completed oil & gas pipeline projects

13
1. FERNAS CONSTRUCTION, 2. MEGA INDUSTRIAL PLANTS, 3. PETGAS SERVICE, 4. FERPA INDUSTRY , 5. FERNAS GYPSUM PLASTER, 6. FERPA PLASTER BOARD, 7. FERCAN MACHINERY, 8. NAS ENERGY, 9. DİYARGAZ NATURAL GAS, 10. BİN CONCRETE, MINING, 11. FERGÜN MINING ASPHALT, 12. ANKİRA ENERGY COMPANY, FERNAS GROUP’S SHAREHOLDINGS FOKUS TOURISM CONSTRUCTION & CONSULTING COMPANY SUBOR GAP PIPE INDUSTRY & TRADE COMPANY DAYEN AIR TRANSPORTATION FERNAS GROUP OF COMPANIES

Upload: hoangdieu

Post on 11-Feb-2017

230 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: completed oil & gas pipeline projects

1. FERNAS CONSTRUCTION,

2. MEGA INDUSTRIAL PLANTS, 3. PETGAS SERVICE, 4. FERPA INDUSTRY , 5. FERNAS GYPSUM PLASTER, 6. FERPA PLASTER BOARD, 7. FERCAN MACHINERY, 8. NAS ENERGY, 9. DİYARGAZ NATURAL GAS, 10. BİN CONCRETE, MINING, 11. FERGÜN MINING ASPHALT, 12. ANKİRA ENERGY COMPANY,

FERNAS GROUP’S SHAREHOLDINGS

• FOKUS TOURISM CONSTRUCTION & CONSULTING COMPANY • SUBOR GAP PIPE INDUSTRY & TRADE COMPANY • DAYEN AIR TRANSPORTATION

FERNAS GROUP OF COMPANIES

Page 2: completed oil & gas pipeline projects

• Year of Registration

• Capital

• Turnover

• Employees

• Total Value of Ongoing Projects

• Open Credit

• Head Office

• President, Member of Board

FERNAS CONSTRUCTION COMPANY

BRIEF INFORMATION : 1982

: 43,850,000 USD

: 403 m USD

: 9.716

: 3,5 billion USD

: 1.5 billion USD

: Ankara / TURKEY

: Mr. Yaşar GİREGİZ

Page 3: completed oil & gas pipeline projects

FERNAS CONSTRUCTION COMPANY FIELD OF ACTIVITIES

•Industrial Projects - Petrochemical Plant - Oil & Gas Pipelines, - Gas Treatment Facilities, Compressor & RMS Stations - Crude oil facilities and storage tanks - Natural gas underground storage surface facilities - Natural gas city distribution projects - Diesel power plant projects - HEPP, WEPP & SOLAR Power Projects

•Hydraulic Water Works and Projects •Road Construction Projects •Mining Projects •Telecommunication Projects •Building Construction Projects

Page 4: completed oil & gas pipeline projects

MACHINERY & EQUIPMENT LIST

31 2

10 12

6 15

2 43

337 33

9 12

3 20

1 2

3

10

106

33 9

30 10

4 4

41

41

5 3

8 3

30 7

150 13

25 5

9 5

8

51

118

50.000

2

Compressors

Dead weight testers

Loaders

Rock Drills

Jack Hammers

PIPELINE MACHINERY

Pipe Layer (side-boom)

Pay welder

Bending Machines

Coating Machines

Welding Machines

Internal Clamps IPLC

Ultrasonic Test Equip.

Crawler

HEAVY CONSTRUCTION

Trenchers

Bulldozers

Graders

Excavators

Horizontal Drilling Machine

CONCRETE & ASPHALT PRODUCTION

Crushing Plants

Asphalt Finishers

Asphalt Plants

Mechanic Plants

X-Ray Equipment

TRANSPORTATION

Mobile Cranes

Truck Cranes

Trailers

Concrete Plants

Concrete Pumps

Concrete Finishers

Trans-mixers

Roller

Asphalt Distributors

Generators

Pumps

Vacuum Lifts

Containers (m2)

Ambulance

Dump Trucks

Gas & Water Trucks

Lubrication Trucks

Tractors and Forklifts

Low-Beds

Pick up, Jeep, Auto

Screening Plants

Page 5: completed oil & gas pipeline projects

COMPLETED OIL & GAS PIPELINE PROJECTS

The total completed pipeline projects with various diameters (16-48”) is 2940 km as end of 2012.

Clients: BP, SHELL, OMV, BOTAS, TPAO, GAIL, PDO, QP

Page 6: completed oil & gas pipeline projects

COMPLETED OIL & GAS PIPELINE PROJECTS SCOPE OF WORK EMPLOYER

Procurement, construction, installation, pre-commissioning and commissioning of 48" high

pressure natural gas pipeline with the length of 341.8 km. and 4 no's of Pig Stations and 11

no's of Block Valve Stations.

GAIL (India) Ltd.

The scope of works included the detail engineering, procurement ,construction,

installation, pre-commissioning and commissioning of 36”- 30km & 12”-12 km natural gas

pipeline and RMS stations and also for modification, up-gradation and expansion of the

existing Pressure Reduction & Metering Stations.

Qatar Petroleum

Engineering, procurement , construction, installation, pre-commissioning and

commissioning of 36" high pressure natural gas pipeline and RMS stations with custody

ultrasonic flow meters, gas leak detection system, ESD valves, HIPPS, PCV’s, MOV’s, FOC

and telecommunication & telemetry systems, SCADA PLC, ESD , F&G.

Qatar Petroleum

Engineering, procurement ,construction, installation, pre-commissioning and assistance in

commissioning of 30"�-100km and 28”-115km high pressure crude oil pipeline and 4 no of Pig

Stations. Scope of works also included 3 no of hot-tap operations and 1 no. of hot-tap /

stopple operation on the existing 28" crude oil pipeline.

PDO

The scope of works includes the detail engineering, procurement construction, installation,

pre-commissioning and commissioning of 24" - 51 km natural gas transmission pipeline

complete with pig launcher & receiver station and one block valve station. Scope of works

also includes 48"x24" hot tap operation.

OMV

The scope of works included the detail engineering, procurement (except free issued 40"

line pipes), construction, installation, pre-commissioning and commissioning for 40�" -60 km

high pressure natural gas pipeline and main line & take-off valve stations and 12“-17 km

high pressure natural gas pipeline and pig stations. (EPIC)

BOTAŞ

The scope of works included the detail engineering, procurement ,construction,

installation, pre-commissioning and commissioning for 40" high pressure natural gas

pipeline with the length of 162.1 km, (EPIC)BOTAŞ

The scope of works included the detail engineering, procurement (except free issued line

pipes), construction, installation, pre-commissioning and commissioning for 14�" high

pressure natural gas pipeline with the length of 99.3 km and 10" high pressure natural gas

pipeline with the length of 58.5 km. (EPIC)

BOTAŞ

The scope of works included the detail engineering, procurement, construction,

installation, pre-commissioning and commissioning for 16" -18.7 km high pressure natural

gas pipeline and hot-tap operation . (EPIC)

TOREADOR

The construction of 42�" crude oil pipeline with the total length of 70 km. (Construction) BOTAŞ

The scope of works included the detail engineering, procurement, construction,

installation, pre-commissioning and commissioning for 126 km. 36" high pressure natural

gas pipeline complete with 4 no of 36�" line valve stations, 2 no of 36" pig stations, and 24�"

take-off valve stations. In addition, 24�" x 24"� hot-tap operation was carried out. (EPIC)

BOTAŞ

The scope of works included the detail engineering, procurement, construction,

installation, pre-commissioning and commissioning for 291 km. 48" high pressure natural

gas pipeline complete with 2 no of 48�" pig stations, 10 no of 48" line valve stations and 4

no's of take-off valve stations. (EPIC)

BOTAŞ

PROJECT NAME

Dahej - Vijaipour Pipeline Up-gradation (DVPL-II)

Project / INDIA

COMPLETED OIL & GAS PIPELINE PROJECTS

EPIC for Consolidated Gas Supply To Mesaieed,

Ras Laffan and Umbab Areas / QATAR

EPIC of Gas Supply to Mesaieed Consumers -

QATAR

Hubara-Sahmah & Sahmah-KP-114 MOLs

Replacement Project / OMAN

Construction of a Natural Gas Pipeline for the

Combined Cycle Power Plant Project for the

Combined Cycle Power Plant Project in

Samsun/Turkey

Nazilli-İzmir Natural Gas Transmission Pipeline

Project Phase 2

Adıyaman-Şanlıurfa-Elazığ-Diyarbakır Natural Gas

Pipeline Phase 2 & Phase 3 Project

Ordu-Giresun Natural Gas Pipeline Phase-I and

Phase-II Project / TURKEY

Akçakoca Natural Gas Pipeline Project

Baku- Tbilisi- Ceyhan Crude Oil Pipeline Project

Bozüyük – Adapazarı Natural Gas Pipeline Phase-I

& Phase-II Project

Doğu Bayazıt-Erzurum Natural Gas Main Pipeline

Project

Page 7: completed oil & gas pipeline projects

COMPLETED OIL & GAS PIPELINE PROJECTS SCOPE OF WORK EMPLOYER

The scope of works included the detail engineering, procurement, construction, installation, pre-

commissioning and commissioning for 118.5 km. 36" high pressure natural gas pipeline complete

with 3 no's of 36" line valve stations and 48.3 km. 24" high pressure natural gas pipeline complete

with 2 no of 24" line valve stations.(EPIC)

BOTAŞ

Detail engineering, procurement, construction, installation, pre-commissioning and commissioning

for the entire intermediate pigging terminal equipped with 42" pig receiver and 42" pig launcher

complete with related equipment. (EPIC)BOTAŞ

SCOPE OF WORK EMPLOYER

This was the first UGS (Underground Gas Storage) Project in Turkey for the storage of 1.6 billion m³ of

natural gas in the existing North Marmara and Değirmenköy Gas Reservoirs. The scope of works

included the engineering, procurement, construction, installation, pre-commissioning and

commissioning for 4 no of centrifugal natural gas compressor units, gas dehydration system, HC dew

point control system for 600,000 Nm³/h capacity, custody flow metering unit, chemical injection

units, inlet gas heater, separators, slug catchers, flares and other gas process equipment and

instrumentation, UPS, DCS, HIPPS, ESDV system, MV switchgear system, PLC-SCADA systems, fire &

gas system, 40 km. 48 core FOC, piping to ANSI 900 and ANSI 600 classes, 20" high pressure natural gas

pipeline with the length of 3.3 km, 16" high pressure natural gas pipeline with the length of 12.9 km.

and 6" high pressure natural gas pipeline with the length of 1.1 km. (LSTK)

Turkish Petroleum

Integrated Utilities & Offsite Packages &Tanks for Dahej Petrochemical Complex. (EPIC)

The planned complex will comprise an ethylene cracker and associated units and polymer plants to

manufacture 1.1 million tones of ethylene, 400,000 tones of propylene, 150,000 tones of benzene,

and 115,000 tones of butadiene per year.

OPaL

Engineering, procurement (except free issued line pipes), construction, installation, pre-

commissioning and commissioning of 36“-30km high pressure natural gas pipeline and Pressure

Reduction and Metering Stations. The Stations shall be equipped with pig traps, ESDV systems,

custody flow metering units, pressure reduction units, flare systems, IA System, UPS, PLC-SCADA

systems, Fire & Gas systems, 60 km. Long FOC and telecommunication and telemetry systems.

Qatar Petroleum

The EPIC of Gas Compressor Station project. Two Gas compressors, designed for a flow of 14.225

MMSCD, both run by gas turbines. Gas turbines as well as compressors both are supplied by M/s

Solar USA. Compressors are designed to compress the gas from 75 bar upto 110 bar. (1W+1S) (9.86

MW each 19.72 MW)

Gujarat State

Petronet

Construction of the complete Power Plant was undertaken by FERNAS Construction Company as EPIC

Contractor. To operate mobil power plant through leasing for 5 years and produce 4.257.254.605 kWh

electricity

Electricity Generation

Oil Storage Tanks 14,500 bbls, Fuel Tanks, Installation of Centrifugal, Reciprocating and Submersible

Pumps, Chemical Injection Systems, Flare Line, Power Generating Center (3x1,000 kVA) and

Syncronizing Systems, High and Low Voltage Switchboards, Transformers, Oil, Gas and Process Piping

Shell Turkey

3 x 15,000 bbls Oil Storage Tanks, Underground Drainage and Condensate Tanks, Oil Metering Station,

2 x 300 m³/h 60 bar. Centrifugal Pumps, Fire Fighting and Tank Cooling Systems, Underground Water

Tanks.

Kazakturkmunay Ltd

PROJECT NAME

COMPLETED OIL & GAS PIPELINE PROJECTS

Russia-Turkey Natural Gas Pipeline Renewing and

Expansion Project

Kastel Crude Oil Block Station and Surface

Facilities / TURKEY

EPIC for Fuel Gas Supply To Umbab and QAFCO-5 /

QATAR

Aporrny Surface Facilities

Construction/KAZAKHISTAN

Baku-Tbilisi-Ceyhan Crude Oil Pipeline IPT-2

Intermediate Pigging Terminal Project

COMPLETED OIL & GAS PROJECTS FACILITIESPROJECT NAME

Dahej Petrochemical Complex Project / INDIA

LSTK Contract for Gas Compressor Station Project

at Location, Gana / INDIA

Build & Operate of BATMAN 100 MW Power Plant

/ TURKEY

North Marmara & Değirmenköy Underground

Natural Gas Storage Surface Facilities / TURKEY

Page 8: completed oil & gas pipeline projects

IRRIGATION •Main Channel 860 km. •Discharge Channel 306 km. •Tunnel 7,500 m •Siphon 21,000 m

MINING •Excavation 357 M m³ •Kolemanit OPM 113 M T •Gold OPM by Excavation 32 M m³

ROADS •Asphalt Roads 1,250 km. •Other Roads 1,100 km. •Tunnels (Highway) 3,000 m.

BUILDINGS •Hotel 33,700 m² •School 47,500 m² •Library 3,500 m² •Bus Station 20,000 m²

SUMMARY OF OTHER COMPLETED PROJECTS

TELECOMMUNICATION •Copper cable 8,200 km. (20/0.4-1800/0.5) •FOC (12-96 cores) 1,860 km.

Page 9: completed oil & gas pipeline projects

ONGOING PROJECTS LIST EMPLOYER

TANAP DOĞALGAZ İLETİM A.ŞGas Transmission Company Limited

IOCL

Diyarbakır Natural Gas Distribution CO.

EMPLOYER

DSİ - State Hydraulics Works / TURKEY

DSİ - State Hydraulics Works / TURKEY

DSİ - State Hydraulics Works / TURKEY

DSİ - State Hydraulics Works / TURKEY

DSİ - State Hydraulics Works / TURKEY

DSİ - State Hydraulics Works / TURKEY

EMPLOYER

DSİ - State Hydraulics Works / TURKEY

KRG-IRAQ Ministry

DSİ - State Hydraulics Works / TURKEY

DSİ - State Hydraulics Works / TURKEY

DSİ - State Hydraulics Works / TURKEY

DSİ - State Hydraulics Works / TURKEY

DSİ - State Hydraulics Works / TURKEY

EMPLOYER

General Directorate of Highways/TURKEY

General Directorate of Highways/TURKEY

General Directorate of Highways/TURKEY

General Directorate of Highways/TURKEY

General Directorate of Highways/TURKEY

General Directorate of Highways/TURKEY

General Directorate of Highways/TURKEY

EMPLOYER

Enerjisa Electricity Generation Inc.

General Directorate Turkish Coal Enterprises

KOZA Gold Operations Company

General Directorate of Mining Operations/TURKEY

ONGOING MINING & STRIPPING PROJECTSPROJECT NAME

TUFANBEYLİ MINE OPERATION PROJECT

36,500,000 tones of Coal Production -Eynez-Soma

ONGOING ROAD PROJECTSPROJECT NAME

Bala - Aksaray - Ereğli Road Construction (216 KM) Project / TURKEY

Trabzon-Gümüşhane Road&Tunnels Construction Project / TURKEY

Balıkesir-Dursunbey-Harmancık-Tavşanlı Road Construction Project / TURKEY

Batman Right Bank Irrigation System Project / Batman / TURKEY

Batman Left Bank Irrigation System Project / Batman / TURKEY

GEMBOS Derivation & Yeşildağ Irrigation Project / Konya / TURKEY�

GARZAN Dam & HEPP (49.0 MW)

Çukuralan Open Quarry Overburden Project

Simav Open Boron Quarry Overburden Project

Diyarbakır-Mardin Road Construction Project / TURKEY

Denizli- Horsunlu Road Construction Project

Çanakkale- Çan Road Construction Project

Giresun- Espiye Highway Tunnels Construction Project / TURKEY

ONGOING ENERGY PROJECTS

ERUH Dam & HEPP (61.80 MW)

PROJECT NAME

ONGOING IRRIGATION & POTABLE WATER PROJECTSPROJECT NAME

KARASU REG. & HEPP (31.58 MW)

ŞİRVAN Dam & HEPP (31.40 MW)

ANKİRA REG. & HEPP (12.76 MW)

Kars Dam Irrigation Pipeline KARS/ TURKEY

ERBIL Water Supply Improvement System& DUHOK Distribution Network /Erbil/ IRAQ

Gazipaşa Antalya Irrigation Project/Antalya/ TURKEY�

Adana Misis Second Phase Irrigation Project / Adana/ TURKEY

ÇAĞ ÇAĞ HEPP (15.60 MW)

Diyarbakır City Natural Gas Distribution Project (BO)

ONGOING OIL & GAS PROJECTSPROJECT NAME

Trans Anatolian Natural Gas Pipeline Project (TANAP) Lot-1 (56"- 375 KM ) / TURKEY

Bakhrabad-Siddhirganj Gas Transmission Pipeline Project/ BANGLADESH(30“-60km)�

EPC Works for Laying of Pipeline and Composite Works for South Jetty Pipeline

Page 10: completed oil & gas pipeline projects

FERNAS’ SUBCONTRACTOR LIST FOR TAP PROJECT

Catering

Field Services (Work Permit,Local Taxes,Insurances,Medical &First Aid,Security,etc)

Engineering Works

Building Works

Transportation Works

Environmental Consultant

Civil Works (Grading, Excavation,Rebar, Concrete,etc)

Electrical & Instrumentation Works

Cathodic Protection

Mechanical Works ( Equipment Installation, Piping )

Civil & Pipeline Equipment Provider (Sales/Rental)

Hydrostatic Test Works

Third Parties

NDT & Ultrasonic Test Works

Office Container and Panelized System Site Building Suppliers

Page 11: completed oil & gas pipeline projects

FERNAS’ CERTIFICATE & MEMBERSHIPS

Page 12: completed oil & gas pipeline projects

CONTACT PERSON

NAME : ALPER GULSER TITLE : TECHNICAL OFFICE MANAGER E-MAIL : [email protected]

Page 13: completed oil & gas pipeline projects

THANK YOU

www.fernas.com.tr