construction documents for icestone factory

24
K D Architecture Project 237 S. Washington Wichita, Kansas 67202 Designer Danny Kliewer Date 11.30.2011 IceStone Factory N

Upload: daniel-kliewer

Post on 08-Mar-2016

234 views

Category:

Documents


3 download

DESCRIPTION

This is an example of a construction document set created by Daniel Kliewer

TRANSCRIPT

Page 1: Construction Documents for IceStone Factory

KD

A r c h i t e c t u r e

Project

237 S. WashingtonWichita, Kansas 67202

Designer

Danny Kliewer

Date 11.30.2011

I c e S t o n e Factory

N

Page 2: Construction Documents for IceStone Factory

KD

A r c h i t e c t u r e

Project

237 S. WashingtonWichita, Kansas 67202

Designer

Danny Kliewer

Date 11.30.2011

SP 1.1............................................................................................. S ite PlanA1.1....................................................................................Ground Floor PlanA1.2.....................................................................................Second Floor PlanA1.3................................................................First Floor Reflected Ceiling PlanA1.4............................................................Second Floor Reflected Ceiling PlanA1.5................................................................................................Roof PlanA2.1...................................................... . . . . . . . . .North Elevation, East ElevationA2.2..................................................... . . . . . . . . .South Elevation, West ElevationA3.1............................................................................Section A-A, Section B-BA4.1........................................................................................ .Wall Section 1A4.2........................................................................................ .Wall Section 2A4.3........................................................................................ .Wall Section 3A5.1............................................................ . Operable/Removable Glass Panel A5.2..................................................................In-Wall Water Drainage SystemA5.3....................................... . Concrete Structural Wall to Concrete Slab BandA5.4.....................................................Plan Detail of Glass Facade at the CornerA5.5.........................Plan Detail of Glass Facade to Structural Wall ConnectionA5.6................................................. .Glass Facade to Concrete Foundation WallA5.7................................Concrete Facade Panel to Structural Wall Connection A5.8.................................... .Steel Lateral Bracing to Structural Wall ConnectionA5.9.................................................................Clerestory Window ConnectionA5.10........................................................... . Wind Intake Green Roof System

Table of Contents

Occupancy Type: F-2Total Occupancy of Building: 327Construction Type: Type II-AAllowable Total Square Footage of Building: No LimitActual Total Square Footage of Building: 13,938 sq. ft.

Building Information

Sample Page Reference

Page 3: Construction Documents for IceStone Factory

KD

A r c h i t e c t u r e

Project

237 S. WashingtonWichita, Kansas 67202

Designer

Danny Kliewer

Date

Scale

11.30.2011

Exterior Materials1 ...................Cleveland Pear2 ....................Hybrid Poplar3 .............Concrete Sidewalk4 .Recycled Material Pavers5 ........Natural Fescue Grass6 .......................Zoysia Grass7 .................Asphalt Parking

Site Plan SP1.1

3/64”=1’-0”

Page 4: Construction Documents for IceStone Factory

11.30.2011

KD

Project

237 S. WashingtonWichita, Kansas 67202

Designer

Danny Kliewer

Date

Scale

A1.1Ground Floor Plan

1/16”=1’-0”

Space Legend1 ............................ShowroomArea: 1416 s.f. Occ: 142 ....................Education AreaArea: 625 s.f. Occ: 313 ........................Factory FloorArea: 5602 s.f. Occ: 564 ...........................WarehouseArea: 1205 s.f. Occ: 45 .................Staff Break RoomArea: 195 s.f. Occ: 46 ..........................Mech./Elec.Area: 109 s.f. Occ: 17 ..................................StorageArea: 50 s.f. Occ: 1

Material Legend1 Recycled Material Flooring2 ...................................Carpet3 ......Concrete Stair Landing

Page 5: Construction Documents for IceStone Factory

11.30.2011

KD

A r c h i t e c t u r e

Project

237 S. WashingtonWichita, Kansas 67202

Designer

Danny Kliewer

Date

Scale

A1.2Second Floor Plan

1/16”=1’-0”

Space Legend1 ........................Waiting AreaArea: 1897 s.f. Occ: 1262 ................Conference RoomArea: 425 s.f. Occ: 43 ...........................CEO OfficeArea: 175 s.f. Occ: 24 ............................CFO OfficeArea: 175 s.f. Occ: 25 .................Store Mgr. OfficeArea: 154 s.f. Occ: 2

Material Legend1 ...................................Carpet2 ......................Concrete Tiles3 ......Concrete Stair Landing

Page 6: Construction Documents for IceStone Factory

KD

A r c h i t e c t u r e

Project

237 S. WashingtonWichita, Kansas 67202

Designer

Danny Kliewer

Date

Scale

11.30.2011

A1.3First Floor Reflected Ceiling Plan

1/16”=1’-0”

Page 7: Construction Documents for IceStone Factory

KD

A r c h i t e c t u r e

Project

237 S. WashingtonWichita, Kansas 67202

Designer

Danny Kliewer

Date

Scale

11.30.2011

A1.4Second Floor Reflected Ceiling Plan

1/16”=1’-0”

Page 8: Construction Documents for IceStone Factory

KD

A r c h i t e c t u r e

Project

237 S. WashingtonWichita, Kansas 67202

Designer

Danny Kliewer

Date

Scale

11.30.2011

A1.5Roof Plan

1/16”=1’-0”

Page 9: Construction Documents for IceStone Factory

KD

A r c h i t e c t u r e

Project

237 S. WashingtonWichita, Kansas 67202

Designer

Danny Kliewer

Date

Scale

11.30.2011

A2.1

North Elevation

East Elevation

1/16”=1’-0”

Page 10: Construction Documents for IceStone Factory

KD

A r c h i t e c t u r e

Project

237 S. WashingtonWichita, Kansas 67202

Designer

Danny Kliewer

Date

Scale

11.30.2011

South Elevation

West Elevation

IceStone

IceStone

1/16”=1’-0”

A2.2

Page 11: Construction Documents for IceStone Factory

KD

A r c h i t e c t u r e

Project

237 S. WashingtonWichita, Kansas 67202

Designer

Danny Kliewer

Date

Scale

11.30.2011

A3.1

Section A-A

Section B-B

1/16”=1’-0”

Space Legend:Sec. A-A1 ...........................Warehouse2 ........................Factory Floor3 ......................Office Balcony

Space Legend:Sec. B-B1 ........................Factory Floor2 ............................Showroom3 ........................Waiting Area

Page 12: Construction Documents for IceStone Factory

KD

A r c h i t e c t u r e

Project

237 S. WashingtonWichita, Kansas 67202

Designer

Danny Kliewer

Date

Scale

11.30.2011

A4.1Wall Section 1

1/4”=1’-0”

Page 13: Construction Documents for IceStone Factory

KD

A r c h i t e c t u r e

Project

237 S. WashingtonWichita, Kansas 67202

Designer

Danny Kliewer

Date

Scale

11.30.2011

A4.2Wall Section 2

1/4”=1’-0”

*Water Drain. SystemThe water Drainage System consists of the roof drain gate, the steel drain mesh, and the steel drainage pipe.

Page 14: Construction Documents for IceStone Factory

KD

A r c h i t e c t u r e

Project

237 S. WashingtonWichita, Kansas 67202

Designer

Danny Kliewer

Date

Scale

11.30.2011

A4.3Wall Section 3

1/4”=1’-0”

Page 15: Construction Documents for IceStone Factory

KD

A r c h i t e c t u r e

Project

237 S. WashingtonWichita, Kansas 67202

Designer

Danny Kliewer

Date

Scale

11.30.2011

Operable/Removable Glass Panel A5.1

1 1/2”=1’-0”

Page 16: Construction Documents for IceStone Factory

KD

A r c h i t e c t u r e

Project

237 S. WashingtonWichita, Kansas 67202

Designer

Danny Kliewer

Date

Scale

11.30.2011

In-Wall Water Drainage System A5.2

1”=1’-0”

Page 17: Construction Documents for IceStone Factory

KD

A r c h i t e c t u r e

Project

237 S. WashingtonWichita, Kansas 67202

Designer

Danny Kliewer

Date

Scale

11.30.2011

Concrete Structural Wall to Concrete Slab Band A5.3

1”=1’-0”

Page 18: Construction Documents for IceStone Factory

KD

A r c h i t e c t u r e

Project

237 S. WashingtonWichita, Kansas 67202

Designer

Danny Kliewer

Date

Scale

11.30.2011

1 1/2”=1’-0”

Plan Detail of Glass Facade at the Corner A5.4

Page 19: Construction Documents for IceStone Factory

KD

A r c h i t e c t u r e

Project

237 S. WashingtonWichita, Kansas 67202

Designer

Danny Kliewer

Date

Scale

11.30.2011

1 1/2”=1’-0”

Plan Detail of Glass Facade to Structural Wall Connection A5.5

Page 20: Construction Documents for IceStone Factory

KD

A r c h i t e c t u r e

Project

237 S. WashingtonWichita, Kansas 67202

Designer

Danny Kliewer

Date

Scale

11.30.2011

1 1/2”=1’-0”

Glass Facade to Concrete Foundation Wall A5.6

Page 21: Construction Documents for IceStone Factory

KD

A r c h i t e c t u r e

Project

237 S. WashingtonWichita, Kansas 67202

Designer

Danny Kliewer

Date

Scale

11.30.2011

1 1/2”=1’-0”

Concrete Facade Panel to Structural Wall Connection A5.7

Page 22: Construction Documents for IceStone Factory

KD

A r c h i t e c t u r e

Project

237 S. WashingtonWichita, Kansas 67202

Designer

Danny Kliewer

Date

Scale

11.30.2011

1 1/2”=1’-0”

Steel Lateral Bracing to Structural Wall Connection A5.8

Page 23: Construction Documents for IceStone Factory

KD

A r c h i t e c t u r e

Project

237 S. WashingtonWichita, Kansas 67202

Designer

Danny Kliewer

Date

Scale

11.30.2011

Clerestory Window Connection

1”=1’-0”

A5.9

Page 24: Construction Documents for IceStone Factory

KD

A r c h i t e c t u r e

Project

237 S. WashingtonWichita, Kansas 67202

Designer

Danny Kliewer

Date

Scale

11.30.2011

Wind Intake Green Roof System

1 1/2”=1’-0”

A5.10