  • 7/24/2019 Control-M Training Doc

    1/27

    294804987.doc

    Control-M Training Document

    Document Type: Training

    Control-M Training Document

    Page 1

  • 7/24/2019 Control-M Training Doc

    2/27

    294804987.doc

    Training

    Introduction

    CONTROL M automates job processing in our data center.

    It performs virtually all the job handling tass of computer

    operators.

    It provides a user interface !hich enables the user to intervene inthe process of production management.

    It provides continual data and status information regarding jobprocessing.

    CONTROL M contains many facilities and components. "oring together#they all serve to automate your data center. This section introduces thesefacilities and components from a functional perspective# beginning !ith themajor components !hich comprise the heart of CONTROL M and

    progressing to the more minor components !hich enhance the functionalityof CONTROL M.

    Main Components

    The follo!ing components are essential to CONTROL M$

    %ob scheduling de&nitions

    'ctive %obs &le

    CONTROL M monitor

    Objective:

    The purpose of this document is to describe the speci&c %ob handlingsubmitted via CONTROL(M.

    This document !ill provide the frame!or and functional overvie! of the)MC CONTROL(M

    Control-M Training Document

    Page 2

  • 7/24/2019 Control-M Training Doc

    3/27

    294804987.doc

    Logging into BMC Control-MTo log into Control(M double clic on the Control(M *nterprise Managericon on the destop.

    CONTROL-M Enterprise Manager GUI 6.2.01.lnk

    The follo!ing logon screen !ill appear.

    To login to the di+erent environments select the 'dvanced button$

    ,or -rod $ ost Name$ //Host Name>>

    -ort Number$

    ,or 0' $ ost Name$ //Host Name>>

    -ort Number$

    ,or T1T$ ost Name$ //Host Name>>

    -ort Number$ Once the connection settings are entered clic 'pply settings.1erver should be ost Name.

    2ser Id3 cavie! -ass!ord$ 4initial is Temp556 /cliclogin7

    ' ne! session !ill need to be opened for each -rod# 0'# and T1T.

    Control-M Training Document

    Page 3

  • 7/24/2019 Control-M Training Doc

    4/27

    294804987.doc

    "hen logging in the follo!ing screen !ill appear$

    All Active Jobs$ 'll jobs !aiting8completed for the current scan

    day

    All Jobs$ 'll jobs scanned in for day including jobs that havebeen deleted. 9eleted jobs !ill be removed at the ne:t daysscan.

    Dynamic Filter$ the dynamic &lter can be used to &lter formore speci&c information

    'll 'ctive %obs is mostly used. Clic O;. This also can be added as adefault so it !ill login to the same place every time.

    *nterprise Manager

  • 7/24/2019 Control-M Training Doc

    5/27

    294804987.doc

    Current 'ctive ,ile 4ActiveJob File =AJF6

    Ctm>prod 3 Control M *nvironment

    'pplication

  • 7/24/2019 Control-M Training Doc

    6/27

    294804987.doc

    Nodes

    Change Title to %O)>N'M* /O;7

    Control-M Training Document

    Page 6

  • 7/24/2019 Control-M Training Doc

    7/27

    11/14/2015 11/14/2015 294804987.doc

    1 NODES & NODE GRO!S

    Node"' node is a place for !or to be performed. It could be a 2NI? node# a NTnode or it could be a printer. ' node must be de&ned to the !orload serverso that the server no!s that is has a !orload client and no!s the name

    of that client. ' client must also de&ne a node name for the !orload serverto be de&ned to the client.

    Node: Node name !ill be the server name

    Node Grou#"The node group pro&le de&nes a group of nodes !here !or can beperformed so that you can schedule !or to multiple nodes or the bestavailable node in a group. 2sing this approach re@uires that you have all

    needed resources for the job on every server that is de&ned to this nodegroup.

    $ C%LEND%RS

    %obs are scanned in to the job tracing system# using de&ned calendars !ithdates and8or times de&ned to the job.

    Control-M Training Document

    Page 7

  • 7/24/2019 Control-M Training Doc

    8/27

    11/14/2015 11/14/2015 294804987.doc

    RESORCES !RO'ILES

    Resource pro&les are used for !orload balancing. To de&ne a resourcepro&le# go to Control(M *nterprise Manager 4if not currently logged in thenlog in to desired environment6. 1elect Resources.

    There are four types of resources in Control M

    Prerequisite Conditions$ The out conditions sent out by jobsthat have completed successfully. These can be removed

    manually if a job stream8job needs to be rerun.

    Control Resource$ Not currently used. Resources that arede&ned as e:clusive or shared.

    Quantitative Resource$ Resources de&ned by @uantity.1tandards$ all jobs re@uire anASI>'LL and C-2Anodename@uantitative resource. 2sed to stop speci&c jobs from runningdue to scheduled outages.

    lobal Conditions$ Not currently used. a special case ofprere@uisite conditions that create job dependencies bet!eenCONTROL(M installations.

    Control-M Training Document

    Page 8

  • 7/24/2019 Control-M Training Doc

    9/27

    11/14/2015 11/14/2015 294804987.doc

    ( 'ILE )%*C+

    ,ile "atch constantly !atches for a speci&ed &le on a node. Once the &lede&ned is seen the &le !atch job !ill !atch the &le for :: amount of time to!atch it gro!. Once the number of iterations to !atch the speci&ed &le hasbeen met the &le !atch job !ill post a condition so the job !aiting for the&le !ill run.

    If a &le comes in multiple times a day the job and the &le !atch job must mede&ned as a cyclic process.

    't the ne! day scan the previous day &le !atch job !ill end and the ne:tdays if any !ill be scanned into the 'ctive ,ile.

    Control M &le !atch loos for!ard and !ill not loo bac for a &le.

    Control-M Training Document

    Page 9

  • 7/24/2019 Control-M Training Doc

    10/27

    11/14/2015 11/14/2015 294804987.doc

    , GRO!S & OBS

    Setting u# ne. Grou#"

    Grou#" /re 0older" or job" /nd 2o"t o Control M job" /re "et u# .it0Grou#"Grou#"3ob" /re de4ned in t0e Control-M De"5to# b6 t0e

    Enter#ri"e Sc0eduling *e/27 Mo"t o t0e inor2/tion i" gener/l /nd t0e2ore "#eci4c #/r2" /re on t0e job level78

    Go to Edit

    Sc0eduling Grou#" Ne.

    5.1.1

    eneral !ab

    Job Name"'t group level should be named same as group8table.

    #$ner "user that the job is running under%

    Aut&or "!ho set up the job 4default if not changed is emuser6

    !as'ty(e: 1cheduling prod# ctm>@a# or ctm>tst

    *c&edulin+ !able Name: )ust start $it& A((lication *ystem,denti-er de-ned .or t&e +rou( /A*,0 limit to B5 characters

    A((lication : A*,

    rou(: should be same as scheduling table name

    Control-M Training Document

    Page 10

  • 7/24/2019 Control-M Training Doc

    11/27

    11/14/2015 11/14/2015 294804987.doc

    !ime From: time group should start( no time speci&ed# group !illstart !ith scan. %obs in group !ill not run until preds or time issatis&ed at the job level

    1ntil: last possible time group can run

    Descri(tion: a description about the group limited to 5 characters.

    2*c&edulin+ !a+s /N#!3: used only on 4obs $it& +rou(s0

    !a+ Name: Name of calendar 4some have the group name6. Cande&ne multiple

    calendars# no calendars on job level.

    )ont& Days Calendar: 'ctual calendar name that the tag namerefers to.

    "hen setting this up mae sure all months are checed andonce the Month

    9ays calendar is &lled in used the greenchec mar to completethe calendar%

    )a5 6ait: Number of days group should stay in the active &le# mustbe completed

    for each calendar de&ned. green check when complete

    Active Date: From: date that group can start to run

    Control-M Training Document

    Page 11

  • 7/24/2019 Control-M Training Doc

    12/27

    11/14/2015 11/14/2015 294804987.doc

    1ntil: last date group !ill run

    Control-M Training Document

    Page 12

  • 7/24/2019 Control-M Training Doc

    13/27

    11/14/2015 11/14/2015 294804987.doc

    DConditions

    78delete

    Pencil8add ne! condition

    ,n Conditions" predecessors

    Name: group8job name pred

    Date: *!A! " !aiting for condition# does not loo at date

    #DA! 9 loos for condition from current order date

    PR3 9 loos for condition from previous date.

    once complete !ith pred information

    #ut Conditions 9 successors. Condition sent out to prere@uisitetable to satisfy other in conditions

    Control-M Training Document

    Page 13

  • 7/24/2019 Control-M Training Doc

    14/27

    11/14/2015 11/14/2015 294804987.doc

    2*et : used to specify 'uto*dit variables to be resolved before groupsubmission.

    Not used at group level

    Control-M Training Document

    Page 14

  • 7/24/2019 Control-M Training Doc

    15/27

    11/14/2015 11/14/2015 294804987.doc

    2*&outs"This panel is used to specify shout messages to be sent upon groupcompletion 4Not used at group level6

    PostProc: The panel indicates conditional post processing actions to be performed hen the last !ob in

    the gro"p finishes processing# depending on the s"ccessf"l or "ns"ccessf"l completion of all the !obs in

    the gro"p.

    Control-M Training Document

    Page 15

  • 7/24/2019 Control-M Training Doc

    16/27

    11/14/2015 11/14/2015 294804987.doc

    Setting u# ne. ob"

    %ob Name $ Name of job# M21T start !ith '1I. Limited to EF characters

    ,ile Name$ script job is running. Limited to B5 characters

    -ath Name$ path !here script is located

    O!ner$ 2ser id that runs the job

    'uthor$ job created by . . .

    Tastype$ %ob

    Table8

  • 7/24/2019 Control-M Training Doc

    17/27

    11/14/2015 11/14/2015 294804987.doc

    ,or group scheduling this panel is not used in the job level e:cept for the TagRelationship &eld.

    'nd3job !ill not load at scan time

    Or 3 job !ill scan

    Control-M Training Document

    Page 17

  • 7/24/2019 Control-M Training Doc

    18/27

    11/14/2015 11/14/2015 294804987.doc

    Cyclic$ chec if job is to run multiple times a day

    Interval$ number of minutes bet!een cycles

    Ma:imum$ Ma: number of times to run the job

    Ma:!ait$ number of days job !ill !ait in the active &le# group level ma:!aitoverrides job level.

    Time

    ,rom$ 1tart time of job

    2ntil$ end time of job( usually used to place an end time on a cyclic process

    Con&rm $ 3 scanning job into the 'ctive %ob ,ile 4'%,6 in con&rmation status. %ob!ill not run until con&rmed

    Node I98

  • 7/24/2019 Control-M Training Doc

    19/27

    11/14/2015 11/14/2015 294804987.doc

    IN conditions$ predecessors for job

    Name ( (name of pred job

    9ate ( ( O9'T $ current date

    1T'T$ doesnGt loo at date

    -R*H$ prior date

    Can use 4 6 to do 'nd8Or statements bet!een predecessors.

    O2T conditions$ condition posted to the prere@uisite table in Control M so otherjobs can run.

    Control-M Training Document

    Page 19

  • 7/24/2019 Control-M Training Doc

    20/27

    11/14/2015 11/14/2015 294804987.doc

    0uantative Resources$ resources de&ned that the job !ill !ait for before running

    Re@uired ( C-2A

    '1I>'LL

    Control Resources$ not used at this time. 'n *?CL21IH*81'R* type of resource.

    Control-M Training Document

    Page 20

  • 7/24/2019 Control-M Training Doc

    21/27

    11/14/2015 11/14/2015 294804987.doc

    1et Hariables$ -arms de&ned to a job

    Name 3 -'RM# -'RMB# etc

    Halue3parm sent

    JLI)M*M1KM re@uired to set

  • 7/24/2019 Control-M Training Doc

    22/27

    11/14/2015 11/14/2015 294804987.doc

    The 1teps panel indicates conditional post processing actions to be performed#depending on the outcome of speci&ed statements.

    This panel is used to de&ne On 1tatements and 9o 1tatements.

    Control-M Training Document

    Page 22

  • 7/24/2019 Control-M Training Doc

    23/27

    11/14/2015 11/14/2015 294804987.doc

    These Post Process definitions need to be in place to generate standard format alerts when any of theseconditions occur. Using the standard format alerts, the Event Management system will be able to forward alerts tolarify to open cases appropriately. !ormally, all "ob definitions should have a !#T#$ condition defined, as thiswill generate the alert and subse%uent larify case if the "ob aborts.

    The &To& field should always be set to &E'& to send the shout message to the ontrol(M )lert 'erver. To alert for "ob running too long* +hen* Eectime Urgency* Urgent 'hout Tet*

    --#+!E Eectime Eceeded To alert for "ob running not long enough* +hen* Eectime Urgency* Urgent 'hout Tet*

    --#+!E Eectime Too /ow

    To alert for "ob submitting0start1 too late* +hen* /ate 'ub Urgency* Urgent 'hout Tet*--#+!E Missed /ate 'ub

    To alert for "ob completing too late* +hen* /ate Time Urgency* Urgent 'hout Tet* --#+!E Missed /ate Time

    To alert for "ob abort2ended not ok* +hen* !#T#$ Urgency* 3ery Urgent 'hout Tet* --#+!E Ended !ot #$ 4--#MP'T)T

    Control-M Training Document

    Page 23

  • 7/24/2019 Control-M Training Doc

    24/27

    11/14/2015 11/14/2015 294804987.doc

    Tags 1election$ tag from group to de&ne calendar for the job.

    (multiple calendars can be de&ned to one job by selecting the appropriate tags fromthe tag list.

    (the tag must be de&ned at the group level in order for the job to use it.

    9 MONI*ORING CON*ROL-M OBS *+ROG+ EN*ER!RISEM%N%GER

    %obs !ill be able to be monitored as they process through Control(M *nterpriseManager. There are several status codes8colors# follo!ing is a list of those codes and

    there meanings. This can be seen by right clicing on the group and selecting 1tatus1ummary.

    Control-M Training Document

    Page 24

  • 7/24/2019 Control-M Training Doc

    25/27

    11/14/2015 11/14/2015 294804987.doc

    Control-M Training Document

    Page 25

    There are several options available for jobs in theEnterprise Manager. Right click on the job or groupand a list of available options will show up in bold

    print.

    Status Summary-a list of statuses and meaningsand stats on how many jobs are in a specific status. (see previous page)

    Properties-jobgroup detail information.

    Hold! "lace job on holdConfirm-satisfy a user confirmation status

    Free-Release from holdRerun-Restart a job

    Delete-Delete job from AJF. Deleted jobs will notpermanently be deleted until the next san.Undelete-if job is deleted an be plaed ba! inshedule with "ndelete

    Kill-stop a job that is urrently running.Force OK-mar! the job o!# ontinue with stream

    Sysout-Statistics view last run info on jobDocumentation

    Log!y"- loo! at what job is waiting on

    #eig!$or!ood-identifies jobs that arepredeessors or dependents of a seleted job or$roup %heduling table and highlights the nodes ofthose jobs in the Flow Diagram

    %ranc! menus-preds and suessors of jobseleted.

    Find in Flo&diagram-find it in the flow diagram

    view.

  • 7/24/2019 Control-M Training Doc

    26/27

    11/14/2015 11/14/2015 294804987.doc

    9717171 'lo. Di/gr/2 ie.: 'lo. di/gr/2 2ode di"#l/6" /dr/t cont/ining t0e job #roduction ;o. in / gr/#0ic or2/t7*0e job ;o. re;ect" job de#endencie" indic/ted b6#rere

  • 7/24/2019 Control-M Training Doc

    27/27

    11/14/2015 11/14/2015 294804987.doc

    Frequently Asked Questions

    $hen does the ne%t da& begin'

    The ne da& scan is at 11 am ()T. *ll !obs that are in green stat"s or that ha+e a ma% aitof 0 ill be remo+ed and the ne !obs for the da& ill be scanned in.

    ,o does a !ob ithin a gro"p get remo+ed from the scan temporaril&'

    -e"est the !ob to be e%pired in the gro"p. The Tag -elationship ill be changed from rto *nd hich ill allo all the other !obs in the gro"p to be scanned in. nce the !ob is read& to be

    scanned bac in change the Tag relationship bac to *nd.

    ,o does a gro"p get reran'

    f an entire gro"p needs to be reran then the o"t conditions for the gro"p if an&3 and the

    !obs m"st be remo+ed from the Prere"isite Table so the !obs in the gro"p ill r"n in the correctorder. -e"est the conditions to be remo+ed and a rer"n to the !obs.