comos @ uhde it- supported plant engineering an overview

22
Comos @ Uhde IT- supported plant engineering An overview of IT-applications Betreiberkreis Comos Mr. Cymbrowski Dortmund, May 2013

Upload: others

Post on 27-Dec-2021

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Comos @ Uhde IT- supported plant engineering An overview

Comos @ UhdeIT- supported plant engineeringAn overview of IT-applications

Betreiberkreis Comos

Mr. Cymbrowski

Dortmund, May 2013

Page 2: Comos @ Uhde IT- supported plant engineering An overview

Comos @ Uhde

IT supported plant engineering ©2013

2

Content / Structure

Overview

Process engineering (Comos® PR)

Instrumentation & Electrical (Comos® EI)

Equipment (Comos® EQ)

Progress Measurement (Comos® HESTIA)

Page 3: Comos @ Uhde IT- supported plant engineering An overview

Comos @ Uhde

IT supported plant engineering ©2013

3

Global Information Technology - Engineering Systems Department

Division: Global Information Technology ITG

Head: Dr. Röper

Staff: ~70 employees

Department: Engineering Systems

Head: Mr. Stramma

Deputy: Ms. Wronn

Staff: ~ 20 employees

Applications:

– Comos (Siemens)

– SP P&ID, SP-I, SP 3D (Intergraph)

– PDMS, AVEVA Net (AVEVA)

– AutoCAD (Autodesk)

– IRP (Uhde Development)

Page 4: Comos @ Uhde IT- supported plant engineering An overview

Comos @ Uhde

IT supported plant engineering ©2013

4

Comos facts

Comos facts

– More than 400 global floating licences (Comos basic + Comos ET)

– More than 400 Comos user worldwide

– Own expertise in Comos customizing since 1996

– Productive usage of Comos since 1997

– 5 Comos Administrators

– 4 Comos Applications � Comos PR, EQ, EI, HESTIA

– Comos 9.2 (32Bit) Update 5004

– 4 physical + 20 virtual Terminalserver (max. 8 - 10 User) with load-balancing

– Additional servers in subsidiaries worldwide

(India, Russia, Mexico, Thailand, South Africa, Australia, E)

– Windows 2008 R2 64Bit with Citrix 6.0

Page 5: Comos @ Uhde IT- supported plant engineering An overview

Comos @ Uhde

IT supported plant engineering ©2013

5

Information Technologies – Overview – UTE (=“Uhde Total Engineering”)

PipingIRP

ElectricalComos EI

Progress

ControlPrimavera

PFDAutoCAD

ProcessComos PR

Document

ManagementSAP-DMS

EstimateUCS

Mechanical Completion

ICAPS

cFolders

Techn. Calc.Programms

SimulationAspen Plus

De

live

rab

les

Co

mo

sH

ES

TIA

EquipmentComos-EQ

Structure Data Explorer

SDE

PDS

SP 3D

Piping &Arrangement

PDMS

AutoCAD PID

PIDSP P&ID

SP-I

Instrument

sComos EI

Site Management

SMS

Cost

ReportingZwika

Cost Control

inhouseserv.KKE

Cost Control

subcontractsKKF

Record of

OrdersBUL

Material

Management

Expediting

SAP / Web

Shipping

LOADS

Spares

SAP / Web

Manual copyingManual electronic

transfer

Automatic electronic

transfer

Bill ofQuantityAvanti Pro

MaterialReceivingSiteTraxx

Logistic

Provider(Deufol,

Duisport)

SP-I

Instrument

sComos EI

ElectricalComos EI

EquipmentComos-EQ

Mass balance streams

Process Fluid list

Process Data tomeasurement &control points

Process Fluid list

Stream tables Process fluid listProcess Data to measuring- and control points

Pipe classesFluids (incl. Design-conditions)

Instrumentation data

Equipmentlist

Technical datafor the order

Purchase requisition

E-Consumer

Component listComponent list

Calculation data

Order Data

Building- and Assembly-data

Equipmentlist

Construction Unit

WorkunitsEngineering hours

Activities

Manpower loading data

Page 6: Comos @ Uhde IT- supported plant engineering An overview

Comos @ Uhde

IT supported plant engineering ©2013

6

Month 0Month 6

Month 20 Month 28 Month 32Month 4

Month 10 Month 26

ConstructionCommis-sioningDetail EngineeringBasic Engineering

Simulation

SmartPlant P&ID

AutoCAD PFD

Comos® PR

Comos® EQ

Comos® EI

PDMS / PDS / SP 3D

IRP

Use of IT Tools for contract processing

Page 7: Comos @ Uhde IT- supported plant engineering An overview

Comos @ Uhde

IT supported plant engineering ©2013

7

Content / Structure

Overview

Process engineering (Comos® PR)

Instrumentation & Electrical (Comos® EI)

Equipment (Comos® EQ)

Progress Measurement (Comos® HESTIA)

Page 8: Comos @ Uhde IT- supported plant engineering An overview

Comos @ Uhde

IT supported plant engineering ©2013

8

Process Engineering: Comos® PR

PipingIRP

ElectricalComos EI

Progress

ControlPrimavera

PFDAutoCAD

ProcessComos PR

Document

ManagementSAP-DMS

EstimateUCS

Mechanical Completion

ICAPS

cFolders

Techn. Calc.Programms

SimulationAspen Plus

De

live

rab

les

HE

ST

IA

EquipmentComos-EQ

Structure Data Explorer

SDE

PDS

SP 3D

Piping &Arrangement

PDMS

AutoCAD PID

PIDSP P&ID

SP-I

Instrument

sComos EI

Site Management

SMS

Cost

ReportingZwika

Cost Control

inhouseserv.KKE

Cost Control

subcontractsKKF

Record of

OrdersBUL

Material

Management

Expediting

SAP / Web

Shipping

LOADS

Spares

SAP / Web

Manual copyingManual electronic

transfer

Automatic electronic

transfer

Bill ofQuantityAvanti Pro

MaterialReceivingSiteTraxx

Logistic

Provider(Deufol,

Duisport)

Mass balance streams

Process Fluid list

Process Data tomeasurement &control points

Process Fluid list

Stream tables Process fluid listProcess Data to measuring- and control points

Pipe classesFluids (incl. Design-conditions)

Page 9: Comos @ Uhde IT- supported plant engineering An overview

Comos @ Uhde

IT supported plant engineering ©2013

9

Comos® PR: Task

� Administration of process data of

– Fluids

– Material streams

– Instrumentation

� Editing of the material streams derived from simulation for the PFD-material

streams bar

� Editing and transfer of process data of fluids and instruments to downstream

disciplines

� Link between fluids and material streams

� Relating material streams to instruments

� Internal consistency check

(e.g. between design conditions of fluid and material streams)

Page 10: Comos @ Uhde IT- supported plant engineering An overview

Comos @ Uhde

IT supported plant engineering ©2013

10

Comos® PR: Architecture / Structure

Process Database

I

M

P

O

R

T

C

A

L

C

U

L

A

T

I

O

N

S

Working Area

E

X

P

O

R

T

Elektronic Transfer

Selected measuring and control devicesfr. COMOS EI

Mass balance fr. Simulations-tools or Excel

Fluid list to

IRP

Streams to

AutoCAD (PFDs)

Fluid list to

COMOS EI

Selected measuring and control devices to

COMOS EI

Database

Fluids

Instr. & MSR

Database

Database

Selected measuring and control devices

fr. SPPID

Fluid list to

SPPID 1)

Streams

Page 11: Comos @ Uhde IT- supported plant engineering An overview

Comos @ Uhde

IT supported plant engineering ©2013

11

Content / Structure

Overview

Process engineering (Comos® PR)

Instrumentation & Electrical (Comos® EI)

Equipment (Comos® EQ)

Progress Measurement (Comos® HESTIA)

Page 12: Comos @ Uhde IT- supported plant engineering An overview

Comos @ Uhde

IT supported plant engineering ©2013

12

Instrumentation: Comos® EI

PipingIRP

ElectricalComos EI

Progress

ControlPrimavera

PFDAutoCAD

ProcessComos PR

Document

ManagementSAP-DMS

EstimateUCS

Mechanical Completion

ICAPS

cFolders

Techn. Calc.Programms

SimulationAspen Plus

De

live

rab

les

HE

ST

IA

EquipmentComos-EQ

Structural Data Explorer

SDE

PDS

SP 3D

Piping &Arrangement

PDMS

AutoCAD PID

PIDSP P&ID

SP-I

Instrument

sComos EI

Site Management

SMS

Cost

ReportingZwika

Cost Control

inhouseserv.KKE

Cost Control

subcontractsKKF

Record of

OrdersBUL

Material

Management

Expediting

SAP / Web

Shipping

LOADS

Spares

SAP / Web

Manual copyingManual electronic

transfer

Automatic electronic

transfer

Bill ofQuantityAvanti Pro

MaterialReceivingSiteTraxx

Logistic

Provider(Deufol,

Duisport)

Process Data tomeasurement &control points

Process Fluid list

Process fluid listProcess Data to measuring- and control points

Pipe classesFluids (incl. Design-conditions)

Instrumentation data

Technical datafor the order

Equipmentlist

Page 13: Comos @ Uhde IT- supported plant engineering An overview

Comos @ Uhde

IT supported plant engineering ©2013

13

Comos® EI- Instrumentation: Tasks

� Generation and management of

– Instrument specifications for enquiries and ordering

– Control system specifications with I/O-list and logic diagrams

– BoQ for Erection

– Wiring diagram

� Generation of

– Loop-Index

– Loop-Summaries

– I/O-List

– Cable list

– Instrument list

Page 14: Comos @ Uhde IT- supported plant engineering An overview

Comos @ Uhde

IT supported plant engineering ©2013

14

Electrical: Comos® EI

PipingIRP

ElectricalComos EI

Progress

ControlPrimavera

PFDAutoCAD

ProcessComos PR

Document

ManagementSAP-DMS

EstimateUCS

Mechanical Completion

ICAPS

cFolders

Techn. Calc.Programms

SimulationAspen Plus

De

live

rab

les

HE

ST

IA

EquipmentComos-EQ

Structural Data Explorer

SDE

PDS

SP 3D

Piping &Arrangement

PDMS

AutoCAD PID

PIDSP P&ID

SP-I

Instrument

sComos EI

Site Management

SMS

Cost

ReportingZwika

Cost Control

inhouseserv.KKE

Cost Control

subcontractsKKF

Record of

OrdersBUL

Material

Management

Expediting

SAP / Web

Shipping

LOADS

Spares

SAP / Web

Manual copyingManual electronic

transfer

Automatic electronic

transfer

Bill ofQuantityAvanti Pro

MaterialReceivingSiteTraxx

Logistic

Provider(Deufol,

Duisport)

Equipmentlist

Purchase requisition

E-Consumer

Page 15: Comos @ Uhde IT- supported plant engineering An overview

Comos @ Uhde

IT supported plant engineering ©2013

15

Comos® EI- Electrical: Tasks

� Generation and management of

– Enquiry- and order specifications for E-equipments

– Cost calculation for E-equipments

– Bill of quantities

– Cable laying

� Generation of

– E-consumer list

– Switchboard list, calculation of load

– Cable lists

– Cable pulling list, Section assignment, Cable tray assignment

Page 16: Comos @ Uhde IT- supported plant engineering An overview

Comos @ Uhde

IT supported plant engineering ©2013

16

Content / Structure

Overview

Process engineering (Comos® PR)

Instrumentation & Electrical (Comos® EI)

Equipment (Comos® EQ)

Progress Measurement (Comos® HESTIA)

Page 17: Comos @ Uhde IT- supported plant engineering An overview

Comos @ Uhde

IT supported plant engineering ©2013

17

Equipment: Comos® EQ

PipingIRP

ElectricalComos EI

Progress

ControlPrimavera

PFDAutoCAD

ProcessComos PR

Document

ManagementSAP-DMS

EstimateUCS

Mechanical Completion

ICAPS

cFolders

Techn. Calc.Programms

SimulationAspen Plus

De

live

rab

les

HE

ST

IA

EquipmentComos-EQ

Structural Data Explorer

SDE

PDS

SP 3D

Piping &Arrangement

PDMS

AutoCAD PID

PIDSP P&ID

SP-I

Instrument

sComos EI

Site Management

SMS

Cost

ReportingZwika

Cost Control

inhouseserv.KKE

Cost Control

subcontractsKKF

Record of

OrdersBUL

Material

Management

Expediting

SAP / Web

Shipping

LOADS

Spares

SAP / Web

Manual copyingManual electronic

transfer

Automatic electronic

transfer

Bill ofQuantityAvanti Pro

MaterialReceivingSiteTraxx

Logistic

Provider(Deufol,

Duisport)

Equipmentlist

E-Consumer

Component list

Calculation data

Order Data

Equipmentlist

Construction Unit

Building- and Assembly-data

Workunits

Page 18: Comos @ Uhde IT- supported plant engineering An overview

Comos @ Uhde

IT supported plant engineering ©2013

18

Comos® EQ: Tasks

� Construction and administration of

– Equipment specifications for inquiry and order

– Building- and installation relevant data

– Requirements for E-Consumer (especially in proposal phase)

� Generation of

– Name-Only-list

– Equipment list with technical data

– E-Consumer-list

Page 19: Comos @ Uhde IT- supported plant engineering An overview

Comos @ Uhde

IT supported plant engineering ©2013

19

Content / Structure

Overview

Process engineering (Comos® PR)

Instrumentation & Electrical (Comos® EI)

Equipment (Comos® EQ)

Progress Measurement (Comos® HESTIA)

Page 20: Comos @ Uhde IT- supported plant engineering An overview

Comos @ Uhde

IT supported plant engineering ©2013

20

Progress Measurement: Comos® HESTIA

PipingIRP

ElectricalComos EI

Progress

ControlPrimavera

PFDAutoCAD

ProcessComos PR

Document

ManagementSAP-DMS

EstimateUCS

Mechanical Completion

ICAPS

cFolders

Techn. Calc.Programms

SimulationAspen Plus

Equipment

Comos-EQStructural

Data ExplorerSDE

PDS

SP 3D

Piping &Arrangement

PDMS

AutoCAD PID

PIDSP P&ID

SP-I

Instrument

sComos EI

Site Management

SMS

Cost

ReportingZwika

Cost Control

inhouseserv.KKE

Cost Control

subcontractsKKF

Record of

OrdersBUL

Material

Management

Expediting

SAP / Web

Shipping

LOADS

Spares

SAP / Web

Manual copyingManual electronic

transfer

Automatic electronic

transfer

Bill ofQuantityAvanti Pro

MaterialReceivingSiteTraxx

Logistic

Provider(Deufol,

Duisport)

De

live

rab

les

Co

mo

sH

ES

TIA

Engineering hours

Activities

Manpower loading data

Page 21: Comos @ Uhde IT- supported plant engineering An overview

Comos @ Uhde

IT supported plant engineering ©2013

21

HESTIA – Integration of Work Processes in EngineeringMain Motivation

� fast preparation and implementation of project time schedule

� definition of common engineering deliverables for the Uhde Group

� creation of transparent and common progress measurement methods

� integration of the different tasks of the Lead Engineers

� creation of a list of deliverables on demand

The Name

HESTIA is an acronym for Home office services ESTImating&planning

Approach

Page 22: Comos @ Uhde IT- supported plant engineering An overview

Comos @ Uhde

IT supported plant engineering ©2013

22

Deliverable definition /

Scope verification

HESTIA Tasks

Man hour calculation

Split of Work definition

Time Schedule setup

Progress tracking

Project setup /

Partner definition