Country Status Presentation by Eghert Daniel Copenhagen April 20, 2007. PRIORITY PROJECTS. ARMENIA. Argichi Small Hydroelectric Project Estimated annual CER-s: 17052 t CO2, Estimated CER-s until 2012 85 000 t CO2. “Jradzor” Small Hydro Electric Project - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Country Status Presentation by Eghert Daniel Copenhagen       April 20, 2007

Country Status

Presentation by Eghert Daniel

Copenhagen April 20, 2007

Page 2: Country Status Presentation by Eghert Daniel Copenhagen       April 20, 2007

No Project Identification (name)

Estimated amount of CO2

reductions until 2012

(Tones)

Estimated amount of

CO2 reductions after 2012 (Tones) 7

years

EstimatedStart Date

Status Financial due diligence

Tentative Price(EUR/Tones)

Priority

1“Landfill Gas Capturing and Utilization in Bishkek, Kyrgyzstan”

437 000 180 000 2007LoA received, partners shall be identified and project shall be registered

Project host does not have financing for the project implementation.

5 1

2Ordubad Hydroelectric Project, Nakhchivan Autonomous Republic of Azerbaijan

437 0001 020

0002010

LoI signed and LoE issued.PDD is prepared and shall be submitted for validation.

State company Azerenergy provides needed financing and can apply also loans

5 2

3Argichi Small Hydroelectric Project, Armenia

85 000 119 000 2008PDD is validated and LoA issued. Company needs

additional loan arrangement

7 3

4“Jradzor” Small Hydro Electric Project, Armenia

41 000 57 000 2008PDD is validated and LoA issued. Company needs

additional loan arrangement

74

5

Optim. of raw material grinding, clinker burning, fuel burning and clinker consumption for the production of cement at CJSC “MICA-CEMENT, Armenia

320 000 630 000 2008

PDD is prepared but not validated due to the different opinions between the Consultant and Validator

Plant is in operation and part of financing can be provided by the owner

7

5

6Production of synthetic rubber from butadiene instead of using natural gas in CISC “Nairit –Plant”, Armenia

800 000≥ 1 400

0002009

LoI is signed, and new owners are preparing feasibility study plan. PDD preparation is not started

New owner is interested to use new technology. Loan will be used for process reconstruction

5

6

PRIORITY PROJECTS

Page 3: Country Status Presentation by Eghert Daniel Copenhagen       April 20, 2007
Page 4: Country Status Presentation by Eghert Daniel Copenhagen       April 20, 2007

ARMENIA

Page 5: Country Status Presentation by Eghert Daniel Copenhagen       April 20, 2007

Argichi Small Hydroelectric ProjectEstimated annual CER-s: 17052 t CO2, Estimated CER-s until 2012 85 000 t CO2

“Jradzor” Small Hydro Electric ProjectEstimated annual CER-s: 8215 t CO2, Estimated CER-s until 2012: 41 000 t CO2

Page 6: Country Status Presentation by Eghert Daniel Copenhagen       April 20, 2007

Optimization of raw material grinding, clinker burning, fuel burning and clinker consumption for the production of cement at CJSC “MICA-CEMENT”, Armenia

Total investment cost of the project activities is estimated to be 3,623mill. EURO (4,348 mill. USDEstimated annual (2008) CER –s: 107 415 tons CO2, Estimated CER-s up to 2012: 320 000 tons CO2Estimated CER-s after 2012 630 000 tons CO2

Page 7: Country Status Presentation by Eghert Daniel Copenhagen       April 20, 2007

Production of synthetic rubber from butadiene instead of using natural gas in CISC “Nairit –Plant”

Estimated annual CER-s: 200 000 t CO2, Estimated CER-s until 2012: 800 000 t CO2 Estimated CER-s after 2012: 1 400 000 t CO2

Page 8: Country Status Presentation by Eghert Daniel Copenhagen       April 20, 2007

AZERBAIJAN

Page 9: Country Status Presentation by Eghert Daniel Copenhagen       April 20, 2007

Reduction of gas leakages at Azerigaz company,Baku,

Project description: Identification of gas leakages, fulfillment of repair works at gas network and main units, change of equipment at compressor stations.

Page 10: Country Status Presentation by Eghert Daniel Copenhagen       April 20, 2007

Ordubad Hydroelectric Project, Nakhchivan Autonomous Republic of Azerbaijan

Estimated annual CER-s: 145 740 t CO2, Estimated CER-s until 2012: 437 000 t CO2 Estimated CER-s after 2012: 1 020 000 t CO2Ordubad 36 MW HPP investment cost is estimated to be 80 million Euros or 2.2 mill. Euro/MWe installed. Financing will be secured by the State.

Page 11: Country Status Presentation by Eghert Daniel Copenhagen       April 20, 2007

GEORGIA

Page 12: Country Status Presentation by Eghert Daniel Copenhagen       April 20, 2007

Catalytic N2O destruction project at the Nitric Acid Plant of AZOTI JSC/Energy Invest JSC, Rustavi

The implementation of the project activity will result in an ex-ante estimation of GHG emission reductions of conservatively calculated 160,000 t CO2e per year. Please note - that estimates of GHG emission reductions are made for reference purposes only - actual emission reductions will be determined based on measurement results on ex-post basis.

Page 13: Country Status Presentation by Eghert Daniel Copenhagen       April 20, 2007

Emissions reduction in gas distribution network at KazTransGaz LTD enterprise in Tbilisi

Page 14: Country Status Presentation by Eghert Daniel Copenhagen       April 20, 2007

MOLDOVA

Page 15: Country Status Presentation by Eghert Daniel Copenhagen       April 20, 2007

Waste Water Treatment Plant – biogas collection from sludge, Chisinau

The GHG emission relevant for this project includes: the open release of CH4 from open anaerobic sludge pits;CO2 emissions due to production of electricity by fossil fuels.

Page 16: Country Status Presentation by Eghert Daniel Copenhagen       April 20, 2007

KAZAKHSTAN

Page 17: Country Status Presentation by Eghert Daniel Copenhagen       April 20, 2007

Landfill gas capturing at Almaty Landfill, Almaty, Kazakhstan

and

Astana District Heating leakages reduction in distribution network, Astana, Kazakhstan

Page 18: Country Status Presentation by Eghert Daniel Copenhagen       April 20, 2007

KYRGYZSTAN

Page 19: Country Status Presentation by Eghert Daniel Copenhagen       April 20, 2007

“Landfill Gas Capturing and Utilization in Bishkek

The financial situation of the Project proponent would not allow them to finance the project totally. Landfill operator company Meenet-Service has no savings or other free capital, and therefore the investment must be based on the upfront payment for the future CER-s.

Estimated annual (2008) CER-s: 76 000 t CO2, Estimated CER-s until 2012: 400 000 t CO2 Estimated CER-s after 2012: 560 000 t CO2

Based on the test pumping results, maximum total expected emission reduction when the plant is in full operation throughout a year is approx. 80.000 tons CO2/year. The plant was expected to be in operation by mid 2007.

Total investment need for Stage 1: approx 0,8 mill EUR.

Page 20: Country Status Presentation by Eghert Daniel Copenhagen       April 20, 2007

Bishkel Landfill CDM Project, Kyrgyzstan

Page 21: Country Status Presentation by Eghert Daniel Copenhagen       April 20, 2007

UZBEKISTAN

Page 22: Country Status Presentation by Eghert Daniel Copenhagen       April 20, 2007

Nitrous Oxide Reduction at Navoiyazot Fertilizer Industry , Navoi

Reduction of nitrous oxide emissions in the production of nitrogen fertilizers Open JSC "ELECTRKIMESANOAT" Chirchik

Utilization of tail oil gas at “Uzneftegas” Karaulbazarsky district, Buharsky region