PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL07)
AMOUNT
SR
Soil investigation
The contractor shall implemented of exploratory drilling and Notemechanical test in all types of soil with on site testing and theissuance of the final report which contain the test results andrecommendations of the foundation work.
01 Research and treatment for cavities
Implementation through a perforating exploratory(cavity probing) In 1 M3
all types of rock to determined the horizontal and vertical elongation
of cavities, the contractor will be responsible for treatment all
cavities By injection and treatment for all cavities and voids of rock
with all necessary work accordance with the technical
specifications and instructions of the Supervising engineer
SITE DEVELOPMENT
Earthworks, concrete works, water proofing, moisture Note
protection for foundations works are measured in BOQ AP06
The bidder is advised to visit the site before quoting the rates in
order to get himself familiarized with the present site conditions
Site clearance and demolitions
02 Demolish and clear away existing structures, pavings, electrical
lighting, pavements or upstands, cut and plug or reroute existing
service lines or utilities inside property line, clear site of rubbish or
any impediments, loose top soil and as deemed necessary, for
the total site cluster number 7 (CL07) area, approximately
(16150m2), subject to engineer approval and as coordinated with
public pension agency as shown on drawing CL07- XC-01 1 Item
To Collection SR
ITEM DESCRIPTION QTY UNIT RATE
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
1 / 51
REVISED PAGE
Date: MAY 2012
7/28/2019 CL07 (MAY 2012)
http://slidepdf.com/reader/full/cl07-may-2012 2/51
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL07)
AMOUNT
SRITEM DESCRIPTION QTY UNIT RATE
SITE GRADING
Bulk excavate over site on unclassified ground including all hard Noteand rock layers to reduced levels generally in cutting profiles the
work shall include clear away to approved disposals.
All additional excavation required for temporary works and spaces, Note
shoring, dewatering, removal of surplus excavated materials,
support, temporary spoil heaps and general compaction
EXCAVATION AND EARTHWORK
Necessary moving or transportation about the site excavation
material including handling to temporary stockpile or ultimate
disposal off site is to be included in the unit rate of excavation
SITE PREPARATION AND GRADING
01 Excavation oversite on unclassified ground including all hard and 50 M3
rock layers (if any) to reduced levels generally in cutting profiles
and forming depressions, falls and the like and clear away to
approved disposal tip.
02 Fill oversite with approved imported fill material according to site 6500 M3
soil report recommendation including compaction in making up
levels to required formations, embankments, contouring and the
like as per drawings and spec.
Note
Work on proposed structural built-up areas from part of the Work Note
pertaining to respective building or structure as measured
elsewhere.
To Collection SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
2 / 51
REVISED PAGE
Date: MAY 2012
7/28/2019 CL07 (MAY 2012)
http://slidepdf.com/reader/full/cl07-may-2012 3/51
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL07)
AMOUNT
SRITEM DESCRIPTION QTY UNIT RATE
PAVING AND SURFACING
01 Supply and install precast concrete shotblasted pavers (beige 910 M2
color) size 400x400x60mm thk. including 100mm thick
cast-in-place concrete slab with A193-WWF mesh reinforcement,
20mm thick cement mortar setting bed, moisture barrier on
compacted subgrade, 3mm water proofing membrane on R.C. slab
as per detail no A1 on drawing CL07-XL301 to suit required
locations as shown on drawing CL07-XL101
02 Supply and install precast concrete shotblasted pavers (gray & 1700 M2
light gray colors) size 400x400x60mm thk including 100mm thick
cast-in-place concrete slab with A193-WWF mesh reinforcement,
20mm thick cement mortar setting bed, polyethylene moisture
barrier, compacted subgrade, 3mm water proofing membrane onR.C. slab as per detail no. A2 on drawing CL07-XL301 to suit
required locations as shown on drawing CL07-XL101
03 Supply and install precast concrete shotblasted pavers (beige & 85 M2
light beige color) size 400x400x60mm thk w./grey color granite
band shotblasted size 200x200x30mm thk including 100mm thick
cast-in-place concrete slab with A193-WWF mesh reinforcement,
20mm thick cement mortar setting bed, polyethylene moisture
barrier, compacted subgrade, 3mm water proofing membrane on
R.C. slab as per detail no. B3 on drawing CL07-XL301 to suit
required locations as shown on drawing CL07-XL101
04 Supply and install polished granite paving dark &light colors,size 350 M2
400x400x30mm thk w.\ granite band dark color, size
200x200x30mm including 100mm thick cast-in-place concrete slab
with A193-WWF mesh reinforcement, 20mm thick cement mortar
setting bed, polyethylene moisture barrier, compacted subgrade,
3mm water proofing membrane on R.C. slab as per detail no. C4
on drawing CL07-XL301 to suit required locations as shown on
drawing CL07-XL101
To Collection SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
3 / 51
REVISED PAGE
Date: MAY 2012
7/28/2019 CL07 (MAY 2012)
http://slidepdf.com/reader/full/cl07-may-2012 4/51
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL07)
AMOUNT
SRITEM DESCRIPTION QTY UNIT RATE
PAVING AND SURFACING
01 Supply and install concrete screed with epoxy coat finish including 7010 M2
100mm/50mm thick cast-in-place concrete slab with A193-WWF
reinforcement mesh, polyethylene moisture barrier, compacted sub
grade, 3mm water proofing membrane on R.C. slab as per detail
no. D on drawing CL07-XL301 to suit required locations as shown
on drawing CL07-XL101
02 Supply and install asphalt paving comprising 80mm bituminous 6157 M2
wearing course, bituminous prime coat, including granular base
course, 3mm water proofing membrane on R.C. slab as per detail
no. E on drawing CL07-XL301 to suit required locations as shown
on drawing CL07-XL101
CURBS AND EDGING
03 Supply and install precast concrete road curb, size 300X500X150 1546 M
mm with exposed aggregate finish including bedding, haunching,
cast in place concrete base and concrete grout behind curb, 20mm
thick cement mortar setting bed, on R.C. slab as per detail no.1 on
drawing CL07-XL302 to suit required locations as shown on
drawing CL07-XL101
SUNDRIES
Tree/palm pit
Formation of cast iron grating tree / palm pits surround
including concrete edge pavers and cement mortar setting
bed as detail 2 on drawing XL302 to suit required locations
as shown on drawing CL07-XL101
04 Cast iron grating tree / palm pits 21 No.
wheel stopper
Precast concrete wheel stopper including dowels, grouting
and accessories for complete installation as per detail 3 on
drawing XL302 to suit required locations as shown on
drawing CL07-XL101
05 Precast concrete wheel stopper 231 No.
To Collection SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
4 / 51
REVISED PAGE
Date: MAY 2012
7/28/2019 CL07 (MAY 2012)
http://slidepdf.com/reader/full/cl07-may-2012 5/51
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL07)
AMOUNT
SRITEM DESCRIPTION QTY UNIT RATE
SITE SIGNAGE
Manufacturer's standard outdoor sings, letters and plaquesincluding fixings, finishes, accessories complete as per
details on drawing CL07-XL601 up to CL07-XL604 and as per
specifications
01 ( RESIDENTIAL SIGN ) 10 No.
02 ( GATE SIGN ) 1 No.
03 ( ADVERTISING PANEL ) 1 No.
Manufacturer's standard outdoor sings, letters and plaques
including fixings, finishes, accessories complete as per details on drawing CL07-XC-07 up to CL07-XC-09 and as per
specifications
REGULATORY SIGNS
04 Ref. type R2-1 (GIVE WAY ) 8 No.
05 Ref. type R5-1 ( ENTRY PROHIBITED ) 4 No.
06 Ref. type R8-1 ( NO LEFT TURN ) 1 No.
07 Ref. type R8-2 ( NO RIGHT TURN ) 2 No.
08 Ref. type W11-1 ( PEDESTRAIN CROSSING ) 9 No.
INFORMATIVE SIGNS
09 Ref. type I-1 (PARKING) 2 No.
10 Ref. type I-2 (ENTRY ) 2 No.
To Collection SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
5 / 51
REVISED PAGE
Date: MAY 2012
7/28/2019 CL07 (MAY 2012)
http://slidepdf.com/reader/full/cl07-may-2012 6/51
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL07)
AMOUNT
SRITEM DESCRIPTION QTY UNIT RATE
ROAD SIGNAGE & PAVEMENTMARKING
Thermoplastic paint for traffic marking on drive way atbasement/ground floor and ramps floor as per
Manufacturer's standard as shown on details on drawing
CL07-XC-07 up to CL07-XC-09 and as per specification and as
per engineer's instructions
pavement marking
01 White edge line, ref. detail 2 830 M
02 Lane marking, as per detail 3 390 M
03 Central plaza parking sign, as per detail 4 195 M
04 Small mosque sign, as per detail 5 120 M
05 Baskeball playground sign, as per detail 6 55 M
06 Dotted line marking (give way line), ref. detail 7 740 M
07 South gate sign, as per detail 8 98 M
08 Through traffic arrow, ref. detail 9-1 34 No.
09 Right turn arrow, ref. detail 9-212 No.
10 Left turn arrow, ref. detail 9-3 6 No.
11 Through & right turn arrow, ref. detail 9-4 3 No.
12 Through & left turn arrow, ref. detail 9-5 5 No.
MISCELLANEOUS STRUCTURES
Reinforced concrete ( ETS ROOM ) under ground with stairs
including earthworks, concrete works, water proofing ,
doors , finishing and all associated work as per drawing
and spec.
13 ETS Room 1 Item
To Collection SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
6 / 51
REVISED PAGE
Date: MAY 2012
7/28/2019 CL07 (MAY 2012)
http://slidepdf.com/reader/full/cl07-may-2012 7/51
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL07)
AMOUNT
SRITEM DESCRIPTION QTY UNIT RATE
LANDSCAPING
Trees including pit excavation, stakes and ties, soilplanting mix, mulching, filter membrane and drainage
layer all as details and planting schedule as per detail
P1 on drawing CL07-XL-401
01 T/Fm 37 No.
Lawn planting, including soil planting mix, filter membrane
and drainage layer, screed sloped to drain all as per details
and planting schedule as per detail P2 on drawing
CL07-XL-401
02 L/Cd 392 M2
To Collection SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
7 / 51
REVISED PAGE
Date: MAY 2012
7/28/2019 CL07 (MAY 2012)
http://slidepdf.com/reader/full/cl07-may-2012 8/51
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL07)
AMOUNT
SRITEM DESCRIPTION QTY UNIT RATE
SITE DEVELOPMENT
Collection
Sheet -1
Sheet -2
Sheet -3
Sheet -4
Sheet -5
Sheet -6
Sheet -7
To Bill Summary SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
8 / 51
REVISED PAGE
Date: MAY 2012
7/28/2019 CL07 (MAY 2012)
http://slidepdf.com/reader/full/cl07-may-2012 9/51
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL07)
AMOUNT
SRITEM DESCRIPTION QTY UNIT RATE
DIVISION 2 - SITE WORK
TRAFFIC MARKING DIMENSION
Thermoplastic paint for traffic marking on parking pavement
as detail 11 shown on drawing CL-GA-901 and specification
01 Parking lane marking 1895 M
02 Handicapped marking on floor 10 No.
To Bill Summary SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
9 / 51
REVISED PAGE
Date: MAY 2012
7/28/2019 CL07 (MAY 2012)
http://slidepdf.com/reader/full/cl07-may-2012 10/51
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL07)
AMOUNT
SRITEM DESCRIPTION QTY UNIT RATE
DIVISION 9 - FINISHES
EXTERNAL FINISHES
Finishing : walls including metal angle beads and lathing at
junctions of differing backgrounds
01 Non toxic epoxy paint on structure ,ref. W07 to suit external 3250 M2
surface
To Bill Summary SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
10 / 51
REVISED PAGE
Date: MAY 2012
7/28/2019 CL07 (MAY 2012)
http://slidepdf.com/reader/full/cl07-may-2012 11/51
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL07)
AMOUNT
SRITEM DESCRIPTION QTY UNIT RATE
DIVISION 10 - SPECIALITIES
SIGNAGE
Manufacturer's standard indoor signs, letters and plaques
including fixings, finishes, accessories complete as per
interior design drawings CL07-i901 up to CL07-i905 and all
required materials and equipments to complete and finish
the works according to specifications, drawings and code of
practice
01 Ref. type S10 25 No
02 Ref. type S11 10 No
To Bill Summary SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
11 / 51
REVISED PAGE
Date: MAY 2012
7/28/2019 CL07 (MAY 2012)
http://slidepdf.com/reader/full/cl07-may-2012 15/51
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL07)
AMOUNT
SRITEM DESCRIPTION QTY UNIT RATE
Drainage installation to the external drainage network
Construction work for briks inspection chamber, the work shallinclude bit not limited to earth work, plain concrete for
foundation BED, concrete channel at chamber DED with
standard cast iron manhole frame and double cover, UPVC
pipework schedule 40 to nearest main sewer manhole and all
materials and equipments required to complete and finish the
work according to specifications, drawings and code of practice
01 Inspection chamber, ref. (IC) 600x600mm 8 No
02 Slow down chamber 3 No
To Collection SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
15 / 51
REVISED PAGE
Date: MAY 2012
7/28/2019 CL07 (MAY 2012)
http://slidepdf.com/reader/full/cl07-may-2012 16/51
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL07)
AMOUNT
SRITEM DESCRIPTION QTY UNIT RATE
MANHOLE AND COVERS
Supply , install, testing and commissioning precastconcrete sewer manholes with standard traffic (heavy duty)
type cast iron manhole covers and frames, access ladders,
concrete channel at manhole bed, foundation bed, drop
pipe to manhole where required, all associated earthworks,
damp proofing, and all materals, equipments required to
complete and finish. the work according to specifications
section 02605, 02730, drawings and code of practices
01 Sewer manhole, ref. (SMH) 3 No.
POTABLE WATER INSTALLATION
Supply, install and testing pipework, UPVC Schedule 80 for
potable water the work shall include but not limited tofittings, supports, all associate works and all materials and
equipments required to complete and finish the work
according to drawings, specification and code of practices
02 50 mm dia. 305 M
03 63 mm dia. 100 M
04 100 mm dia. 320 M
Reinforced concrete under ground water tank and pump
room with proprietary cast iron manhole covers and frames
the work shall include but not limited to earthworks,concrete works, sump pit, and submersible pump internal
lining and water proofing, access ladders, pipework and
valving, test main fold vent pipes, truck fill pipework with
back flow preventer, ventilating fan and duct work within
tank and pump room structure, and UPVC schedule 80
drainge pipe from submersible pump to the nearest sewer
manhole and all materials and equipments required to
complete and finish the work according to drawings,
specification and code of practices
05 Potable water tank CAP 230 M3 1 No.
06 Potable water tank CAP 269 M4 1 No.
07 Fire water tank CAP. 176 M3 1 No.
To Collection SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
16 / 51
REVISED PAGE
Date: MAY 2012
7/28/2019 CL07 (MAY 2012)
http://slidepdf.com/reader/full/cl07-may-2012 17/51
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL07)
AMOUNT
SRITEM DESCRIPTION QTY UNIT RATE
POTABLE WATER SUPPLY SYSTEM
Drainage installations
Reinforced concrete gray water tank with proprietarymedium duty cast iron manhole cover and frame, includingsump pit, submersible pumps, internal lining, access ladder vent pipework within tank as detailed on drawing (Concretework, earthwork & water proofing measured elsewhere)
01 Gray water tank CAP. 11 M3 2 No.
02 Gray water tank CAP. 29 M3 1 No.
03 Gray water tank CAP. 41 M3 1 No.
04 Gray water tank CAP. 42 M3 1 No.
Packaged type variable speed discharge pressure systemGray water lift pumps (one duty & one stand-by), includingpiping and valves network within pump chamber, completewith all controllers, accessories for automatic operation asscheduled on drawing as per spec. section 15453
02 Gray water lift pumps CAP. 5 KW 5 Set
Allow for the design, supply and installation of packagedtype waste water treatment plant complete including filter,chemical feeders, air blowers controls, wirings, piping andall as associated works as per specifications section 02736and scheduled on drawing
07 Packaged water treatment unit. Cap. 11 m3/day 2 No.
07 Packaged water treatment unit. Cap. 29 m3/day 1 No.
07 Packaged water treatment unit. Cap. 41 m3/day 1 No.
07 Packaged water treatment unit. Cap. 42 m3/day 1 No.
NON-POTABLE WATER INSTALLATION
Supply, install and testing pipework, UPVC Schedule 80 for non-potable water the work shall include but not limited tofittings, supports, all associate works and all materials andequipments required to complete and finish the work
according to drawings, specification and code of practices
04 100 mm dia. 120 M
Accessories
05 Isolating & check valve assembly 100 mm dia. 3 No
To Collection SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
17 / 51
REVISED PAGE
Date: MAY 2012
7/28/2019 CL07 (MAY 2012)
http://slidepdf.com/reader/full/cl07-may-2012 22/51
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL07)
AMOUNT
SRITEM DESCRIPTION QTY UNIT RATE
DIVISION 15 - MECHANICAL
MANHOLE AND COVERS
Supply, install and testing pipework, UPVC Schedule 80 for
potable water the work shall include but not limited to
fittings, supports, all associate works and all materials and
equipments required to complete and finish the work
according to drawings, specification and code of practices
01 20 mm dia. 560 M
02 25 mm dia. 20 M
03 50 mm dia. 285 M
04 63 mm dia. 200 M
05 75 mm dia. 50 M
06 100 mm dia. 50 M
Supply, install and testing pipework, UPVC Schedule 80 for
non-potable water the work shall include but not limited to
fittings, supports, all associate works and all materials and
equipments required to complete and finish the work
according to drawings, specification and code of practices
07 50 mm dia. 430 M
08 63 mm dia. 33 M
09 75 mm dia. 335 M
10 100 mm dia. 80 M
Drainage installations
Reinforced concrete gray water tank with proprietary
medium duty cast iron manhole cover and frame, including
sump pit, submersible pumps, internal lining, access ladder
vent pipework within tank as detailed on drawing (Concrete
work, earthwork & water proofing measured elsewhere)
11 Gray water tank CAP. 11 M3
2 No.
To Collection SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
22 / 51
REVISED PAGE
Date: MAY 2012
7/28/2019 CL07 (MAY 2012)
http://slidepdf.com/reader/full/cl07-may-2012 25/51
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL07)
AMOUNT
SRITEM DESCRIPTION QTY UNIT RATE
DIVISION 15 - MECHANICAL
FIRE WATER UTILITIES
Supply, install, testing and commissioning portable
multipurpose fire extinguisher the work shall include but
not limited to fixing to wall, all associate works and all
materials and equipments required to complete and finish
the work according to drawings, specification and code of
practices
01 Ref. PFE 2 No
02 Ref. CO2 20 No
To Collection SR
Collection
Sheet -14
Sheet -15
Sheet -16
Sheet -17
Sheet -18
Sheet -19
Sheet -20
Sheet -21
Sheet -22
Sheet -23
Sheet -24
Sheet -25
To Bill Summary SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
25 / 51
REVISED PAGE
Date: MAY 2012
7/28/2019 CL07 (MAY 2012)
http://slidepdf.com/reader/full/cl07-may-2012 26/51
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL07)
AMOUNT
SRITEM DESCRIPTION QTY UNIT RATE
DIVISION 15B - MECHANICAL
HVAC INSTALLATIONS
CHILLED WATER SYSTEM
Under ground pipe work
Supply, install and test black steel pipe work including duct
leak detection system for underground chilled water piping,
fittings thermal insulation, trench work , flexible connections
and accessories as per required drawings and spec.
sections15050 to 15140 ,15510
01 300 mm dia. 325 M
02 250 mm dia. 65 M
03 200 mm dia. 200 M
04 150 mm dia. 355 M
05 100 mm dia. 125 M
ETS room and main ent. Lobbys pipe work
Supply, install and test black steel pipe work includingfittings thermal insulation, flexible connections and
accessories as per required drawings and spec.
sections15050 to 15140 ,15510
06 15 mm dia. 90 M
07 25 mm dia. 15 M
08 32 mm dia. 210 M
09 100 mm dia. 200 M
10 150 mm dia. 120 M
11 200 mm dia. 20 M
12 300 mm dia. 85 M
To Collection SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
26 / 51
REVISED PAGE
Date: MAY 2012
7/28/2019 CL07 (MAY 2012)
http://slidepdf.com/reader/full/cl07-may-2012 27/51
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL07)
AMOUNT
SRITEM DESCRIPTION QTY UNIT RATE
DIVISION 15B - MECHANICAL
HVAC INSTALLATIONS
CHILLED WATER SYSTEM
Supply and install valve / BTU meter
Butterfly valve
01 Ref. MBFV 300 mm dia., 1 No.
Isolating valve
02 32mm dia., 20 No.
Check valve
03 32mm dia., 10 No.
BTU meter
04 32mm dia., 10 No.
Supply, install, test and commission, Ventilating fans as
details on drawings and specifications, section 15860
06 Ref. EF- 01, 40 LPS capacity 10 No.
Supply and install heat exchanger including valves and
short length piping as detailed on drawings and as per
specifications
07 Ref. HEX-01 to 04, 1634 KW capacity 4 No.
Supply, install and test galvanized steel sheet rectangular
ductwork, including supports as per drawings and
specifications
08 Various gauge 500 Kg
Supply and install duct installation
09 Thermal semi-rigid insulation to rectangular ductwork 25 mm indoor 90 M2
To Collection SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
27 / 51
REVISED PAGE
Date: MAY 2012
7/28/2019 CL07 (MAY 2012)
http://slidepdf.com/reader/full/cl07-may-2012 45/51
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL07)
AMOUNT
SRITEM DESCRIPTION QTY UNIT RATE
DIVISION 16 - ELECTRICAL
AUDIO / VIDEO IP INTERCOM SYSTEM
Supply , installation testing and commissioning of audio /
video IP intercom system comprising of outdoor station unit
with built-in color camera, indoor station units with built -in
monitors, electrical door lock , AC power supply, cables and
conduits and associated works as required to suit the
locations shown on drawings and coordination & integration
& communication kit with other systems shall be conducted
during work execution as per technical specifications,
drawings and by making arrangement with supervising
engineer to achieve the work to the best possible and
specifications
To suit audio /video phone IP intercom system network equipped
with:
01 Waterproof outdoor station unit (48 lines) including but not limited to 18 No
color camera, mic, speaker, push buttons, power supply, etc.
02 Electric door lock 18 No
03 Network controller with power supply 10 No
04 Exit push button 18 No
05 Electric door strike 20 No
06 Audio / video IP intercom system network including conduits, 1 Item
wiring, pull boxes, connections, and all required accessories
to form a complete and fully operative system
To Collection SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
45 / 51
REVISED PAGE
Date: MAY 2012
7/28/2019 CL07 (MAY 2012)
http://slidepdf.com/reader/full/cl07-may-2012 50/51
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL07)
AMOUNT
SRITEM DESCRIPTION QTY UNIT RATE
DIVISION 16 - ELECTRICAL
Collection
Sheet - 31
Sheet - 32
Sheet - 33
Sheet - 34
Sheet - 35
Sheet - 36
Sheet - 37
Sheet - 38
Sheet - 39
Sheet - 40
Sheet - 41
Sheet - 42
Sheet - 43
Sheet - 44
Sheet - 45
Sheet - 46
Sheet - 47
Sheet - 48
Sheet - 49
To Bill Summary SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
50 / 51
REVISED PAGE
Date: MAY 2012