    BOILER START UP

  • 8/8/2019 Cold Start Up[1].

    2/16

  • 8/8/2019 Cold Start Up[1].

    3/16

  • 8/8/2019 Cold Start Up[1].

    4/16

  • 8/8/2019 Cold Start Up[1].

    5/16

    BOILER EXPANSION

    DOWNWARD DIRECTION - 234 MM.

    LEFT AND RIGHT SIDE - 39 MM.

    FRONT AND REAR SIDE - 25 MM.

    REAR PASS RING HDR 127 MM

  • 8/8/2019 Cold Start Up[1].

    6/16

  • 8/8/2019 Cold Start Up[1].

    7/16

  • 8/8/2019 Cold Start Up[1].

    8/16

  • 8/8/2019 Cold Start Up[1].

    9/16

    Conti

    Purge permissives

    All feeders off, All hot air gates closed,

    all scanners show no flame. Put LDO System in operation.

    Maintain Furnace / Wind box DP

    Light up Boiler with AB elevation(Rotate firing).

  • 8/8/2019 Cold Start Up[1].

    10/16

    COLD START UP

    Charging of 6.6 KV Electrical Supply System

    & Charging of 6.6 KV Switch Board..

    Starting of CW & ACW Water Pump.

    Start DMCW system

    Starting of Air Compressor system Charging of DM Make up System, Fill FST &

    Condensate Storage tank.

    Open of Boiler Side Vents & Drains.

    Filling of Boiler Drum through Boiler Fill pump(250 m3).

    Start of Air Pre heater A & B (Ensure APH iscoming on Air Motor).

  • 8/8/2019 Cold Start Up[1].

    11/16

  • 8/8/2019 Cold Start Up[1].

    12/16

    Conti Charge PRDS

    Take Turbine on barring gear

    Taking Generator Seal Oil system in Serviceand fill H2 gas.

    Provide Turbine Gland sealing

    Start Vacuum pumps & pull vacuum

    Put HPBP in operation

    Charge HFO heating line

    Start HFO Pump Put De aerator & Hot well Level Control on

    auto.

    Put De aerator to initial heating.

  • 8/8/2019 Cold Start Up[1].

    13/16

    Conti. Increase firing by taking HFO guns after

    attaining HFO temperature.

    Increase the pressure to 20 ksc and MSTemp 340 350 deg C and RH Temp 350deg C

    Roll Turbine to 690 rpm and soak the turbinefor 35 40 mins

    Maintain MS Pr and Temp

    Roll Turbine to 3000 rpm& soak for 20 mins

    Synchronize the machine

    Close HP & LP BP

  • 8/8/2019 Cold Start Up[1].

    14/16

    Conti

    Take pulveriser A in service and rise the

    load to 50 MW.( 28 Kg/cm2, 170 Deg C)

    Charge LP Heaters from steam side. Take Pulveriser B in service and rise

    the load to 75 MW.( 50 kg/cm2, 250

    Deg c) Take 100 % feed water line.

  • 8/8/2019 Cold Start Up[1].

    15/16

    Conti

    Take Mill C in service and rise the load to 100MW.( 70 Kg/cm2, 350 Deg C)

    Charge the HP Heaters from water side first

    and then steam side. Take second BFP in service.

    Establish second air & flue gas gas cycle. ( iestarting second ID & FD fan).

    Take Mill D in service and rise the load to 170MW.(110 Kg/cm2, 540 Deg C)

    Take CMC in service.

    Rise the load to 250 MW.

  • 8/8/2019 Cold Start Up[1].

    16/16

    Conti

    It takes 6.33 Hrs to reach full load.