clic module progress of thermal tests for clic duty cycles
DESCRIPTION
CLIC MODULE Progress of thermal tests for CLIC duty cycles. Preparation phase. Duty cycles. 20 o C. Power measurements Air speed measurements FEA simulator. Nominal operation mode Failure modes Transients. Nominal operation mode. Day 3. Day 2. Day 1. Tests flowchart. - PowerPoint PPT PresentationTRANSCRIPT
105-March-2014 BE-RF-PM
CLIC MODULEProgress of thermal tests for CLIC duty cycles
205-March-2014 BE-RF-PM
• Power measurements
• Air speed measurements
• FEA simulator
Preparation phase Duty cycles
• Nominal operation mode
• Failure modes
• Transients
20 oC
305-March-2014 BE-RF-PM
Nominal operation mode
Step Component Power (W)
1. Zero position
DB-Quads 0PETS unit 0
RFN-Loads 0SAS 0
SAS-Load 0
2. Power-up DB-Quads
DB-Quads 150PETS unit 0
RFN-Loads 0
SAS 0
SAS-Load 0
3. Unloaded conditions
DB-Quads 150
PETS unit 220
RFN-Loads 178
SAS 820
SAS-Load 178
4. Loaded conditions
DB-Quads 150
PETS unit 220
RFN-Loads 178
SAS 683
SAS-Load 137
Day
1
Day
2
Day
3
405-March-2014 BE-RF-PM
Tests flowchart
Zero
position
Power-up
DBQ
Unloaded
conditions
Loaded
conditions
DB and MB
DB and MB
DB and MB
DB and MB
DBQ#1 every 1 oC
PETS#1 and AS#5 every 1 oC
AS#5 every 1 oC
20/0
2/14
25/0
2/14
24/0
2/14
505-March-2014 BE-RF-PM
Power-up DBQ
605-March-2014 BE-RF-PM
Unloaded conditions
705-March-2014 BE-RF-PM
Unloaded conditions
805-March-2014 BE-RF-PM
Loaded conditions
905-March-2014 BE-RF-PM
Loaded conditions
1005-March-2014 BE-RF-PM
Thermal transients
DBQ only Unloaded Unloaded Loaded
SAS#1 18.7 14.7
SAS#2 19.5 16.0
SAS#3 19.3 15.8
SAS#4 19.8 15.3
AS Load 1 17.7 16.1
AS Load 2 19.0 17.9
AS Load 3 19.2 16.4
AS Load 4 16.6 17.4
PETSu#1 35.0 -
PETSu#2 73.7 -
RFN Loads 45.6 -
Thermal transients in minutes