completed and future projects

16
Completed and future projects www.Qntra.com [email protected] om

Upload: teness

Post on 11-Jan-2016

32 views

Category:

Documents


0 download

DESCRIPTION

Completed and future projects. www.Qntra.com. [email protected]. Last projects:. Automatic parking system Q- Park in BILLA Market - Nadezhda. [email protected]. www.Qntra.com. Automatic parking system Q-Park in „ Sopharma Business Towers “ Trade Center. Current project. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Completed and future projects

Completed and future projects

www.Qntra.com [email protected]

Page 2: Completed and future projects

• Automatic parking system Q-Park in BILLA Market - Nadezhda

Last projects:

www.Qntra.com [email protected]

Page 3: Completed and future projects

• Automatic parking system Q-Park in „Sopharma Business Towers“ Trade Center

Page 4: Completed and future projects
Page 5: Completed and future projects

Current project

The project is on high security level, it includes Entrance terminal: QPM-100-Entrance, Exit terminal: QPM-200-Exit, Pay station: QPM-1000-PS and high intensity barriers Park Plus 101. The deadline for the project

is August 2014.

Page 6: Completed and future projects

Parking system Q-Park in trade center Siven :

Entrance terminal for barcode tickets issuing, Paying by Payment station with an operator, Terminal for free validation of barcode tickets for LIDL Market, Car Count system, high quality barriers, provided by the Belgian partner of Qntra - Automatic Systems S.A

IntroductionIntroduction : :

www.Qntra.com [email protected]

Page 7: Completed and future projects

BILLA Market – Poduyane

Entrance terminal QPM-100-Entrance, Exit terminal QPM-200-Exit, Automatic pay station QPM-1000-PS, Electromechanical barrier BL12, Inductive loop, Traffic light, QPS -Parking management software – software for payment management.

BILLA Market – Nadezhda Entrance terminal QPM-100-Entrance, Exit

terminal QPM-200-Exit, Automatic pay station QPM-1000-PS, Electromechanical barrier BL12, Inductive loop, Traffic light, QPS -Parking management software – software for payment management.

B I L L A

Page 8: Completed and future projects

Pictures from the project Poduyane

BILLA

Page 9: Completed and future projects

Pictures from the project Nadezhda

BILLA

Page 10: Completed and future projects

“Qntra Ltd” company successfully finished project for automatic parking system Q-Park on Burgas Airport, together with “Data Systems Engineering Ltd” .The system includes three entrance terminals QPM-100-Entrance, thre exit terminals QPM-200-Exit, four pay stations QPM-1000 PS, six autonatical barriers Park Plus 100, Software for parking management QPS.

BURGAS AIRPORT

Page 11: Completed and future projects

BURGAS AIRPORT

Page 12: Completed and future projects

In May “Qntra Ltd” company successfully finished project for automatic parking system Q-Park on Varna Airport, together with “Data Systems Engineering Ltd” The system includes two entrance terminals QPM-100-Entrance, three exit terminals QPM-200-Exit , three automatic pay stations QPM-1000 PS , five automatic barrier Park Plus 100, Software for parking management QPS.

VARNA AIRPORT

Page 13: Completed and future projects

Integrated parking system Q-Park includes Entrance terminal QPM-100-Entrance, and Exit terminal QPM-200-Exit.

JUMBO MARKET

Page 14: Completed and future projects

Automated parking system includes: Entrance terminal QPM-100-Entrance,Exit terminal QPM-200-Exit, Automatic Pay station QPM-1000 PS, with additional functionality for parking payments Automatic barrier Park Plus 101 and Software for parking management QPS.

SOPHARMA BUSINESS TOWERS

Page 15: Completed and future projects

“Qntra Ltd.” company successfully realized its own project for automatic parking system Q-Park in Albena resort. The system includes two entrance terminals QPM-100-Entrance, three exit terminals QPM-200-Exit , six automatic pay stations QPM-1000 PS , four automatic barriers BL 229, Software for parking management - QPS.

ALBENA RESORT

Page 16: Completed and future projects

1505 Sofia, Bulgaria

Redouta47 Popova

Shapka Str. , Floor 2

Phone :(02)421 97 07 0887 390 797

e-mail:[email protected]

CONTACTCONTACTSS: