MaverickGoldProjectExpandingResourcesandAdvancingtoGoldProductionin2013
-
ForwardLookingStatements
2
Some statements contained in this presentation are forwardlooking and, therefore,involve uncertainties or risks that could cause actual results to differ materially. Suchforwardlooking statements include comments regarding mining and milling operations,mineral resource and reserve statements and exploration program performance. Factorsthat could cause actual results to differ materially include metal price volatility, economicand political events affecting metal supply and demand, fluctuations in mineralizationgrade, geological, technical, mining or processing problems, exploration programs andfuture results of exploration programs, future profitability and production.
Historical resources in this presentation are historical estimates that predate NI 43101and are not compliant with current definitions, and have not been verified by thecompany; consequently, they should not be relied on by investors.
www.aurigagold.ca
-
TheAurigaGoldOpportunity
www.aurigagold.ca 3
NeartermObjective Achievegoldproductionin2013(+40,000opa)andexpandgoldresourcesto+onemillionounces
Vision Expandgoldproductionto100,000oz/yearanddoublegoldresourcestogreaterthan2millionounces
throughexpansion,newdiscoveriesandregional/sectorconsolidation
StrategicAdvantage FavourableminingjurisdictioninManitobawithregionalinfrastructure Low$18millioncapitalrequirementtoresumeproductionutilizingexistingmineandmillinfrastructure Existingpermitsandminingleaseinplace,NOAforopenpitminingtobesubmittedinOctober2012 Reducedriskopenpitminestartup Underexploredregionalgoldbearinggeologicalenvironment Managementexperiencedatdiscovery,resourceexpansion,developmentandoperations
SuperiorInvestmentOpportunity AttractivevaluationEnterpriseValue/ouncevs PeerCompanies StrongvaluationofPricetoCashFlow
PathtoProduction
PropertyAcquisitionNovember2010
InitialPuffyNI43101Resource
August2011
PuffyPEAOpenPit/UGJanuary2012
InitialNokomis43101Resource
CompleteMillRefurb
TestMiningQ12013
Production2013
-
ReFocusingonMaverickGoldProject,ManitobaRestartofMiningOperationsPlannedfor2013
4
HistoryofPuffyMineDevelopment/Operations OperatedfromJan88toApr89byPioneerMetals Produced29koz from19881989from370,000tonnes 1987Kilborn feasibilityrecommended500tpd mill:
Capex:~32mln in1987/88 Pioneeractuallybuiltmillwithcapacityof1,000tpd;
stillinexcellentconditiontoday 6.9kmu/gdriftingtoaverticaldepthof130m 1993Kilborn feasibility:
Resource:524,376oz@~7.6g/tAu Reserve:184,[email protected]/tAu
AurigaGoldDevelopmentatMaverick Neartermgoldproduction,withsignificant
explorationupside 65kmfromFlin Flon,15kmfromSherridon Nearoperatinggoldandbasemetalmines,rail
lineandpowerinfrastructure PositivePEAonopenpitandU/Gminingprogram
Lowcapitalcostrequirementfor40,000ozAuperannumstartup($18.1millionCAPEX)
NPV(pretax5%):$95.4Million(pretax8%):$79.6Million
IRR(pretax)84% Explorationtargeting >1millionounces
InitialNI43101,174,000ouncesIndicated,558,000ounces Inferred@~5.8g/tAu
Experiencedmanagementwithaprovenrecordof
minedevelopment,resourcediscovery
andexpansion.
www.aurigagold.ca
T
o
n
n
a
g
e
(
t
p
d
)
Grade(g/t)
00.511.522.533.544.5
0
200
400
600
800
1000
1200
Tonnage
Grade
-
Auriga GoldCapitalStructureandSharePrice
5
Auriga GoldCorp.(AIA:TSXV)
SharedataandcashpositionasofOctober2,2012
SharesOutstanding 54,652,980
WarrantsandOptionsO/S 28,013,768
FullyDiluted 82,666,748
MarketCapitalization $10.9million
CashPosition $1.0million
Debt $0.9million
Indicativetermsheetsforgoldloanfacilitybeingreviewed*
OptionsandWarrants
No.ofWarrants/
Options
Avg.Exercise
Price
Options 3,107,500 $0.27
Commonsharewarrants 24,906,268 $0.44
Expiringb/wOct2012 February2017
SignificantHolders Ownership
PioneerMetals(Barrick Gold) 8.2%
ClaudeResourcesInc. 6.2%
ManagementandDirectors 5.2%
InstitutionalHoldings 2.9%
XstrataCanada 2.4%
AIA:TSXVSharePrice
Source:tmx.comandAuriga Gold
www.aurigagold.ca*For details see June 21, 2012 PR
-
FundingOptionsGoldPrepayLoanAgreement:$23Million
IndicativeTermSheet Totalloan:$23million AurigaGoldscapitalexpenditures:$18.1million Loanrepayment:monthlygolddeliveries
averaginglessthan20%ofscheduledgoldproduction
Term:repaymentover36monthsfollowinga6monthgraceperiod
Goldpricing:Flexibilitytosellatprevailingmarketrates
Subjecttoduediligence
6 www.aurigagold.ca
-
AurigaGoldManagementandDirectorsFinance,DevelopmentandOperationalExpertiseinPlace
7
ExperienceinDiscovery,ResourceExpansion,MineDevelopmentandOperations
www.aurigagold.ca
Gorden Glenn, Interim President & CEO, DirectorOver 20 years experience in the financial industry as Investment Banker(TD Securities and Desjardins) and Research Analyst as well as variousroles in mining companies evaluating economic and technical validity ofmostly Canadian projects.
Mike Kernick, General ManagerMr. Kernick has over 20 years experience in underground and open pitmining operations, particularly in narrow vein gold mining. FormerlyMine Superintendent at the Lake Shore Gold, Bell Creek Mine,Underground Superintendent at Trelawneys Chester Mine and prior tothat, Mine Manager at Liberty Mines RedstoneMine.
Vic Hugo, CMA, Financial Controller and CFOAn accounting professional with over 15 years of international financialmanagement experience, particularly in the mining and manufacturingsectors.
Eric Loch, PMP, Projects ManagerMr. Loch has over 20 years experience successfully building capitalprojects with understanding of project engineering and construction inthe mining and industrial sectors. He has held senior projectmanagement positions with DeBeers and Rio Tinto.
Bruce Mackie, M.Sc., P.Geo., Geological and Technical AdvisorMr. Mackie is a professional geologist, with over 35 years of miningindustry experience in Canada and internationally. He has a provenexploration record, having managed several successful projects inuranium, gold and base metals in senior positions with Noranda, HemloGold and North American Palladium.
Alison Tullis, Investor Relations ManagerEight years of investor relations experience in a variety of industrysectors most recently providing IR consulting services to miningcompanies.
Chris Irwin, LL.M., DirectorMr. Irwin is President of Irwin Professional Corporation, a corporationproviding legal services mainly to the natural resource sector.
James D.A. White, DirectorMr. White is the Managing Partner of Baynes & White, a Torontobasedpension and benefits actuarial consulting firm.
Brian Robertson, P.Eng., DirectorOver 30 years experience in corporate management, explorationprograms, project management, mine permitting, construction,development and operation as well as the evaluations or corporateacquisitions.
-
MaverickGoldProjectExistingInfrastructure PastAuProduction ResourceExpansionPotential
8
PastProducingPuffyMineandMillDevelopment Produced28,000oz from19881989 Existing1,000tpd millandprovidesstartupto
productionatreducedcapitalcost Existingportalandramptoundergroundmine
workings 2012PEAmineplan:recoveryof348,000oz over
7.5yearsatthePuffyDepositResourceExpansiontargeting>1Moz Gold ExpandandupgradegoldresourcesatPuffyand
Nokomisdepositsbystepoutandinfilldrilling NumerousdrillingtargetsoutlinedfromVTEM
surveyalong20kmgoldbearinghorizon Recentdrillingintersected7.63mwith125.08g/t
AuatNokomis
-
9MaverickGoldProjectPuffyDeposit GeologySurfacePlanandSection
OPEN
NI43101ResourceEstimate(August2011) 174,000ouncesIndicated,558,000ouncesInferred
www.aurigagold.ca
A385 [email protected]/[email protected]/tAu A383 2.0m
@12.0g/tAu
A384 [email protected]/tAu
A381 [email protected]/tAu,[email protected]/tAU
-
10
MaverickGold PuffyMineSurfacePlanandResourceModel
Portal/RamptoU/GMine
N
1000tpdMill
1.5kmstrikelength,openonstrikeandtoNE
open
open
open
Underground workings
Resources: IndicatedInferredPuffy Veins
3DmodellookingW
3DmodellookingNW
www.aurigagold.ca
-
MaverickGoldProject PuffyMinePreliminaryEconomicAssessmentPEAFebruary2012 basedonAugust2011NI43101ResourceEstimate
www.aurigagold.ca 11
AverageAnnualProduction: 45,000oz/annumAuRecoverableGold1: 348,000recoveredoz [email protected]/tAudiluted
20.3%fromopenpits;79.7%fromu/gMillingRate: 750tpdMillRecovery: 90%LifeofMine: 7.5years
TotalCAPEX: $18.1M(incl.$3.02mcontingency)
AverageLOMcashcost: CAD$949/oz
UndiscountedCashFlow(pretax): $130.5MPayback: 20th month
ofprocessingoreNPV(pretax,5%) 2: $95.4M(pretax,8%)2: $79.6 MIRR(pretax): 84%
1. InitialMinePlaninFebruary2012PEA2. BasedongoldatUSD$1400/oz
Goldprice,operatingcost,capitalcostsensitivityanalysis@8%NPV
-
MaverickGoldProject PuffyMinePreliminaryEconomicAssessmentPEAFebruary2012 basedonAugust2011NI43101Resource Estimate
12
Openpitcostanticipatedat$650/ozexcludingsustainingcapital
20.3%ofgoldproductionfrominitiallowriskopenpitproduction
$949/oz averageLOMoperatingcashcostincluding$77/oz sustainingcapital
$18.1millionCapex toproduction
$130.5millioncumulativecashflowat$1400/oz
Paybackin20months
www.aurigagold.ca
$50,000,000
$25,000,000
$0
$25,000,000
$50,000,000
$75,000,000
$100,000,000
$125,000,000
$150,000,000
$175,000,000
$200,000,000
oz
10000oz
20000oz
30000oz
40000oz
50000oz
60000oz
OuncesRecovered
CumulativeCashFlowat$1400/ozAuCumulativeCashFlowat$1600/ozAu
112345678 112345678$0
$200
$400
$600
$800
$1,000
$1,200
$1,400
oz
10000oz
20000oz
30000oz
40000oz
50000oz
60000oz
U/G
OpenPit
OperatingCost/oz
TotalOp+SustCost/oz
-
MaverickGoldProject PuffyMineLongitudinalSectionFacingWest
13
Longitudinalsectionlookingwestshowingexistingundergroundworkings,proposedopenpits,andproposedstopes fromallzones.BasedonFebruary 2012PEAandAugust2011,NI43101Resource
Estimate
Pit 1
RecoveredOunces
OpenPits:Pit1:20,760ozPit2:4,950ozPit3:6,060ozPit4/5:37,740ozTotalPits:69,510oz
UndergroundMiningAreas:Area1:49,000ozArea2:124,000ozArea3:108,000ozArea4:23,000ozTotalUndergound:304,000oz
Pit 4/5Pit 1 Pit 2 Pit 3
www.aurigagold.ca
AREA 1
AREA 3AREA 2
AREA 4
-
14
MaverickGoldProjectMaverickMill 1000tpd
-
MaverickProject SignificantResourceExpansionPotential
15
Targetinginexcessof1,000,000ouncesgold
WelldefinedmajorregionalgoldmineralizedstructureatthenorthernborderofFlin Flongreenstonebelt
Ongoingdrillprogramtoexpandresources
MaverickPropertycoversover20kmofstrikelength
Targethaswelldefinedgeophysicstrendwithseveralshowingsfoundalongstrike
InitialPuffyDepositNI43101GoldResourcesof174,000oz AuIndicatedand558,000oz
HistoricalnearsurfaceresourcesatNokomis,potentialmillfeedforPuffyMill
PuffyDepositandOnsiteMill
NokomisDeposit68,[email protected]/t
www.aurigagold.ca
-
MaverickGold NokomisDeposit8kmNortheastfromtheMaverickMill
16
Potentialopenpitsatellitedeposit Confirmationdrillingprogramcomplete,A.C.A.Howe
engagedtocompleteNI43101report,expectedinQ32012 Initialhighgradegoldintercepts
125.08g/tover7.6m(incl.1,830g/tover0.5m); 12.27g/tover5.2m; 5.1g/tover6.4m; 9.65g/tover5.6m(incl.62.23g/tover0.5m)
Highgradenearsurfacemineralization
www.aurigagold.ca
-
MaverickGoldProductionTimeline
17
2 0 1 22 0 1 3 2 0 1 4
Q 1 Q 2 Q 3 Q 4
Resource ExpansionDrilling
NI43101Reports
Mill,powerandancillarybuildingrefurbishmentandsitepreparation
Communityengagement
Openpitandtestmining
U/Gdevelopment anddewatering
U/G teststope andmining
Paybackcomplete@$1400/oz Au
NOKOMISResource
PUFFYFEAS.Study
GoldProductionMilestone
-
MaverickGoldProjectPotentialGoldProductionExpansion
18
Areaconsolidation
Tollmillingopportunities
Resourceexpansionon
majorstructure
++ExtendMineLife
ExplorationsuccessonMaverick
Gold
MaverickPropertycovers20
kmofmajorregional
mineralizedstructure
+ResourceExpansion
NokomisDeposit
HistoricalResource
68,[email protected]/tAu
8kmfromPuffyMineandMill
Openpitpotential
Targetingfullmillcapacityat
1000tpd
>50,000oz/yr
CombinedU/Gandopenpit
PEAStudy750tpd7.5yearminelife348,000
recoveredgoldounces
45,000oz/yr
www.aurigagold.ca
-
Auriga GoldPeerComparison
19
Superiorinvestmentopportunity: 54.7millionshareso/s AttractiveEV/oz relativetopeers SuperiorprojectedannualCF/Share LowCAPEXtoproduction
BasedonSeptember4,2012shareprices,totaloz includesreservesandresources,compiledfromsourcesbelievedtobereliable.Operatingcompanyproductionfiguresbasedonactualfinancialresults.Source:SEDAR,corporatewebsites. AurigaGoldproductionandcashflowdatabasedonFebruary2012PEA.Assumes$23Mgoldloanfacility(seepressreleasedatedJune21,2012).Thismodelisforcomparisonpurposesonlyandshouldnotbeconstruedasaspecificfinancingplan.
$
/
o
z
Company SymbolShare
Price($)SharesO/S
(M)MarketCap
($M)Total
Oz(M) Oz.paOp CostperOz.
EnterpriseValue(EV
$M) EV/ozEstCF$M@$1400 EV/CF
Shares/AuOz
PricetoCashFlow
QMXGoldCorporation QMX.TO 0.40 30.1 $12.0 1.9 83,000 $1,400 $25.9 13.6 15.8 BrigusGold BRD.TO 0.92 217.3 $199.9 4.6 57,001 $800 $198.0 41.6 34.2 5.8 45.7 5.85xClaudeResources CRJ.TO 0.68 173.7 $118.1 4.1 44,756 $1,082 $75.1 18.5 14.2 5.3 42.5 8.30xGoldenBand GBN.V 0.17 284.7 $48.4 0.8 45,000 $1,076 $83.4 99.7 14.6 5.7 340.2 3.32xMetanor Resources MTO.V 0.26 226.6 $58.9 1.6 60,000 $464 $63.8 39.9 56.2 1.1 141.5 1.05xSanGold SGR.TO 0.76 325.3 $247.2 4.3 74,227 $970 $223.1 52.3 31.9 7.0 76.2 7.75xSt.AndrewsGold SAS.V 0.44 368.2 $162.2 5.2 74,022 $919 $153.8 29.4 35.6 4.3 70.4 4.55xAurigaGold AIA.V 0.20 54.7 $10.4 0.7 40,000 $950 $13.7 18.8 18.0 0.8 74.7 0.61xAurigaFullyFunded AIA.V 0.20 54.7 $10.4 0.7 40,000 $950 $37.4 51.1 18.0 2.1 74.7 0.61x
0.020.040.060.080.0100.0120.0
EV/oz
-
AurigaGoldSummary
20
MaverickGoldProject(100%) Manitoba Neartermgoldproduction,withexcellentexplorationupside Pastproducingproperty,withsignificantonsiteinfrastructure
1000tpd mill,ancillaryfacilities,rampandundergroundworkings,roadaccesstoproperty,powerandraillines
PositivePEAonU/Gandopenpittestminingonnearsurfaceresources CAPEX:$18.1Million;undiscountedcashflow:$130Million
Managementexperiencedatdiscovery,resourceexpansion,developmentandoperations
NI43101ResourceEstimate: 174,000ouncesIndicated,558,000ounces Inferred ContinuedresourceexpansionandupgradedrillingatNokomis
andPuffydeposits
Mokoman CopperGoldProperty(100%) Saskatchewan
FoxPGMNiCuProperties(75100%) Manitoba
Centrallylocatednearexistingminesand
infrastructureintheFlin Flon Mining
District,Manitoba
www.aurigagold.ca
-
21
Formoreinformation:
AurigaGoldCorp.A I A : T S XV8KingStreetEastSuite1300Toronto,ON
AlisonTullisManager,InvestorRelations4162142785atullis@aurigagold.cawww.aurigagold.ca
AIA_AurigaGoldAIA.AurigaGold
-
MaverickGoldProjectFlin Flon GoldandVMSBaseMetalDistricts
22
StrategicallylocatedinoneofManitobaspremierminingcamps accesstopeople,infrastructureandGOLD
MAVERICKGOLDPROJECT
FLINFLON
SNOWLAKE
SHERRIDON
CRANBERRYLAKE
-
MaverickGoldProjectMineralResources AllZones
23
[email protected]/tcutoffgrade(undergroundmodel)
ResourceCategory Tonnes Grade(g/t) InsituOzs Gold
Indicated 702,000 6.29 142,000
Inferred 3,018,000 5.65 548,000
[email protected]/tcutoffgrade(openpitmodel)
ResourceCategory Tonnes Grade(g/t) InsituOzsGold
Indicated 242,000 4.16 32,000
Inferred 78,000 3.81 10,000
Nokomisadditionalsatelliteresources(undergroundmodel)
ResourceCategory Tonnes Grade(g/t) InsituOzs Gold
ProvenandProbable 349,110 6.10 68,523
*HistoricalresourcesinthepresentationarehistoricalestimatesthatpredateNI43101andarenotcompliantwithcurrentdefinitions,havenotbeenverifiedbythecompanyandconsequentlyshouldnotbereliedonbyinvestors.
NI43101ResourceEstimate October2011 Underground:3,720,000tonnes containing690,000oz Goldatacutoffgradeof2.5g/t;and OpenPit:320,000tonnes containing42,000 oz Goldata0.6g/tcutoffgrade
HistoricalResources
The resource was estimated by Fred Brown, CPG, and Eugene Puritch, P.Eng. of P&E Mining Consultants Inc. Mr. Puritch and Mr. Brown are Qualified Persons ("QPs") as defined by NI43101. Bruce Mackie, P.Geo., was QP for the Companys drill program and supervised the preparation of the scientific or technical information for the property. The contents of thispress release has been reviewed and approved by Mr. Brown, Mr. Puritch and Mr. Mackie. An NI 43101 technical report supporting this resource estimate will be filed on SEDAR within 45days of this press release.
-
PuffyMineCombinedU/GandOpenPitModelfromFebruary2012PEA
OpenpitminingmethodandConventionalopenpitmining Mining:$5.50/tonnecostsbycontractor Definitiondrillingandgradecontrol $1.41/tonneof
Wasterockstripping $4.50/tonnewasterock Undergroundminingmethod Roomandpillar(Slushblastedmuckdown30 diptosilldrift)
costsbyCompanypersonnel Rampandventilationraises $3,000/metreMiningandtransporttomill $106/tonnemilledDefinitiondrillingandgradecontrol $2.97/tonnemilled
Othercosts Processing $25/tmilledTailingsandwatermanagement $1/tmilledGeneralandAdministration $11.06/tmilledUndergroundmineindirectcosts $4.40/tmilledMineclosure $1.3M
Totaloremilled 2,039,000t Miningrecovery Surface90%;U/G88% Averagedilutedheadgrade 5.8gAu/t Millthroughput 750tpd Millrecovery 90% Totalestimatedgoldrecovered 348,000troyoz Au Goldprice US$1,400/oz Au US$:CAD$exchangerate US$1=CAD$1.014
Goldroyalty 3%Totalgrossrevenuefromgoldsales $478MPretaxundiscountedcashflow $130MPretaxNPV(5%) $95MPretaxNPV(8%) $79MPretaxIRR 84%PretaxPayback 2.5yrs
-
NoncoreProjectstobeRationalized
Mokoman CopperGoldProperty(100%) Saskatchewan 1,500hapropertywithahistoricresourceof6.0milliontonnesat0.90%Cuand0.18g/t
Au(NonNI43101)FoxPGMNiCuProperties(75100%) Manitoba 58,000hawithhighpotentialforPGMs+Ni/Cu GreatFallszonewithgrabsamplesupto5g/tPtPd+Au,1.1%Niand2.3%Cu
25 www.aurigagold.ca