csa working group disa. where we were as a csa, disa tracked all of the ccs top 3 annual exercises...

5
CSA Working Group DISA

Upload: phillip-kennedy

Post on 18-Jan-2016

216 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: CSA Working Group DISA. Where we were As a CSA, DISA tracked all of the CCs top 3 annual exercises –Validated Annex K to CC OPLAN –Validated C4 Requirements

CSA Working Group

DISA

Page 2: CSA Working Group DISA. Where we were As a CSA, DISA tracked all of the CCs top 3 annual exercises –Validated Annex K to CC OPLAN –Validated C4 Requirements

Where we were

• As a CSA, DISA tracked all of the CCs top 3 annual exercises– Validated Annex K to CC OPLAN– Validated C4 Requirements– Provided SME’s as required

• Not integrated into JTS• No JLLIS Program

Page 3: CSA Working Group DISA. Where we were As a CSA, DISA tracked all of the CCs top 3 annual exercises –Validated Annex K to CC OPLAN –Validated C4 Requirements

Where We Are

• Under the DISA Operations Directorate– Established a Joint Training Program (Staff X2)

• Joint Staff J7 JTSS• CC Exercise Specialist

– Synchronized DRRS, Quality Assurance and JTS into one branch

• Incorporating JTS orientation and JTIMS training into DISA in-processing checklist

• Collecting Lessons Learned• Working with Joint Staff J7 on JLLIS instance• Conducting JTIMS/JLLIS Agency training• Coordinating with Combatant Commands on DISA exercise

participation

Page 4: CSA Working Group DISA. Where we were As a CSA, DISA tracked all of the CCs top 3 annual exercises –Validated Annex K to CC OPLAN –Validated C4 Requirements

Where We Are Continued

• Created a JTP shell in JTIMS– AMETL– Directors Guidance – Draft in staffing– 12 in- house CAT training events– Real world event – Haiti– Combatant Command events – place holders– Small training objective library– Participate in 3 exercises annually

Page 5: CSA Working Group DISA. Where we were As a CSA, DISA tracked all of the CCs top 3 annual exercises –Validated Annex K to CC OPLAN –Validated C4 Requirements

Where We Are Going

• JTIMS TPA documentation• AMETL refinement

– Aligned with DISA’s Campaign Plan– Synchronized with the UJTL

• Assess DISA participation in exercises– Aligned with CC requirements– Integrated with other CSAs– Validated thru JTIMS

• Integrated training with Joint Task Forces• Validate Agency Readiness

– Quality Assurance Assessments– Exercise Participation– CIP and KR Validation– JFRR