ENVIRONMENTAL, HEALTH & SAFETY MANAGEMENT SYSTEM ST ANDARD CONTRACTOR EHS REQUIREMENTS 1.0 Introdut!on " #ur$o% '.0 So$ (.0 D )n!t !on% *.0 D +! t!on% -.0 EMS ISO 1*001/ ru !rnt% 2.0 Gnr 3 Ru!r nt% 4.0 H5 rd Cou n!t!on Ru!rnt% 6.0 En+!ron nt3 R u!r nt% 7.0 S8 t9 Ru!r nt% 10.0 Dount Contro3 Lo: A$$nd!; A R%tr!td C<!3% A$$nd!; =Contrtor C<!3 U% For A$$nd!; C S!t S$!) Ru!r nt% " In%trut!on% " #rodur% A$$nd!; DEHS Tr!n!n: & H3t< Sur+!33n U.S. On39/ A$$nd!; E Contrtor A>no?3d :nt o8 R!$t D!%3!r 8or D!%tr!@ut!on E;trn3 to A:!3nt The information provided in this document is condential, based on information available to Agilent Technologies, Inc. at the time of preparation and believed to be accurate. The information provided does not purport to be all-inclusive or contain all the information that is required by the third party to which Agilent has provided it. The information contained herein are provided “ A I! and are sub"ect to change without notice. Agilent ma#es no representations or warranties of any #ind, e$press or implied and will not be liable for any damages resulting from or in connection with their use. 1.0 INTRODUCTI ON " #UR#OSE  This document defnes respo nsibilities and pr ovides requir ements or planning and carrying out contractor work at Agilent T echnologies aciliti es. The purpose o these requirements is to minimize or eliminate risk to personnel health & saety and to the env ironment. This document co ntains basic saety inormation regarding emergency response proced ures or Contractors working at Agilent  T echnologies acilities. This document identifes some but not all work practices and procedures that must be ollowed to minimize impact to personnel health & saety and to the environment while working at Agilent Technologies. All Contractors and !ub"Contractors perorming work at Agilent T echnologies acilities are e#pected to comply with these requirements and all applicable laws and regulations o any governmental entity or sovereign authority that pertain to environmental health and saety standards and$or work practices. %ailure to abide by these requirements and applicable environmental health and saety standards and $or work practices may subect you or your frm to corrective action that may result in disqualifcation or uture consideration o work at Agilent or termination o any contract agreements with Agilent. 'hen attached to the Contractor$vendor agreement this document and its appendi#es b ecome part o the co ntract terms. The Contractor must ensure that the requirements put orth in this document are met and that all Contractor For external distribution see disclaimer on first and last page of document Any printed copy of this document is an uncontrolled document. The current version is available in the Enterprise Solutions Knowledge Portal at HTTP:wcosedoc.cos.agilent.comstellentgroupsehsdocumentsend!users""##$".doc Effective %& 'une &"%( Page " of &$ )ev %*

Upload: amitbanerjee51

Post on 03-Jun-2018

216 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Contractor EHS Requirements Standard

8/12/2019 Contractor EHS Requirements Standard

http://slidepdf.com/reader/full/contractor-ehs-requirements-standard 1/25

ENVIRONMENTAL, HEALTH & SAFETY MANAGEMENT SYSTEM STANDARD

CONTRACTOR EHS REQUIREMENTS

1.0 Introdut!on " #ur$o%'.0 So$(.0 D)n!t!on%*.0 D+!t!on%-.0 EMS ISO 1*001/ ru!rnt%2.0 Gnr3 Ru!rnt%4.0 H5rd Coun!t!on Ru!rnt%6.0 En+!ronnt3 Ru!rnt%7.0 S8t9 Ru!rnt%10.0 Dount Contro3 Lo:A$$nd!; AR%tr!td C<!3%A$$nd!; =Contrtor C<!3 U% ForA$$nd!; CS!t S$!) Ru!rnt% " In%trut!on% " #rodur%A$$nd!; DEHS Tr!n!n: & H3t< Sur+!33n U.S. On39/A$$nd!; EContrtor A>no?3d:nt o8 R!$t

D!%3!r 8or D!%tr!@ut!on E;trn3 to A:!3nt The information provided in this document iscondential, based on information available to Agilent Technologies, Inc. at the time of preparation andbelieved to be accurate. The information provided does not purport to be all-inclusive or contain all theinformation that is required by the third party to which Agilent has provided it. The information containedherein are provided “A I! and are sub"ect to change without notice. Agilent ma#es no representations orwarranties of any #ind, e$press or implied and will not be liable for any damages resulting from or inconnection with their use.

1.0 INTRODUCTION " #UR#OSE

 This document defnes responsibilities and provides requirements or planning andcarrying out contractor work at Agilent Technologies acilities. The purpose othese requirements is to minimize or eliminate risk to personnel health & saetyand to the environment. This document contains basic saety inormationregarding emergency response procedures or Contractors working at Agilent

 Technologies acilities. This document identifes some but not all work practicesand procedures that must be ollowed to minimize impact to personnel health &saety and to the environment while working at Agilent Technologies.

All Contractors and !ub"Contractors perorming work at Agilent Technologiesacilities are e#pected to comply with these requirements and all applicable lawsand regulations o any governmental entity or sovereign authority that pertain toenvironmental health and saety standards and$or work practices. %ailure toabide by these requirements and applicable environmental health and saetystandards and $or work practices may subect you or your frm to corrective actionthat may result in disqualifcation or uture consideration o work at Agilent ortermination o any contract agreements with Agilent.

'hen attached to the Contractor$vendor agreement this document and itsappendi#es become part o the contract terms. The Contractor must ensure thatthe requirements put orth in this document are met and that all Contractor

For external distribution see disclaimer on first and last page of document

Any printed copy of this document is an uncontrolled document. The current version is available in the Enterprise Solutions Knowledge Portal atHTTP:wcosedoc.cos.agilent.comstellentgroupsehsdocumentsend!users""##$".doc

Effective %& 'une &"%( Page " of &$ )ev %*

Page 2: Contractor EHS Requirements Standard

8/12/2019 Contractor EHS Requirements Standard

http://slidepdf.com/reader/full/contractor-ehs-requirements-standard 2/25

ENVIRONMENTAL, HEALTH & SAFETY MANAGEMENT SYSTEM STANDARD

CONTRACTOR EHS REQUIREMENTS

personnel and !ub"Contractor personnel are trained in and comply with allaspects o this document.

'.0 SCO#E

 These requirements apply to Contractors classifed as ollows()ow *mpact Contractors must comply with requirements in sections +., and -.,.igh *mpact Contractors must comply with requirements in sections +., / 0.,.

Lo? I$t Contrtor% 1erorm activities at Agilent Technologies acilities thatmost likely will not have a negative impact on the environment or health & saetyo other employees on site. )ow *mpact Contractors are not involved with highrisk type activities 2e.g. chemical electrical mechanical or elevated suraces3.

4#amples o )ow *mpact Contractor activities include( %ood service securityconsultants engineering architectural o5ce equipment repair and maintenanceo5ce services 2copy center3 *normation Technology 2*T3 !ervices etc.

H!:< I$t Contrtor% 1erorm activities at Agilent Technologies acilities thatmay have a potential negative impact on the environment or the health & saetyo other employees on site. igh *mpact Activities include but are not limited to(• 'orking in chemical usage areas like chemical storage areas waste treatment

waste storage areas waer abs biotech labs and chemical labs.

• 'orking with tools machines or systems that contain process chemicals orchemical wastes.

• 'orking with chemicals or delivering chemicals.

• 'orking on energized electrical circuits and$or electrical related activities• 'orking with mechanical equipment and$or machinery

• 'orking on e#posed elevated work suraces above - eet.

• Construction related activities

• 6ther high"risk activities determined by the 1roect 7anager and$or 4!.

4#amples o igh *mpact Contractor activities may include( construction tradesacility operations and maintenance environmental$az7at cleanup anddecontamination process equipment installation calibration repair maintenancetesting chemical delivery warehousing shipping$receiving operationslandscaping pest control anitorial services etc. 24#amples are possibilities8 the

actual category o a contractor is determined by the type o operations theyperorm.3

 These requirements 96 :6T apply to 4#ternal Temporary 'orkers 24T';s %.

(.0 DEFINITIONS

 For external distribution see disclaimer on first and last page of document

Any printed copy of this document is an uncontrolled document. The current version is available in the Enterprise Solutions Knowledge Portal atHTTP:wcosedoc.cos.agilent.comstellentgroupsehsdocumentsend!users""##$".doc

Effective %& 'une &"%( Page % of &$ )ev %*

Page 3: Contractor EHS Requirements Standard

8/12/2019 Contractor EHS Requirements Standard

http://slidepdf.com/reader/full/contractor-ehs-requirements-standard 3/25

ENVIRONMENTAL, HEALTH & SAFETY MANAGEMENT SYSTEM STANDARD

CONTRACTOR EHS REQUIREMENTS

(.1 A:!3nt #roBt Mn:r " A:!3nt Ho%t The Agilent representative assigned to oversee and coordinate proects involving

Contractor work. *n the situation where a 1roect 7anager may have a regionalrole managing the Contractor an Agilent ost is the site contact.

(.' ContrtorA frm who is contracted directly with Agilent to perorm work or provide serviceson the premises o Agilent Technologies *nc.

(.( 6ther terms used in this standard are defned in Agilent 4! !tandard /D)n!t!on%.

*.0 DEVIATIONS

9eviations rom this document are not permitted e#cept in cases where localregulations are more stringent.

-.0 ENVIRONMENTAL MANAGEMENT SYSTEM ISO 1*001/REQUIREMENTS

Applicable to both Low Impact  andHigh Impact Contractors.

Agilent Technologies has registered all manuacturing sites to the *!6 <=,,<4nvironmental 7anagement !ystem based on the Agilent Technologies Corporate4nvironmental ealth & !aety 7anagement !ystem. To maintain this

registration sites are required to demonstrate strong commitment toenvironmental regulatory compliance resource conservation and pollutionprevention. Contractors are an integral part o this *!6 <=,,< certifcation e>ort.

 Thereore Agilent Contractors are e#pected to ully support and cooperate withthese e>orts.

Agilent Technologies 4nvironmental 1olicyAgilent will act in an environmentally responsible manner in regard to ouroperations products and services. To achieve this result we will(<. 6perate a common environmental management system that includes

reporting o our perormance and the practice o continual improvement.?. 4nsure our products and operations comply with relevant environmental

legislation and regulations.@. Conduct our operations in a manner that is committed to recycling

conservations o resources prevention o pollution and promotion oenvironmental responsibility among our employees.

=. esponsibly manage the use o hazardous materials in our operationsproducts and services and promote recycling or reuse o our products.

For external distribution see disclaimer on first and last page of document

Any printed copy of this document is an uncontrolled document. The current version is available in the Enterprise Solutions Knowledge Portal atHTTP:wcosedoc.cos.agilent.comstellentgroupsehsdocumentsend!users""##$".doc

Effective %& 'une &"%( Page & of &$ )ev %*

Page 4: Contractor EHS Requirements Standard

8/12/2019 Contractor EHS Requirements Standard

http://slidepdf.com/reader/full/contractor-ehs-requirements-standard 4/25

ENVIRONMENTAL, HEALTH & SAFETY MANAGEMENT SYSTEM STANDARD

CONTRACTOR EHS REQUIREMENTS

+. *norm suppliers including contractors o our environmental e#pectationsand require them to adopt environmental management practices alignedwith these e#pectations.

http($$www.agilent.com$about$epolicy.pd 

A:!3nt T<no3o:!% Ou$t!on3 H3t< nd S8t9 #o3!9Agilent will create the health and saety practices and work environments thatenable our people to work inury and illness ree. To achieve this result we will(<. Assure managers and employees are trained and accountable or

preventing work related inuries and illnesses.?. 4nsure Agilent Technologies operations comply with applicable occupational

health and saety regulations.@. 6perate an occupational health and saety management system that

includes providing accurate inormation about the health and saety aspects

o our operations and maintain the practice o continual improvement.=. 1romote wellness programs that contribute to the productivity health andwell being o employees.

+. *norm suppliers including contractors o our occupational health andsaety e#pectations and require them to adopt sound occupational healthand saety management practices.

<tt$""???.:!3nt.o"@out"o<%$o3!9.$d8 

2.0 GENERAL REQUIREMENTS

Applicable to both Low Impact  and High Impact Contractors.

2.1 R:u3tor9 Co$3!n The Contractor and !ub"Contractor personnel shall(• 4nsure compliance with all applicable laws and regulations o any

governmental entity or sovereign authority that pertain toenvironmental health and saety standards and$or work practices.

 This would include developing and implementing appropriate ob"specifc 4! programs.

• Correct unsae work practices conditions and regulatory violationscommitted by Contractor and !ub"Contractor personnel.

• :otiy the Agilent 1roect 7anager$ost o conditions or practicesound on site that could result in serious inury property damage or

environmental damage.

2.' Er:n9 R$ort!n:1

9ial the site emergency number to report any emergency.

2.( Md!3 Er:n!%1

% !ee Appendi# C or site specifc inormation

 For external distribution see disclaimer on first and last page of document

Any printed copy of this document is an uncontrolled document. The current version is available in the Enterprise Solutions Knowledge Portal atHTTP:wcosedoc.cos.agilent.comstellentgroupsehsdocumentsend!users""##$".doc

Effective %& 'une &"%( Page ( of &$ )ev %*

Page 5: Contractor EHS Requirements Standard

8/12/2019 Contractor EHS Requirements Standard

http://slidepdf.com/reader/full/contractor-ehs-requirements-standard 5/25

ENVIRONMENTAL, HEALTH & SAFETY MANAGEMENT SYSTEM STANDARD

CONTRACTOR EHS REQUIREMENTS

*n the event o a medical emergency and when an infrmary clinic orhospital is not in reasonable pro#imity to an Agilent site the Contractor isresponsible or providing trained frst aid responders and adequate frst aidsupplies per local urisdiction. The Contractor doesn;t have to have on"sitefrst aid capabilities but they must have a process that doesn;t rely onAgilent.

7any Agilent sites have trained emergency responders who may respond tomedical emergencies. owever Agilent 4mergency esponse Teams maynot be available during all work hours or on weekends and holidays.

2.* E+ut!on%1

All Contractor and !ub"Contractor personnel must know the evacuationalarm signals emergency evacuation routes and evacuation

assembly$staging areas or their primary work locations. 'hen the buildingalarm sounds or notifcation is given all individuals 7B!T evacuate.

2.- In!dnt R$ort!n:All incidents resulting in inuries that require medical treatment 2i.e. morethan frst aid3 and property damage or near miss incidents that couldhave resulted in serious inury or property damage must immediately bereported to the Agilent 1roect 7anager$ost in writing or via email. A copyo the completed incident report must be given to the Agilent 1roect7anager$ost within =D hours.

2.2 R$ort o8 InBur!%

 The contractor shall report to the Agilent 1roect 7anager $ost all work"related inuries and illnesses involving Contractor$!ubcontractor workersthat require medical treatment 2i.e. more than frst aid3 as soon as theContractor obtains knowledge o such incident.

 The Contractor is also responsible or maintaining records o lost time andrestricted time that result rom work"related inuries or illnesses sustainedby its workers or subcontractor workers assigned to work at Agilent. Theserecords shall be available or inspection upon request by Agilent within thescope o applicable data privacy regulations.

 The Contractor is responsible or immediately notiying the appropriate

regulatory agencies or related governmental entities or sovereignauthorities and$or insurance carrier as required by country or local

 urisdiction o any occupational inury or illness involving thecontractor$subcontractor workers. The contractor is urther responsible orcompleting and submitting any reports or other records required by theabove notifcations.

For external distribution see disclaimer on first and last page of document

Any printed copy of this document is an uncontrolled document. The current version is available in the Enterprise Solutions Knowledge Portal atHTTP:wcosedoc.cos.agilent.comstellentgroupsehsdocumentsend!users""##$".doc

Effective %& 'une &"%( Page + of &$ )ev %*

Page 6: Contractor EHS Requirements Standard

8/12/2019 Contractor EHS Requirements Standard

http://slidepdf.com/reader/full/contractor-ehs-requirements-standard 6/25

ENVIRONMENTAL, HEALTH & SAFETY MANAGEMENT SYSTEM STANDARD

CONTRACTOR EHS REQUIREMENTS

2.4 In!dnt In+%t!:t!onAll serious or potentially serious incidents involving Contractor and

!ubcontractor personnel on Agilent property or those that involve Agilentemployees or property damage will be investigated ointly by theContractor the Agilent 1roect 7anager$ost and a member o the Agilent4! sta> when available.

2.6 H5rd R$ort!n:Any identifed hazards discovered by the contractor that is beyond theirability and$or responsibility to f# must be immediately reported to theAgilent 1roect 7anager$ost or immediate corrective action.

2.7 Er:n9 Eu!$nt A%%Access to emergency equipment 2including electrical panels3 must be kept

clear at all times 2e.g. fre e#tinguishers emergency showers $ eyewashstations alarm pull stations 74T bo#es A49;s 4T equipment wheelchairs etc.3.

4mergency 4quipment must not be removed or relocated without approvalrom an Agilent 1roect 7anager.

2.10 InBur9 I33n%% #r+nt!on #ro:r " S8t9 #ro:r The contractor shall develop and maintain all appropriate saety programsor inury and illness prevention programs or its workers assigned to Agilent.!uch programs shall include training that is appropriate to the general typeo work which Contractor;s worker is to perorm and shall adhere to all

regulatory requirements.

2.11 S8t9 Eu!$nt1rior to commencement o an assignment contractor will assure thatcontract and subcontract personnel are outftted with all appropriatepersonal protective equipment 21143 that is issued or the specifc person2e.g. steel"toed shoes and prescription saety glasses with side shields3 andappropriate Egeneral issueF 114 2e.g. hearing protection and non"prescription saety glasses3 and 114 or site specifc hazards 2e.g.respirators and laser eye protection3.

2.1' Corrt!+ At!on #ro%% The Contractor must implement a process to track closure o any correctiveactions identifed as a result o an incident investigation compliance auditor non"conormance with our 4nvironmental ealth & !aety 7anagement!ystem.

For external distribution see disclaimer on first and last page of document

Any printed copy of this document is an uncontrolled document. The current version is available in the Enterprise Solutions Knowledge Portal atHTTP:wcosedoc.cos.agilent.comstellentgroupsehsdocumentsend!users""##$".doc

Effective %& 'une &"%( Page $ of &$ )ev %*

Page 7: Contractor EHS Requirements Standard

8/12/2019 Contractor EHS Requirements Standard

http://slidepdf.com/reader/full/contractor-ehs-requirements-standard 7/25

ENVIRONMENTAL, HEALTH & SAFETY MANAGEMENT SYSTEM STANDARD

CONTRACTOR EHS REQUIREMENTS

2.1( So>!n: #o3!91

Agilent Technologies has a :6 !76G*:H policy or all owned or leased

acilities. !moking is not permitted inside any building or structure nearany building entrances near air intakes or common paths o travel.!moking is only allowed in designated outdoor E!76G*:H A4A!F.

2.1* En+!ronnt3 H3t< & S8t9 Tr!n!n: The Contractor is responsible or ensuring all o its employees andsubcontractors have the proper training with regard to environmentalhealth and saety and are competent to perorm their ob unctions atAgilent work sites. Contractor will participate in any limited training o>eredby Agilent to ensure that Contractor employees and subcontractors areamiliar with Agilent;s products saety procedures and environmentalrequirements etc. The Contractor will make a copy o the content o their

training available to Agilent upon request. Agilent may provide theContractor with a copy o Agilent;s training content or comparisonpurposes. The Contractor is not allowed to use any material with theAgilent name or logo unless authorized by Agilent.

 Training e#pectations or contractors working at non"B.!. Agilent sites arecovered by the paragraph above and local country regulations. Additionalinormation on the training e#pectations or contractors working at Agilentsites in the B.!. are contained in Appendi# 9.

2.1- L!n%% " #r!t% The Contractor must ensure all contractor and subcontract personnel have

the required licenses or permits or the work they perorm. 

2.12 C3n Roo #rotoo31

Agilent defned gowning protocol must be ollowed in areas sensitive tocontamination 2e.g. laboratories biotech labs etc.3.

2.14 #r>!n: " TrAll tra5c rules must be obeyed while on Agilent properties including stopsigns yield signs parking restrictions pedestrian crosswalks and postedspeed limits.

2.16 U% o8 Eu!$nt " V<!3% The Contractor must provide their own tools equipment and vehicles. Alltools and equipment must be clearly label with ownership identifcation.

2.17 N? Eu!$nt1

% !ee Appendi# C or site specifc inormation% see Appendi# C or site specifc inormation

 For external distribution see disclaimer on first and last page of document

Any printed copy of this document is an uncontrolled document. The current version is available in the Enterprise Solutions Knowledge Portal atHTTP:wcosedoc.cos.agilent.comstellentgroupsehsdocumentsend!users""##$".doc

Effective %& 'une &"%( Page * of &$ )ev %*

Page 8: Contractor EHS Requirements Standard

8/12/2019 Contractor EHS Requirements Standard

http://slidepdf.com/reader/full/contractor-ehs-requirements-standard 8/25

ENVIRONMENTAL, HEALTH & SAFETY MANAGEMENT SYSTEM STANDARD

CONTRACTOR EHS REQUIREMENTS

:ew equipment purchased or leased on AgilentIs behal that poses acilityor environmental and$or saety concerns must ollow site E:ew 4quipment1urchase procedures. Coordinate with the Agilent 1roect 7anager$ost.

2.'0 V!%!tor%Contractors are not allowed to bring visitors or amily onto the site unlesspre"approved by the Agilent 1roect 7anager $ ost.

2.'1 =<+!or% t<t ?!33 @ on%!drd !%ondut !n3ud•  Thet damage or unauthorized possession or use o property$systems.

• Bnauthorized access to computer fles.

• Bse possession sale dissemination or other involvement in illegaldrugs or controlled substances.

• Bnauthorized use or possession o alcohol.

• Jeing under the inKuence o alcohol drugs or controlled substances.

• Acts o physical violence or acts involving threats intimidationharassment or coercion.

• *ntroduction onto Agilent Technologies property o e#plosives frearmschemicals or other dangerous weapons or devices and the like withoutAgilent Technologies prior written permission.

• !aety violations which present a risk o serious inury or propertydamage.

• Creation viewing distribution or storage o se#ually e#plicit materials.

2.'' Sto$$!n: or> 

%or an 4! violation Agilent may direct the contractor to immediately stopwork and leave the site.

4.0 HAARD COMMUNICATION

Applicable to High Impact Contractors 2i contractor and$or subcontractorsbring chemicals onto an Agilent !ite or contract employees are working with or inclose pro#imity to chemicals or chemical delivery systems.3

4.1 R%tr!td C<!3%!ee Appendi# A or a list o chemicals restricted rom use at Agilent sites.

4.' C<!3 A$$ro+3All hazardous chemicals 2solids liquids and gases including compressedgases3 used on Agilent sites must be pre"approved by Agilent 4! !ta>.

4.( Contractor and their subcontractors must complete the ContractorChemical Bse %orm or equivalent 2where the required inormation is listed3

For external distribution see disclaimer on first and last page of document

Any printed copy of this document is an uncontrolled document. The current version is available in the Enterprise Solutions Knowledge Portal atHTTP:wcosedoc.cos.agilent.comstellentgroupsehsdocumentsend!users""##$".doc

Effective %& 'une &"%( Page , of &$ )ev %*

Page 9: Contractor EHS Requirements Standard

8/12/2019 Contractor EHS Requirements Standard

http://slidepdf.com/reader/full/contractor-ehs-requirements-standard 9/25

Page 10: Contractor EHS Requirements Standard

8/12/2019 Contractor EHS Requirements Standard

http://slidepdf.com/reader/full/contractor-ehs-requirements-standard 10/25

ENVIRONMENTAL, HEALTH & SAFETY MANAGEMENT SYSTEM STANDARD

CONTRACTOR EHS REQUIREMENTS

Contractors are e#pected to understand and comply with all laws and regulationso any governmental entity or sovereign authority that pertains to environmentalhealth and saety standards and work practices applicable to the activities theyperorm. Additional requirements specifc to Agilent are listed in sections D.</ D.-.

6.1 H5rdou% Cont!n!n: =u!3d!n: Mtr!3%1

!ome Agilent acilities may have hazardous containing building materials2CJ73 2e.g. asbestos lead based paints polychlorinated biphenyls 21CJs3 eractory Ceramic %ibers 2C%s33 and Agilent recognizes its duty to inormcontractors o any known presence o CJ7 2sites may be required byregulation to maintain an asbestos register see appendi# C or site specifcinormation3. The Contractor must inorm all Contractor and !ub"Contractorpersonnel o the presence o CJ7 in the areas identifed. Contractor and!ub"Contractor personnel shall avoid disturbing CJ7 materials on ceiling

pipes boilers or other areas.

Contractors who plan to disturb CJ7 must inorm the Agilent 1roect7anager$ost well in advance to ensure proper notifcation is met andbusinesses have enough time to plan or potential interruptions. 6nlypersons licensed and trained in CJ7 operations and maintenance orremoval activities shall perorm any work that may disturb or removehazardous containing building materials.

* material is ound suspected o containing CJ7 that has not beenidentifed on the site"specifc inormation a certifed asbestos inspector orqualifed CJ7 technician or material other than asbestos must investigate

this material beore the suspect material is disturbed.

emoval o asbestos"containing Koor tile must ollow Agilent 6perations and7aintenance 1rocedures or working on asbestos"containing Koor coverings.

9amaged asbestos material or debris shall not be disturbed. * contractorpersonnel fnd asbestos"containing materials that have been damaged theymust report it to their supervisor and the Agilent 1roect 7anager$ost.

CJ7 materials shall not be used in renovation or new construction on anyAgilent site.

6.' Indoor A!r Qu3!t9Jeore beginning activities that will generate odors in or near occupiedareas or building air intakes 2e.g. using paints adhesives combustionengines or other odor"producing chemicals or processes3 Agilent 1roect7anagement$ost must be contacted to pre"plan appropriate controls andan employee communication plan as appropriate. Lentilation or otherprocess controls must be provided to prevent the buildup o vapors or gases

 For external distribution see disclaimer on first and last page of document

Any printed copy of this document is an uncontrolled document. The current version is available in the Enterprise Solutions Knowledge Portal atHTTP:wcosedoc.cos.agilent.comstellentgroupsehsdocumentsend!users""##$".doc

Effective %& 'une &"%( Page - of &$ )ev %*

Page 11: Contractor EHS Requirements Standard

8/12/2019 Contractor EHS Requirements Standard

http://slidepdf.com/reader/full/contractor-ehs-requirements-standard 11/25

ENVIRONMENTAL, HEALTH & SAFETY MANAGEMENT SYSTEM STANDARD

CONTRACTOR EHS REQUIREMENTS

that could result in health hazards fre hazards or nuisance odors. * odorscannot be adequately controlled activities must be completed when area isunoccupied.

*ndoor use o internal combustion engine driven equipment is not normallypermitted indoors but i so must have scrubbers installed and$or beevaluated or carbon mono#ide buildup and odor generation prior to use.Air monitoring and portable blowers are required to control carbonmono#ide buildup.

6.( Stor Dr!n #rott!on The discharge o anything to the storm drain other than rainwater isprohibited. 6utdoor activities must be reviewed to include plans to preventaccidental release to the storm drain and contain any unplanned release

2e.g. power washing operations must implement damming and suctioningo residual3. :ote( many roo drains eventually drain to storm drains.

6.* %t Mn:nt nd D!%$o%3

%t?tr D!%$o%3 / The discharge o any material must be to theproper drain. Agilent acilities contain drains or sanitary sewage industrialwastewater treatment and may have acilities or Kammable solventcollection or other liquid wastes. Activities generating waste liquids mustbe pre"planned with Agilent 1roect 7anagement$ost and Agilent 4! toveriy the appropriate drain or collection method or waste discharge.

H5rdou% %t /  The Contractor is responsible or all contractor andsubcontractor purchased chemicals and any hazardous waste generated bythe contractor and subcontractor using their purchased materials in theordinary course o their work e.g. let over paint etc. The Contractor isresponsible or the prompt removal rom Agilent sites o any suchhazardous waste generated and or ollowing all applicable laws ordisposal. Agilent '1!$4! is responsible or managing the o>"site transerand disposal o the hazardous waste that is hazardous due to Agilentbusiness processes e.g. removal o contaminated duct work or equipmentetc. *t may be necessary to make ob or task specifc determinations as towho EownsF specifc hazardous waste the Contractor or Agilent.

So3!d %t Stor:, D!%$o%3, nd R93!n: /  The Contractorand !ubcontractor personnel are required to sort separate and recyclerecyclable materials while perorming work on the Agilent site. TheContractor and the !ubcontractor personnel will adhere to the ollowing(• :o hazardous wastes will be placed into any trash receptacle or

compactor on Agilent sites.

For external distribution see disclaimer on first and last page of document

Any printed copy of this document is an uncontrolled document. The current version is available in the Enterprise Solutions Knowledge Portal atHTTP:wcosedoc.cos.agilent.comstellentgroupsehsdocumentsend!users""##$".doc

Effective %& 'une &"%( Page %" of &$ )ev %*

Page 12: Contractor EHS Requirements Standard

8/12/2019 Contractor EHS Requirements Standard

http://slidepdf.com/reader/full/contractor-ehs-requirements-standard 12/25

ENVIRONMENTAL, HEALTH & SAFETY MANAGEMENT SYSTEM STANDARD

CONTRACTOR EHS REQUIREMENTS

• All chemical containers must be empty beore placing them in any trashreceptacle. 4mpty is defned as having no liquids pastes or large

amounts o residue remaining in the container. * not empty chemicalcontainer may be required to be disposed o as hazardous waste.•  The Contractor must remove chemical containers brought on site by the

Contractor.

6.- Dont!nt!on1

!ome Agilent acilities contain process piping process ductwork andprocess tools that carry or contain hazardous materials. 9econtaminationand sample verifcation must be completed beore the pipes ductworkand$or process tools are removed rom the site unless arrangements havebeen made or suitable o>site treatment or disposal.

6.2 C<!3 R3%Agilent 1roect 7anagement$ost and Agilent 4! must be notifedimmediately regarding any chemical release to air ground water or stormdrain.

7.0 SAFETY REQUIREMENTS

Applicable to High Impact Contractors and activity creating potential healthand saety concerns or building occupants.

Contractors are e#pected to understand and comply with all applicable laws andregulations o any governmental entity or sovereign authority that pertain toenvironmental health and saety standards and$or work practices applicable tothe activities they perorm. These include but are not limited to(

• !torage handling and use o Kammable liquids and hazardous materials

• !torage handling and use o compressed gas cylinders

• 1eriodic saety inspections o equipment and work"site housekeeping

• Bse o all protection while working at heights

• %ollowing electrical saety practices and lock out $ tag out procedures

• 1roper use o personal protective equipment

• 1roper maintenance and use o ladders and other equipment

• Huarding o wall and Koor openings open trenches and e#cavations

At Agilent;s written request the Contractor or their !ubcontractors must providedocumentation o its completion o any regulatory obligations under thisagreement. The Contractor shall maintain documentation and verifcation owork"related certifcations and licenses o its workers or subcontractors.

% see Appendi# C or site specifc inormation

 For external distribution see disclaimer on first and last page of document

Any printed copy of this document is an uncontrolled document. The current version is available in the Enterprise Solutions Knowledge Portal atHTTP:wcosedoc.cos.agilent.comstellentgroupsehsdocumentsend!users""##$".doc

Effective %& 'une &"%( Page %% of &$ )ev %*

Page 13: Contractor EHS Requirements Standard

8/12/2019 Contractor EHS Requirements Standard

http://slidepdf.com/reader/full/contractor-ehs-requirements-standard 13/25

ENVIRONMENTAL, HEALTH & SAFETY MANAGEMENT SYSTEM STANDARD

CONTRACTOR EHS REQUIREMENTS

Additional saety requirements specifc to Agilent !ites are listed in sections 0.< /0.<=.

7.1 Con%trut!on nd Rno+t!on H5rd%'hen construction or demolition work may create harmul e#posures to theenvironment or building occupants the Agilent 1roect 7anager$ost andAgilent 4! must be involved in planning appropriate controls to managethe hazards and communicate appropriate inormation to buildingoccupants.

7.' Hot or> 1

• A ot 'ork 1ermit process approved by Agilent and$or their lossprevention engineering frm is required or any temporary operationinvolving open Kame heat or spark production. This includes but is not

limited to brazing cutting grinding soldering pipes thawing weldingand torch"applied roofng. This permit must also meet the minimumrequirements o any applicable laws and regulations o anygovernmental entity or sovereign authority.

#rut!on% u%t @ t>n to $r+nt !ntr8rn ?!t< r :%dtt!on u!$nt nd %o> dttor% t<t 9 +ut t<r or t< @u!3d!n:. 1

 To prevent the ormation o to#ic gases caused by decomposition weldingand other hot work are prohibited in areas where the vapors o chlorinatedhydrocarbons may be present in the atmosphere.

7.( Con)nd S$%1

!ome Agilent sites contain Confned !paces and 1ermit equired Confned!paces. 4ntry into 1ermit equired Confned !pace must meet localregulatory requirements including rescue availability. Activities should beperormed remotely rom outside the confned space i possible.• Agilent 4! must be notifed o any construction activities that create a

new confned space.

• Agilent 4! must be notifed o any confned spaces that have not beenidentifed with signs or are not on the inventory list.

7.* E3tr!3 S8t96nly individuals meeting local requirements or qualifcation licensing andtraining will install repair modiy or remove electrical service wiring orequipment at Agilent sites.

% see Appendi# C or site specifc inormation% see Appendi# C or site specifc inormation<

 For external distribution see disclaimer on first and last page of document

Any printed copy of this document is an uncontrolled document. The current version is available in the Enterprise Solutions Knowledge Portal atHTTP:wcosedoc.cos.agilent.comstellentgroupsehsdocumentsend!users""##$".doc

Effective %& 'une &"%( Page %& of &$ )ev %*

Page 14: Contractor EHS Requirements Standard

8/12/2019 Contractor EHS Requirements Standard

http://slidepdf.com/reader/full/contractor-ehs-requirements-standard 14/25

ENVIRONMENTAL, HEALTH & SAFETY MANAGEMENT SYSTEM STANDARD

CONTRACTOR EHS REQUIREMENTS

4lectrical work should be perormed on de"energized circuits unless acompelling reason e#ists requiring the work be conducted on energizedelectrical circuits. 4#ceptions are made or testing and calibrating oequipment that must be operating to be tested or calibrated.

* energized electrical work will be perormed the Contractor is e#pected toimplement an 4nergized 4lectrical 'ork program with appropriate workpermits guarding 114 and sae work practices. Bnguarded energized partsshall not be let unattended.

7.- Lo> Out " T: Out Enr:9 Contro3 #ro:r/ The Contractor shall implement an energy control program 2)ock out $ Tag6ut3 that meets applicable laws and regulations o any governmental entity

or sovereign authority that pertain to environmental health and saetystandards and$or work practices to include control o electrical and otherorms o hazardous energy as necessary.• Contractors must coordinate )6T6 activities with Agilent 1roect

7anager$ost when employees o both Agilent and the Contractor or!ubcontractor are involved.

7.2 A!%3%, E;!t%, nd 3>!n: Sur8%All e#its aisle ways and other walking suraces must be kept ree and clearo equipment tools materials debris and other tripping or slipping hazardsat all times.

'hen construction activities create a hazard or pedestrians the area mustbe barricaded to prevent entry and 94T6B signs posted to redirectpedestrian tra5c. Agilent 1roect 7anager$ost and$or 4! must reviewany plans to block an e#it aisle.

Agilent 1roect 7anagement must approve temporary staging oconstruction tools and materials in corridors. Cones or barricades must beused to isolate any staged equipment and identiy the owner o theequipment.

7.4 Hou%>$!n:9ebris and other scrap materials o the ob must be cleaned up daily and

placed in debris bo#es or other suitable containers or disposal on a regularbasis.

7.6 F!r #rott!on S9%t% nd Ut!3!t!% I$!rnt%1

% see Appendi# C or site specifc inormation

 For external distribution see disclaimer on first and last page of document

Any printed copy of this document is an uncontrolled document. The current version is available in the Enterprise Solutions Knowledge Portal atHTTP:wcosedoc.cos.agilent.comstellentgroupsehsdocumentsend!users""##$".doc

Effective %& 'une &"%( Page %( of &$ )ev %*

Page 15: Contractor EHS Requirements Standard

8/12/2019 Contractor EHS Requirements Standard

http://slidepdf.com/reader/full/contractor-ehs-requirements-standard 15/25

ENVIRONMENTAL, HEALTH & SAFETY MANAGEMENT SYSTEM STANDARD

CONTRACTOR EHS REQUIREMENTS

• 'ork on fre protection systems that requires the system to be impairedmust meet the e#pectations o Agilent and$or their loss prevention

engineering frm. This process must also meet the minimumrequirements o any applicable laws and regulations o anygovernmental entity or sovereign authority.

Contractor personnel shall never operate any switch or valve used tocontrol building services processes or equipment unless authorized by theAgilent 1roect 7anager$ost. 

7.7 O+r<d ?or> 6verhead work above another person is strictly prohibited. An Ee#clusionzoneF with a sae radius must be cordoned o> with warning tape andwarning signs below overhead work areas. Additional precautions must be

taken to prevent damage rom alling tools when overhead work must occurabove equipment or production lines.

7.10 Strutur3 Su$$ort%Approval rom the Agilent 1roect 7anager$ost must be received beoredrilling or cutting into building structural components.

7.11 No!%Activities involving equipment and tools that produce high noise levels 2M+dJA or over3 should be avoided in occupied areas during working hours.!hort duration activities 2less than <+ minutes3 may be perormed withpermission o the Agilent 1roect 7anager$ost.

7.1' #o?dr Atutd " Cord!t Crtr!d: Too3% The use o powder"actuated$cordite cartridge tools is prohibited in Agilentbuildings. The Agilent 1roect 7anager$ost and 4! !ta> may giveapproval or the use o such tools in special cases. All uses o powderactuated$cordite cartridge tools must comply with applicable regulations.

7.1( Crn, H3!o$tr, nd Ho!%t L!8t%1

Crane and helicopter lits require a ECrane )it 1ermitF and appropriate pre"planning with the Agilent 1roect 7anager$ost.

 

7.1* or>!n: A3on1ersonnel working in potentially hazardous locations should have at leastone other person present at all times or be under continuous surveillanceby a responsible person as consistent with local regulations and thecontractor;s internal requirements.

% see Appendi# C or site specifc inormation

 For external distribution see disclaimer on first and last page of document

Any printed copy of this document is an uncontrolled document. The current version is available in the Enterprise Solutions Knowledge Portal atHTTP:wcosedoc.cos.agilent.comstellentgroupsehsdocumentsend!users""##$".doc

Effective %& 'une &"%( Page %+ of &$ )ev %*

Page 16: Contractor EHS Requirements Standard

8/12/2019 Contractor EHS Requirements Standard

http://slidepdf.com/reader/full/contractor-ehs-requirements-standard 16/25

ENVIRONMENTAL, HEALTH & SAFETY MANAGEMENT SYSTEM STANDARD

CONTRACTOR EHS REQUIREMENTS

10.0DOCUMENT CONTROL LOG

Dount Contro3 nd A$$ro+3Lersions o this document prior to its import into the Gnowledge 1ortal are consideredobsolete versions. To access revision history and document ownership inormation ater

migrating to the Gnowledge 1ortal clic# here and then select the

For external distribution see disclaimer on first and last page of document

Any printed copy of this document is an uncontrolled document. The current version is available in the Enterprise Solutions Knowledge Portal atHTTP:wcosedoc.cos.agilent.comstellentgroupsehsdocumentsend!users""##$".doc

Effective %& 'une &"%( Page %$ of &$ )ev %*

Page 17: Contractor EHS Requirements Standard

8/12/2019 Contractor EHS Requirements Standard

http://slidepdf.com/reader/full/contractor-ehs-requirements-standard 17/25

ENVIRONMENTAL, HEALTH & SAFETY MANAGEMENT SYSTEM STANDARD

CONTRACTOR EHS REQUIREMENTS

A##ENDI A

RESTRICTED CHEMICALS

Certain chemicals are restricted rom use within Agilent because o their potentialadverse e>ects and the commercial availability o viable substitutes. Agilent;s positionon these chemicals is summarized in Agilent;s 4! 1osition !tatement( estrictedChemicals.

A%@%to%

Asbestos is a known human carcinogen that has viable substitutes or all constructionapplications. Asbestos"containing material is not allowed in any new construction or oruse in building modifcations and repairs within Agilent.

• Asbestos 2CA!N <@@?"?<"=3 also known as actinolite amianthus amosite

amphibole anthophyllite chrysotile crocidolite and tremolite. The prohibition against using asbestos"containing material in new construction or orbuilding modifcations and repairs is contained in Agilent 4! !tandard *ndustrialygiene !ection [email protected] a3.

O5on D$3t!n: Su@%tn%

Larious chloroKuorocarbons 2C%Cs3 and hydrochloroKuorocarbons 2C%Cs3 are associatedwith a decrease in the earth;s ozone layer. Collectively these compounds are reerred toas 6zone 9epleting !ubstances 269!s3. The prohibition against using 69!s inmanuacturing and details on Agilent;s phase out o 69!s is contained in Agilent 4!1osition !tatement / 69! 4limination.

G39o3 Et<r%

Certain ethylene"based glycol ethers and their acetates were associated withmiscarriages in a study o the semiconductor industry. Jecause o this associationAgilent and other maor electronics companies have banned or restricted their use.4#cept or use as analytical check standards the ollowing fve compounds are bannedrom use within Agilent(

<. ?"7etho#yethanol 2CA!N <,0"D-"=3

?. ?"7etho#yethyl acetate 2CA!N <<,"=0"-3

@. ?"4tho#yethyl acetate 2CA!N <<<"<+"03

=. ?"4tho#yethanol 2CA!N <<,"D,"+3+. 9iethylene glycol dimethyl ether 2CA!N <<<"0-"-3

 The prohibition against using these fve compounds is in Agilent 4! 1osition !tatement/ Hlycol 4ther 4limination.

Ot<r #otnt!339 H5rdou% C<!3%

 For external distribution see disclaimer on first and last page of document

Any printed copy of this document is an uncontrolled document. The current version is available in the Enterprise Solutions Knowledge Portal atHTTP:wcosedoc.cos.agilent.comstellentgroupsehsdocumentsend!users""##$".doc

Effective %& 'une &"%( Page %* of &$ )ev %*

Page 18: Contractor EHS Requirements Standard

8/12/2019 Contractor EHS Requirements Standard

http://slidepdf.com/reader/full/contractor-ehs-requirements-standard 18/25

ENVIRONMENTAL, HEALTH & SAFETY MANAGEMENT SYSTEM STANDARD

CONTRACTOR EHS REQUIREMENTS

 The company"wide list o restricted chemicals is kept to a minimum so as not toneedlessly limit the technology. owever consistent with the hierarchy o controls ormitigating risks all Agilent entities need to aggressively eliminate or seek out viableless hazardous substitutes or the potentially hazardous chemicals used in theiroperations. 'hen less hazardous substitutes are not available the volume o potentiallyhazardous chemicals stored and in"use needs to be kept at the lowest amount practical.

 For external distribution see disclaimer on first and last page of document

Any printed copy of this document is an uncontrolled document. The current version is available in the Enterprise Solutions Knowledge Portal atHTTP:wcosedoc.cos.agilent.comstellentgroupsehsdocumentsend!users""##$".doc

Effective %& 'une &"%( Page %, of &$ )ev %*

Page 19: Contractor EHS Requirements Standard

8/12/2019 Contractor EHS Requirements Standard

http://slidepdf.com/reader/full/contractor-ehs-requirements-standard 19/25

ENVIRONMENTAL, HEALTH & SAFETY MANAGEMENT SYSTEM STANDARD

CONTRACTOR EHS REQUIREMENTS

A##ENDI = CONTRACTOR CHEMICAL USE FORM

In%trut!on% T< Contrtor %<33 o@t!n $r!or ?r!ttn EHS $$ro+3 8or 33 <5rdou%<!3% $ro$o%d 8or u%, @9 t< ontrt $r%onn3 nd"or %u@ontrtor $r%onn3,t 33 A:!3nt %!t%.

Contractor/User Information:

Contractor: Agilent Project Manager:

Contractor Contact & Phone: Agilent Project Number (or PO#):

Date Submitted: Location:

Hazardous Substance(s) Information: A comlete! legible! u"to"date Saet$ Data Sheet (SDS) %hall be attached or each roo%ed haardou% %ub%tance'

Name of Hazardous Substance

 (as it appears on SDS)

  Duration of Use

Permanent or Longterm !emporar"

 

Description of Hazardous Substance: (pick all that apply)

 Adhe%ie a%e% Solder Oil *n+% ,lu- Paint.Coating Cleaner.Degrea%er 

Solent Plating Chemical Corro%ie Other (%eci$):

CONTAINS NO HAZARDOUS MATERIALS (See SDS)

/uantit$ to be u%ed: 0ate o 1%e:

2here 3ill chemical be u%ed4 5ldg'.Po%t:

Process Description:

Proce%% chemical 3ill be u%ed in

Method o %torage: Chemical cabinet 6an+ Other 7777777777777777777777777 

Method o di%o%al: 77777777777777777777777777777777777777777777777777777777777777777777  Attach additional 8Contractor Chemical 1%e ,orm%8 or haardou% %ub%tance% a% nece%%ar$'

#gi$ent !ec%no$ogies& '$oba$ orp$ace Ser*ices +HS #ppro*a$ Agilent9% ;S aroal %igniie% ermi%%ion to bring the haardou% chemical on %ite'

6he Contractor %hall retain %ole re%on%ibilit$ to coml$ 3ith alicable la3% and regulation% goerning the u%e and di%o%al o chemical%'6he Contractor %hall coordinate haard communication to occuant% in or near area% o their haardou% %ub%tance(%) u%e 3ith the AgilentProject Manager'

;S Aroal or 1%e: 777777777777777777777777777777777777777777777777 Date: 7777777777777

Secial ;S Comment%.Con%ideration%.0e<uirement%: 7777777777777777777777777777777777777777777777777777777777777777777777777777777777777777  7777777777777777777777777777777777777777777777777777777777777777777777777777777777777777 

 For external distribution see disclaimer on first and last page of document

Any printed copy of this document is an uncontrolled document. The current version is available in the Enterprise Solutions Knowledge Portal atHTTP:wcosedoc.cos.agilent.comstellentgroupsehsdocumentsend!users""##$".doc

Effective %& 'une &"%( Page %# of &$ )ev %*

Page 20: Contractor EHS Requirements Standard

8/12/2019 Contractor EHS Requirements Standard

http://slidepdf.com/reader/full/contractor-ehs-requirements-standard 20/25

ENVIRONMENTAL, HEALTH & SAFETY MANAGEMENT SYSTEM STANDARD

CONTRACTOR EHS REQUIREMENTS

Contractor Management 0ere%entatie: 7777777777777777777777777777777777 Date: 77777777777777 

A##ENDI C

SITE S#ECIFIC REQUIREMENTS " #ROCEDURES " INSTRUCTIONS

)ocal 4! !ta> have created separate attachments containing site specifc inormationon the ollowing topics. !ee web link athttps($$wps.service.agilent.com$globalPehs$contractorPmgmt$contractorPsaety$inde#.htm

4mergency 1hone :umber4vacuation 1roceduresazard Communication *normation 4#change!moking AreasArea !pecifc Clean oom 1rotocol

:ew 4quipment 1urchasing 1roceduresAsbestos Containing Juilding 7aterial inormation)ead Containing Juilding 7aterials inormation9econtamination 1roceduresConstruction 7aterial 9isposal 1roceduresConfned !pace *nventory & azard 4valuation inormation%ire !ystem 'ork 1roceduresot 'ork 1ermit proceduresCrane $ elicopter )it 1ermit procedures%ire 1revention 1lan4nvironmental ealth & !aety Aspects

SITES MAY CHOOSE TO ADD THE FOLLOING DOCUMENTATION

• Acknowledgement o receipt o Appendi# C inormation

• 9ocumentation o contractor training on Appendi# C elements

 For external distribution see disclaimer on first and last page of document

Any printed copy of this document is an uncontrolled document. The current version is available in the Enterprise Solutions Knowledge Portal atHTTP:wcosedoc.cos.agilent.comstellentgroupsehsdocumentsend!users""##$".doc

Effective %& 'une &"%( Page %- of &$ )ev %*

Page 21: Contractor EHS Requirements Standard

8/12/2019 Contractor EHS Requirements Standard

http://slidepdf.com/reader/full/contractor-ehs-requirements-standard 21/25

ENVIRONMENTAL, HEALTH & SAFETY MANAGEMENT SYSTEM STANDARD

CONTRACTOR EHS REQUIREMENTS

A##ENDI D

EHS TRAINING & HEATH SURVEILLANCE U.S. ONLY/

%or work on Agilent sites in the B.!. by contractor2s3 2both proect contractor work andcontinuous contractor work3 three types o 4!"related training is applicable(

Gnr3 EHS Tr!n!n:Heneral 4! training is conducted by Contractor or a third party hired byContractor to provide such training. Contractor is responsible or providing theacility trainers and supplies needed or such training. Contractor is responsibleor travel local transportation and living e#penses or its employees includingwages while attending any and all general training. Contractor will be responsibleor maintaining records o completion or all its employees subcontractors oragents or general 4! training and upon request will be provided to Agilent.

A:!3nt EHS Tr!n!n:(Agilent 4! training is conducted by Agilent or an Agilent approved third partyresource either at an Agilent acility or at a mutually agreed upon site. Agilentsponsors and supplies the acility trainers and needed supplies or Agilent 4!training. Contractor is responsible or travel local transportation and livinge#penses or its employees including wages while attending Agilent 4! training.Agilent maintains records o completion or Agilent specifc 4! training which isavailable upon request.

A:!3nt O$rt!n: #rodur%(Agilent requires that all contract employees are amiliar with and have su5cientlyreviewed required standard operating procedures and required processes defnedby Agilent when initially approved and once per year thereater. Agilent specifcnon"technical procedures and processes are made available to Contractor andContractor is responsible or conducting said trainings and reviews. *t is theContractor;s responsibility to maintain associated training records and to be ableto supply proo o completion upon request. Contractor is responsible or travellocal transportation living e#penses and wages while attending or conducting thistraining.

As applicable or the specifc work being contracted courses that are considered as

Gnr3 EHS Tr!n!n: include but are not limited to(• Jiosaety

• Jloodborne 1athogens

• Chemical !aety

• Chemical !aety in the )aboratory

• Confned !pace 4ntry

• Cryogenics 2supplemented with Agilent saety procedure2s33

 For external distribution see disclaimer on first and last page of document

Any printed copy of this document is an uncontrolled document. The current version is available in the Enterprise Solutions Knowledge Portal atHTTP:wcosedoc.cos.agilent.comstellentgroupsehsdocumentsend!users""##$".doc

Effective %& 'une &"%( Page &" of &$ )ev %*

Page 22: Contractor EHS Requirements Standard

8/12/2019 Contractor EHS Requirements Standard

http://slidepdf.com/reader/full/contractor-ehs-requirements-standard 22/25

ENVIRONMENTAL, HEALTH & SAFETY MANAGEMENT SYSTEM STANDARD

CONTRACTOR EHS REQUIREMENTS

• 9angerous Hoods Transportation

• 4lectrical !aety

%all 1rotection• %orklit$1owered *ndustrial Truck

• Has Cylinder andling

• Heneral 4rgonomics

• azardous 7aterials 7anagement$Awareness

• azardous !ubstance Communication

• oist & Crane !aety

• *onizing adiation

• )ockout$Tagout

• :oise$earing Conservation

• 1ersonal 1rotective 4quipment 21143

• espiratory 1rotection

Courses that are A:!3nt EHS Tr!n!n: are those courses that are specifc to a uniquehazard associated with work at Agilent. %or e#ample a contractor that perormsmanuacturing work involving chemicals would be e#pected to have successullycompleted Chemical !aety and azcom training but i the work involves the use o ahazardous chemical with unique hazard such as a specifc hydroKuoric acid solutiontraining on the hazards and controls or that hydroKuoric acid solution would be A:!3ntEHS Tr!n!n: that would be needed in addition to general Chemical !aety and azcomtraining.

*n certain cases an 4!"related training course can be considered both Gnr3 EHS

Tr!n!n: andA:!3nt EHS Tr!n!n: depending on the type o contractor training beingprovided. %or e#ample a contractor that perorms manuacturing work involving the useo open"beamed high powered lasers would be e#pected to have successully completed)aser !aety Training as Gnr3 EHS Tr!n!n:. owever a contractor 2e.g. anitor3that needs to enter a laser use area at Agilent may need to successully complete aversion o )aser !aety Training and i so that training would be considered A:!3nt EHSTr!n!n: or the anitor. The distinction being a competent contractor hired to perormwork involving the use o lasers is e#pected to be knowledgeable in laser saety while acompetent anitor is not e#pected to be knowledgeable in laser saety. %or the anitorlaser hazards and controls may be unique to his or her work at Agilent.

6ther e#amples o A:!3nt EHS Tr!n!n: may include but are not limited to(

• 7ethylene Chloride )ead Arsenic and other chemicals with specifc regulatorytraining requirements

• 17 Has Training specifc to the site

• Agilent 1roduct !aety Training

• !ite"!pecifc 4mergency Training

• !ite azardous 'aste Awareness

 For external distribution see disclaimer on first and last page of document

Any printed copy of this document is an uncontrolled document. The current version is available in the Enterprise Solutions Knowledge Portal atHTTP:wcosedoc.cos.agilent.comstellentgroupsehsdocumentsend!users""##$".doc

Effective %& 'une &"%( Page &% of &$ )ev %*

Page 23: Contractor EHS Requirements Standard

8/12/2019 Contractor EHS Requirements Standard

http://slidepdf.com/reader/full/contractor-ehs-requirements-standard 23/25

Page 24: Contractor EHS Requirements Standard

8/12/2019 Contractor EHS Requirements Standard

http://slidepdf.com/reader/full/contractor-ehs-requirements-standard 24/25

ENVIRONMENTAL, HEALTH & SAFETY MANAGEMENT SYSTEM STANDARD

CONTRACTOR EHS REQUIREMENTS

A##ENDI E

CONTRACTOR ACNOLEDGEMENT OF RECEI#T

* have received and reviewed the Agilent Contractor 4!equirements and understand the requirements applicable toactivities our company will be perorming at Agilent Technologies.

'e will make sure all employees o our company and !ub"Contractorcompanies understand and agree to the requirements applicable tothe activities our company will be perorming.

Agilent Technologies Company :ame

!ignature(26ptional3

!ignature(

 Typed :ame( Typed :ame(

 Title( Title(

9ate( 9ate(

D!%3!r 8or D!%tr!@ut!on E;trn3 to A:!3nt The information provided in this document iscondential, based on information available to Agilent Technologies, Inc. at the time of preparation andbelieved to be accurate. The information provided does not purport to be all-inclusive or contain all the

For external distribution see disclaimer on first and last page of document

Any printed copy of this document is an uncontrolled document. The current version is available in the Enterprise Solutions Knowledge Portal atHTTP:wcosedoc.cos.agilent.comstellentgroupsehsdocumentsend!users""##$".doc

Effective %& 'une &"%( Page &( of &$ )ev %*

Page 25: Contractor EHS Requirements Standard

8/12/2019 Contractor EHS Requirements Standard

http://slidepdf.com/reader/full/contractor-ehs-requirements-standard 25/25

ENVIRONMENTAL, HEALTH & SAFETY MANAGEMENT SYSTEM STANDARD

CONTRACTOR EHS REQUIREMENTS

information that is required by the third party to which Agilent has provided it. The information containedherein are provided “A I! and are sub"ect to change without notice. Agilent ma#es no representations orwarranties of any #ind, e$press or implied and will not be liable for any damages resulting from or in