compro & project list ezone
TRANSCRIPT
-
8/16/2019 Compro & Project List Ezone
1/14
3/29/2016
1
R3
The Winner ofINDONESIA ENERGY 2013
and ASEAN ENERGY AWARDS
2004 ~2014
Berdiri Tahun 1997
Start Production 2000
Men-spesialisasi-kan pada HVAC
Kondisi Daerah Tropis
RUMAH SAKIT / LABORATORIUM / BSL 1~ 3
FACTORY PHARMACY/ F&B /
SERVER COMPUTER / MALL /
OFFICE / HOME
Comply DEPKES 2012
INDOOR UNIT
Comply ASHRAE 2007 ~ 2012
Comply JCI (Joint Commission International)
INPRES No.13/2011 (Konservasi Energy)
R3
Parameter Clean Room
The Winner ofINDONESIA ENERGY 2013
and ASEAN ENERGY AWARDS
2004 ~2014
1. Temperature
2. Humidity
3. Class Cleanness
4. Pressure Room
5. Air Ventilation (Outside Air)
6. Air Distribution (Laminar)
7. Vibration / Sound8. Light
UNIT AHU
Negative
-
8/16/2019 Compro & Project List Ezone
2/14
3/29/2016
2
R3
AC CONVENTIONAL
TIDAK DAPAT DI PAKAIPADA RUANG CLEAN ROOM
(RUANG OPERASI / KHUSUS)
- Temperature (Only) di Control
- Humidity, Tidak di control
- Class Cleanness
Tidak di control
- Pressure Room Tidak di control
- Outside Air Tidak di control
- Kekuatan Daya Dorong Fan Indoor < 500 Pascal
Untuk Clean RoomKebutuhan daya dorong Fan >1000 Pascal, agar
bisa menembus hambatan di:
a. Pre Filter
b. Medium Filter
c. Hepa Filter
d. Cooling Coil
e. Saluran udara (Ducting) & Belokkan-belokkan-nya
ILLUSTRASI
AC CONVENTIONAL
PEMBAGIAN ZONE SARANA RUANG
OPERASI RUMAH SAKIT
-
8/16/2019 Compro & Project List Ezone
3/14
3/29/2016
3
R3
Professional ExperiencePENYUSUN
Pedoman Teknis Ruang Operasi Rumah Sakit 2012
KEMENKES RI - Bandung
NARASUMBER
1. Kongres Himpunan Ahli Teknik PerumasakitanIndonesia
(HATPI) 2014-Bidakara untuk Tata Udara Rumah Sakit
2. Seminar Pedoman Teknis Prasarana Tata Udara
Rumah Sakit 2014 Hotel Harris-Jakarta
- Balai PengamananFasilitas Kesehatan (BPFK)
- KEMENKES
a. Permenkes RI NO. 530 Tahun 2007
b. UUD RI. No. 44 Tahun 2009 Tentang Rumah Sakit
c. Permenkes RI. No. 2351/Menkes/PER/2011
Salah satunya mengenai Pengujuan & Kalibarasi
Sarana & Prasarana Kesehatan
ORGANIZATION
- ASHRAE Indonesia Chapter - As a Founder
- IAFBI (IkatanAhli Fisika & Bangunan Indonesia) - As a Founder
- HATUR (Associate of Indonesia Air Cond’ Eng’)- As a Founder
- Green Building Council Indonesia (GBCI) – As a Core Founder
- Present Indonesia as aboard of Judge for ASEAN Energy Awards
AWARDS:
- INDONESIA ENERGY AWARD 2013
- ASEAN ENERGY AWARD 2004, 2007, 2008, 2009, 2011, 2012, 2014
- Lain-lain
The Winner ofINDONESIA ENERGY 2013
and ASEAN ENERGY AWARDS
2004 ~2014
UNIT AHU
-
8/16/2019 Compro & Project List Ezone
4/14
3/29/2016
4
PATENTS
Passive Heat Pipe
Functions:
- Cooling & Dehumidifying
- Menurunkan Humidity
Application:
- for System AHU & DX
- for Comfort Zone
Active Heat PipeFunctions:
- Cooling & Dehumidifying
- Mengendalikan Humidity &
Temperature
Application:
- for System DX Only
- for Comfort Zone & Special Design
AHU VariableFunctions:
- Cooling & Dehumidifying
- Mengendalikan Humidity &
Temperature
Application:
- for System AHU Only
- for Comfort Zone & Special Designby :[email protected]
FAN INDOOR
(PLUG FAN)PLUG FAN
ADVANTAGES
‐ High
Efficiency
> 70%
‐ No Fan Belt‐ Clean Operation‐ Low Maintenance‐ Variable Speed Drive‐ Pressure Transducer
-
8/16/2019 Compro & Project List Ezone
5/14
3/29/2016
5
EquatorialZone FRESH THE WORLD
HEAT PIPEPRE-COOL
COOLINGCOIL
AIR CONDITIONING WITH HEAT PIPE
1st
Patent No. P 002 004 00227
WATER
CONDENSATION
COOL&
DRY AIR
I N27°C
RH 50%
17°CRH 80%
HEAT PIPERE-HEAT
13°CRH 95%
23°CRH 60%
EquatorialZone FRESHTHEWORLD ACTIVE-HEAT PIPE
PRE-COOL
COOLINGCOIL
AIR CONDITIONING WITH ACTIVE HEAT PIPE
2nd
Patent No. P 002 005 00234
WATER
CONDENSATION
COOL&
DRY AIR
I N27°C
RH 50%
17°CRH 80%
ACTIVE-HEAT PIPERE-HEAT
13°CRH 95%
23°CRH 60%
SELENOIDVALVE
COMPARISON
AC CONVENTIONAL, AC with ELECTRIC HEATTER
AC with PASIVE HEAT PIPE & AC with ACTIVE HEAT PIPE
KONSERVASI
ENERGYI
KONSERVASI
ENERGYI
I N
27°C
RH 50%
COOL
&
HUMID AIR
15°C
RH 90%
CONVENTIONAL AIR CONDITIONING
WATER
CONDENSATION
COOLING
COIL
SAVING
ENERGY
UP TO 20%
SAVING
ENERGY
UP TO 40%
EquatorialZone FRESH THE WORLD
HEAT PIPEPRE-COOLH E A T P I P E
R E - H E A T
COOLINGCOIL
SHF= 0.6
SensibleHeat60%
LatenHeat40%
Pre-CoolRe-Heat
Temperature INLETHOT & HUMID
(High Moisture Content)
Temperature OUTLETCOOL & DRY
(Low Moisture Content) DEW POINT
LOAD DIAGRAM (Ezone - HEAT PIPE)
Equatorial Zone FRESHTHE WORLD
SensibleHeat80%
LatenHeat20%
Temperature INLETHOT & HUMID
(High Moisture Content)
Temperature OUTLETCOOL & Humid
(High Moisture Content)
DEWPOINT
(With Heat-Pipe)
LOAD DIAGRAM (Conventional Air-Con)
COOLINGCOIL
SHF= 0.8
DEWPOINT
(Conventional)
Conventional
Load diagram
General Air Conditioning
Load diagram
Air Conditioning
With ACTIVE HEAT PIPE
Load diagram
Air Conditioning
With ACTIVE HEAT PIPE
SAVING ENERGY
UP TO 40%
BLUE Line :
RED Line :
-
8/16/2019 Compro & Project List Ezone
6/14
3/29/2016
6
illustrasi System AC Conventional
Clean Room (Class 100.000 atau lebih )
AC + PORTABLE Dehumidifier
illustrasi System AC Conventional
Clean Room (Class 100.000 atau lebih )
AC + DEHUMIDIFIER
-
8/16/2019 Compro & Project List Ezone
7/14
3/29/2016
7
illustrasi System AC Conventional
Clean Room (Class 100.000 atau lebih )
AC + ELECTRIC HEATER
illustrasi System AC MODERN
Clean Room (Class 100.000 atau lebih )
AC + ACTIVE HEAT PIPE (Tanpa Elec’ Heater & Tanpa Dehunidifier)
SAVING
ENERGY
UP TO 40%
-
8/16/2019 Compro & Project List Ezone
8/14
3/29/2016
8
No Name Application Room (Actual) Cleanness TahunTEMP(°C) RH (%) Pressure Class
1 RS. Jantung Harapan Kita OT-1, 2, 3 Preparation 20 ~ 23 53 ~ 58 Positive 100K 2005
2 RSUD. Dr. Soetomo Phase 1 23 ~ 25 55 ~ 60 - General 2006
3 RSUD. Dr. Soetomo Phase 2 23 ~ 25 55 ~ 60 - General 2007
4 RSUD. Dr. Soetomo Phase 3 23 ~ 25 55 ~ 60 - General 2008
5 RSCM MRI 19 ~ 23 51 ~ 57 Positive - 2006
6 RS. Sari Asih OT-1 22 ~ 23 52~ 56 Positive 100K 2004
7 RS. Mayapada OT-1 21 ~ 23 52 ~ 57 Positive 100K 2004
8 RSUD Abdoel Muloek All Building (OT-1, 2, 3 ,4) 22 ~ 25 50 ~ 60 Positive 100K 2007
9 RS. Eka Hospital-BSD OT-1, 2,3,4, MRI, Angio 19 ~ 23 48 ~ 57 Positive 100K 2008
10 RS. Eka Hospital-RIAU OT-1, 2,3,4, MRI, Angio 20 ~ 23 48 ~ 57 Positive 100K 2008
11 RS. A.W. SJAHRANIE OT-1 & OT-2 18 ~ 23 48 ~ 57 Positive 100K 2007
12 KMN - Kebon Jeruk Lasik, OT-1, OT-2 20 ~ 22 50 ~ 58 Positive 100K 2005
13 KMN - Manado Lasik, OT-1, OT-2 20 ~ 22 50 ~ 57 Positive 100K 2007
14 KMN - Semarang Lasik, OT-1, OT-2 20 ~ 22 50 ~ 58 Positive 100K 2010
15 KMN - Lebak Bulus Lasik, OT-1, OT-2, OT-3 20 ~ 22 50 ~ 57 Positive 100K 2012
16 RS. Pantai Indah Kapuk Office 23 ~ 25 55 ~ 60 - General 2006
17 RS Medistra OT-1 21 ~ 23 52 ~ 57 Positive 100K 200718 BPOM LAB-1, 2,3 22 ~ 23 52 ~ 58 Positive 100K 2012
19 RS Wahidin - Makasar LAB BSL-3 23 ~ 24 54 ~ 58 Negative 100K 2008
20 RS Wahidin - Makasar OT-1, OT2, OT3 OT4 22 ~ 23 56 ~ 58 Positive 100K 2009
21 RS Hasanudin LAB BSL-3 23 ~ 24 54 ~ 58 Negative 100K 2010
22 RS Cinere OT-1 22 ~ 23 52~ 56 Positive 100K 2006
23 RS. Omni OT-1 & OT-2 20 ~ 23 52~ 56 Positive 100K 2007
24 RS ST Carolus - BSD All Building (OT-1, OT2) 22 ~ 23 52~ 56 Positive 100K 2012
25 Bio Farma Vaksin Flue Burung 21 ~ 23 53 ~ 56 Positive 10K 2008
26 Dankos Penychilin, Non Betalactam 20 ~ 24 50~ 55 Positive 100K 2008
Project List for Clean Room (Heat Pipe)
Project List for Clean Room (Heat Pipe)Cleanness Tahun
TEMP(°C) RH (%) Pressure Class
27 Vision Indonesia Optical Factory - Clean Room 20 ~ 23 20 ~ 40 Positive 100, 10K, 100K 2012
28 J E C- Kedoya 2 LASIK & 7 OT 20 ~ 23 45 ~ 55 Positive 10K & 100K 2012 - JCI
29 BIMCHospital-BALI 3 OT, 2 ISOLATION 21 ~ 23 50 ~ 55 Positive 100K 2012 - JCI
30 RS Betshaida-Serpong 4 OT& 1 CSSD 20 ~ 22 51 ~ 55 Positive 100K 2012
31 Kopi Kapal Api - Phase 1 Mixer, Weighing, Mixing, 24 ~ 25 45 ~ 55 Positive 100K 2012
32 Kopi Kapal Api - Phase 2 Filling, Top Pack 23 ~ 25 46 ~ 55 Positive 100K 2013
33 Klinik Mata Solo (JEC) 1 LASIK 20 ~ 23 45 ~ 55 Positive 10K & 100K 2013
34 Jakarta Heart Centre OT-1, OT2, Cathlab 1,2,3 21 ~ 24 46 ~ 55 Positive 10K & 100K 2013
35 BBPHSOH Basler & Hofmann Labs BSL -3 20 ~ 23 45 ~ 55 Negative 100K 2013
36 RS Siloam-Lippo Vilage RSUS-OT-5 20 ~ 22 50 ~ 53 Positive 100K 2014
37 RS Siloam-Balikpapan 2 x Mayor, Minor, ICU, Recov 20 ~ 22 49 ~ 52 Positive 100K 2014
38 RS Siloam-Cinere OT1 20 ~ 22 49 ~ 52 Positive 100K 2014
39 RS Colombia ASIA OR1,2,3, ORDept, ICU, MRI, CT 19 ~ 22 51 ~ 55 Positive 100K 2014
40 RSUDJawa Timur OT1 ~ OT7 included Spolhook Positive 100K 2014
41 RSUP Hadilukito-Yogyakarta All Building Positive 100K 2014
42 Mayora Beverages Positive 100K 2014
43 RSUDDharmais Rawat Inap & Clean Room Positive 100K 2014
44 RS Siloam-Purwakarta OT1, 2, 3, Corridor, Clean R 22 ~ 23 53 ~ 55 Positive 100K 2014
45 RS Al Irsyad-Surabaya OT1 19 ~ 22 51 ~ 55 Positive 10K 2014
46RSUD Mata Nasiaonal
Cicendo-Badung
OK Isolasi, OK 2, 3, 4, 5, 6, 7, 8, 9,
Ante, Coridoor, Steril, Anastesi,
Recovery, Admin
19.5 ~ 22 50 ~ 53Positive &
Negative100K 2014
Under Installation
Under Installation
Under Design
No Name ApplicationRoom(Actual)
Tender Ezone Design
-
8/16/2019 Compro & Project List Ezone
9/14
3/29/2016
9
Project List for Clean Room (Heat Pipe)
C leann ess T ah un
TEMP(°C) RH (% ) Pressure Class
47 RSUP Jantung Harapan Kita OK C 21 ~ 22 52 ~ 56 Positive 100K 2014
48 RSUD Jakarta Selatan Cooridor, Preparations & Others 22 ~ 23 52 ~ 58 Positive - 2015
49 RSUD CIAWI ICU 23 ~ 23 53 ~ 58 Positive - 2016
50 RSUD CIAWI ISOLATION (NEGATIVE) + ANTE Negative - 2016
51 MMC - JAKARTACath Lab, OT Mayor, OT Minor, Kor
Bersih21 ~ 22 50 ~ 56 Positive 100K 2016
52 RSUD KOJA 4 OT, Korifor bersih, Pre & Post Op Positive 100K 2016
53 RS UD A RIF IN A CHMA D-P KU 6 OT Mayor dan & IS OLA SIPositive &
Negative100K 2016
54Others Factory, Hospital, Lab,
Food, PharmacyClean Room
Positive
&
Negative
10K ~ 100K
2016
~
2017
Ezone Design (Tender)
No Name ApplicationRoom (Actual)
Under Instalatation
Under Instalatation
Under Instalatation
UNITINDOOR
www.ac‐ezone.com
RS Limijati‐Bandung
3 Ruang OK
RuangFertilisasi
RuangEmbryology
-
8/16/2019 Compro & Project List Ezone
10/14
3/29/2016
10
JAKARTA EYE CENTRE
KEDOYA
Terdapat 9 Ruang OT
JAKARTA EYE CENTRE
KEDOYA
Corridor
OT Room
-
8/16/2019 Compro & Project List Ezone
11/14
3/29/2016
11
AC - R. ISO
R. ISOPanel ACT: 23.8⁰C
RH: 54%
AC-R.OTR.OT
(under Installation) R. Preparation
Nusa DuaBali
- 3 R.OT,
- 2 Sterile
- 2 ISO
OK-1
Ruang
- OK1, 20HP
- OK2 ,18HP
- CATLAB, 18HP
OK-2
-
8/16/2019 Compro & Project List Ezone
12/14
3/29/2016
12
EKA HOSPITAL-BSD EKA HOSPITAL-PEKANBARU
Ruang MRI
OK
OK
Serpong
Depan Belakang
OK ANGIO
Controol AC
AHU- DX -Active Heat Pipe-Plug Fan Indoor
Positive Pressure
CT Scan
DANKOS ‐ JAKARTA
-
8/16/2019 Compro & Project List Ezone
13/14
3/29/2016
13
PT. GARUDA FOOD
SURABAYA
Replacement Roof TopFor SWGR –Room
BP-West Java
(Class 1 Div 2, Group C&D)
-
8/16/2019 Compro & Project List Ezone
14/14
3/29/2016
14
BP West JavaZulu F/S
Air Conditioning
BP West JavaPapa F/S
BP West JavaPapa F/S
BP West JavaMMC SWGR-ROOM
Terima Kasih