BOILER START UP
-
8/8/2019 Cold Start Up[1].
2/16
-
8/8/2019 Cold Start Up[1].
3/16
-
8/8/2019 Cold Start Up[1].
4/16
-
8/8/2019 Cold Start Up[1].
5/16
BOILER EXPANSION
DOWNWARD DIRECTION - 234 MM.
LEFT AND RIGHT SIDE - 39 MM.
FRONT AND REAR SIDE - 25 MM.
REAR PASS RING HDR 127 MM
-
8/8/2019 Cold Start Up[1].
6/16
-
8/8/2019 Cold Start Up[1].
7/16
-
8/8/2019 Cold Start Up[1].
8/16
-
8/8/2019 Cold Start Up[1].
9/16
Conti
Purge permissives
All feeders off, All hot air gates closed,
all scanners show no flame. Put LDO System in operation.
Maintain Furnace / Wind box DP
Light up Boiler with AB elevation(Rotate firing).
-
8/8/2019 Cold Start Up[1].
10/16
COLD START UP
Charging of 6.6 KV Electrical Supply System
& Charging of 6.6 KV Switch Board..
Starting of CW & ACW Water Pump.
Start DMCW system
Starting of Air Compressor system Charging of DM Make up System, Fill FST &
Condensate Storage tank.
Open of Boiler Side Vents & Drains.
Filling of Boiler Drum through Boiler Fill pump(250 m3).
Start of Air Pre heater A & B (Ensure APH iscoming on Air Motor).
-
8/8/2019 Cold Start Up[1].
11/16
-
8/8/2019 Cold Start Up[1].
12/16
Conti Charge PRDS
Take Turbine on barring gear
Taking Generator Seal Oil system in Serviceand fill H2 gas.
Provide Turbine Gland sealing
Start Vacuum pumps & pull vacuum
Put HPBP in operation
Charge HFO heating line
Start HFO Pump Put De aerator & Hot well Level Control on
auto.
Put De aerator to initial heating.
-
8/8/2019 Cold Start Up[1].
13/16
Conti. Increase firing by taking HFO guns after
attaining HFO temperature.
Increase the pressure to 20 ksc and MSTemp 340 350 deg C and RH Temp 350deg C
Roll Turbine to 690 rpm and soak the turbinefor 35 40 mins
Maintain MS Pr and Temp
Roll Turbine to 3000 rpm& soak for 20 mins
Synchronize the machine
Close HP & LP BP
-
8/8/2019 Cold Start Up[1].
14/16
Conti
Take pulveriser A in service and rise the
load to 50 MW.( 28 Kg/cm2, 170 Deg C)
Charge LP Heaters from steam side. Take Pulveriser B in service and rise
the load to 75 MW.( 50 kg/cm2, 250
Deg c) Take 100 % feed water line.
-
8/8/2019 Cold Start Up[1].
15/16
Conti
Take Mill C in service and rise the load to 100MW.( 70 Kg/cm2, 350 Deg C)
Charge the HP Heaters from water side first
and then steam side. Take second BFP in service.
Establish second air & flue gas gas cycle. ( iestarting second ID & FD fan).
Take Mill D in service and rise the load to 170MW.(110 Kg/cm2, 540 Deg C)
Take CMC in service.
Rise the load to 250 MW.
-
8/8/2019 Cold Start Up[1].
16/16
Conti
It takes 6.33 Hrs to reach full load.