generator start-up · 2013-02-15 · generator using full frequency-dependent machine and network...

2
Starting Recovery Utilization Start-Up Start-Up Start-Up Generator Generator Using full frequency-dependent machine and network models, the Generator Start-Up module analyzes cold-state starting of generators under normal and emergency conditions. The entire generator start-up process is modeled, including automatic control relay simulation and the dynamic behavior of exciters/AVRs, governors/turbines, and Power System Stabilizers (PSS). You can simulate the starting of generators, connection of generators to the network before reaching synchronizing speed, acceleration of motors, action of MOVs, and operation circuit breakers.

Upload: others

Post on 18-Mar-2020

6 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Generator Start-Up · 2013-02-15 · Generator Using full frequency-dependent machine and network models, the Generator Start-Up module analyzes cold-state starting of generators

StartingRecovery

Utilization

Start-UpStart-UpStart-UpGeneratorGenerator

U s i n g f u l l f r e q u e n c y - d e p e n d e n t m a c h i n e a n d n e t w o r k m o d e l s , t h e

G e n e r a t o r S t a r t - U p m o d u l e a n a l y z e s c o l d - s t a t e s t a r t i n g o f g e n e r a t o r s

u n d e r n o r m a l a n d e m e r g e n c y c o n d i t i o n s . T h e e n t i r e g e n e r a t o r

s t a r t - u p p r o c e s s i s m o d e l e d , i n c l u d i n g a u t o m a t i c c o n t r o l r e l a y

s i m u l a t i o n a n d t h e d y n a m i c b e h a v i o r o f e x c i t e r s / A V R s ,

g o v e r n o r s / t u r b i n e s , a n d P o w e r S y s t e m S t a b i l i z e r s ( P S S ) . Yo u c a n

s i m u l a t e t h e s t a r t i n g o f g e n e r a t o r s , c o n n e c t i o n o f g e n e r a t o r s t o

t h e n e t w o r k b e f o r e r e a c h i n g s y n c h r o n i z i n g s p e e d , a c c e l e r a t i o n

o f m o t o r s , a c t i o n o f M O V s , a n d o p e r a t i o n c i r c u i t b r e a k e r s .

Page 2: Generator Start-Up · 2013-02-15 · Generator Using full frequency-dependent machine and network models, the Generator Start-Up module analyzes cold-state starting of generators

10 CFR 50 Appendix B • 10 CFR 21 • ANSI/ASME N45.2-1977 • ASME NQA-1ISO 9001 • ANSI/ IEEE Std 730.1-1989 • CAN/CSA-Q396.1.2-89

ge

ne

ra

to

r s

tar

t-

up

ge

ne

ra

to

r s

tar

t-

up

Comparison ofResults to Field Data

Unlimited Buses* & ElementsNo Voltage LimitationsLooped & Radial SystemsIntegrated 1-Phase, 3-Phase, & DC SystemsMultiple Generators & Grid ConnectionsMultiple Isolated Sub-SystemsCustomizable LibrariesGraphical Display of Results on One-Line DiagramsCustomizable Font Types, Sizes, Styles, & ColorsCustomizable Display of Ratings & ResultsGraphical Display of Equipment Impedance & GroundingAutomatic Error CheckingGraphical Display of Overstressed DevicesGraphical Display of Over/Under Voltage BusesDynamically Adjust Display of Results

*Maximum number of energized buses during calculations is license dependent.

Key Features• Cold-State Generator Starting• Load Generators Prior to Synchronous Speed• Frequency-Dependent Machine Models• Frequency-Dependent Network Models• An Expansion to the Transient Stability Module• Utilizes User-Defined Dynamic Models

Flexible Operation • Parameter correction due to saturation effects • Initial field flashing circuit & switching time • Special dynamic turbine actions during start-up • Detailed & user-programmable speed-governor system control • System switching actions controlled by relay settings • Variety of relay controls (Volt, Hz, V/Hz, dHz/dt) • Motor acceleration at under-voltage & under- • frequency conditions

Capabilities • Quick recovery of power to critical loads • Determine optimum loading time • Schedule of loading sequence • Analysis of generator & motor starting behavior • Analysis of governor & AVR starting behavior • Diesel generator starting for critical applications • such as nuclear generation plants • Analysis of power recovery to critical loads • when power grid connection is lost • Cold-state starting of stand-by generator • under normal & emergency conditions • Motor acceleration & rejection • Simulate relay actions automatically during analysis

Dynamic Models • Exciters • Automatic Voltage Regulators (AVR) • Governors • Turbines • Power System Stabilizers (PSS)

MeasurementPowerStation

MeasurementPowerStation

Quick Recovery of Power to Critical Loads

Operat ion Technology, Inc. • www.etap.com • 17 Goodyear • I rv ine, CA 92618 • 949.462.0100 • Fax 949.462.0200