*** NO SEASONAL ASSIGNMENTS FOR THIS PERIOD
12/4/2008 Page 28 of 50
LINE ASSIGNMENT OF BUSESSATURDAY SCHEDULE
DIVISION 15-3 -25 14 15 6
SUPPLEMENT TO REPORT 4-12 12 23 14 24 295
LINE NO. AM BASE PM OWL 1200 1245 1900 2000 7500 7600 7980 8000 8100 9200 9400 9500 Total
90 8 9 9 1692 6 7 8 2 1494 16 17 16 8 33152 3 4 4 3 12154 --- --- --- --- 1156 4 4 4 2 7 7158 1 1 1 --- 1163 7 7 7 10164 5 5 5 8165 2 2 2 14166 2 2 3 11169 0 0 0 1183 2 2 2 --- 5222 2 2 2 6 16224 8 9 9 4 13230 4 4 5 18 18233 9 11 10 9 2 11234 6 6 6 5236 --- --- --- --- 3 3290 --- --- --- --- 5 5292 3 3 3 0
0
SUBTOTAL 88 95 96 4 13 34 18 204SPARE 26 19 18 2 6 4 38TOTAL 114 114 114 15 40 22 242
OPERATING SPARES AS % OF SCH. 18.6%
DIVISION 15 SEASONAL SERVICE
DIVISION 15 RAPID SERVICE 44
LINE NO. AM BASE PM OWL 1200 1245 1900 2000 7500 7600 7980 8000 9200 9400 9500 Total
724 --- --- --- --- 7 11734 --- --- --- --- 7 7750 --- --- --- --- 21 21761 9 10 10794 --- --- --- --- 0
SUBTOTAL 9 10 10 7 7 21 39SPARE 3 2 2 1 2 4 8TOTAL 12 12 12 8 9 25 47
OPERATING SPARES AS % OF SCH. 20.5%
DIVISION 15 COMBINED REGULAR AND RAPID SERVICE
AM BASE PM OWL 1200 1245 1900 2000 7500 7600 7980 8000 9200 9400 9500 Total
SUBTOTAL 97 105 106 4 13 41 7 21 18 243SPARE 29 21 20 2 7 2 4 4 46TOTAL 126 126 126 15 48 9 25 22 289
OPERATING SPARES AS % OF SCH. 18.9%
EQUIPMENTSCHEDULE
*** NO SEASONAL ASSIGNMENTS FOR THIS PERIOD
EQUIPMENT
EQUIPMENTSCHEDULE
COMBINED SCHEDULE
12/4/2008 Page 29 of 50
LINE ASSIGNMENT OF BUSESSATURDAY SCHEDULE
DIVISION 1814 10 -24
SUPPLEMENT TO REPORT 4-12 12 23 14 24 295
LINE NO. AM BASE PM OWL 1200 1245 1900 2000 7500 7600 7980 8000 8100 9200 9400 9500 Total
40 13 22 19 2 2 2042 7 8 9 3 3111 10 16 16 1 1 5 13115 3 5 4 22117 9 12 16 11126 14202 4207 2 3210 11 14 18 2211 3212 1 1 3 15439 3 3 3 20442 3444 4 4 4 2 11445 3 4 2 3 3446 4 4 7 6 6550 5 5 7 3
1 143
143 3
01 2
SUBTOTAL 73 98 108 5 10 17 192SPARE 55 30 20 2 3 37TOTAL 128 128 128 128 12 20 229
OPERATING SPARES AS % OF SCH. 19.3%
DIVISION 18 SEASONAL SERVICE
DIVISION 18 RAPID SERVICE 44
LINE NO. AM BASE PM OWL 1200 1245 1900 2000 7500 7600 7980 8000 9200 9400 9500 Total
710 7 8 8 15711 6 7 7 12 12715 20 20740 13 14 14
2 4
SUBTOTAL 26 29 29 2 12 20 51SPARE 9 6 6 1 2 4 10TOTAL 35 35 35 3 14 24 61
OPERATING SPARES AS % OF SCH. 19.6%
DIVISION 18 EXPRESS SERVICE 3
LINE NO. AM BASE PM OWL 1200 1245 1900 2000 7500 7600 7980 8000 9200 9400 9500 Total
450X 4
SUBTOTAL 4SPARE 1TOTAL 5
OPERATING SPARES AS % OF SCH. 25.0%
DIVISION 18 COMBINED REGULAR AND RAPID SERVICE
AM BASE PM OWL 1200 1245 1900 2000 7500 7600 7980 8000 9200 9400 9500 Total
SUBTOTAL 99 127 137 5 10 19 12 20 247SPARE 64 36 26 2 4 2 4 48TOTAL 163 163 163 12 23 14 24 295
OPERATING SPARES AS % OF SCH. 19.4%
EQUIPMENT
SCHEDULE EQUIPMENT
SCHEDULE
*** NO SEASONAL ASSIGNMENTS FOR THIS PERIOD
EQUIPMENT
EQUIPMENTSCHEDULE
COMBINED SCHEDULE
12/4/2008 Page 30 of 50
DIVISION LINE ASSIGNMENT REPORT
December 14, 2008
SUNDAY
LINE ASSIGNMENT OF BUSESSUNDAY SCHEDULE
DIVISION 124 295
SUPPLEMENT TO REPORT 4-12 24 295
LINE NO. AM BASE PM OWL 1200 1245 1900 2000 2300 3000 4100 8000 8100 9200 9400 9500 Total
18 12 15 15 1 026 1 045 10 13 15 2 053 7 9 10 060 10 13 14 2 062 4 4 4 066 1 1 1 0265 3 3 3 0460 7 8 10 0
0 0 0
SUBTOTAL 54 66 72 6SPARE 31 19 13TOTAL 85 85 85
OPERATING SPARES AS % OF SCH. #DIV/0!
DIVISION 1 SEASONAL SERVICE
DIVISION 1 RAPID SERVICE
LINE NO. AM BASE PM OWL 1200 1245 1900 2000 2300 3000 8000 9200 9400 9500 Total
705 0 0 0753 0 0 0745 7 7 7760 6 6 7
SUBTOTAL 13 13 14SPARE 4 4 3TOTAL 17 17 17
OPERATING SPARES AS % OF SCH. #DIV/0!DIVISION 1 COMBINED REGULAR AND RAPID SERVICE
AM BASE PM OWL 1200 1245 1900 2000 2300 3000 8000 9200 9400 9500 Total
SUBTOTAL 67 79 86 6SPARE 35 23 16TOTAL 102 102 102
OPERATING SPARES AS % OF SCH. #DIV/0!
EQUIPMENTSCHEDULE
*** NO SEASONAL ASSIGNMENTS FOR THIS PERIOD
EQUIPMENT
EQUIPMENTSCHEDULE
COMBINED SCHEDULE
12/4/2008 Page 32 of 50
LINE ASSIGNMENT OF BUSESSUNDAY SCHEDULE
DIVISION 224 295
SUPPLEMENT TO REPORT 4-12 24 295
LINE NO. AM BASE PM OWL 1200 1245 1900 2000 2300 3000 4100 8000 8100 9200 9400 9500 Total
26 14 19 20 055 7 9 9 2 060 0 0 0 2 066 10 13 14 0102 3 3 3 0105 8 11 10 1 0120 3 3 3 0121 4 4 4 0124 0 0 0 0127 0 0 0 0200 7 10 10 0611 4 4 4 0612 4 4 4 0
0
0
SUBTOTAL 64 80 81 5SPARE 32 16 15TOTAL 96 96 96
OPERATING SPARES AS % OF SCH. #DIV/0!
DIVISION 2 SEASONAL SERVICE
EQUIPMENTSCHEDULE
*** NO SEASONAL ASSIGNMENTS FOR THIS PERIOD
12/4/2008 Page 33 of 50
LINE ASSIGNMENT OF BUSESSUNDAY SCHEDULE
DIVISION 3-2 -25 231
SUPPLEMENT TO REPORT 4-12 24 295
LINE NO. AM BASE PM OWL 1200 1245 1900 2000 2300 3000 4100 8000 8100 9200 9400 9500 Total
81 11 16 1683 6 7 7 284 9 13 14 1175 --- --- --- ---180 6 9 9 2201 2 2 2206 5 5 5251 8 10 10 2252 3 3 3485 5 5 5685 --- --- --- ---
SUBTOTAL 55 70 71 7SPARE 29 14 13TOTAL 84 84 84
OPERATING SPARES AS % OF SCH. #DIV/0!
DIVISION 3 SEASONAL SERVICE
LINE NO. AM BASE PM OWL 1200 1245 1900 2000 2300 3000 8000 9200 9400 9500 Total
79X * 0 0 0 0 0TOTAL = (Total Already Calculated Above) 0 0 0 0
DIVISION 3 RAPID SERVICE
LINE NO. AM BASE PM OWL 1200 1245 1900 2000 2300 3000 8000 9200 9400 9500 Total
728 --- --- --- --- 21 21751 --- --- --- --- 11780 9 10 10 22 22
0
SUBTOTAL 9 10 10 22 21 54SPARE 3 2 2 4 4 10TOTAL 12 12 12 26 25 64
OPERATING SPARES AS % OF SCH. 18.5%
DIVISION 3 COMBINED REGULAR AND RAPID SERVICE
AM BASE PM OWL 1200 1245 1900 2000 2300 3000 8000 9200 9400 9500 Total
SUBTOTAL 64 80 81 7 22 21 54SPARE 32 16 15 4 4 10TOTAL 96 96 96 26 25 64
OPERATING SPARES AS % OF SCH. 18.5%
EQUIPMENT
*** MAXIMUM SEASONAL ASSIGNMENTS INCLUDED IN SUBTOTALS
SCHEDULE
EQUIPMENT
EQUIPMENT
EQUIPMENT
SCHEDULE
SCHEDULE
COMBINED SCHEDULE
12/4/2008 Page 34 of 50
LINE ASSIGNMENT OF BUSESSUNDAY SCHEDULE
DIVISION 524 77
SUPPLEMENT TO REPORT 4-12 24 295
LINE NO. AM BASE PM OWL 1200 1245 1900 2000 2300 3000 4100 8000 8100 9200 9400 9500 Total
108 9 10 11 30110 5 6 6 25115 5 7 7 2 19204 9 11 11 4 24 24206 3 3 3 17207 9 11 13 15209 --- 2212 5 5 5 13305 2 2 2 0
00
SUBTOTAL 47 55 58 4 26 145SPARE 22 14 11 5 27TOTAL 69 69 69 31 172
OPERATING SPARES AS % OF SCH. 18.6%
DIVISION 5 SEASONAL SERVICE
DIVISION 5 RAPID SERVICE
LINE NO. AM BASE PM OWL 1200 1245 1900 2000 2300 3000 8000 9200 9400 9500 Total
754 8 9 9 24 24757 7 7 7 14 14
00
SUBTOTAL 15 16 16 38 38SPARE 4 3 3 8 8TOTAL 19 19 19 46 46
OPERATING SPARES AS % OF SCH. 21.1%
DIVISION 5 OTHER SERVICE
LINE NO. AM BASE PM OWL 1200 1245 1900 2000 2300 3000 8000 9200 9400 9500 Total
SUBTOTALSPARETOTAL
OPERATING SPARES AS % OF SCH. #DIV/0!
DIVISION 5 COMBINED REGULAR AND RAPID SERVICE
AM BASE PM OWL 1200 1245 1900 2000 2300 3000 8000 9200 9400 9500 Total
SUBTOTAL 62 71 74 4 38 26 183SPARE 26 17 14 8 5 35TOTAL 88 88 88 46 31 218
OPERATING SPARES AS % OF SCH. 19.1%
EQUIPMENT
EQUIPMENTSCHEDULE
COMBINED SCHEDULE
EQUIPMENT
SCHEDULE EQUIPMENT
SCHEDULE
*** NO SEASONAL ASSIGNMENTS FOR THIS PERIOD
12/4/2008 Page 35 of 50
LINE ASSIGNMENT OF BUSESSUNDAY SCHEDULE
DIVISION 624 214
SUPPLEMENT TO REPORT 4-12 24 295
LINE NO. AM BASE PM OWL 1200 1245 1900 2000 2300 3000 4100 8000 8100 9200 9400 9500 Total
2 --- --- --- --- 4 1 17 2220 --- --- --- --- 11 1128 22 2230 --- --- --- --- 13 1333 --- --- --- --- 035 0217 0534 0
000000
SUBTOTAL 50 1 17 68SPARE 10 3 13TOTAL 60 1 20 81
OPERATING SPARES AS % OF SCH. 19.1%
DIVISION 6 SEASONAL SERVICE
EQUIPMENTSCHEDULE
*** NO SEASONAL ASSIGNMENTS FOR THIS PERIOD
12/4/2008 Page 36 of 50
LINE ASSIGNMENT OF BUSESSUNDAY SCHEDULE
DIVISION 724 -1649
SUPPLEMENT TO REPORT 4-12 24 295
LINE NO. AM BASE PM OWL 1200 1245 1900 2000 2300 3000 4100 8000 8100 9200 9400 9500 Total
2 6 8 9 2110 7 10 10 1 1314 14 14 14 2 3116 7 8 7 2320 3 828 9 13 13 030 2 1135 4 6 7 738 3 3 3 16217 7 11 11 2 2220 3305 2 2 2 10534 3 3 5 5
00
SUBTOTAL 62 78 81 10 150SPARE 34 18 15 27TOTAL 96 96 96 177
OPERATING SPARES AS % OF SCH. 18.0%
DIVISION 7 SEASONAL SERVICE
DIVISION 7 RAPID SERVICE
LINE NO. AM BASE PM OWL 1200 1245 1900 2000 2300 3000 8000 9200 9400 9500 Total
704 8 12 13 0 0 704 0 0 0 25 25714 0 0 0 714 0 0 0 7
0 0 0 0 0 0 0 220
SUBTOTAL 8 12 13 1418 25 1472SPARE 8 4 3 284 5 295TOTAL 16 16 16 1702 30 1767
OPERATING SPARES AS % OF SCH. 20.0%
DIVISION 7 COMBINED REGULAR AND RAPID SERVICE
AM BASE PM OWL 1200 1245 1900 2000 2300 3000 8000 9200 9400 9500 Total
SUBTOTAL 70 90 94 10 1418 25 1622SPARE 42 22 18 284 5 322TOTAL 112 112 112 1702 30 1944
OPERATING SPARES AS % OF SCH. 19.9%
EQUIPMENT
EQUIPMENTSCHEDULE
COMBINED SCHEDULE
EQUIPMENTSCHEDULE
*** NO SEASONAL ASSIGNMENTS FOR THIS PERIOD
12/4/2008 Page 37 of 50
LINE ASSIGNMENT OF BUSESSUNDAY SCHEDULE
DIVISION 85 88
SUPPLEMENT TO REPORT 4-12 24 295
LINE NO. AM BASE PM OWL 1200 1245 1900 2000 2300 3000 4100 8000 8100 9200 9400 9500 Total
150 10 10 14 2 23152 6 6 7 18154 --- --- --- --- 3158 2 2 2 4161 2 3 3 10163 8164 5 5 7 0165 4 4 4 21166 3 3 3 7168 --- --- --- --- 2169 --- --- --- --- 6236 2 2 2 3243 --- --- --- --- 6245 --- --- --- --- 12645 --- --- --- --- 0
00
SUBTOTAL 34 35 42 2 123SPARE 16 15 8 23TOTAL 50 50 50 146
OPERATING SPARES AS % OF SCH. 18.7%
DIVISION 8 SEASONAL SERVICE
DIVISION 18 RAPID SERVICE
LINE NO. AM BASE PM OWL 1200 1245 1900 2000 2300 3000 8000 9200 9400 9500 Total
741 --- --- --- --- 8750 7 6 7 16 16
00
SUBTOTAL 7 6 7 16 24SPARE 1 2 1 3 5TOTAL 8 8 8 19 29
OPERATING SPARES AS % OF SCH. 20.8%
DIVISION 8 METRO LINER
LINE NO. AM BASE PM OWL 1200 1245 1900 2000 2300 3000 8000 9200 9400 9500 Total
901 11 11 12 27 27
SUBTOTAL 11 11 12 27 27SPARE 3 3 2 5 5TOTAL 14 14 14 32 32
OPERATING SPARES AS % OF SCH. 18.5%
DIVISION 8 COMBINED REGULAR AND RAPID SERVICE
AM BASE PM OWL 1200 1245 1900 2000 2300 3000 8000 9200 9400 9500 Total
SUBTOTAL 52 52 61 2 16 27 174SPARE 20 20 11 3 5 33TOTAL 72 72 72 19 32 207
OPERATING SPARES AS % OF SCH. 19.0%
EQUIPMENT
SCHEDULE EQUIPMENT
SCHEDULE
*** NO SEASONAL ASSIGNMENTS FOR THIS PERIOD
EQUIPMENT
EQUIPMENTSCHEDULE
COMBINED SCHEDULE
12/4/2008 Page 38 of 50
LINE ASSIGNMENT OF BUSESSUNDAY SCHEDULE
DIVISION 924 58
SUPPLEMENT TO REPORT 4-12 24 295
LINE NO. AM BASE PM OWL 1200 1245 1900 2000 2300 3000 4100 8000 8100 9200 9400 9500 Total
70 15 16 16 2 1476 9 11 11 2 2178 10 12 12 18176 --- --- --- --- 3180 4 5 5 2258 --- --- --- --- 7260 11 15 15 5267 4 4 4 27268 3 3 3 7287 --- --- --- --- 12484 7 7 10 5485 --- --- --- --- 19487 4 4 4 5490 3 3 3 3620 --- --- --- --- 12665 1 1 1 4687 4 4 4 12
50
0
SUBTOTAL 75 85 88 4 185SPARE 29 19 16 36TOTAL 104 104 104 221
OPERATING SPARES AS % OF SCH. 19.5%
DIVISION 9 SEASONAL SERVICE
LINE NO. AM BASE PM OWL 1200 1245 1900 2000 2300 3000 8000 9200 9400 9500 Total
79X 0 40
TOTAL = (Total Already Calculated Above) 0 4
DIVISION 9 RAPID SERVICE
LINE NO. AM BASE PM OWL 1200 1245 1900 2000 2300 3000 8000 9200 9400 9500 Total
762 --- --- --- --- 13770 --- --- --- --- 0
00
SUBTOTAL 13SPARE 3TOTAL 16
OPERATING SPARES AS % OF SCH. 23.1%
DIVISION 9 COMBINED REGULAR AND RAPID SERVICE
AM BASE PM OWL 1200 1245 1900 2000 2300 3000 8000 9200 9400 9500 Total
SUBTOTAL 75 85 88 4 198SPARE 29 19 16 39TOTAL 104 104 104 237
OPERATING SPARES AS % OF SCH. 19.7%
EQUIPMENT
*** MAXIMUM SEASONAL ASSIGNMENTS INCLUDED IN SUBTOTALS
SCHEDULE
EQUIPMENT
EQUIPMENT
EQUIPMENT
SCHEDULE
SCHEDULE
COMBINED SCHEDULE
12/4/2008 Page 39 of 50
LINE ASSIGNMENT OF BUSESSUNDAY SCHEDULE
DIVISION 1024 -8 61
SUPPLEMENT TO REPORT 4-12 24 295
LINE NO. AM BASE PM OWL 1200 1245 1900 2000 2300 3000 4100 8000 8100 9200 9400 9500 Total
2 5 7 7 314 11 14 17 7 32 4 3616 5 7 7 1820 15 16 15 2 530 12 20 20 1133 16 22 24 6 29
8000
SUBTOTAL 64 86 90 15 32 4 138SPARE 43 21 17 6 1 28TOTAL 107 107 107 38 5 166
OPERATING SPARES AS % OF SCH. 20.3%
DIVISION 10 SEASONAL SERVICE
DIVISION 10 RAPID SERVICE
LINE NO. AM BASE PM OWL 1200 1245 1900 2000 2300 3000 8000 9200 9400 9500 Total
720 22 26 27 3 3730 0 0 0 54 54920 --- --- --- ---
00
SUBTOTAL 22 26 27 54 3 57SPARE 10 6 5 11 11TOTAL 32 32 32 65 3 68
OPERATING SPARES AS % OF SCH. 19.3%
DIVISION 10 COMBINED REGULAR AND RAPID SERVICE
AM BASE PM OWL 1200 1245 1900 2000 2300 3000 8000 9200 9400 9500 Total
SUBTOTAL 86 112 117 15 54 32 7 195SPARE 53 27 22 11 6 1 39TOTAL 139 139 139 65 38 8 234
OPERATING SPARES AS % OF SCH. 20.0%
EQUIPMENTSCHEDULE
*** NO SEASONAL ASSIGNMENTS FOR THIS PERIOD
EQUIPMENT
EQUIPMENTSCHEDULE
COMBINED SCHEDULE
12/4/2008 Page 40 of 50
LINE ASSIGNMENT OF BUSESSUNDAY SCHEDULE
DIVISION 1515 6
SUPPLEMENT TO REPORT 4-12 24 295
LINE NO. AM BASE PM OWL 1200 1245 1900 2000 2300 3000 4100 8000 8100 9200 9400 9500 Total
90 4 7 7 1692 6 8 8 2 1494 11 16 16 33152 1 1 1 12154 --- --- --- --- 1156 4 4 4 2 7158 1 1 1 --- 1163 7 8 8 10164 1 1 1 8165 2 2 2 14166 1 2 2 11169 0 0 0 1183 2 2 2 --- 5222 3 3 3 16224 4 5 5 13230 3 4 4 18 18233 9 9 9 11234 6 6 6 5236 --- --- --- --- 3290 --- --- --- --- 5292 3 3 3 0
0
SUBTOTAL 68 82 82 4 18 204SPARE 29 15 15 4 38TOTAL 97 97 97 22 242
OPERATING SPARES AS % OF SCH. 18.6%
DIVISION 15 SEASONAL SERVICE
DIVISION 15 RAPID SERVICE
LINE NO. AM BASE PM OWL 1200 1245 1900 2000 2300 3000 8000 9200 9400 9500 Total
724 --- --- --- --- 11734 --- --- --- --- 7 7750 --- --- --- --- 21 21761 6 8 8794 --- --- --- --- 0
SUBTOTAL 6 8 8 7 21 39SPARE 4 2 2 2 4 8TOTAL 10 10 10 9 25 47
OPERATING SPARES AS % OF SCH. 20.5%
DIVISION 15 COMBINED REGULAR AND RAPID SERVICE
AM BASE PM OWL 1200 1245 1900 2000 2300 3000 8000 9200 9400 9500 Total
SUBTOTAL 74 90 90 4 7 21 18 243SPARE 33 17 17 2 4 4 46TOTAL 107 107 107 9 25 22 289
OPERATING SPARES AS % OF SCH. 18.9%
EQUIPMENT
EQUIPMENTSCHEDULE
COMBINED SCHEDULE
EQUIPMENTSCHEDULE
*** NO SEASONAL ASSIGNMENTS FOR THIS PERIOD
12/4/2008 Page 41 of 50
LINE ASSIGNMENT OF BUSESSUNDAY SCHEDULE
DIVISION 1810 -24
SUPPLEMENT TO REPORT 4-12 24 295
LINE NO. AM BASE PM OWL 1200 1245 1900 2000 2300 3000 4100 8000 8100 9200 9400 9500 Total
40 13 18 22 2 2042 3 3 4 3111 9 12 13 1 13115 2 3 3 22117 7 10 15 11126 14202 4207 2 3210 12 15 17 2211 3212 1 1 1 15439 3 3 3 20442 3444 4 4 4 11445 3 4 2 3446 4 4 7 6550 5 5 7 3
143
14302
SUBTOTAL 66 82 98 5 192SPARE 50 34 18 37TOTAL 116 116 116 116 229
OPERATING SPARES AS % OF SCH. 19.3%
DIVISION 18 SEASONAL SERVICE
DIVISION 18 RAPID SERVICE
LINE NO. AM BASE PM OWL 1200 1245 1900 2000 2300 3000 8000 9200 9400 9500 Total
710 15711 4 6 6 12 12715 20 20740
4
SUBTOTAL 4 6 6 12 20 51SPARE 3 1 1 2 4 10TOTAL 7 7 7 14 24 61
OPERATING SPARES AS % OF SCH. 19.6%
DIVISION 18 EXPRESS SERVICE
LINE NO. AM BASE PM OWL 1200 1245 1900 2000 2300 3000 8000 9200 9400 9500 Total
450X 0 0 0 0 4
SUBTOTAL 4SPARE 1TOTAL 5
OPERATING SPARES AS % OF SCH. 25.0%
DIVISION 18 COMBINED REGULAR AND RAPID SERVICE
AM BASE PM OWL 1200 1245 1900 2000 2300 3000 8000 9200 9400 9500 Total
SUBTOTAL 70 88 104 5 12 20 247SPARE 53 35 19 2 4 48TOTAL 123 123 123 14 24 295
OPERATING SPARES AS % OF SCH. 19.4%
EQUIPMENT
EQUIPMENTSCHEDULE
COMBINED SCHEDULE
EQUIPMENT
SCHEDULE EQUIPMENT
SCHEDULE
*** NO SEASONAL ASSIGNMENTS FOR THIS PERIOD
12/4/2008 Page 42 of 50
APPENDIX
Page 44 of 50
LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITY
LINE ASSIGNMENTS SORTED BY DIVISION
DIV LINE DIV LINE DIV LINE DIV LINE DIV LINE
1 18 5 108 8 164 15 90 18 445
1 26 5 110 8 165 15 92 18 450X
1 45 5 115 8 166 15 94 18 446
1 53 5 204 8 168 15 152 18 550
1 60 5 206 8 169 15 154 18 710
1 62 5 207 8 236 15 156 18 711
1 66 5 209 8 243 15 158 18 715
1 265 5 212 8 245 15 163 18 740
1 460 5 305 8 645 15 164
1 705 5 754 8 741 15 165
1 745 5 757 8 750 15 166
1 753 6 2 8 901 15 169
1 760 6 20 9 70 15 183
2 26 6 28 9 76 15 222
2 55 6 30 9 78 15 224
2 60 6 33 9 176 15 230
2 66 6 35 9 180 15 233
2 102 6 217 9 258 15 234
2 105 6 534 9 260 15 236
2 120 7 02 9 267 15 290
2 121 7 10 9 268 15 292
2 124 7 14 9 287 15 724
2 127 7 16 9 484 15 734
2 200 7 20 9 485 15 750
2 611 7 28 9 487 15 761
2 612 7 30 9 490 15 794
3 81 7 35 9 620 18 40
3 83 7 38 9 665 18 42
3 84 7 217 9 687 18 111
3 175 7 220 9 762 18 115
3 180 7 305 9 770 18 117
3 201 7 534 10 2 18 126
3 206 7 704 10 4 18 202
3 251 7 714 10 16 18 207
3 252 8 150 10 20 18 210
3 485 8 152 10 30 18 211
3 685 8 154 10 33 18 212
3 728 8 158 10 720 18 439
3 751 8 161 10 730 18 4423 780 8 163 10 920 18 444
Page 45 of 50
LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITY
LINE ASSIGNMENTS SORTED BY LINE NUMBER
LINE DIV LINE DIV LINE DIV LINE DIV LINE DIV
2 6 90 15 183 15 444 18 761 15
2 7 92 15 200 2 445 18 762 9
2 10 94 15 201 3 446 18 770 9
4 10 102 2 202 18 460 1 780 3
10 7 105 2 204 5 484 9 794 15
14 7 108 5 206 3 485 3 901 8
16 7 110 5 206 5 485 9 920 10
16 10 111 18 207 5 487 9 450X 18
18 1 115 5 207 18 490 9
20 6 115 18 209 5 534 6
20 7 117 18 210 18 534 7
20 10 120 2 211 18 550 18
26 1 121 2 212 5 611 2
26 2 124 2 212 18 612 2
28 6 126 18 217 6 620 9
28 7 127 2 217 7 645 8
30 6 150 8 220 7 665 9
30 7 152 8 222 15 685 3
30 10 152 15 224 15 687 9
33 6 154 8 230 15 704 7
33 10 154 15 233 15 705 1
35 6 156 15 234 15 710 18
35 7 158 8 236 8 711 18
38 7 158 15 236 15 714 7
40 18 161 8 243 8 715 18
42 18 163 8 245 8 720 10
45 1 163 15 251 3 724 15
53 1 164 8 252 3 728 3
55 2 164 15 258 9 730 10
60 1 165 8 260 9 734 15
60 2 165 15 265 1 740 18
62 1 166 8 267 9 741 8
66 1 166 15 268 9 745 1
66 2 168 8 287 9 750 8
70 9 169 8 290 15 750 15
76 9 169 15 292 15 751 3
78 9 175 3 305 5 753 1
81 3 176 9 305 7 754 5
83 3 180 3 439 18 757 584 3 180 9 442 18 760 1
Page 46 of 50
LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITYBUS LINES ASSIGNED OUT OF MORE THAN ONE DIVISION
LINE
2 6 7 1016 7 1020 6 7 1026 1 228 6 730 6 7 1033 6 1035 6 760 1 266 1 2
115 5 18152 8 15154 8 15158 8 15163 8 15164 8 15165 8 15166 8 15169 8 15180 3 9206 3 5207 5 18212 5 18217 6 7236 8 15305 5 7485 3 9534 6 7750 8 15
DIVISION
Page 47 of 50
LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITYRAPID LINES
LINE
704 7705 1710 18711 18714 7715 18720 10724 15728 3730 10734 15740 18741 8745 1750 8 15751 3753 1754 5757 5760 1761 15762 9770 9780 3794 15920 10
DIVISION
Page 48 of 50
LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITY
DIVISION NUMBER1 - 2052 - 1953 - 2205 - 2226 - 797 - 2488 - 2299 - 235
10 - 25915 - 26218 - 280
TOTAL 2434
* DIVISION 12 NOT INCLUDED IN TOTAL
(From the Equipment Update Report, FINAL, December 14, 2008)
MAXIMUM OPERATING (STORAGE) CAPACITY
Page 49 of 50
LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITY
I. Active Fleet
A. Peak Fleet
1.
2. Active OtherSeasonal unscheduled service.
II. Inactive Fleet
A.
B.
C. Buses Approved for sale.
That portion of the revenue fleet regularly engaged in providing transportation service.
Scheduled Service/Peak Service
FLEET DEFINITIONS
Contingency Fleet - Revenue vehicles not regularly engaged in providing public transportation but available in the event of an unforeseen shortage of active fleet vehicles. (NOTE: Must meet Federal Transportation Administration eligibility requirements)
The number of buses required to support the peak service requirement for all operating service, including regularly scheduled, temporary and seasonal scheduled service.
Buses proposed for sale and awaiting approval.
Page 50 of 50
LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITYEQUIPMENT DESIGNATION SUMMARY12/14/2008
FLEET DESIGNATOR NUMBER (TYPE) MAKE TYPE
NO.OF SEATS ACCESSIBLE SERVICE SERVICE TYPE FUEL TYPE
12 TMC ADB -STANDARD 43 REAR DOOR LOCAL AS DESIGNATED DIESEL
19 TMC ADB -STANDARD 43 FRONT DOOR LOCAL AS DESIGNATED DIESEL
20 TMC ADB -STANDARD 43 REAR DOOR LOCAL AS DESIGNATED DIESEL
30 NEW FLYER ADB - LOW-FLOOR 40 FRONT DOOR LOCAL AS DESIGNATED DIESEL
42 NABI ADB - HYBRID 42 FRONT DOOR LOCAL AS DESIGNATED 42' HYBRID GAS
44 GMC ADB -INTERMEDIATE 36 REAR DOOR LOCAL AS DESIGNATED (35') DIESEL
45 NEOPLAN USA ADB -STANDARD 43 FRONT DOOR LOCAL AS DESIGNATED CNG
46 NEOPLAN USA ADB -STANDARD 43 FRONT DOOR LOCAL AS DESIGNATED CNG
50 NEW FLYER ADB -STANDARD 43 FRONT DOOR LOCAL AS DESIGNATED CNG
53 NEW FLYER ADB - LOW-FLOOR 40 FRONT DOOR LOCAL AS DESIGNATED CNG
63 NEOPLAN USA ADB -STANDARD 43 FRONT DOOR LOCAL AS DESIGNATED CNG
67 NEOPLAN USA ADB -STANDARD 43 FRONT DOOR LOCAL AS DESIGNATED CNG
70 NABI ADB - LOW-FLOOR 40 FRONT DOOR LOCAL AS DESIGNATED CNG
73 NABI ADB - LOW-FLOOR 40 FRONT DOOR LOCAL AS DESIGNATED CNG
75 NABI ADB - LOW-FLOOR 40 FRONT DOOR LOCAL AS DESIGNATED CNG
76 NABI ADB - LOW-FLOOR 40 FRONT DOOR LOCAL AS DESIGNATED CNG
79 NABI ADB - COMPOSITE 40 FRONT DOOR LOCAL AS DESIGNATED CNG
80 NABI ADB - COMPOSITE 46 FRONT DOOR LOCAL AS DESIGNATED 45' CNG
92 NABI ADB - ARTIC 57 FRONT DOOR LOCAL AS DESIGNATED 60' CNG
94 NABI ADB - ARTIC 57 FRONT DOOR LOCAL AS DESIGNATED 60' CNG
95 NABI ADB - ARTIC 57 FRONT DOOR LOCAL AS DESIGNATED 60' CNG