CLIC structure collaboration meeting. G. Riddone, AB-RF 2008.07.04. Agenda . Status of the production and test program (CERN, KEK, SLAC) Testing of PETS (CERN, SLAC) Design of quadrants and disks (KEK) Pulse compressor for Nextef at KEK. Status – x-band ac. structures . - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: CLIC structure collaboration meeting](https://reader035.vdocuments.us/reader035/viewer/2022081514/568164a0550346895dd691eb/html5/thumbnails/1.jpg)
1
CLIC structure collaboration meeting
G. Riddone, AB-RF
2008.07.04
![Page 2: CLIC structure collaboration meeting](https://reader035.vdocuments.us/reader035/viewer/2022081514/568164a0550346895dd691eb/html5/thumbnails/2.jpg)
Agenda • Status of the production and test program
(CERN, KEK, SLAC)• Testing of PETS (CERN, SLAC)• Design of quadrants and disks (KEK)• Pulse compressor for Nextef at KEK
2
![Page 3: CLIC structure collaboration meeting](https://reader035.vdocuments.us/reader035/viewer/2022081514/568164a0550346895dd691eb/html5/thumbnails/3.jpg)
Status – x-band ac. structures
![Page 4: CLIC structure collaboration meeting](https://reader035.vdocuments.us/reader035/viewer/2022081514/568164a0550346895dd691eb/html5/thumbnails/4.jpg)
CLIC vg1 quadrant damped TD18_vg2.4_quad#3
• For the preparation decision to follow the same procedure as SLAC for the disk version
• Done at CERN: dimensional control, Rf check, cleaning, assembly test shipping to SLAC on 24.06
• To be done at SLAC: heat treatment, brazing of the cooling pipes, SEM, baking, final assembly, rf checks
• CERN agreement on additional SLAC costs
• Question: Tuning (yes/no) decision postponed after heat treatment
• Heat treatment at CERN done for #1 (same cycle as for SLAC) then rf check, dimensional control, tuning test
![Page 5: CLIC structure collaboration meeting](https://reader035.vdocuments.us/reader035/viewer/2022081514/568164a0550346895dd691eb/html5/thumbnails/5.jpg)
C10 damped structures
Cer
n ag
reem
ent
![Page 6: CLIC structure collaboration meeting](https://reader035.vdocuments.us/reader035/viewer/2022081514/568164a0550346895dd691eb/html5/thumbnails/6.jpg)
CLIC vg1 structures
6
![Page 7: CLIC structure collaboration meeting](https://reader035.vdocuments.us/reader035/viewer/2022081514/568164a0550346895dd691eb/html5/thumbnails/7.jpg)
Status - PETS
Received bars for 12 GHz test Dimensional control: OK (+/- 10 mm)
![Page 8: CLIC structure collaboration meeting](https://reader035.vdocuments.us/reader035/viewer/2022081514/568164a0550346895dd691eb/html5/thumbnails/8.jpg)
PETS 11.4 GHz w/o damping mat.• Done at CERN before shipping to SLAC
– Dimensional control of two bars– Brazing and preparation of the couplers– Assembly test– Rf check – Cleaning of all pieces – EB welding of the bars– Tank and couplers assembly– Final EB welding: 07.07– rf test + UHV test
PETS shall be shipped to SLAC in CW28 at the latest
8
![Page 9: CLIC structure collaboration meeting](https://reader035.vdocuments.us/reader035/viewer/2022081514/568164a0550346895dd691eb/html5/thumbnails/9.jpg)
11.4 GHz Loads (x4) for KEK11.4 GHz Loads (x4) for KEK 2 with KEK
flanges and 2 with SLAC flanges– Rf design done – Mechanical design done– Call for tender under way– Fabrication: by end of October– Supply of the material: shipped to CERN, not
received yet
SLAC flanges: pieces available at CERN, brazing and assembly by end of July