CLIC-Pakistan collaboration. Joint CERN-Pakistan Committee ( JCPC) G. Riddone, 2013.04.11 [ contribution from A. Nawaz]. New addendum under finalization. Collaboration follow-up with Mr Azhar (bi-monthly phone meetings). CLIC RF system. Requirements Accelerating structures and PETS. - PowerPoint PPT PresentationTRANSCRIPT
PMCLIC-Pakistan collaboration Joint CERN-Pakistan Committee (JCPC)G. Riddone, 2013.04.11
[contribution from A. Nawaz]
PM2
11
/04
/20
13
New addendum under finalization
Collaboration follow-up with Mr Azhar (bi-monthly phone meetings)
PM3
CLIC RF system
11
/04
/20
13
PM4
Requirements Accelerating structures and PETSDictated by beam physics and RF ultra high precision machining
Turning – milling Several annealing
steps (no burrs, no
scratches)
G.
Rid
done,
30
/01
/20
13
PM5
Current collaboration Mechanical design
Following new addendum (from April 2013)◦ Mechanical engineer at CERN for six months ◦ Technician at CERN for 3 months
Engineering work mainly focused on x-band production and two-beam module activities (e.g tooling for assembly and transport of RF structures),
Quality of work fully satisfactoryDeadlines respected 1
1/0
4/2
01
3
PM6
Current collaboration Micro-precision machiningExtended collaboration to fabrication
and testing of micro-precision components for the CLIC two-beam module
Machining of RF structures:◦ disks for accelerating structures
◦ bars for PETS
11
/04
/20
13
Different UP machines and machine strategy being investigated (for details refer to contribution of A. Nawaz)
PM7
Future collaborationMeeting with Mr H. Hoorani and
colleagues on 09.04.2013:◦Finalisation of the new agreement◦Discussion of possible extension of
collaboration to other areas of the CLIC machine: CTF3 and beam physics Contact with respective technical people
to be established
11
/04
/20
13
Pakistan – CLIC Collaboration
Study/ Development of RF Structures for future possible collaboration
A. Nawaz, status on 10.04.2013
a) Initial Development of samples in Dec., 2011 to Jan., 2012
Extremity Disk A (CLIATCAS0028)
U Clamp (CLIATLSS0023)
Extremity Disk A (CLIATCAS0028)
U Clamp (CLIATLSS0022)
U CLAMP (CLIATLSS0029)
Al
Al
Cu
Al
Al
b) Development of PETS Rod using 02 different machining strategies:
Development of PETS Rod in July, 2012 (Strategy one):
Development of PETS Rod in Oct., 2012 (Strategy two):
PETS Rod in Copper - July, 2012 PETS Rod in Al – Oct., 2012
c) Development of Disk:
Disk in Copper without Annealing steps - Dec, 2012 (Sample # 1)
Disk in Copper with two Annealing steps - Jan, 2013 (Sample # 2)
Disk in Copper without Annealing steps - Dec, 2012 (Sample # 1)
Disk in Copper with two Annealing steps - Jan, 2013 (Sample # 2)
Disk in Copper with two Annealing steps – March, 2013 (Sample # 3)