FINISHED PROJECTS LIGHTING SPRINKLERS/IRRIGATION 175 GARAGE LIGHTING FIXTURES WHERE USING 200 WATT BULBS AND REDUCED THOSE WITH COMPACT FLOURESCENTS SAVING US 158 WATTS PER FIXTURE AND ALSO REPLACED THE ONES ON THE SIDE 9 OF THEM REMOVED THE 300 WATT ONES AND REPLACED WITH A SINGLE 38-42 WATT ONES GIVING US A SAVING OF AVERAGE 250 WATTS PER FIXTURE IIRRIGATION WAS DOWN ONE VALVE WAS MISSING. A SIMPLE SOLUTION WAS TO REFEED THRU THE GARAGE AND SPLIT THE SINGLE ZONE INTO 3 ZONES AND ADDED ANOTHER CONTROLLER AND A SERIES OF ISOLATION VALVES

Upload: manuel-rodriguez

Post on 07-Aug-2015

15 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: COMPLETED PROJECTS 2013

FINISHED PROJECTS

LIGHTING

SPRINKLERS/IRRIGATION

175 GARAGE LIGHTING FIXTURES WHERE USING 200 WATT BULBS AND REDUCED THOSE WITH

COMPACT FLOURESCENTS SAVING US 158 WATTS PER FIXTURE AND ALSO REPLACED THE ONES

ON THE SIDE 9 OF THEM REMOVED THE 300 WATT ONES AND REPLACED WITH A SINGLE 38-42

WATT ONES GIVING US A SAVING OF AVERAGE 250 WATTS PER FIXTURE

IIRRIGATION WAS DOWN ONE VALVE WAS MISSING. A SIMPLE SOLUTION WAS TO

REFEED THRU THE GARAGE AND SPLIT THE SINGLE ZONE INTO 3 ZONES AND ADDED

ANOTHER CONTROLLER AND A SERIES OF ISOLATION VALVES

Page 2: COMPLETED PROJECTS 2013

RECEIVING AREA

SAFETY/WARNING SIGNALS &

SIGNS

Page 3: COMPLETED PROJECTS 2013

CLEANING & PAINTING

SURVEILANCE CAMERAS/

SECURITY

Page 4: COMPLETED PROJECTS 2013

BAYWALK

PAVERS, PAINTING, GRASS

MOVING PHOTO CELL SAVING US A AVERAGE 3 HOURS DAILY SAVING US 1,095 HOURS A YEAR

(PARKING GARAGE LIGHTS, INCLUDING ALL OUTSIDE LIGHTING

Page 5: COMPLETED PROJECTS 2013

LOBBY

TRASH CHUTE

REPAIRED SLOPE INSIDE HAD BEEN BENT OUT OF PLACE ALSO REPLACED ONE SELINOID AND

TOUCH PAD SAVING A MINIMUN OF 10 MAN HOURS

PARTY/MEDIA ROOM