  • 7/29/2019 cold srat up

    1/21

    PROCEDURE FOR COLD

    STARTUP(TYPICAL FOR 500MW)

    AJAY KUMAR

  • 7/29/2019 cold srat up

    2/21

    ID INDUCED DRAFT

    FD FORCED DRAFT

    DMCW DE-MINERALIZED COOLING WATER

    LOP LUBE OIL PUMP

    CT CONDENSATE TRANSFER

    FOP FUEL OIL PUMP

    CWP COOLING WATER PUMP

    ACWP AUXILIARY COOLING WATER PUMP

    RH RE - HEATER

    SH SUPER HEATER

  • 7/29/2019 cold srat up

    3/21

    MMWC MILLIMETER OF WATER COLUMN

    BFP BOILER FEED PUMP

    BCW BOILER CIRCULATING WATER

    VFD VARIABLE FREQUENCY DRIVE

    IGV INLET GUIDE VANES

    RAPH ROTARY AIR PRE-HEATERCC CONTROLLED CIRCULATION

    SADC SECONDARY AIR DAMPER CONTROL

    DP DIFFERENTIAL PRESSURE

    NWL NORMAL WATER LEVEL

    LOFCV LIGHT OIL FUEL CONTROL VALVE

  • 7/29/2019 cold srat up

    4/21

    CHARGE 11 KV BUS, REQUIRED FOR ID FAN

    CHARGE 3.3/6.6 KV BUS, REQUIRED FOR DMCW,INSTR./PLANT AIR COMPRESSORs, & FD FAN

    CHARGE 415V BUS, REQUIRED FOR LOPs , CTs &

    FOPs

  • 7/29/2019 cold srat up

    5/21

    START CWPs (BOTH 1 & 2)

    START ACWPs (BOTH A & B, KEEP ACWP-C AS

    STANDBY)

    LINE UP DM MAKEUP, DMCW & CT PUMPs

    START CW BOOSTER PUMPs (BOTH A & B)

  • 7/29/2019 cold srat up

    6/21

    START INSTRUMENT AIR COMPRESSOR

    START PLANT /SERVICE AIR COMPRESSOR

  • 7/29/2019 cold srat up

    7/21

    OPEN BOILER DRUM VENTS

    OPEN DIVISIONAL PANEL SUPER HEATER AIR VENTS

    OPEN FINAL SUPER HEATER OUTLET HEADER AIR VENTS

    OPEN STARTUP VENTS

    OPEN ROOF SUPER HEATER AIR VENTS

    OPEN SUPER HEATER HEADER DRAIN

  • 7/29/2019 cold srat up

    8/21

    CLOSE ECO / WATER WALL DRAINS

    OPEN ECO RECIRCULATION VALVE

    OPEN RH VENTS

  • 7/29/2019 cold srat up

    9/21

    START BOILER FILL PUMPs

    FILL WATER IN BOILER DRUM UPTO NWL

    (-50MM).

    FILL DEAERATOR WITH WATER UPTO 1000MMWC

    START ONE OF THE BFPs

    START BCW PUMPs (CC PUMPs)

  • 7/29/2019 cold srat up

    10/21

    ENSURE ALL MANHOLES IN AIR & FLUE GAS PATH

    ARE CLOSED

    OPEN ALL GATES & KEEP THE ALL DAMPERS INMAXIMUM POSITION

    CLOSE I/L & O/L GATES OF ID FANS

    CLOSE O/L GATE OF FD FANS

    6. PREPARE AIR & FLUE GAS PATH

  • 7/29/2019 cold srat up

    11/21

    START ID FAN

    START FD FAN

    REGULATE O/L DAMPER OF FD FAN & VFD / IGV OF ID FAN

    TO ACHIEVE A FURNACE PRESSURE CLOSE TO -10MMWC

    START RAPH

    START SCANNER AIR FAN

  • 7/29/2019 cold srat up

    12/21

    ENSURE AVAILABILITY OF PURGE PERMISSIVES

    START PURGE CYCLE

    AFTER COMPLETION OF PURGING, SET SADC INAUTO

    ENSURE WIND BOX DP IS MAINTAINED AT 40MMWC

  • 7/29/2019 cold srat up

    13/21

    START LDO PUMP

    ENSURE OPENING OF MANUAL ISO. VALVESFOR ATM. STEAM & LIGHT OIL AT EACH CORNOR

    PURGE OIL GUNS WITH STEAM

    ENSURE OIL GUNS ARE ENGAGED PROPERLY & INRETRACTED POSITION.

    ENSURE ATOMIZING AIR PRESSURE IS 7Kg/SQ CM

    ENSURE LDO PRESSURE IS ABOUT 9 Kg/SQ.CM

    INITIALIZE LIGHT UP - OPEN LOFCV & IGNITECORNOR PAIR 1 & 3, & THEN CORNOR PAIR 2 &4

  • 7/29/2019 cold srat up

    14/21

    CLOSE BOILER DRUM AIR VENTS ONCE DRUMPRESSURE REACHES 2 Kg/SQ. CM

    CLOSE SUPER HEATER HEADER DRAINS

    ONCE THE DRUM PRESSURE REACHES 6Kg/SQ

    CM, CLOSE ALL SH VENTS

    ENSURE STARTUP VENTS REMAIN OPEN &

    MAIN STOP VALVES (BOTH OF BOILER &TURBINE) REMAINS CLOSED

  • 7/29/2019 cold srat up

    15/21

    CHARGING

    MAIN STEAM LINE CHARGING

    OBSERVE MS PRESSURE EXCEEDING 8 KG/CM2

    CD- HEAVY OIL START-UP:

    SWITCH ON HFO PUMP-A IN HFO SYSTEM

    SWITCH ON PAIR 2&4

    WHEN MAIN STEAM PRESSURE CROSSES 8.0KG/SQ.CM CHARGE HP & LP BYPASS

  • 7/29/2019 cold srat up

    16/21

    KEEP ON OPENING HP BYPASS VALVES1&2 TILL THE FOLLOWING ROLLINGPARAMETERS ARE REACHED

    Drum Pressure >50 KG/CM2

    MS flow > 200TPH

    MAIN STEAM Pressure >40 KG/CM2

    MAIN STEAM TEMPERATURE >3500C

    RH STEAM TEMPERATURE >3200C

  • 7/29/2019 cold srat up

    17/21

    TURBINE START-UP

    SGC TURBINE STARTUP

    OPEN DRAIN BEFORE HPCV1&HPCV2 SET SPEED REF. TO 180 RPM AND

    SWITCH ON THE LOAD CONTROLLER

    SELECT TSC MODE TO NORMAL

    OBSERVE THE X2 CRITERIAFULFILLNESS

  • 7/29/2019 cold srat up

    18/21

    SELECT SGC TURBINE

    OBSERVE ESVS OPENING

    OBSERVE TURBINE SPEED CROSSING300 RPM

    OBSERVE TURBINE SPEED CROSSING2950RPM

    OBSERVE GENERATOR FIELD BREAKERIS ON

  • 7/29/2019 cold srat up

    19/21

    OBSERVE SYNCHRONISER SWITCHES ON & CLOSES THEGENERATOR BREAKER

    OBSERVE GENERATOR LOAD CROSSES 50 MW ANDEHTC SWITCHES OVER TO LOAD CONTROL MODE AT

    IF THE LOAD DOESNOT CROSS 50 MW RAISE SPEED REF CLOSE HP BYPASS VALVES

    SET HP BYPASS PRESSURE SP TO 175 KG/CM2

    SET HP BYPASS PRESSURE CONTROLLER TO AUTO

    OBSERVE THAT LP BYPASS VALVES CLOSED CLOSE START UP VENTS

  • 7/29/2019 cold srat up

    20/21

    UNIT SYNCHRONISED AND LOAD >50

    MW

    MILLS IN SERVICE AND INCREASE THE

    LOAD

  • 7/29/2019 cold srat up