contractor safety ehs standard & requirements. agenda: background definitions ehs standard ...

47
Contractor Safety EHS standard & Requirements

Upload: letitia-sharlene-bruce

Post on 23-Dec-2015

256 views

Category:

Documents


5 download

TRANSCRIPT

Page 1: Contractor Safety EHS standard & Requirements. Agenda:  Background  Definitions  EHS standard  Metrics  Self Assessment tool Contractor Safety

Contractor SafetyContractor SafetyEHS standard & Requirements

Page 2: Contractor Safety EHS standard & Requirements. Agenda:  Background  Definitions  EHS standard  Metrics  Self Assessment tool Contractor Safety

Agenda: Background Definitions EHS standard Metrics Self Assessment tool

Contractor SafetyContractor Safety

Page 3: Contractor Safety EHS standard & Requirements. Agenda:  Background  Definitions  EHS standard  Metrics  Self Assessment tool Contractor Safety

Agenda: Background Definitions EHS standard Metrics Self Assessment tool

Contractor SafetyContractor Safety

Page 4: Contractor Safety EHS standard & Requirements. Agenda:  Background  Definitions  EHS standard  Metrics  Self Assessment tool Contractor Safety

BackgroundBackground Australia - February 18, 2000

A contractor was welding on piping attached to a process tank when flammable vapors inside the tank ignited. The hatch cover on the tank was blown free of the tank striking the welder in the head with a fatal blow.

Switzerland - July 13, 2002

 A contractor was operating a “stand-up“ lift truck in a building under construction when the lift truck dislodged a temporary cover over an opening in the floor. The contractor fell through the opening 23 feet to his death.

Venezuela - July 26, 2003

 A contractor was replacing a section of damaged roof when he lost his balance and fell through the damaged roofing material 19 feet to his death.

Ireland - March 19, 2004

A contractor was handling acetylene cylinders when a powerful explosion occurred that killed the worker and injured a co-worker.

Puerto Rico - July 8, 2005

A structural steel contractor’s employees were assembling the decking material of a new equipment platform when a section became dislodged, causing the workers to fall from through the elevated deck and killing one worker and injuring a second as they struck the ground below.

Puerto Rico - July 17th , 2007

As part of an expansion, a new lighting circuit needed to be connected to the existing circuits located inside an electrical box. The subcontractor was evaluating existing circuits when he received a shock of approximately 277 volts/ 20 A.

Page 5: Contractor Safety EHS standard & Requirements. Agenda:  Background  Definitions  EHS standard  Metrics  Self Assessment tool Contractor Safety

BackgroundBackground

Q1/2008 • 6 Contractor Accidents

• 1 Amputation • 3 Potential Casualties

Page 6: Contractor Safety EHS standard & Requirements. Agenda:  Background  Definitions  EHS standard  Metrics  Self Assessment tool Contractor Safety

Agenda: Background Definitions EHS standard Metrics Self Assessment tool

Contractor SafetyContractor Safety

Page 7: Contractor Safety EHS standard & Requirements. Agenda:  Background  Definitions  EHS standard  Metrics  Self Assessment tool Contractor Safety

DefinitionsDefinitions What is a contractor ?

General term Individual or companyHired to provide services => upfront agreed scope of work

(I.E Period of time/ Defined deliverables, Project, etc….)

Responsible for means & methodsPayments as defined in:– contract, service agreement or equivalent

Not a J&J employee Not directly supervised by J&J staff

Page 8: Contractor Safety EHS standard & Requirements. Agenda:  Background  Definitions  EHS standard  Metrics  Self Assessment tool Contractor Safety

DefinitionsDefinitions Sub-contractor

Hired by the contractorTo execute a part of his work Specialized in particular tasks

Page 9: Contractor Safety EHS standard & Requirements. Agenda:  Background  Definitions  EHS standard  Metrics  Self Assessment tool Contractor Safety

DefinitionsDefinitions Different Contractor types

ATS :– Administrative & Technical Services

Housekeeping/janitorial, food service, premise security, Information technology, research technicians, engineering design, equipment and software validation/development, etc

Page 10: Contractor Safety EHS standard & Requirements. Agenda:  Background  Definitions  EHS standard  Metrics  Self Assessment tool Contractor Safety

DefinitionsDefinitions Different Contractor types

BGS :–Building, Grounds, and Equipment Maintenance

Includes minor installation and maintenance of heating, ventilation, air conditioning (HVAC), electrical systems and equipment, plumbing systems and equipment, maintenance of J&J production equipment etc.

Page 11: Contractor Safety EHS standard & Requirements. Agenda:  Background  Definitions  EHS standard  Metrics  Self Assessment tool Contractor Safety

DefinitionsDefinitions Different Contractor types

CPS :– Construction Project Services

Employed in the Construction, Renovation, or Demolition/Removal of Buildings, Facilities or Equipment on projects funded by J&J or affiliate companies for their business purposes or use.

Page 12: Contractor Safety EHS standard & Requirements. Agenda:  Background  Definitions  EHS standard  Metrics  Self Assessment tool Contractor Safety

DefinitionsDefinitions J&J contract owner

J&J employee– Maintains contacts between contractor company & J&J– Is responsible for approving supplied services or work

Before contractor gets paid

Can be at different levels in an organization

Page 13: Contractor Safety EHS standard & Requirements. Agenda:  Background  Definitions  EHS standard  Metrics  Self Assessment tool Contractor Safety

Agenda: Background Definitions EHS standard Metrics Self Assessment tool

Contractor SafetyContractor Safety

Page 14: Contractor Safety EHS standard & Requirements. Agenda:  Background  Definitions  EHS standard  Metrics  Self Assessment tool Contractor Safety

EHS standard1) Contractor Selection Process2) Task specific Analysis of

Aspects/ Hazards and Impacts/ Risks3) Orientations & Inductions4) Practical organization, communication & Evaluation

– Engagement

5) Management Program Review

Contractor SafetyContractor Safety Aspects/ImpactsHazards/Risks

ContractorEngagement

Program Evaluation

Orientation/ Induction

Selection

Nobody

gets hurt !

Page 15: Contractor Safety EHS standard & Requirements. Agenda:  Background  Definitions  EHS standard  Metrics  Self Assessment tool Contractor Safety

1) Contractor Selection process1) Contractor Selection process Requirements

Systematic process executed by a multidisciplinary team to classify contractors as High, Moderate & Low RiskHigh Risk contractors

– In dept screening on performance of EHS management system

High level identification of Hazards/ Risks; Aspects/ Impacts to be used as input in the selection processContinuous improvement => See self assessment tool

GoalThe right contractor for the job

Selection

Nobody

gets hurt !

Page 16: Contractor Safety EHS standard & Requirements. Agenda:  Background  Definitions  EHS standard  Metrics  Self Assessment tool Contractor Safety

1) Contractor Selection process1) Contractor Selection process Tool

Contractor classification based on potential business & EHS Impact

Selection

Nobody

gets hurt !

Page 17: Contractor Safety EHS standard & Requirements. Agenda:  Background  Definitions  EHS standard  Metrics  Self Assessment tool Contractor Safety

Requirement Sharing of A / I & H/R with contractor by site staff Process to review, analyse & implement controls for A/I & H/R that contractors bring on site.Process to create & share the results of risk assessments between contractor companies & the J&J contract owners

– Prior to the commencement of a work

Continuous improvement => See self assessment tool

Aspects/ImpactsHazards/Risks

Selection

Nobody

gets hurt !2) Task specific Analysis of

Aspects/ Hazards & Impacts/ Risks2) Task specific Analysis of

Aspects/ Hazards & Impacts/ Risks

Page 18: Contractor Safety EHS standard & Requirements. Agenda:  Background  Definitions  EHS standard  Metrics  Self Assessment tool Contractor Safety

2) Task specific Analysis of Aspects/ Hazards & Impacts/ Risks

2) Task specific Analysis of Aspects/ Hazards & Impacts/ Risks

Requirement Ongoing service contractors Task specific A/I & H/R reviews based on scope, scale & contractor company classification.

– Low Risk => 3 Year– Moderate Risk => 2 Year– High Risk => Annual

Goal Full knowledge of EHS Risks

Aspects/ImpactsHazards/Risks

Selection

Nobody

gets hurt !

Page 19: Contractor Safety EHS standard & Requirements. Agenda:  Background  Definitions  EHS standard  Metrics  Self Assessment tool Contractor Safety

2) Task specific Analysis of Aspects/ Hazards & Impacts/ Risks

2) Task specific Analysis of Aspects/ Hazards & Impacts/ Risks

Aspects/ImpactsHazards/Risks

Selection

Nobody

gets hurt !

Tool :Assessment tool with simple 5 x 5 matrix– Health and Safety Section

10 hazard classifications/63 expressions

– Environmental Section 7 aspect classifications/16 expressions

Page 20: Contractor Safety EHS standard & Requirements. Agenda:  Background  Definitions  EHS standard  Metrics  Self Assessment tool Contractor Safety

2) Task specific Analysis of Aspects/ Hazards & Impacts/ Risks

2) Task specific Analysis of Aspects/ Hazards & Impacts/ Risks

Page 21: Contractor Safety EHS standard & Requirements. Agenda:  Background  Definitions  EHS standard  Metrics  Self Assessment tool Contractor Safety

3) Orientations & Inductions3) Orientations & Inductions

Requirement All contractor employees at the beginning of their assignment Refresher trainings at defined intervals not exceeding 3 years

– Based on Contractor company classification Low Risk => 3 Year Moderate Risk => 2 Year High Risk => Annual

Take into consideration– Contractor company classification– Nature of the jobs being executed– Potential negative impact on affected employees

Aspects/ImpactsHazards/Risks

Orientation/ Induction

Selection

Nobody

gets hurt !

Page 22: Contractor Safety EHS standard & Requirements. Agenda:  Background  Definitions  EHS standard  Metrics  Self Assessment tool Contractor Safety

3) Orientations & Inductions3) Orientations & Inductions

RequirementFormal recordkeeping process tracking participationContinuous improvement => See self assessment tool

GoalClearly communicated expectations

Aspects/ImpactsHazards/Risks

Orientation/ Induction

Selection

Nobody

gets hurt !

Page 23: Contractor Safety EHS standard & Requirements. Agenda:  Background  Definitions  EHS standard  Metrics  Self Assessment tool Contractor Safety

3) Orientations & Inductions3) Orientations & Inductions Remarks

Often first contact of tradesmen with :– The site, – Contracting company – Contract owner.

Focus on:– Site specific requirements

Permits, evacuation, gowning, etc.

Avoid:– Means & methods to execute job requirements

Potential liability issue as this might be perceived as training

Aspects/ImpactsHazards/Risks

Orientation/ Induction

Selection

Nobody

gets hurt !

Page 24: Contractor Safety EHS standard & Requirements. Agenda:  Background  Definitions  EHS standard  Metrics  Self Assessment tool Contractor Safety

4) Practical organization, Communication & Evaluation

4) Practical organization, Communication & Evaluation

RequirementControl & Monitoring of contractor employee accessInformal observations

– Ongoing evaluation of how things are going– Formal follow-up for significant infringements– Proven practices => See self assessment tool

Systematic “End of Job” or “Annual” evaluations by J&J contract owners.Systematically sharing results of observations and/ or End Of Job/ Annual Reviews with the contractors.

GoalCollaboration to assure contract requirements are met with adherence to EHS expectations

Aspects/ImpactsHazards/Risks

ContractorEngagement

Orientation/ Induction

Selection

Nobody

gets hurt !

Page 25: Contractor Safety EHS standard & Requirements. Agenda:  Background  Definitions  EHS standard  Metrics  Self Assessment tool Contractor Safety

4) Practical organization, Communication & Evaluation

4) Practical organization, Communication & Evaluation

Aspects/ImpactsHazards/Risks

ContractorEngagement

Orientation/ Induction

Selection

Nobody

gets hurt !

When you discover this at your site you only have 2 choices :

You step up and correct, OR. you close an eye and walk by.

Page 26: Contractor Safety EHS standard & Requirements. Agenda:  Background  Definitions  EHS standard  Metrics  Self Assessment tool Contractor Safety

5) Management Program Review

5) Management Program Review

Requirement Annual documented multidisciplinary review processEvaluation of contractor response/ records regarding

– Formulation of corrective actions as result of : Observations, End of Job/ Annual reviews Accident/ Incident Investigation

Using previous obtained information in the decision process if a contractor remains a company in good standing.

Aspects/ImpactsHazards/Risks

ContractorEngagement

Program Evaluation

Orientation/ Induction

Selection

Nobody

gets hurt !

Page 27: Contractor Safety EHS standard & Requirements. Agenda:  Background  Definitions  EHS standard  Metrics  Self Assessment tool Contractor Safety

5) Management Program Review

5) Management Program Review

Requirement Evaluation of all continuous improvement efforts to assure they target weakest program areas

Goal: Check for effectiveness

Aspects/ImpactsHazards/Risks

ContractorEngagement

Program Evaluation

Orientation/ Induction

Selection

Nobody

gets hurt !

Page 28: Contractor Safety EHS standard & Requirements. Agenda:  Background  Definitions  EHS standard  Metrics  Self Assessment tool Contractor Safety

Agenda: Background Definitions EHS standard Metrics Self Assessment tool

Contractor SafetyContractor SafetyAspects/ImpactsHazards/Risks

ContractorEngagement

Program Evaluation

Orientation/ Induction

Selection

Nobody gets hurt !

Page 29: Contractor Safety EHS standard & Requirements. Agenda:  Background  Definitions  EHS standard  Metrics  Self Assessment tool Contractor Safety

Enterprise-Level MetricsEnterprise-Level Metrics

1. Contractor Injury Rates Injury Rate Per 100 Contractor Employees (IRCE)

IRCE = All injuries*100/Average # contractors per day

2. Multidisciplinary Risk Assessment per Project For BGS & CPS, percent of projects where Aspects/Impacts and

Hazards/Risks were identified internally by a multidisciplinary team prior to initiating the selection process.

3. Contractor Engagement For BGS & CPS, percent of contractor jobs where there was an in-

person contact between the J&J project sponsor/contact and the executing contractor employees.

50% - 75% 75% - 90% > 90% < 50 %

50% - 75% 75% - 90% > 90% < 50 %

Page 30: Contractor Safety EHS standard & Requirements. Agenda:  Background  Definitions  EHS standard  Metrics  Self Assessment tool Contractor Safety

Enterprise-Level MetricsEnterprise-Level Metrics

Data Collection1st round => MY 2009 – Prepare organization– Identify potential difficulties

YE 2009– Complete reporting & analyzis

Page 31: Contractor Safety EHS standard & Requirements. Agenda:  Background  Definitions  EHS standard  Metrics  Self Assessment tool Contractor Safety

Agenda: Background Definitions EHS standard Metrics Self Assessment tool

Contractor SafetyContractor SafetyAspects/ImpactsHazards/Risks

ContractorEngagement

Program Evaluation

Orientation/ Induction

Selection

Nobody gets hurt !

Page 32: Contractor Safety EHS standard & Requirements. Agenda:  Background  Definitions  EHS standard  Metrics  Self Assessment tool Contractor Safety

Self Assessment ToolSelf Assessment Tool1,2 & 3 are pre-defined questions

Well defined criteria what red, yellow, green means

Continuous improvement

Page 33: Contractor Safety EHS standard & Requirements. Agenda:  Background  Definitions  EHS standard  Metrics  Self Assessment tool Contractor Safety

Self Assessment Tool(Risk Assessment & Orientation/ Induction)Self Assessment Tool(Risk Assessment & Orientation/ Induction)

Page 34: Contractor Safety EHS standard & Requirements. Agenda:  Background  Definitions  EHS standard  Metrics  Self Assessment tool Contractor Safety

Self Assessment Tool(Contractor Engagement)Self Assessment Tool(Contractor Engagement)

Page 35: Contractor Safety EHS standard & Requirements. Agenda:  Background  Definitions  EHS standard  Metrics  Self Assessment tool Contractor Safety

Self Assessment Tool(Program Review)Self Assessment Tool(Program Review)

Page 36: Contractor Safety EHS standard & Requirements. Agenda:  Background  Definitions  EHS standard  Metrics  Self Assessment tool Contractor Safety

What’s wrong ?

•The number of safety incidents/accidents at construction sites

• Increase in level of seriousness

Page 37: Contractor Safety EHS standard & Requirements. Agenda:  Background  Definitions  EHS standard  Metrics  Self Assessment tool Contractor Safety

Project AssessmentProject Assessment Assessed

9 projects ( Including large, small, complex, less complex)

Method Tool provided by CURT (Construction users Round Table) Added elements from J&J’s EHS contractor management standard Comparison done for 20 area’s (See back up slide)

37

Page 38: Contractor Safety EHS standard & Requirements. Agenda:  Background  Definitions  EHS standard  Metrics  Self Assessment tool Contractor Safety

38

Projects AssessmentProjects Assessment

Page 39: Contractor Safety EHS standard & Requirements. Agenda:  Background  Definitions  EHS standard  Metrics  Self Assessment tool Contractor Safety

Projects AssessmentProjects Assessment

39

Organizational changes: Reversed score ( Low numbers indicate no-changes)

Page 40: Contractor Safety EHS standard & Requirements. Agenda:  Background  Definitions  EHS standard  Metrics  Self Assessment tool Contractor Safety

Key LearningsKey Learnings

We have good safety practices Create a safety culture and awareness from start of project Define higher accountability for safety Develop an integrated, project specific safety plan, areas of attention:

Communication (inform and engage people & management) Safety enforcement (set safety standards and live by them) Incentive program (show that you care)

Training/induction on safe behavior Organize independent audits

40

Page 41: Contractor Safety EHS standard & Requirements. Agenda:  Background  Definitions  EHS standard  Metrics  Self Assessment tool Contractor Safety

Key areasKey areas

41

Organization

Procedures Training

Supervision

SAFETY CULTURE

EHS

engineering

business

Page 42: Contractor Safety EHS standard & Requirements. Agenda:  Background  Definitions  EHS standard  Metrics  Self Assessment tool Contractor Safety

Organization

Procedures

Training/tools

Supervision

Overview action planOverview action plan

42

SelectionPre-

construction Construction Close out

• EHS in selectionprocess

• Reinforce role Safety Coordinator

• Define R&R & authority of safety personnel

• Mgt commitment • Safety leadership

• EHS assessment tool

• Safety checklistin RFP

• EHS assessment(safety workshop)

• Project specific safety Plan

• Induction program• Action focused

safety program• Incident program

• Safety close out report

• J&J lead by example

• Identify tools to promote safety

• Create safety awareness

• Enforce Safety Plan• Promote safety• Tool box meetings• Task risk assessment

• More detailed safety metrics in ESI

• Develop safety improvement program

• Safety Coordinator to ensure contractorsafety capabilities

• Safety training for full team

• Involvement Mgt in safety

• Independent safety audits

• All• Business• EHS• Engineering

Page 43: Contractor Safety EHS standard & Requirements. Agenda:  Background  Definitions  EHS standard  Metrics  Self Assessment tool Contractor Safety

SelectionSelection Ensure EHS aspects in the contractor

selection process Reinforce role of the EHS & Safety

Coordinator EHS assessment (if needed):

– Define project complexity to support risk based decision making– EHS screening of contractor– Feedback ESI

Safety checklist in RFP– Ask for Contractor safety program– Not just safety metrics or VCA certification

43

Page 44: Contractor Safety EHS standard & Requirements. Agenda:  Background  Definitions  EHS standard  Metrics  Self Assessment tool Contractor Safety

Pre-constructionPre-construction Define R&R and authority of safety personnel Organize project specific safety workshop and

perform a safety risk assessment Develop a project specific safety plan Identify tools to promote safety Create safety awareness Organize safety training for the full team (project

specific)

44

Page 45: Contractor Safety EHS standard & Requirements. Agenda:  Background  Definitions  EHS standard  Metrics  Self Assessment tool Contractor Safety

ConstructionConstruction Main responsibilities for the contractor

EHS execution planAction focused safety programTask focused risk assessmentsIncident investigation program(Independent) safety auditsPromotion of safety culture & safe behaviors

Management engagement (show you care !)Focus on actions rather than just resultsSchedule regular tours/ visitsParticipate in person in accident/incident investigations

Safety training full team J&J lead by example

45

Page 46: Contractor Safety EHS standard & Requirements. Agenda:  Background  Definitions  EHS standard  Metrics  Self Assessment tool Contractor Safety

Close outClose out

Safety Close out note/reportMore than metrics aloneBackground informationLessons Learned on actions, tools used, ….

Input from learnings to our processes & procedures