corp presentation

25
TSXV: AIA October 2012 Maverick Gold Project Expanding Resources and Advancing to Gold Production in 2013

Upload: ritesh-shethi

Post on 20-Oct-2015

28 views

Category:

Documents


1 download

DESCRIPTION

ghnv

TRANSCRIPT

  • TSXV:AIAOctober2012

    MaverickGoldProjectExpandingResourcesandAdvancingtoGoldProductionin2013

  • ForwardLookingStatements

    2

    Some statements contained in this presentation are forwardlooking and, therefore,involve uncertainties or risks that could cause actual results to differ materially. Suchforwardlooking statements include comments regarding mining and milling operations,mineral resource and reserve statements and exploration program performance. Factorsthat could cause actual results to differ materially include metal price volatility, economicand political events affecting metal supply and demand, fluctuations in mineralizationgrade, geological, technical, mining or processing problems, exploration programs andfuture results of exploration programs, future profitability and production.

    Historical resources in this presentation are historical estimates that predate NI 43101and are not compliant with current definitions, and have not been verified by thecompany; consequently, they should not be relied on by investors.

    www.aurigagold.ca

  • TheAurigaGoldOpportunity

    www.aurigagold.ca 3

    NeartermObjective Achievegoldproductionin2013(+40,000opa)andexpandgoldresourcesto+onemillionounces

    Vision Expandgoldproductionto100,000oz/yearanddoublegoldresourcestogreaterthan2millionounces

    throughexpansion,newdiscoveriesandregional/sectorconsolidation

    StrategicAdvantage FavourableminingjurisdictioninManitobawithregionalinfrastructure Low$18millioncapitalrequirementtoresumeproductionutilizingexistingmineandmillinfrastructure Existingpermitsandminingleaseinplace,NOAforopenpitminingtobesubmittedinOctober2012 Reducedriskopenpitminestartup Underexploredregionalgoldbearinggeologicalenvironment Managementexperiencedatdiscovery,resourceexpansion,developmentandoperations

    SuperiorInvestmentOpportunity AttractivevaluationEnterpriseValue/ouncevs PeerCompanies StrongvaluationofPricetoCashFlow

    PathtoProduction

    PropertyAcquisitionNovember2010

    InitialPuffyNI43101Resource

    August2011

    PuffyPEAOpenPit/UGJanuary2012

    InitialNokomis43101Resource

    CompleteMillRefurb

    TestMiningQ12013

    Production2013

  • ReFocusingonMaverickGoldProject,ManitobaRestartofMiningOperationsPlannedfor2013

    4

    HistoryofPuffyMineDevelopment/Operations OperatedfromJan88toApr89byPioneerMetals Produced29koz from19881989from370,000tonnes 1987Kilborn feasibilityrecommended500tpd mill:

    Capex:~32mln in1987/88 Pioneeractuallybuiltmillwithcapacityof1,000tpd;

    stillinexcellentconditiontoday 6.9kmu/gdriftingtoaverticaldepthof130m 1993Kilborn feasibility:

    Resource:524,376oz@~7.6g/tAu Reserve:184,[email protected]/tAu

    AurigaGoldDevelopmentatMaverick Neartermgoldproduction,withsignificant

    explorationupside 65kmfromFlin Flon,15kmfromSherridon Nearoperatinggoldandbasemetalmines,rail

    lineandpowerinfrastructure PositivePEAonopenpitandU/Gminingprogram

    Lowcapitalcostrequirementfor40,000ozAuperannumstartup($18.1millionCAPEX)

    NPV(pretax5%):$95.4Million(pretax8%):$79.6Million

    IRR(pretax)84% Explorationtargeting >1millionounces

    InitialNI43101,174,000ouncesIndicated,558,000ounces Inferred@~5.8g/tAu

    Experiencedmanagementwithaprovenrecordof

    minedevelopment,resourcediscovery

    andexpansion.

    www.aurigagold.ca

    T

    o

    n

    n

    a

    g

    e

    (

    t

    p

    d

    )

    Grade(g/t)

    00.511.522.533.544.5

    0

    200

    400

    600

    800

    1000

    1200

    Tonnage

    Grade

  • Auriga GoldCapitalStructureandSharePrice

    5

    Auriga GoldCorp.(AIA:TSXV)

    SharedataandcashpositionasofOctober2,2012

    SharesOutstanding 54,652,980

    WarrantsandOptionsO/S 28,013,768

    FullyDiluted 82,666,748

    MarketCapitalization $10.9million

    CashPosition $1.0million

    Debt $0.9million

    Indicativetermsheetsforgoldloanfacilitybeingreviewed*

    OptionsandWarrants

    No.ofWarrants/

    Options

    Avg.Exercise

    Price

    Options 3,107,500 $0.27

    Commonsharewarrants 24,906,268 $0.44

    Expiringb/wOct2012 February2017

    SignificantHolders Ownership

    PioneerMetals(Barrick Gold) 8.2%

    ClaudeResourcesInc. 6.2%

    ManagementandDirectors 5.2%

    InstitutionalHoldings 2.9%

    XstrataCanada 2.4%

    AIA:TSXVSharePrice

    Source:tmx.comandAuriga Gold

    www.aurigagold.ca*For details see June 21, 2012 PR

  • FundingOptionsGoldPrepayLoanAgreement:$23Million

    IndicativeTermSheet Totalloan:$23million AurigaGoldscapitalexpenditures:$18.1million Loanrepayment:monthlygolddeliveries

    averaginglessthan20%ofscheduledgoldproduction

    Term:repaymentover36monthsfollowinga6monthgraceperiod

    Goldpricing:Flexibilitytosellatprevailingmarketrates

    Subjecttoduediligence

    6 www.aurigagold.ca

  • AurigaGoldManagementandDirectorsFinance,DevelopmentandOperationalExpertiseinPlace

    7

    ExperienceinDiscovery,ResourceExpansion,MineDevelopmentandOperations

    www.aurigagold.ca

    Gorden Glenn, Interim President & CEO, DirectorOver 20 years experience in the financial industry as Investment Banker(TD Securities and Desjardins) and Research Analyst as well as variousroles in mining companies evaluating economic and technical validity ofmostly Canadian projects.

    Mike Kernick, General ManagerMr. Kernick has over 20 years experience in underground and open pitmining operations, particularly in narrow vein gold mining. FormerlyMine Superintendent at the Lake Shore Gold, Bell Creek Mine,Underground Superintendent at Trelawneys Chester Mine and prior tothat, Mine Manager at Liberty Mines RedstoneMine.

    Vic Hugo, CMA, Financial Controller and CFOAn accounting professional with over 15 years of international financialmanagement experience, particularly in the mining and manufacturingsectors.

    Eric Loch, PMP, Projects ManagerMr. Loch has over 20 years experience successfully building capitalprojects with understanding of project engineering and construction inthe mining and industrial sectors. He has held senior projectmanagement positions with DeBeers and Rio Tinto.

    Bruce Mackie, M.Sc., P.Geo., Geological and Technical AdvisorMr. Mackie is a professional geologist, with over 35 years of miningindustry experience in Canada and internationally. He has a provenexploration record, having managed several successful projects inuranium, gold and base metals in senior positions with Noranda, HemloGold and North American Palladium.

    Alison Tullis, Investor Relations ManagerEight years of investor relations experience in a variety of industrysectors most recently providing IR consulting services to miningcompanies.

    Chris Irwin, LL.M., DirectorMr. Irwin is President of Irwin Professional Corporation, a corporationproviding legal services mainly to the natural resource sector.

    James D.A. White, DirectorMr. White is the Managing Partner of Baynes & White, a Torontobasedpension and benefits actuarial consulting firm.

    Brian Robertson, P.Eng., DirectorOver 30 years experience in corporate management, explorationprograms, project management, mine permitting, construction,development and operation as well as the evaluations or corporateacquisitions.

  • MaverickGoldProjectExistingInfrastructure PastAuProduction ResourceExpansionPotential

    8

    PastProducingPuffyMineandMillDevelopment Produced28,000oz from19881989 Existing1,000tpd millandprovidesstartupto

    productionatreducedcapitalcost Existingportalandramptoundergroundmine

    workings 2012PEAmineplan:recoveryof348,000oz over

    7.5yearsatthePuffyDepositResourceExpansiontargeting>1Moz Gold ExpandandupgradegoldresourcesatPuffyand

    Nokomisdepositsbystepoutandinfilldrilling NumerousdrillingtargetsoutlinedfromVTEM

    surveyalong20kmgoldbearinghorizon Recentdrillingintersected7.63mwith125.08g/t

    AuatNokomis

  • 9MaverickGoldProjectPuffyDeposit GeologySurfacePlanandSection

    OPEN

    NI43101ResourceEstimate(August2011) 174,000ouncesIndicated,558,000ouncesInferred

    www.aurigagold.ca

    A385 [email protected]/[email protected]/tAu A383 2.0m

    @12.0g/tAu

    A384 [email protected]/tAu

    A381 [email protected]/tAu,[email protected]/tAU

  • 10

    MaverickGold PuffyMineSurfacePlanandResourceModel

    Portal/RamptoU/GMine

    N

    1000tpdMill

    1.5kmstrikelength,openonstrikeandtoNE

    open

    open

    open

    Underground workings

    Resources: IndicatedInferredPuffy Veins

    3DmodellookingW

    3DmodellookingNW

    www.aurigagold.ca

  • MaverickGoldProject PuffyMinePreliminaryEconomicAssessmentPEAFebruary2012 basedonAugust2011NI43101ResourceEstimate

    www.aurigagold.ca 11

    AverageAnnualProduction: 45,000oz/annumAuRecoverableGold1: 348,000recoveredoz [email protected]/tAudiluted

    20.3%fromopenpits;79.7%fromu/gMillingRate: 750tpdMillRecovery: 90%LifeofMine: 7.5years

    TotalCAPEX: $18.1M(incl.$3.02mcontingency)

    AverageLOMcashcost: CAD$949/oz

    UndiscountedCashFlow(pretax): $130.5MPayback: 20th month

    ofprocessingoreNPV(pretax,5%) 2: $95.4M(pretax,8%)2: $79.6 MIRR(pretax): 84%

    1. InitialMinePlaninFebruary2012PEA2. BasedongoldatUSD$1400/oz

    Goldprice,operatingcost,capitalcostsensitivityanalysis@8%NPV

  • MaverickGoldProject PuffyMinePreliminaryEconomicAssessmentPEAFebruary2012 basedonAugust2011NI43101Resource Estimate

    12

    Openpitcostanticipatedat$650/ozexcludingsustainingcapital

    20.3%ofgoldproductionfrominitiallowriskopenpitproduction

    $949/oz averageLOMoperatingcashcostincluding$77/oz sustainingcapital

    $18.1millionCapex toproduction

    $130.5millioncumulativecashflowat$1400/oz

    Paybackin20months

    www.aurigagold.ca

    $50,000,000

    $25,000,000

    $0

    $25,000,000

    $50,000,000

    $75,000,000

    $100,000,000

    $125,000,000

    $150,000,000

    $175,000,000

    $200,000,000

    oz

    10000oz

    20000oz

    30000oz

    40000oz

    50000oz

    60000oz

    OuncesRecovered

    CumulativeCashFlowat$1400/ozAuCumulativeCashFlowat$1600/ozAu

    112345678 112345678$0

    $200

    $400

    $600

    $800

    $1,000

    $1,200

    $1,400

    oz

    10000oz

    20000oz

    30000oz

    40000oz

    50000oz

    60000oz

    U/G

    OpenPit

    OperatingCost/oz

    TotalOp+SustCost/oz

  • MaverickGoldProject PuffyMineLongitudinalSectionFacingWest

    13

    Longitudinalsectionlookingwestshowingexistingundergroundworkings,proposedopenpits,andproposedstopes fromallzones.BasedonFebruary 2012PEAandAugust2011,NI43101Resource

    Estimate

    Pit 1

    RecoveredOunces

    OpenPits:Pit1:20,760ozPit2:4,950ozPit3:6,060ozPit4/5:37,740ozTotalPits:69,510oz

    UndergroundMiningAreas:Area1:49,000ozArea2:124,000ozArea3:108,000ozArea4:23,000ozTotalUndergound:304,000oz

    Pit 4/5Pit 1 Pit 2 Pit 3

    www.aurigagold.ca

    AREA 1

    AREA 3AREA 2

    AREA 4

  • 14

    MaverickGoldProjectMaverickMill 1000tpd

  • MaverickProject SignificantResourceExpansionPotential

    15

    Targetinginexcessof1,000,000ouncesgold

    WelldefinedmajorregionalgoldmineralizedstructureatthenorthernborderofFlin Flongreenstonebelt

    Ongoingdrillprogramtoexpandresources

    MaverickPropertycoversover20kmofstrikelength

    Targethaswelldefinedgeophysicstrendwithseveralshowingsfoundalongstrike

    InitialPuffyDepositNI43101GoldResourcesof174,000oz AuIndicatedand558,000oz

    HistoricalnearsurfaceresourcesatNokomis,potentialmillfeedforPuffyMill

    [email protected]/tAu

    PuffyDepositandOnsiteMill

    NokomisDeposit68,[email protected]/t

    www.aurigagold.ca

  • MaverickGold NokomisDeposit8kmNortheastfromtheMaverickMill

    16

    Potentialopenpitsatellitedeposit Confirmationdrillingprogramcomplete,A.C.A.Howe

    engagedtocompleteNI43101report,expectedinQ32012 Initialhighgradegoldintercepts

    125.08g/tover7.6m(incl.1,830g/tover0.5m); 12.27g/tover5.2m; 5.1g/tover6.4m; 9.65g/tover5.6m(incl.62.23g/tover0.5m)

    Highgradenearsurfacemineralization

    www.aurigagold.ca

  • MaverickGoldProductionTimeline

    17

    2 0 1 22 0 1 3 2 0 1 4

    Q 1 Q 2 Q 3 Q 4

    Resource ExpansionDrilling

    NI43101Reports

    Mill,powerandancillarybuildingrefurbishmentandsitepreparation

    Communityengagement

    Openpitandtestmining

    U/Gdevelopment anddewatering

    U/G teststope andmining

    Paybackcomplete@$1400/oz Au

    NOKOMISResource

    PUFFYFEAS.Study

    GoldProductionMilestone

  • MaverickGoldProjectPotentialGoldProductionExpansion

    18

    Areaconsolidation

    Tollmillingopportunities

    Resourceexpansionon

    majorstructure

    ++ExtendMineLife

    ExplorationsuccessonMaverick

    Gold

    MaverickPropertycovers20

    kmofmajorregional

    mineralizedstructure

    +ResourceExpansion

    NokomisDeposit

    HistoricalResource

    68,[email protected]/tAu

    8kmfromPuffyMineandMill

    Openpitpotential

    Targetingfullmillcapacityat

    1000tpd

    >50,000oz/yr

    CombinedU/Gandopenpit

    PEAStudy750tpd7.5yearminelife348,000

    recoveredgoldounces

    45,000oz/yr

    www.aurigagold.ca

  • Auriga GoldPeerComparison

    19

    Superiorinvestmentopportunity: 54.7millionshareso/s AttractiveEV/oz relativetopeers SuperiorprojectedannualCF/Share LowCAPEXtoproduction

    BasedonSeptember4,2012shareprices,totaloz includesreservesandresources,compiledfromsourcesbelievedtobereliable.Operatingcompanyproductionfiguresbasedonactualfinancialresults.Source:SEDAR,corporatewebsites. AurigaGoldproductionandcashflowdatabasedonFebruary2012PEA.Assumes$23Mgoldloanfacility(seepressreleasedatedJune21,2012).Thismodelisforcomparisonpurposesonlyandshouldnotbeconstruedasaspecificfinancingplan.

    $

    /

    o

    z

    Company SymbolShare

    Price($)SharesO/S

    (M)MarketCap

    ($M)Total

    Oz(M) Oz.paOp CostperOz.

    EnterpriseValue(EV

    $M) EV/ozEstCF$M@$1400 EV/CF

    Shares/AuOz

    PricetoCashFlow

    QMXGoldCorporation QMX.TO 0.40 30.1 $12.0 1.9 83,000 $1,400 $25.9 13.6 15.8 BrigusGold BRD.TO 0.92 217.3 $199.9 4.6 57,001 $800 $198.0 41.6 34.2 5.8 45.7 5.85xClaudeResources CRJ.TO 0.68 173.7 $118.1 4.1 44,756 $1,082 $75.1 18.5 14.2 5.3 42.5 8.30xGoldenBand GBN.V 0.17 284.7 $48.4 0.8 45,000 $1,076 $83.4 99.7 14.6 5.7 340.2 3.32xMetanor Resources MTO.V 0.26 226.6 $58.9 1.6 60,000 $464 $63.8 39.9 56.2 1.1 141.5 1.05xSanGold SGR.TO 0.76 325.3 $247.2 4.3 74,227 $970 $223.1 52.3 31.9 7.0 76.2 7.75xSt.AndrewsGold SAS.V 0.44 368.2 $162.2 5.2 74,022 $919 $153.8 29.4 35.6 4.3 70.4 4.55xAurigaGold AIA.V 0.20 54.7 $10.4 0.7 40,000 $950 $13.7 18.8 18.0 0.8 74.7 0.61xAurigaFullyFunded AIA.V 0.20 54.7 $10.4 0.7 40,000 $950 $37.4 51.1 18.0 2.1 74.7 0.61x

    0.020.040.060.080.0100.0120.0

    EV/oz

  • AurigaGoldSummary

    20

    MaverickGoldProject(100%) Manitoba Neartermgoldproduction,withexcellentexplorationupside Pastproducingproperty,withsignificantonsiteinfrastructure

    1000tpd mill,ancillaryfacilities,rampandundergroundworkings,roadaccesstoproperty,powerandraillines

    PositivePEAonU/Gandopenpittestminingonnearsurfaceresources CAPEX:$18.1Million;undiscountedcashflow:$130Million

    Managementexperiencedatdiscovery,resourceexpansion,developmentandoperations

    NI43101ResourceEstimate: 174,000ouncesIndicated,558,000ounces Inferred ContinuedresourceexpansionandupgradedrillingatNokomis

    andPuffydeposits

    Mokoman CopperGoldProperty(100%) Saskatchewan

    FoxPGMNiCuProperties(75100%) Manitoba

    Centrallylocatednearexistingminesand

    infrastructureintheFlin Flon Mining

    District,Manitoba

    www.aurigagold.ca

  • 21

    Formoreinformation:

    AurigaGoldCorp.A I A : T S XV8KingStreetEastSuite1300Toronto,ON

    AlisonTullisManager,InvestorRelations4162142785atullis@aurigagold.cawww.aurigagold.ca

    AIA_AurigaGoldAIA.AurigaGold

  • MaverickGoldProjectFlin Flon GoldandVMSBaseMetalDistricts

    22

    StrategicallylocatedinoneofManitobaspremierminingcamps accesstopeople,infrastructureandGOLD

    MAVERICKGOLDPROJECT

    FLINFLON

    SNOWLAKE

    SHERRIDON

    CRANBERRYLAKE

  • MaverickGoldProjectMineralResources AllZones

    23

    [email protected]/tcutoffgrade(undergroundmodel)

    ResourceCategory Tonnes Grade(g/t) InsituOzs Gold

    Indicated 702,000 6.29 142,000

    Inferred 3,018,000 5.65 548,000

    [email protected]/tcutoffgrade(openpitmodel)

    ResourceCategory Tonnes Grade(g/t) InsituOzsGold

    Indicated 242,000 4.16 32,000

    Inferred 78,000 3.81 10,000

    Nokomisadditionalsatelliteresources(undergroundmodel)

    ResourceCategory Tonnes Grade(g/t) InsituOzs Gold

    ProvenandProbable 349,110 6.10 68,523

    *HistoricalresourcesinthepresentationarehistoricalestimatesthatpredateNI43101andarenotcompliantwithcurrentdefinitions,havenotbeenverifiedbythecompanyandconsequentlyshouldnotbereliedonbyinvestors.

    NI43101ResourceEstimate October2011 Underground:3,720,000tonnes containing690,000oz Goldatacutoffgradeof2.5g/t;and OpenPit:320,000tonnes containing42,000 oz Goldata0.6g/tcutoffgrade

    HistoricalResources

    The resource was estimated by Fred Brown, CPG, and Eugene Puritch, P.Eng. of P&E Mining Consultants Inc. Mr. Puritch and Mr. Brown are Qualified Persons ("QPs") as defined by NI43101. Bruce Mackie, P.Geo., was QP for the Companys drill program and supervised the preparation of the scientific or technical information for the property. The contents of thispress release has been reviewed and approved by Mr. Brown, Mr. Puritch and Mr. Mackie. An NI 43101 technical report supporting this resource estimate will be filed on SEDAR within 45days of this press release.

  • PuffyMineCombinedU/GandOpenPitModelfromFebruary2012PEA

    OpenpitminingmethodandConventionalopenpitmining Mining:$5.50/tonnecostsbycontractor Definitiondrillingandgradecontrol $1.41/tonneof

    Wasterockstripping $4.50/tonnewasterock Undergroundminingmethod Roomandpillar(Slushblastedmuckdown30 diptosilldrift)

    costsbyCompanypersonnel Rampandventilationraises $3,000/metreMiningandtransporttomill $106/tonnemilledDefinitiondrillingandgradecontrol $2.97/tonnemilled

    Othercosts Processing $25/tmilledTailingsandwatermanagement $1/tmilledGeneralandAdministration $11.06/tmilledUndergroundmineindirectcosts $4.40/tmilledMineclosure $1.3M

    Totaloremilled 2,039,000t Miningrecovery Surface90%;U/G88% Averagedilutedheadgrade 5.8gAu/t Millthroughput 750tpd Millrecovery 90% Totalestimatedgoldrecovered 348,000troyoz Au Goldprice US$1,400/oz Au US$:CAD$exchangerate US$1=CAD$1.014

    Goldroyalty 3%Totalgrossrevenuefromgoldsales $478MPretaxundiscountedcashflow $130MPretaxNPV(5%) $95MPretaxNPV(8%) $79MPretaxIRR 84%PretaxPayback 2.5yrs

  • NoncoreProjectstobeRationalized

    Mokoman CopperGoldProperty(100%) Saskatchewan 1,500hapropertywithahistoricresourceof6.0milliontonnesat0.90%Cuand0.18g/t

    Au(NonNI43101)FoxPGMNiCuProperties(75100%) Manitoba 58,000hawithhighpotentialforPGMs+Ni/Cu GreatFallszonewithgrabsamplesupto5g/tPtPd+Au,1.1%Niand2.3%Cu

    25 www.aurigagold.ca