Designed for Reliability
Complete EPC solutions for the mission-critical
captive /standby power plants
www.neptunus-power.com Neptunus Power Plant Services Pvt. Ltd.
![Page 2: Complete EPC solutions Designed for Reliability for the ... · Greenfield project - 4 x 6 MW HFO based power Plant for Captive generation, using Niigata 750 rpm engines EPC project:](https://reader034.vdocuments.us/reader034/viewer/2022050411/5f87cfa44247a329d549dfb7/html5/thumbnails/2.jpg)
The Context
● Continuity of power supply is critical for process industries
● Higher reliability expectations from mission critical-utilities like
the DG based captive /standby power plant
● Key challenges faced - designing adequate capacity, optimized
layout, response time, operational challenges, efficient fuel
management, ventilation & noise management, Environmental
& Safety compliance etc.
![Page 3: Complete EPC solutions Designed for Reliability for the ... · Greenfield project - 4 x 6 MW HFO based power Plant for Captive generation, using Niigata 750 rpm engines EPC project:](https://reader034.vdocuments.us/reader034/viewer/2022050411/5f87cfa44247a329d549dfb7/html5/thumbnails/3.jpg)
The Neptunus Way
Our design philosophy: “design that works”
because it’s thought from the operator’s perspective
➔ 23+ years in O&M leads to life-cycle considerations➔ Practical user perspective➔ Opex vs Capex optimization ➔ Long term value creation
![Page 4: Complete EPC solutions Designed for Reliability for the ... · Greenfield project - 4 x 6 MW HFO based power Plant for Captive generation, using Niigata 750 rpm engines EPC project:](https://reader034.vdocuments.us/reader034/viewer/2022050411/5f87cfa44247a329d549dfb7/html5/thumbnails/4.jpg)
Our Solutions
#1 EPC & Turnkey Solutions#2 Operations & Predictive
Maintenance Solutions
Capabilities to deliver integrated solutions, ready for Industry 4.0 using
IIoT and Cloud-based Remote Monitoring
![Page 5: Complete EPC solutions Designed for Reliability for the ... · Greenfield project - 4 x 6 MW HFO based power Plant for Captive generation, using Niigata 750 rpm engines EPC project:](https://reader034.vdocuments.us/reader034/viewer/2022050411/5f87cfa44247a329d549dfb7/html5/thumbnails/5.jpg)
#1 Turnkey Solutions
EPC Services
back-up/ standby/
captive power plants
Diesel, Gas, Biogas as well as dual-fuel powered engines
Type of Projects ● New Plant ● Existing Plant ○ Refurbishment,
Rebuilding,○ Repowering, ○ Shifting of
existing units
![Page 6: Complete EPC solutions Designed for Reliability for the ... · Greenfield project - 4 x 6 MW HFO based power Plant for Captive generation, using Niigata 750 rpm engines EPC project:](https://reader034.vdocuments.us/reader034/viewer/2022050411/5f87cfa44247a329d549dfb7/html5/thumbnails/6.jpg)
User Industry Segments
● Data Centers ● Industrial
plants● Commercial
complexes ● Engine Test
Cells ● Oil Rigs ● Platform
supply vessels
![Page 7: Complete EPC solutions Designed for Reliability for the ... · Greenfield project - 4 x 6 MW HFO based power Plant for Captive generation, using Niigata 750 rpm engines EPC project:](https://reader034.vdocuments.us/reader034/viewer/2022050411/5f87cfa44247a329d549dfb7/html5/thumbnails/7.jpg)
Diesel Engine Power Plant
![Page 8: Complete EPC solutions Designed for Reliability for the ... · Greenfield project - 4 x 6 MW HFO based power Plant for Captive generation, using Niigata 750 rpm engines EPC project:](https://reader034.vdocuments.us/reader034/viewer/2022050411/5f87cfa44247a329d549dfb7/html5/thumbnails/8.jpg)
Cogeneration
Electrical Power
![Page 9: Complete EPC solutions Designed for Reliability for the ... · Greenfield project - 4 x 6 MW HFO based power Plant for Captive generation, using Niigata 750 rpm engines EPC project:](https://reader034.vdocuments.us/reader034/viewer/2022050411/5f87cfa44247a329d549dfb7/html5/thumbnails/9.jpg)
Biogas to Power
Electrical Power
![Page 10: Complete EPC solutions Designed for Reliability for the ... · Greenfield project - 4 x 6 MW HFO based power Plant for Captive generation, using Niigata 750 rpm engines EPC project:](https://reader034.vdocuments.us/reader034/viewer/2022050411/5f87cfa44247a329d549dfb7/html5/thumbnails/10.jpg)
Waste to Energy (Gasification)
![Page 11: Complete EPC solutions Designed for Reliability for the ... · Greenfield project - 4 x 6 MW HFO based power Plant for Captive generation, using Niigata 750 rpm engines EPC project:](https://reader034.vdocuments.us/reader034/viewer/2022050411/5f87cfa44247a329d549dfb7/html5/thumbnails/11.jpg)
Data Center Backup Power
![Page 12: Complete EPC solutions Designed for Reliability for the ... · Greenfield project - 4 x 6 MW HFO based power Plant for Captive generation, using Niigata 750 rpm engines EPC project:](https://reader034.vdocuments.us/reader034/viewer/2022050411/5f87cfa44247a329d549dfb7/html5/thumbnails/12.jpg)
Neptunus Capabilities
Turnkey EPC services
Detail Design
Procurement (including
preparation of tender specs)
Project Management
MEP & FP Design & Execution
Project Execution
![Page 13: Complete EPC solutions Designed for Reliability for the ... · Greenfield project - 4 x 6 MW HFO based power Plant for Captive generation, using Niigata 750 rpm engines EPC project:](https://reader034.vdocuments.us/reader034/viewer/2022050411/5f87cfa44247a329d549dfb7/html5/thumbnails/13.jpg)
Solution Packages
Turnkey MEP Design & Execution Operations & Predictive Maintenance
Fire Protection System HVAC & Noise Management Fuel Tankyard Design
![Page 14: Complete EPC solutions Designed for Reliability for the ... · Greenfield project - 4 x 6 MW HFO based power Plant for Captive generation, using Niigata 750 rpm engines EPC project:](https://reader034.vdocuments.us/reader034/viewer/2022050411/5f87cfa44247a329d549dfb7/html5/thumbnails/14.jpg)
#2 Operations & PDM
● Authorised distributors & service partner for diesel engines of Niigata Japan and EMD USA (a Caterpillar company)
● Extensive experience in repair & service of all leading makes of engines like CAT, Cummins etc.
Advanced Predictive Maintenance
● On-line monitoring of oil quality
● Advance Filtration Solutions
● No need to change lube Oil!
● Condition Monitoring & predictive analysis with Torsional Vibration measurement.
● Earliest warning systems anywhere in industry.
● Equivalent to detecting cancer at Stage 0.
● Applications: Engine, Motor, Pump, Bearing, Gearbox etc.
Oil monitoring & management
IIoT Solution for remote monitoring of all critical plant assets!
Engine life-cycle management
![Page 15: Complete EPC solutions Designed for Reliability for the ... · Greenfield project - 4 x 6 MW HFO based power Plant for Captive generation, using Niigata 750 rpm engines EPC project:](https://reader034.vdocuments.us/reader034/viewer/2022050411/5f87cfa44247a329d549dfb7/html5/thumbnails/15.jpg)
List of Completed Projects
● Tier III data center, Mumbai - Design and PMC Services of
41 MW Power backup plant
○ DG set and accessories
○ Room Ventilation system
○ DG room Acoustic treatment
○ Chimney exhaust system
○ Fuel tank yard and fuel management system
● Existing Data Centre, Pune
○ Brownfield project - Redesign of underground fuel storage & management system
![Page 16: Complete EPC solutions Designed for Reliability for the ... · Greenfield project - 4 x 6 MW HFO based power Plant for Captive generation, using Niigata 750 rpm engines EPC project:](https://reader034.vdocuments.us/reader034/viewer/2022050411/5f87cfa44247a329d549dfb7/html5/thumbnails/16.jpg)
List of Completed Projects
● Kenya Navy : Engines Test Cell Project, Mombassa, Kenya○ Set up a 4100 kW dyno based test cell for testing of multiple naval engines.
○ Greenfield project with a challenging concept since there was no reference / benchmark available for any such facility. We understand that this is the only of its kind project set-up for any navy establishment
● NATCO, Yemen : Fuel Switching from Gas to Diesel○ Brownfield project - conversion of gas based engine power plant to diesel engine power
● MCCPTA, Haldia, West Bengal : Captive Power Plant○ Greenfield project - 4 x 6 MW HFO based power Plant for Captive generation, using Niigata 750 rpm
engines
○ EPC project: Engine room ventilation system, Room acoustical solution, HFO management system, Chimney stack, control panels
![Page 17: Complete EPC solutions Designed for Reliability for the ... · Greenfield project - 4 x 6 MW HFO based power Plant for Captive generation, using Niigata 750 rpm engines EPC project:](https://reader034.vdocuments.us/reader034/viewer/2022050411/5f87cfa44247a329d549dfb7/html5/thumbnails/17.jpg)
● PMC services to set up new
Data Center, Mumbai
● ONGC, Heera Platform,
Bombay High
● MCCPTA, Haldia, West Bengal
● Pioneer Distilleries, Nanded
● Riddhi Siddhi Glycols, Gokak
● Maize Products, Ahmedabad
● Surat Municipal Corporation
● Spectrum Dyes, Surat
● Somany Tiles, Ghaziabad
● Jaipur Municipal Corporation
● Over 15 installations of diesel/gas
powered Captive Power Plants
List of Completed Projects
![Page 18: Complete EPC solutions Designed for Reliability for the ... · Greenfield project - 4 x 6 MW HFO based power Plant for Captive generation, using Niigata 750 rpm engines EPC project:](https://reader034.vdocuments.us/reader034/viewer/2022050411/5f87cfa44247a329d549dfb7/html5/thumbnails/18.jpg)
About Neptunus
● 23+ years in the business of delivering reliable solutions
● More than 2000 assignments completed
● A strong & committed team of ~100 people
● Serving customers in 25 countries across Europe, Asia & Africa
● HQ & workshop in India & warehouse in Middle East
![Page 19: Complete EPC solutions Designed for Reliability for the ... · Greenfield project - 4 x 6 MW HFO based power Plant for Captive generation, using Niigata 750 rpm engines EPC project:](https://reader034.vdocuments.us/reader034/viewer/2022050411/5f87cfa44247a329d549dfb7/html5/thumbnails/19.jpg)
Value System
Teamwork Safety Integrity
Excellence Accountability Stakeholder Delight
![Page 20: Complete EPC solutions Designed for Reliability for the ... · Greenfield project - 4 x 6 MW HFO based power Plant for Captive generation, using Niigata 750 rpm engines EPC project:](https://reader034.vdocuments.us/reader034/viewer/2022050411/5f87cfa44247a329d549dfb7/html5/thumbnails/20.jpg)
Certifications & Awards
● ISO 9001:2015 certified by LRQA
● Rated BBB long term and A2 short term by ICRA and Crisil
● Featured, "Leading SMEs of India 2017" by Dun & Bradstreet and
RBL Bank
● Awarded the India SME 100 Award by the Government of India by
the Ministry of MSME and Axis Bank in 2016
![Page 21: Complete EPC solutions Designed for Reliability for the ... · Greenfield project - 4 x 6 MW HFO based power Plant for Captive generation, using Niigata 750 rpm engines EPC project:](https://reader034.vdocuments.us/reader034/viewer/2022050411/5f87cfa44247a329d549dfb7/html5/thumbnails/21.jpg)
Global Partners
![Page 22: Complete EPC solutions Designed for Reliability for the ... · Greenfield project - 4 x 6 MW HFO based power Plant for Captive generation, using Niigata 750 rpm engines EPC project:](https://reader034.vdocuments.us/reader034/viewer/2022050411/5f87cfa44247a329d549dfb7/html5/thumbnails/22.jpg)
You can count on us for delivering reliable solutions! For more details, contact Neptunus Power Plant Services Pvt. Ltd.
Email : [email protected] Call : +91-95944-10707