CO 2 Capture from IGCC Gas Streams Using the AC-ABC Process 2014 NETL CO 2 Capture Technology Meeting July 31, 2014 Pittsburgh, PA.

Upload: others

Post on 26-Mar-2020

10 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: CO2 Capture from IGCC Gas Streams Using the AC-ABC Process NETL CO2 Capture/G...assembly in progress, Hazop analysis completed). ... refrigeration is needed. • CO. 2. is released

CO2 Capture from IGCC Gas Streams Using the AC-ABC Process

2014 NETL CO2 Capture Technology Meeting July 31, 2014 Pittsburgh, PA.

Page 2: CO2 Capture from IGCC Gas Streams Using the AC-ABC Process NETL CO2 Capture/G...assembly in progress, Hazop analysis completed). ... refrigeration is needed. • CO. 2. is released

Project Overview • Project Participants:

– SRI International. – Bechtel Hydrocarbon Treatment Solutions, Inc. – EIG, Inc. – National Carbon Capture Center – U.S. Department of Energy (National Energy Technology Center)

• Funding: – U.S. Department of Energy: $3,428,309 – Cost Share (SRI and BHTS): $897,660 – Total: $4,325,969

• Performance Dates: – October 2009 through September 2014.

2

Page 3: CO2 Capture from IGCC Gas Streams Using the AC-ABC Process NETL CO2 Capture/G...assembly in progress, Hazop analysis completed). ... refrigeration is needed. • CO. 2. is released

Project Objectives

• Overall objective: – To develop an innovative, low-cost CO2 capture technology based on

absorption on a high-capacity and low-cost aqueous ammoniated solution with high pressure absorber and stripper.

• Specific objectives and project status: – Test the concept on a bench scale batch reactor (completed) – Determine the preliminary optimum operating conditions (completed) – Design and build a small pilot-scale reactor capable of continuous

integrated operation (Design completed; Equipment procurement and assembly in progress, Hazop analysis completed).

– Perform tests to evaluate the process in a coal gasifier environment (in progress)

– Perform a technical and economic evaluation on the technology (Updates are in progress).

3

Page 4: CO2 Capture from IGCC Gas Streams Using the AC-ABC Process NETL CO2 Capture/G...assembly in progress, Hazop analysis completed). ... refrigeration is needed. • CO. 2. is released

Process Fundamentals • Uses well-known reaction between carbon dioxide and

aqueous ammonia : • Reactions are reversible

– Absorption reactions at lower temperature – Desorption reactions at higher temperature

• High pressure operation enhances absorption of CO2. • A similar set of reactions occur between H2S and

ammoniated solution. • H2S from the regenerated gas is converted to elemental

sulfur at high pressures.

4

NH4OH+CO2 NH4HCO3 (NH4) 2CO3+CO2 + H2O 2NH4HCO3 NH4 (NH2CO2)+CO2+2H2O 2NH4HCO3

Page 5: CO2 Capture from IGCC Gas Streams Using the AC-ABC Process NETL CO2 Capture/G...assembly in progress, Hazop analysis completed). ... refrigeration is needed. • CO. 2. is released

Process Block Flow Diagram

5

Page 6: CO2 Capture from IGCC Gas Streams Using the AC-ABC Process NETL CO2 Capture/G...assembly in progress, Hazop analysis completed). ... refrigeration is needed. • CO. 2. is released

Process Highlights • Concentrated ammoniated solution is used to capture

both CO2 and H2S from syngas at high pressure. • Absorber operation at 40o-60o C temperature; No

refrigeration is needed. • CO2 is released at high pressures (30 bar) at <200°C:

– The size of CO2 stripper, the number of stages of CO2 compression, and the electric power for compression of CO2 to the pipeline pressure are reduced.

• High net CO2 loading, up to 20% by weight. • The stripper off-gas stream, containing primarily CO2 and

H2S, is treated using a high pressure Claus process, invented by Bechtel, to form elemental sulfur. – CO2 is retained at high pressures.

6

Page 7: CO2 Capture from IGCC Gas Streams Using the AC-ABC Process NETL CO2 Capture/G...assembly in progress, Hazop analysis completed). ... refrigeration is needed. • CO. 2. is released

Process Advantages • Low cost and readily available reagent (aqueous ammonia). • Reagent is chemically stable under the operating conditions.

– Ammonia does not decompose under the operating conditions.

• High efficiency for CO2 capture – Reduces water-gas shift requirements - Reduced steam consumption.

• No loss of CO2 during sulfur recovery – High pressure conversion; No tail gas treatment

• Low heat consumption for CO2 stripping (<600 Btu/lb CO2). • Extremely low solubility of H2, CO and CH4 in absorber

solution: Minimizes losses of fuel species. • Absorber and regenerator can operate at similar pressure.

– No need to pump solution cross pressure boundaries. Low energy consumption for pumping.

7

Page 8: CO2 Capture from IGCC Gas Streams Using the AC-ABC Process NETL CO2 Capture/G...assembly in progress, Hazop analysis completed). ... refrigeration is needed. • CO. 2. is released

CO2 Capture Efficiency vs Solution Composition

8

0

10

20

30

40

50

60

70

80

90

100

0.40 0.45 0.50 0.55 0.60 0.65 0.70 0.75 0.80

Cap

ture

Effi

cien

cy (%

)

R' (Molar Ratio, CO2/NH3)

Run 17 (4 M, 50 C)

Run 16 (4 M, 33 C)

Run 18 (4 M, 45 C)

Run 19 (4 M, 60 C)

Run 20 (4 M, 43 C)

Run 21 (8 M, 55 C)

Inlet CO2 Partial Pressure 450 kPa

8 M, 55 C4 M, 60 C

4 M, 43 C

Reactor Volume = 0.0045 m3

Reactor Pressue = 265 psia

CO2 Capture Efficiency Exceeds 90%

Page 9: CO2 Capture from IGCC Gas Streams Using the AC-ABC Process NETL CO2 Capture/G...assembly in progress, Hazop analysis completed). ... refrigeration is needed. • CO. 2. is released

Rapid Rate of Reactions Approaching Equilibrium

9

0

10

20

30

40

50

0.1 0.2 0.3 0.4 0.5 0.6 0.7

CO

2Pa

rtial

Pre

ssur

e at

the

Exit

(psi

a)

R', Molar Ratio CO2/NH3

Run 17 (4 M, 50 C)

Run 16 (4 M, 33 C)

Run 13 (4 M, 45 C)

Run 11 (4 M, 45 C)

Run 18 (4 M, 45 C)

Run 19 (4 M, 60 C)

Run 20 (4 M, 43 C)

Run 21 (8 M, 55 C)

Equilibrium Line (10 M, 55 C)

Absorber Operating Pressure = 1800 kPa (265 psia)4 M and 8M Ammonia, 0.88 acfm CO2 flow rate (25 %v/v)

Page 10: CO2 Capture from IGCC Gas Streams Using the AC-ABC Process NETL CO2 Capture/G...assembly in progress, Hazop analysis completed). ... refrigeration is needed. • CO. 2. is released

High Efficiency of H2S Capture

10

Target < 1 ppm H2S

Page 11: CO2 Capture from IGCC Gas Streams Using the AC-ABC Process NETL CO2 Capture/G...assembly in progress, Hazop analysis completed). ... refrigeration is needed. • CO. 2. is released

Measured CO2 Attainable Pressure Function of Temperature

11

0

100

200

300

400

500

600

700

800

900

0 50 100 150 200 250

Tota

l Pre

ssur

e (p

si)

Temperature (οC)

Run 1

Run 2

Run 3

Run 4

Run 5

Vapor Pressure of Water

AC-ABC

Page 12: CO2 Capture from IGCC Gas Streams Using the AC-ABC Process NETL CO2 Capture/G...assembly in progress, Hazop analysis completed). ... refrigeration is needed. • CO. 2. is released

AC-ABC Process Schematic

12

Sour water

Clean Syngas

Syngas Feed Steam

Shift 1

Boiler Feed water

To BPSC

Steam

Shift 2

CO2/H2SStripper

dP=10-20psi

Page 13: CO2 Capture from IGCC Gas Streams Using the AC-ABC Process NETL CO2 Capture/G...assembly in progress, Hazop analysis completed). ... refrigeration is needed. • CO. 2. is released

P & ID for the NCCC Test

13

E-700

Syngas to NCCC pipe / Disposal

Steam

CO2/H2S to vent / BHPC

F

FE-721

Condensate

K-150

E-720

[33][35]

[34]

[32]

Gas Water Separator

Reb

oile

rTh

erm

osip

hon

[45]

[41]

[4]

Piston Compressor

TI711

[42]

G-721

V-700

Syngas from NCCC tar removal

OF

DATE:

SHEET

DRAWING TITLE

JOB NO:

APPROVED BY:

DESIGNED BY:DRAWN BY:

SCALE:

PRO

JEC

T TI

TLE

CHARGE NO:

333 RAVENSWOOD AVE.MENLO PARK, CA 94025

REVISION LOG

# DATEBY DESCRIPTION

PIPING & INSTRUMENT

DIAGRAM

P-01

A AN ISSUED FOR REVIEW 08-14-12

ABSORBERREGENERATOR

SRIR

International

V-900

E-320

E-340

E-900

SSV-152

[3] E-500

PV-521[5]

[12]

[12c]/[25]

[12a]

FE-501

V-600

[11]

WATER WASH

LEANSOLUTION

SURGE TANK

V-620

[73]

P-621

[23]

SPENTWATERTANK

P-641

V-640

TREATEDWATERTANK

[21]

[22]

[24]

S

NY-611

S

NY-612

[1]

Air

P-651

P-601

P-501P-301

P-321

ISSUED FOR REVIEWB AN 03-28-13

[72]

[44]

[43]

[20]

Makeup water

[46]

Page 14: CO2 Capture from IGCC Gas Streams Using the AC-ABC Process NETL CO2 Capture/G...assembly in progress, Hazop analysis completed). ... refrigeration is needed. • CO. 2. is released

Absorber, Stripper, Water Wash Columns

14

Page 15: CO2 Capture from IGCC Gas Streams Using the AC-ABC Process NETL CO2 Capture/G...assembly in progress, Hazop analysis completed). ... refrigeration is needed. • CO. 2. is released

Syngas Compressor

15

Page 16: CO2 Capture from IGCC Gas Streams Using the AC-ABC Process NETL CO2 Capture/G...assembly in progress, Hazop analysis completed). ... refrigeration is needed. • CO. 2. is released

Heat Exchangers and Circulating Pumps

16

Page 17: CO2 Capture from IGCC Gas Streams Using the AC-ABC Process NETL CO2 Capture/G...assembly in progress, Hazop analysis completed). ... refrigeration is needed. • CO. 2. is released

Bechtel Pressure Swing Claus (BPSC) Process

17

Page 18: CO2 Capture from IGCC Gas Streams Using the AC-ABC Process NETL CO2 Capture/G...assembly in progress, Hazop analysis completed). ... refrigeration is needed. • CO. 2. is released

BPSC Process Skid (Columns and sulfur condenser

18

Page 19: CO2 Capture from IGCC Gas Streams Using the AC-ABC Process NETL CO2 Capture/G...assembly in progress, Hazop analysis completed). ... refrigeration is needed. • CO. 2. is released

AC-ABC and BPSC Process Changes to IGCC Reference Case

19

Page 20: CO2 Capture from IGCC Gas Streams Using the AC-ABC Process NETL CO2 Capture/G...assembly in progress, Hazop analysis completed). ... refrigeration is needed. • CO. 2. is released

Plant Performance Summary

20

Plant Performance Units IGCC with SRI AC-ABC and BPSC

Reference Case

Gas Turbine Power MWe 464.0 464.0 Syngas Expander Power MWe 5.7 6.5 Steam Turbine Power MWe 246.2 263.5 Auxiliary Load MWe 150.0 190.8 Net Plant Power MWe 565.9 543.3 Net Plant Efficiency (HHV) - 33.7% 32.6%

Net Plant Heat Rate (HHV) kJ/kWh Btu/kWh

10,679 10,122

11,034 10,458

Page 21: CO2 Capture from IGCC Gas Streams Using the AC-ABC Process NETL CO2 Capture/G...assembly in progress, Hazop analysis completed). ... refrigeration is needed. • CO. 2. is released

Economic Analysis

21

Economic Analysis (June 2011$) IGCC with SRI AC-ABC and BPSC Reference Case

Total Plant Cost, before Owner's Costs, million $1,676 $1,785

Total Plant Cost, before Owner's Costs $2,962/kW $3,286/kW

Initial Chemical Fill Cost, million $4.3 $15.9

Annual Fixed O&M Cost, million $64.5 $68.0

Annual Variable O&M Cost, million $42.4 $45.9

Total Annual O&M Cost, million $106.9 $113.9

FY COE* without TS&M** $108.28 $118.85

FY COE with TS&M $113.33 $124.04 *FY COE = First Year Cost of Electricity

**TS&M = Transport, Storage, and Monitoring

Page 22: CO2 Capture from IGCC Gas Streams Using the AC-ABC Process NETL CO2 Capture/G...assembly in progress, Hazop analysis completed). ... refrigeration is needed. • CO. 2. is released

Anticipated Benefits, if Successful

• We estimate a 22.7 MW improvement in Net Plant Power and a 1.1 percentage point increase in Net Plant Efficiency (HHV basis) than a reference plant (GE gasifier with Selexol AGR and conventional Claus).

• Capital cost is ~6% less expensive than the reference plant on an absolute basis and 9% less on a normalized basis.

• The COE is 9% lower for the SRI AC-ABC and BPSC plant relative to the reference case.

• The process configuration is economically viable per this analysis.

• The process will be tested in this Budget Period at the National Carbon Capture Center.

22

Page 23: CO2 Capture from IGCC Gas Streams Using the AC-ABC Process NETL CO2 Capture/G...assembly in progress, Hazop analysis completed). ... refrigeration is needed. • CO. 2. is released

Acknowledgement • SRI International

– Gopala Krishnan, Indira Jayaweera, Anoop Nagar, Srini Bhamidi, Jianer Bao

• EIG: Eli Gal • Bechtel Hydrocarbon Treatment Solutions:

– Lee Schmoe and Martin Taylor • National Carbon Capture Center: Frank Morton and Tony Wu • DOE-NETL

– Elaine Everett, Megan Napoli, Susan Maley, Lynn Brickett, Jenny Tennent, John Lytenski, Michael Matuszewski, James Black, Peter Kabateck.

23

Page 24: CO2 Capture from IGCC Gas Streams Using the AC-ABC Process NETL CO2 Capture/G...assembly in progress, Hazop analysis completed). ... refrigeration is needed. • CO. 2. is released

DISCLAIMER This presentation was prepared as an account of work sponsored by an agency of the

United States Government. Neither the United States Government nor any agency

thereof, nor any of their employees, makes any warranty, express or implied, or assumes

any legal liability or responsibility for the accuracy, completeness, or usefulness of any

information, apparatus, product, or process disclosed, or represents that its use would

not infringe privately owned rights. Reference herein to any specific commercial product,

process, or service by trade name, trademark, manufacturer, or otherwise does not

necessarily constitute or imply endorsement, recommendation, or favoring by the United

States Government or any agency thereof. The views and opinions of authors expressed

herein do not necessarily state or reflect those of the United States Government or any

agency thereof.

24

Page 25: CO2 Capture from IGCC Gas Streams Using the AC-ABC Process NETL CO2 Capture/G...assembly in progress, Hazop analysis completed). ... refrigeration is needed. • CO. 2. is released

Headquarters: Silicon Valley SRI International 333 Ravenswood Avenue Menlo Park, CA 94025-3493 650.859.2000 Washington, D.C.

SRI International 1100 Wilson Blvd., Suite 2800 Arlington, VA 22209-3915 703.524.2053 Princeton, New Jersey

SRI International Sarnoff 201 Washington Road Princeton, NJ 08540 609.734.2553 Additional U.S. and international locations www.sri.com

Thank You