cl07 (may 2012)

51
PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL07) AMOUNT SR Soil investigation The contractor shall implemented of exploratory drilling and Note mechanical test in all types of soil with on site testing and the issuance of the final report which contain the test results and recommendations of the foundation work. 01 Research and treatment for cavities Implementation through a perforating exploratory(cavity probing) In 1 M 3 all types of rock to determined the horizontal and vertical elongation of cavities, the contractor will be responsible for treatment all cavities By injection and treatment for all cavities and voids of rock with all necessary work accordance with the technical specifications and instructions of the Supervising engineer SITE DEVELOPMENT Earthworks, concrete works, water proofing, moisture Note protection for foundations works are measured in BOQ AP06 The bidder is advised to visit the site before quoting the rates in order to get himself familiarized with the present site conditions Site clearance and demolitions 02 Demolish and clear away existing structures, pavings, electrical lighting, pavements or upstands, cut and plug or reroute existing service lines or utilities inside property line, clear site of rubbish or any impediments, loose top soil and as deemed necessary, for the total site cluster number 7 (CL07) area, approximately (16150m2), subject to engineer approval and as coordinated with public pension agency as shown on drawing CL07- XC-01 1 Item To Collection SR ITEM DESCRIPTION QTY UNIT RATE Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP 1 / 51 REVISED PAGE Date: MAY 2012

Upload: uddinnadeem

Post on 03-Apr-2018

217 views

Category:

Documents


0 download

TRANSCRIPT

7/28/2019 CL07 (MAY 2012)

http://slidepdf.com/reader/full/cl07-may-2012 1/51

PROJECT: Infrastructure buildings of the residential complex (phase 2)

of ITCC complex - RIYADH

REVISED BOQ FOR PARKING CLUSTERS (CL07)

AMOUNT

SR

Soil investigation

The contractor shall implemented of exploratory drilling and Notemechanical test in all types of soil with on site testing and theissuance of the final report which contain the test results andrecommendations of the foundation work.

01 Research and treatment for cavities

Implementation through a perforating exploratory(cavity probing) In 1 M3

all types of rock to determined the horizontal and vertical elongation

of cavities, the contractor will be responsible for treatment all

cavities By injection and treatment for all cavities and voids of rock

with all necessary work accordance with the technical

specifications and instructions of the Supervising engineer 

SITE DEVELOPMENT

Earthworks, concrete works, water proofing, moisture Note

protection for foundations works are measured in BOQ AP06

The bidder is advised to visit the site before quoting the rates in

order to get himself familiarized with the present site conditions

Site clearance and demolitions

02 Demolish and clear away existing structures, pavings, electrical

lighting, pavements or upstands, cut and plug or reroute existing

service lines or utilities inside property line, clear site of rubbish or 

any impediments, loose top soil and as deemed necessary, for 

the total site cluster number 7 (CL07) area, approximately

(16150m2), subject to engineer approval and as coordinated with

public pension agency as shown on drawing CL07- XC-01 1 Item

To Collection SR

ITEM DESCRIPTION QTY UNIT RATE

Project No. J10-13300

ZUHAIR FAYEZ PARTNERSHIP

1 / 51

REVISED PAGE

Date: MAY 2012

7/28/2019 CL07 (MAY 2012)

http://slidepdf.com/reader/full/cl07-may-2012 2/51

PROJECT: Infrastructure buildings of the residential complex (phase 2)

of ITCC complex - RIYADH

REVISED BOQ FOR PARKING CLUSTERS (CL07)

AMOUNT

SRITEM DESCRIPTION QTY UNIT RATE

SITE GRADING

Bulk excavate over site on unclassified ground including all hard Noteand rock layers to reduced levels generally in cutting profiles the

work shall include clear away to approved disposals.

 All additional excavation required for temporary works and spaces, Note

shoring, dewatering, removal of surplus excavated materials,

support, temporary spoil heaps and general compaction

EXCAVATION AND EARTHWORK

Necessary moving or transportation about the site excavation

material including handling to temporary stockpile or ultimate

disposal off site is to be included in the unit rate of excavation

SITE PREPARATION AND GRADING

01 Excavation oversite on unclassified ground including all hard and 50 M3

rock layers (if any) to reduced levels generally in cutting profiles

and forming depressions, falls and the like and clear away to

approved disposal tip.

02 Fill oversite with approved imported fill material according to site 6500 M3

soil report recommendation including compaction in making up

levels to required formations, embankments, contouring and the

like as per drawings and spec.

Note 

Work on proposed structural built-up areas from part of the Work Note

pertaining to respective building or structure as measured

elsewhere.

To Collection SR

Project No. J10-13300

ZUHAIR FAYEZ PARTNERSHIP

2 / 51

REVISED PAGE

Date: MAY 2012

7/28/2019 CL07 (MAY 2012)

http://slidepdf.com/reader/full/cl07-may-2012 3/51

PROJECT: Infrastructure buildings of the residential complex (phase 2)

of ITCC complex - RIYADH

REVISED BOQ FOR PARKING CLUSTERS (CL07)

AMOUNT

SRITEM DESCRIPTION QTY UNIT RATE

PAVING AND SURFACING

01 Supply and install precast concrete shotblasted pavers (beige 910 M2

color) size 400x400x60mm thk. including 100mm thick

cast-in-place concrete slab with A193-WWF mesh reinforcement,

20mm thick cement mortar setting bed, moisture barrier on

compacted subgrade, 3mm water proofing membrane on R.C. slab

as per detail no A1 on drawing CL07-XL301 to suit required

locations as shown on drawing CL07-XL101

02 Supply and install precast concrete shotblasted pavers (gray & 1700 M2

light gray colors) size 400x400x60mm thk including 100mm thick

cast-in-place concrete slab with A193-WWF mesh reinforcement,

20mm thick cement mortar setting bed, polyethylene moisture

barrier, compacted subgrade, 3mm water proofing membrane onR.C. slab as per detail no. A2 on drawing CL07-XL301 to suit

required locations as shown on drawing CL07-XL101

03 Supply and install precast concrete shotblasted pavers (beige & 85 M2

light beige color) size 400x400x60mm thk w./grey color granite

band shotblasted size 200x200x30mm thk including 100mm thick

cast-in-place concrete slab with A193-WWF mesh reinforcement,

20mm thick cement mortar setting bed, polyethylene moisture

barrier, compacted subgrade, 3mm water proofing membrane on

R.C. slab as per detail no. B3 on drawing CL07-XL301 to suit

required locations as shown on drawing CL07-XL101

04 Supply and install polished granite paving dark &light colors,size 350 M2

400x400x30mm thk w.\ granite band dark color, size

200x200x30mm including 100mm thick cast-in-place concrete slab

with A193-WWF mesh reinforcement, 20mm thick cement mortar 

setting bed, polyethylene moisture barrier, compacted subgrade,

3mm water proofing membrane on R.C. slab as per detail no. C4

on drawing CL07-XL301 to suit required locations as shown on

drawing CL07-XL101

To Collection SR

Project No. J10-13300

ZUHAIR FAYEZ PARTNERSHIP

3 / 51

REVISED PAGE

Date: MAY 2012

7/28/2019 CL07 (MAY 2012)

http://slidepdf.com/reader/full/cl07-may-2012 4/51

PROJECT: Infrastructure buildings of the residential complex (phase 2)

of ITCC complex - RIYADH

REVISED BOQ FOR PARKING CLUSTERS (CL07)

AMOUNT

SRITEM DESCRIPTION QTY UNIT RATE

PAVING AND SURFACING

01 Supply and install concrete screed with epoxy coat finish including 7010 M2

100mm/50mm thick cast-in-place concrete slab with A193-WWF

reinforcement mesh, polyethylene moisture barrier, compacted sub

grade, 3mm water proofing membrane on R.C. slab as per detail

no. D on drawing CL07-XL301 to suit required locations as shown

on drawing CL07-XL101

02 Supply and install asphalt paving comprising 80mm bituminous 6157 M2

wearing course, bituminous prime coat, including granular base

course, 3mm water proofing membrane on R.C. slab as per detail

no. E on drawing CL07-XL301 to suit required locations as shown

on drawing CL07-XL101

CURBS AND EDGING

03 Supply and install precast concrete road curb, size 300X500X150 1546 M

mm with exposed aggregate finish including bedding, haunching,

cast in place concrete base and concrete grout behind curb, 20mm

thick cement mortar setting bed, on R.C. slab as per detail no.1 on

drawing CL07-XL302 to suit required locations as shown on

drawing CL07-XL101

SUNDRIES

Tree/palm pit

Formation of cast iron grating tree / palm pits surround

including concrete edge pavers and cement mortar setting

bed as detail 2 on drawing XL302 to suit required locations

as shown on drawing CL07-XL101

04 Cast iron grating tree / palm pits 21 No.

wheel stopper 

Precast concrete wheel stopper including dowels, grouting

and accessories for complete installation as per detail 3 on

drawing XL302 to suit required locations as shown on

drawing CL07-XL101

05 Precast concrete wheel stopper  231 No.

To Collection SR

Project No. J10-13300

ZUHAIR FAYEZ PARTNERSHIP

4 / 51

REVISED PAGE

Date: MAY 2012

7/28/2019 CL07 (MAY 2012)

http://slidepdf.com/reader/full/cl07-may-2012 5/51

PROJECT: Infrastructure buildings of the residential complex (phase 2)

of ITCC complex - RIYADH

REVISED BOQ FOR PARKING CLUSTERS (CL07)

AMOUNT

SRITEM DESCRIPTION QTY UNIT RATE

SITE SIGNAGE

Manufacturer's standard outdoor sings, letters and plaquesincluding fixings, finishes, accessories complete as per 

details on drawing CL07-XL601 up to CL07-XL604 and as per 

specifications

01 ( RESIDENTIAL SIGN ) 10 No.

02 ( GATE SIGN ) 1 No.

03 ( ADVERTISING PANEL ) 1 No.

Manufacturer's standard outdoor sings, letters and plaques

including fixings, finishes, accessories complete as per details on drawing CL07-XC-07 up to CL07-XC-09 and as per 

specifications

REGULATORY SIGNS

04 Ref. type R2-1 (GIVE WAY ) 8 No.

05 Ref. type R5-1 ( ENTRY PROHIBITED ) 4 No.

06 Ref. type R8-1 ( NO LEFT TURN ) 1 No.

07 Ref. type R8-2 ( NO RIGHT TURN ) 2 No.

08 Ref. type W11-1 ( PEDESTRAIN CROSSING ) 9 No.

INFORMATIVE SIGNS

09 Ref. type I-1 (PARKING) 2 No.

10 Ref. type I-2 (ENTRY ) 2 No.

To Collection SR

Project No. J10-13300

ZUHAIR FAYEZ PARTNERSHIP

5 / 51

REVISED PAGE

Date: MAY 2012

7/28/2019 CL07 (MAY 2012)

http://slidepdf.com/reader/full/cl07-may-2012 6/51

PROJECT: Infrastructure buildings of the residential complex (phase 2)

of ITCC complex - RIYADH

REVISED BOQ FOR PARKING CLUSTERS (CL07)

AMOUNT

SRITEM DESCRIPTION QTY UNIT RATE

ROAD SIGNAGE & PAVEMENTMARKING

Thermoplastic paint for traffic marking on drive way atbasement/ground floor and ramps floor as per 

Manufacturer's standard as shown on details on drawing

CL07-XC-07 up to CL07-XC-09 and as per specification and as

per engineer's instructions

pavement marking

01 White edge line, ref. detail 2 830 M

02 Lane marking, as per detail 3 390 M

03 Central plaza parking sign, as per detail 4 195 M

04 Small mosque sign, as per detail 5 120 M

05 Baskeball playground sign, as per detail 6 55 M

06 Dotted line marking (give way line), ref. detail 7 740 M

07 South gate sign, as per detail 8 98 M

08 Through traffic arrow, ref. detail 9-1 34 No.

09 Right turn arrow, ref. detail 9-212 No.

10 Left turn arrow, ref. detail 9-3 6 No.

11 Through & right turn arrow, ref. detail 9-4 3 No.

12 Through & left turn arrow, ref. detail 9-5 5 No.

MISCELLANEOUS STRUCTURES

Reinforced concrete ( ETS ROOM ) under ground with stairs

including earthworks, concrete works, water proofing ,

doors , finishing and all associated work as per drawing

and spec.

13 ETS Room 1 Item

To Collection SR

Project No. J10-13300

ZUHAIR FAYEZ PARTNERSHIP

6 / 51

REVISED PAGE

Date: MAY 2012

7/28/2019 CL07 (MAY 2012)

http://slidepdf.com/reader/full/cl07-may-2012 7/51

PROJECT: Infrastructure buildings of the residential complex (phase 2)

of ITCC complex - RIYADH

REVISED BOQ FOR PARKING CLUSTERS (CL07)

AMOUNT

SRITEM DESCRIPTION QTY UNIT RATE

LANDSCAPING

Trees including pit excavation, stakes and ties, soilplanting mix, mulching, filter membrane and drainage

layer all as details and planting schedule as per detail

P1 on drawing CL07-XL-401

01 T/Fm 37 No.

Lawn planting, including soil planting mix, filter membrane

and drainage layer, screed sloped to drain all as per details

and planting schedule as per detail P2 on drawing

CL07-XL-401

02 L/Cd 392 M2

To Collection SR

Project No. J10-13300

ZUHAIR FAYEZ PARTNERSHIP

7 / 51

REVISED PAGE

Date: MAY 2012

7/28/2019 CL07 (MAY 2012)

http://slidepdf.com/reader/full/cl07-may-2012 8/51

PROJECT: Infrastructure buildings of the residential complex (phase 2)

of ITCC complex - RIYADH

REVISED BOQ FOR PARKING CLUSTERS (CL07)

AMOUNT

SRITEM DESCRIPTION QTY UNIT RATE

SITE DEVELOPMENT

Collection

Sheet -1

Sheet -2

Sheet -3

Sheet -4

Sheet -5

Sheet -6

Sheet -7

To Bill Summary SR

Project No. J10-13300

ZUHAIR FAYEZ PARTNERSHIP

8 / 51

REVISED PAGE

Date: MAY 2012

7/28/2019 CL07 (MAY 2012)

http://slidepdf.com/reader/full/cl07-may-2012 9/51

PROJECT: Infrastructure buildings of the residential complex (phase 2)

of ITCC complex - RIYADH

REVISED BOQ FOR PARKING CLUSTERS (CL07)

AMOUNT

SRITEM DESCRIPTION QTY UNIT RATE

DIVISION 2 - SITE WORK

TRAFFIC MARKING DIMENSION

Thermoplastic paint for traffic marking on parking pavement

as detail 11 shown on drawing CL-GA-901 and specification

01 Parking lane marking 1895 M

02 Handicapped marking on floor  10 No.

To Bill Summary SR

Project No. J10-13300

ZUHAIR FAYEZ PARTNERSHIP

9 / 51

REVISED PAGE

Date: MAY 2012

7/28/2019 CL07 (MAY 2012)

http://slidepdf.com/reader/full/cl07-may-2012 10/51

PROJECT: Infrastructure buildings of the residential complex (phase 2)

of ITCC complex - RIYADH

REVISED BOQ FOR PARKING CLUSTERS (CL07)

AMOUNT

SRITEM DESCRIPTION QTY UNIT RATE

DIVISION 9 - FINISHES

EXTERNAL FINISHES

Finishing : walls including metal angle beads and lathing at

 junctions of differing backgrounds

01 Non toxic epoxy paint on structure ,ref. W07 to suit external 3250 M2

surface

To Bill Summary SR

Project No. J10-13300

ZUHAIR FAYEZ PARTNERSHIP

10 / 51

REVISED PAGE

Date: MAY 2012

7/28/2019 CL07 (MAY 2012)

http://slidepdf.com/reader/full/cl07-may-2012 11/51

PROJECT: Infrastructure buildings of the residential complex (phase 2)

of ITCC complex - RIYADH

REVISED BOQ FOR PARKING CLUSTERS (CL07)

AMOUNT

SRITEM DESCRIPTION QTY UNIT RATE

DIVISION 10 - SPECIALITIES

SIGNAGE

Manufacturer's standard indoor signs, letters and plaques

including fixings, finishes, accessories complete as per 

interior design drawings CL07-i901 up to CL07-i905 and all

required materials and equipments to complete and finish

the works according to specifications, drawings and code of 

practice

01 Ref. type S10 25 No

02 Ref. type S11 10 No

To Bill Summary SR

Project No. J10-13300

ZUHAIR FAYEZ PARTNERSHIP

11 / 51

REVISED PAGE

Date: MAY 2012

7/28/2019 CL07 (MAY 2012)

http://slidepdf.com/reader/full/cl07-may-2012 12/51

7/28/2019 CL07 (MAY 2012)

http://slidepdf.com/reader/full/cl07-may-2012 13/51

7/28/2019 CL07 (MAY 2012)

http://slidepdf.com/reader/full/cl07-may-2012 14/51

7/28/2019 CL07 (MAY 2012)

http://slidepdf.com/reader/full/cl07-may-2012 15/51

PROJECT: Infrastructure buildings of the residential complex (phase 2)

of ITCC complex - RIYADH

REVISED BOQ FOR PARKING CLUSTERS (CL07)

AMOUNT

SRITEM DESCRIPTION QTY UNIT RATE

Drainage installation to the external drainage network

Construction work for briks inspection chamber, the work shallinclude bit not limited to earth work, plain concrete for 

foundation BED, concrete channel at chamber DED with

standard cast iron manhole frame and double cover, UPVC

pipework schedule 40 to nearest main sewer manhole and all

materials and equipments required to complete and finish the

work according to specifications, drawings and code of practice

01 Inspection chamber, ref. (IC) 600x600mm 8 No

02 Slow down chamber 3 No

To Collection SR

Project No. J10-13300

ZUHAIR FAYEZ PARTNERSHIP

15 / 51

REVISED PAGE

Date: MAY 2012

7/28/2019 CL07 (MAY 2012)

http://slidepdf.com/reader/full/cl07-may-2012 16/51

PROJECT: Infrastructure buildings of the residential complex (phase 2)

of ITCC complex - RIYADH

REVISED BOQ FOR PARKING CLUSTERS (CL07)

AMOUNT

SRITEM DESCRIPTION QTY UNIT RATE

MANHOLE AND COVERS

Supply , install, testing and commissioning precastconcrete sewer manholes with standard traffic (heavy duty)

type cast iron manhole covers and frames, access ladders,

concrete channel at manhole bed, foundation bed, drop

pipe to manhole where required, all associated earthworks,

damp proofing, and all materals, equipments required to

complete and finish. the work according to specifications

section 02605, 02730, drawings and code of practices

01 Sewer manhole, ref. (SMH) 3 No.

POTABLE WATER INSTALLATION

Supply, install and testing pipework, UPVC Schedule 80 for 

potable water the work shall include but not limited tofittings, supports, all associate works and all materials and

equipments required to complete and finish the work

according to drawings, specification and code of practices

02 50 mm dia. 305 M

03 63 mm dia. 100 M

04 100 mm dia. 320 M

Reinforced concrete under ground water tank and pump

room with proprietary cast iron manhole covers and frames

the work shall include but not limited to earthworks,concrete works, sump pit, and submersible pump internal

lining and water proofing, access ladders, pipework and

valving, test main fold vent pipes, truck fill pipework with

back flow preventer, ventilating fan and duct work within

tank and pump room structure, and UPVC schedule 80

drainge pipe from submersible pump to the nearest sewer 

manhole and all materials and equipments required to

complete and finish the work according to drawings,

specification and code of practices

05 Potable water tank CAP 230 M3 1 No.

06 Potable water tank CAP 269 M4 1 No.

07 Fire water tank CAP. 176 M3 1 No.

To Collection SR

Project No. J10-13300

ZUHAIR FAYEZ PARTNERSHIP

16 / 51

REVISED PAGE

Date: MAY 2012

7/28/2019 CL07 (MAY 2012)

http://slidepdf.com/reader/full/cl07-may-2012 17/51

PROJECT: Infrastructure buildings of the residential complex (phase 2)

of ITCC complex - RIYADH

REVISED BOQ FOR PARKING CLUSTERS (CL07)

AMOUNT

SRITEM DESCRIPTION QTY UNIT RATE

POTABLE WATER SUPPLY SYSTEM

Drainage installations

Reinforced concrete gray water tank with proprietarymedium duty cast iron manhole cover and frame, includingsump pit, submersible pumps, internal lining, access ladder vent pipework within tank as detailed on drawing (Concretework, earthwork & water proofing measured elsewhere)

01 Gray water tank CAP. 11 M3 2 No.

02 Gray water tank CAP. 29 M3 1 No.

03 Gray water tank CAP. 41 M3 1 No.

04 Gray water tank CAP. 42 M3 1 No.

Packaged type variable speed discharge pressure systemGray water lift pumps (one duty & one stand-by), includingpiping and valves network within pump chamber, completewith all controllers, accessories for automatic operation asscheduled on drawing as per spec. section 15453

02 Gray water lift pumps CAP. 5 KW 5 Set

Allow for the design, supply and installation of packagedtype waste water treatment plant complete including filter,chemical feeders, air blowers controls, wirings, piping andall as associated works as per specifications section 02736and scheduled on drawing

07 Packaged water treatment unit. Cap. 11 m3/day 2 No.

07 Packaged water treatment unit. Cap. 29 m3/day 1 No.

07 Packaged water treatment unit. Cap. 41 m3/day 1 No.

07 Packaged water treatment unit. Cap. 42 m3/day 1 No.

NON-POTABLE WATER INSTALLATION

Supply, install and testing pipework, UPVC Schedule 80 for non-potable water the work shall include but not limited tofittings, supports, all associate works and all materials andequipments required to complete and finish the work

according to drawings, specification and code of practices

04 100 mm dia. 120 M

Accessories

05 Isolating & check valve assembly 100 mm dia. 3 No

To Collection SR

Project No. J10-13300

ZUHAIR FAYEZ PARTNERSHIP

17 / 51

REVISED PAGE

Date: MAY 2012

7/28/2019 CL07 (MAY 2012)

http://slidepdf.com/reader/full/cl07-may-2012 18/51

7/28/2019 CL07 (MAY 2012)

http://slidepdf.com/reader/full/cl07-may-2012 19/51

7/28/2019 CL07 (MAY 2012)

http://slidepdf.com/reader/full/cl07-may-2012 20/51

7/28/2019 CL07 (MAY 2012)

http://slidepdf.com/reader/full/cl07-may-2012 21/51

7/28/2019 CL07 (MAY 2012)

http://slidepdf.com/reader/full/cl07-may-2012 22/51

PROJECT: Infrastructure buildings of the residential complex (phase 2)

of ITCC complex - RIYADH

REVISED BOQ FOR PARKING CLUSTERS (CL07)

AMOUNT

SRITEM DESCRIPTION QTY UNIT RATE

DIVISION 15 - MECHANICAL

MANHOLE AND COVERS

Supply, install and testing pipework, UPVC Schedule 80 for 

potable water the work shall include but not limited to

fittings, supports, all associate works and all materials and

equipments required to complete and finish the work

according to drawings, specification and code of practices

01 20 mm dia. 560 M

02 25 mm dia. 20 M

03 50 mm dia. 285 M

04 63 mm dia. 200 M

05 75 mm dia. 50 M

06 100 mm dia. 50 M

Supply, install and testing pipework, UPVC Schedule 80 for 

non-potable water the work shall include but not limited to

fittings, supports, all associate works and all materials and

equipments required to complete and finish the work

according to drawings, specification and code of practices

07 50 mm dia. 430 M

08 63 mm dia. 33 M

09 75 mm dia. 335 M

10 100 mm dia. 80 M

Drainage installations

Reinforced concrete gray water tank with proprietary

medium duty cast iron manhole cover and frame, including

sump pit, submersible pumps, internal lining, access ladder 

vent pipework within tank as detailed on drawing (Concrete

work, earthwork & water proofing measured elsewhere)

11 Gray water tank CAP. 11 M3

2 No.

To Collection SR

Project No. J10-13300

ZUHAIR FAYEZ PARTNERSHIP

22 / 51

REVISED PAGE

Date: MAY 2012

7/28/2019 CL07 (MAY 2012)

http://slidepdf.com/reader/full/cl07-may-2012 23/51

7/28/2019 CL07 (MAY 2012)

http://slidepdf.com/reader/full/cl07-may-2012 24/51

7/28/2019 CL07 (MAY 2012)

http://slidepdf.com/reader/full/cl07-may-2012 25/51

PROJECT: Infrastructure buildings of the residential complex (phase 2)

of ITCC complex - RIYADH

REVISED BOQ FOR PARKING CLUSTERS (CL07)

AMOUNT

SRITEM DESCRIPTION QTY UNIT RATE

DIVISION 15 - MECHANICAL

FIRE WATER UTILITIES

Supply, install, testing and commissioning portable

multipurpose fire extinguisher the work shall include but

not limited to fixing to wall, all associate works and all

materials and equipments required to complete and finish

the work according to drawings, specification and code of 

practices

01 Ref. PFE 2 No

02 Ref. CO2 20 No

To Collection SR

Collection

Sheet -14

Sheet -15

Sheet -16

Sheet -17

Sheet -18

Sheet -19

Sheet -20

Sheet -21

Sheet -22

Sheet -23

Sheet -24

Sheet -25

To Bill Summary SR

Project No. J10-13300

ZUHAIR FAYEZ PARTNERSHIP

25 / 51

REVISED PAGE

Date: MAY 2012

7/28/2019 CL07 (MAY 2012)

http://slidepdf.com/reader/full/cl07-may-2012 26/51

PROJECT: Infrastructure buildings of the residential complex (phase 2)

of ITCC complex - RIYADH

REVISED BOQ FOR PARKING CLUSTERS (CL07)

AMOUNT

SRITEM DESCRIPTION QTY UNIT RATE

DIVISION 15B - MECHANICAL

HVAC INSTALLATIONS

CHILLED WATER SYSTEM

Under ground pipe work

Supply, install and test black steel pipe work including duct

leak detection system for underground chilled water piping,

fittings thermal insulation, trench work , flexible connections

and accessories as per required drawings and spec.

sections15050 to 15140 ,15510

01 300 mm dia. 325 M

02 250 mm dia. 65 M

03 200 mm dia. 200 M

04 150 mm dia. 355 M

05 100 mm dia. 125 M

ETS room and main ent. Lobbys pipe work

Supply, install and test black steel pipe work includingfittings thermal insulation, flexible connections and

accessories as per required drawings and spec.

sections15050 to 15140 ,15510

06 15 mm dia. 90 M

07 25 mm dia. 15 M

08 32 mm dia. 210 M

09 100 mm dia. 200 M

10 150 mm dia. 120 M

11 200 mm dia. 20 M

12 300 mm dia. 85 M

To Collection SR

Project No. J10-13300

ZUHAIR FAYEZ PARTNERSHIP

26 / 51

REVISED PAGE

Date: MAY 2012

7/28/2019 CL07 (MAY 2012)

http://slidepdf.com/reader/full/cl07-may-2012 27/51

PROJECT: Infrastructure buildings of the residential complex (phase 2)

of ITCC complex - RIYADH

REVISED BOQ FOR PARKING CLUSTERS (CL07)

AMOUNT

SRITEM DESCRIPTION QTY UNIT RATE

DIVISION 15B - MECHANICAL

HVAC INSTALLATIONS

CHILLED WATER SYSTEM

Supply and install valve / BTU meter 

Butterfly valve

01 Ref. MBFV 300 mm dia., 1 No.

Isolating valve

02 32mm dia., 20 No.

Check valve

03 32mm dia., 10 No.

BTU meter 

04 32mm dia., 10 No.

Supply, install, test and commission, Ventilating fans as

details on drawings and specifications, section 15860

06 Ref. EF- 01, 40 LPS capacity 10 No.

Supply and install heat exchanger including valves and

short length piping as detailed on drawings and as per 

specifications

07 Ref. HEX-01 to 04, 1634 KW capacity 4 No.

Supply, install and test galvanized steel sheet rectangular 

ductwork, including supports as per drawings and

specifications

08 Various gauge 500 Kg

Supply and install duct installation

09 Thermal semi-rigid insulation to rectangular ductwork 25 mm indoor  90 M2

To Collection SR

Project No. J10-13300

ZUHAIR FAYEZ PARTNERSHIP

27 / 51

REVISED PAGE

Date: MAY 2012

7/28/2019 CL07 (MAY 2012)

http://slidepdf.com/reader/full/cl07-may-2012 28/51

7/28/2019 CL07 (MAY 2012)

http://slidepdf.com/reader/full/cl07-may-2012 29/51

7/28/2019 CL07 (MAY 2012)

http://slidepdf.com/reader/full/cl07-may-2012 30/51

7/28/2019 CL07 (MAY 2012)

http://slidepdf.com/reader/full/cl07-may-2012 31/51

7/28/2019 CL07 (MAY 2012)

http://slidepdf.com/reader/full/cl07-may-2012 32/51

7/28/2019 CL07 (MAY 2012)

http://slidepdf.com/reader/full/cl07-may-2012 33/51

7/28/2019 CL07 (MAY 2012)

http://slidepdf.com/reader/full/cl07-may-2012 34/51

7/28/2019 CL07 (MAY 2012)

http://slidepdf.com/reader/full/cl07-may-2012 35/51

7/28/2019 CL07 (MAY 2012)

http://slidepdf.com/reader/full/cl07-may-2012 36/51

7/28/2019 CL07 (MAY 2012)

http://slidepdf.com/reader/full/cl07-may-2012 37/51

7/28/2019 CL07 (MAY 2012)

http://slidepdf.com/reader/full/cl07-may-2012 38/51

7/28/2019 CL07 (MAY 2012)

http://slidepdf.com/reader/full/cl07-may-2012 39/51

7/28/2019 CL07 (MAY 2012)

http://slidepdf.com/reader/full/cl07-may-2012 40/51

7/28/2019 CL07 (MAY 2012)

http://slidepdf.com/reader/full/cl07-may-2012 41/51

7/28/2019 CL07 (MAY 2012)

http://slidepdf.com/reader/full/cl07-may-2012 42/51

7/28/2019 CL07 (MAY 2012)

http://slidepdf.com/reader/full/cl07-may-2012 43/51

7/28/2019 CL07 (MAY 2012)

http://slidepdf.com/reader/full/cl07-may-2012 44/51

7/28/2019 CL07 (MAY 2012)

http://slidepdf.com/reader/full/cl07-may-2012 45/51

PROJECT: Infrastructure buildings of the residential complex (phase 2)

of ITCC complex - RIYADH

REVISED BOQ FOR PARKING CLUSTERS (CL07)

AMOUNT

SRITEM DESCRIPTION QTY UNIT RATE

DIVISION 16 - ELECTRICAL

AUDIO / VIDEO IP INTERCOM SYSTEM

Supply , installation testing and commissioning of audio /

video IP intercom system comprising of outdoor station unit

with built-in color camera, indoor station units with built -in

monitors, electrical door lock , AC power supply, cables and

conduits and associated works as required to suit the

locations shown on drawings and coordination & integration

& communication kit with other systems shall be conducted

during work execution as per technical specifications,

drawings and by making arrangement with supervising

engineer to achieve the work to the best possible and

specifications

To suit audio /video phone IP intercom system network equipped

with:

01 Waterproof outdoor station unit (48 lines) including but not limited to 18 No

color camera, mic, speaker, push buttons, power supply, etc.

02 Electric door lock 18 No

03 Network controller with power supply 10 No

04 Exit push button 18 No

05 Electric door strike 20 No

06  Audio / video IP intercom system network including conduits, 1 Item

wiring, pull boxes, connections, and all required accessories

to form a complete and fully operative system

To Collection SR

Project No. J10-13300

ZUHAIR FAYEZ PARTNERSHIP

45 / 51

REVISED PAGE

Date: MAY 2012

7/28/2019 CL07 (MAY 2012)

http://slidepdf.com/reader/full/cl07-may-2012 46/51

7/28/2019 CL07 (MAY 2012)

http://slidepdf.com/reader/full/cl07-may-2012 47/51

7/28/2019 CL07 (MAY 2012)

http://slidepdf.com/reader/full/cl07-may-2012 48/51

7/28/2019 CL07 (MAY 2012)

http://slidepdf.com/reader/full/cl07-may-2012 49/51

7/28/2019 CL07 (MAY 2012)

http://slidepdf.com/reader/full/cl07-may-2012 50/51

PROJECT: Infrastructure buildings of the residential complex (phase 2)

of ITCC complex - RIYADH

REVISED BOQ FOR PARKING CLUSTERS (CL07)

AMOUNT

SRITEM DESCRIPTION QTY UNIT RATE

DIVISION 16 - ELECTRICAL

Collection 

Sheet - 31

Sheet - 32

Sheet - 33

Sheet - 34

Sheet - 35

Sheet - 36

Sheet - 37

Sheet - 38

Sheet - 39

Sheet - 40

Sheet - 41

Sheet - 42

Sheet - 43

Sheet - 44

Sheet - 45

Sheet - 46

Sheet - 47

Sheet - 48

Sheet - 49

To Bill Summary SR

Project No. J10-13300

ZUHAIR FAYEZ PARTNERSHIP

50 / 51

REVISED PAGE

Date: MAY 2012

7/28/2019 CL07 (MAY 2012)

http://slidepdf.com/reader/full/cl07-may-2012 51/51