PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL05)
AMOUNT
SR
Soil investigation
The contractor shall implemented of exploratory drilling and Notemechanical test in all types of soil with on site testing and theissuance of the final report which contain the test results andrecommendations of the foundation work.
01 Research and treatment for cavities
Implementation through a perforating exploratory(cavity probing) In 1 M3
all types of rock to determined the horizontal and vertical elongation
of cavities, the contractor will be responsible for treatment all
cavities By injection and treatment for all cavities and voids of rock
with all necessary work accordance with the technical
specifications and instructions of the Supervising engineer
SITE DEVELOPMENT
Earthworks, concrete works, water proofing, moisture Note
protection for foundations works are measured in BOQ AP06
The bidder is advised to visit the site before quoting the rates in
order to get himself familiarized with the present site conditions
Site clearance and demolitions
02 Demolish and clear away existing structures, pavings, electrical 1 Item
lighting, pavements or upstands, cut and plug or reroute existing
service lines or utilities inside property line, clear site of rubbish orany impediments, loose top soil and as deemed necessary, for the
total site cluster number 5 (CL05) area, approximately (23230m2),
subject to engineer approval and as coordinated with public
pension agency as shown on drawing CL05- XC-01
To Collection SR
RATEITEM D E S C R I P T I O N QTY UNIT
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
1 / 67
REVISED PAGE
Date: MAY 2012
-
7/28/2019 CL05 (MAY 2012)
2/67
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL05)
AMOUNT
SRRATEITEM D E S C R I P T I O N QTY UNIT
SITE GRADING
Bulk excavate over site on unclassified ground including all hard Noteand rock layers to reduced levels generally in cutting profiles the
work shall include clear away to approved disposals.
All additional excavation required for temporary works and spaces, Note
shoring, dewatering, removal of surplus excavated materials,
support, temporary spoil heaps and general compaction
EXCAVATION AND EARTHWORK
Necessary moving or transportation about the site excavation
material including handling to temporary stockpile or ultimate
disposal off site is to be included in the unit rate of excavation
SITE PREPARATION AND GRADING
01 Excavation oversite on unclassified ground including all hard and 50 M3
rock layers (if any) to reduced levels generally in cutting profiles
and forming depressions, falls and the like and clear away to
approved disposal tip.
02 Fill oversite with approved imported fill material according to site 11000 M3
soil report recommendation including compaction in making up
levels to required formations, embankments, contouring and the
like as per drawings and spec.
Note
Work on proposed structural built-up areas from part of the Work
pertaining to respective building or structure as measured
elsewhere.
To Collection SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
2 / 67
REVISED PAGE
Date: MAY 2012
-
7/28/2019 CL05 (MAY 2012)
3/67
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL05)
AMOUNT
SRRATEITEM D E S C R I P T I O N QTY UNIT
PAVING AND SURFACING
01 Supply and install precast concrete shotblasted pavers (beige 3438 M2
color) size 400x400x60mm thk.with photocatalytic titanium doxide
coating including 100mm thick cast-in-place concrete slab with
A193-WWF mesh reinforcement, 20mm thick cement mortar
setting bed, moisture barrier on compacted subgrade, 3mm water
proofing membrane on R.C. slab as per detail no A1 on drawing
CL05-XL301 to suit required locations as shown on drawing
CL05-XL101
02 Supply and install precast concrete shotblasted pavers (beige, & 64 M2
brown color) size 400x400x60mm thk.with photocatalytic titanium
doxide coating including 100mm thick cast-in-place concrete slab
with A193-WWF mesh reinforcement, 20mm thick cement mortarsetting bed, polyethylene moisture barrier, compacted subgrade,
3mm water proofing membrane on R.C. slab as per detail no. A5
on drawing CL05-XL301 to suit required locations as shown on
drawin CL02-XL101
03 Supply and install precast concrete shotblasted pavers (light grey 1749 M2
& grey color) size 400x400x60mm thk.with photocatalytic titanium
doxide coating including 100mm thick cast-in-place concrete slab
with A193-WWF mesh reinforcement, 20mm thick cement mortar
setting bed, polyethylene moisture barrier, compacted subgrade,
3mm water proofing membrane on R.C. slab as per detail no. A6
on drawing CL05-XL301 to suit required locations as shown on
drawing CL05-XL101
04 Supply and install precast concrete shotblasted pavers (beige & 649 M2
light beige color) size 400x400x60mm thk w./grey color granite
band size 200x200x30mm thk including 100mm thick cast-in-place
concrete slab with A193-WWF mesh reinforcement, 20mm thick
cement mortar setting bed, polyethylene moisture barrier,
compacted subgrade, 3mm water proofing membrane on R.C. slab
as per detail no. B3 on drawing CL05-XL301 to suit required
locations as shown on drawing CL05-XL101
05 Supply and install polished granite paving dark &light colors,size 380 M2
400x400x30mm thk w.\ granite band dark color, size200x200x30mm including 100mm thick cast-in-place concrete slab
with A193-WWF mesh reinforcement, 20mm thick cement mortar
setting bed, polyethylene moisture barrier, compacted subgrade,
3mm water proofing membrane as per detail no. C2
on drawing CL05-XL301 to suit required locations as shown on
drawing CL05-XL101
To Collection SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
3 / 67
REVISED PAGE
Date: MAY 2012
-
7/28/2019 CL05 (MAY 2012)
4/67
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL05)
AMOUNT
SRRATEITEM D E S C R I P T I O N QTY UNIT
PAVING AND SURFACING
01 Supply and install concrete screed with epoxy coat finish including 12690 M2
100mm/50mm thick cast-in-place concrete slab with A193-WWF
reinforcement mesh, polyethylene moisture barrier, compacted sub
grade, 3mm water proofing membrane on R.C. slab as per detail
no. D on drawing CL05-XL301 to suit required locations as shown
on drawing CL05-XL101
02 Supply and install 50mm thk rubber pavement green, blue , brown 120 M2
& red color including adhesive mixture,100mm thick cast-in-place
concrete slab with A193-WWF mesh reinforcement smooth finish,
polyethylene moisture barrier, compacted subgrade, 3mm water
proofing membrane on R.C. slab as per detail no. E4 on drawing
CL05-XL301 to suit required locations as shown on drawingCL05-XL101
03 Supply and install 80mm thick ( beige & grey) color, interlocking 1507 M2
concrete pavers including 20mm thik cement ,mortar setting bed,
compacted sand leveling course , compacted aggregate base
course 150mm thick, cast in place concrete foundation, concrete
edger compacted subgrade complete as per detail F8 on drawing
CL05-XL301 to suit required locations as shown on drawing
CL05-XL101
04 Supply and install cast in place concrete paving with A193-WWF 22 M2
mesh reinforcement, smooth finish light grey color, 100mm thick
w.\ brick edge band size 200x200x60mm thick including 20mm
thick cement mortar setting bed, polyethylene moisture barrier,
compacted subgrade, 3mm water proofing membrane on R.C. slab
as per detail no. G7 on drawing CL05-XL301 to suit required
locations as shown on drawing CL05-XL101
EARTH MOUNT
05 Supply and formation of 500-1500 mm height earth mount including
compacted sub base layer, 100 mmm thick layer of sand and
gravel mix, and all required to complete and finish te work as
shown on drawing CL05- XL101, and as per detail no. 5 on drawing
CL05- XL302 and sections details 166 M2
(Softscape and planting soil mix are measured elsewhere)(area
measured on plan)
To Collection SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
4 / 67
REVISED PAGE
Date: MAY 2012
-
7/28/2019 CL05 (MAY 2012)
5/67
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL05)
AMOUNT
SRRATEITEM D E S C R I P T I O N QTY UNIT
CURBS AND EDGING
01 Supply and install precast concrete road curb, size 300X500X150 2728 Mmm with exposed aggregate finish including bedding, haunching,
cast in place concrete base and concrete grout behind curb, 20mm
thick cement mortar setting bed, on R.C. slab as per detail no.1 on
drawing CL05-XL302 to suit required locations as shown on
drawing CL05-XL101
02 Supply and install precast concrete mowing edge, size 28 M
200X100X65 mm including concrete base, 20mm thick cement
mortar setting bed, cast in place concrete base on R.C. slab, as
per detail no. 2 on drawing CL05-XL302 to suit required locations
as shown on drawing CL05-XL101
SUNDRIES
TENSILE STRUCTURE
03 Supply and install tensile staructure comprising columns, tent
fabric, foundation, earthwork, and all required to compleet and fix
the work as shown on drawing CL05- XL101 and as per detail no. 3
on drawing CL05- XL302, and section details and as per
manufacturer's recommendations and subject to engineer's
approoval to cover an area of 80 m2 . Contractor shall submitt shop
drawings for approval before supply 1 No.
Wooden Shade Structure
04 Supply and install wooden shade staructure comprising 200200mm
artificial wooden post, 100200 mm wooden beams , foundation,
earthwork, and all required to compleet and fix the work as per
deatail 6 on drawing XL302 and manufacturer's recommendations
and subject to engineer's approoval to cover an area of 90 m2 . 1 No.
Contractor shall submitt shop drawings for approval before supply
Wooden Bench
05 Supply and install wooden bench comprising concrete walls,reinforced concrete slab with A 193 W.W.F reinforcement mesh
smooth finished including footings, waterproofing membrane, joint
filler, 50x75 mm interior wooden rails, including earthworks,
insulation, finishing, fixing, and all required to complete the work
as per detail no.4 on drawing CL5- XL302 30 M2
To Collection SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
5 / 67
REVISED PAGE
Date: MAY 2012
-
7/28/2019 CL05 (MAY 2012)
6/67
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL05)
AMOUNT
SRRATEITEM D E S C R I P T I O N QTY UNIT
Manufacturer's standard outdoor sings, letters and plaques
including fixings, finishes, accessories complete as per
details on drawing CL05-XL601,602 and as per specifications
01 Ref. type 1 ( RESIDENTIAL SIGN ) 6 No.
02 Ref. type 2 ( DIRECTIONAL SIGN ) 4 No.
03 Ref. type 3 ( CENTRAL PLAZZA SIGN ) 1 No.
04 Ref. type 4 ( ADVERTISING PANEL ) 2 No.
Manufacturer's standard outdoor sings, letters and plaques
including fixings, finishes, accessories complete as perdetails on drawing CL05-XC-05, CL05-XC-06 and as per
specifications
INFORMATIVE SIGNS
05 Ref. type I-1 ( PARKING ) 3 No.
06 Ref. type I-2 ( ENTRY ) 6 No.
REGULATORY SIGNS
07 Ref. type R2-1 (GIVE WAY ) 9 No.
08 Ref. type R5-1 ( ENTRY PROHIBTED ) 11 No.
09 Ref. type R 8-1 ( NO LEFT TURN ) 2 No.
10 Ref. type R 17-6 (MANDATORY MOVEMENT - L ) 1 No.
WARNING SIGNS
11 Ref. type W11-1 ( PEDESTRAIN CROSSING ) 17 No.
To Collection SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
6 / 67
REVISED PAGE
Date: MAY 2012
-
7/28/2019 CL05 (MAY 2012)
7/67
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL05)
AMOUNT
SRRATEITEM D E S C R I P T I O N QTY UNIT
ROAD SIGNAGE & PAVEMENTMARKING
Thermoplastic paint for traffic marking on drive way atbasement/ground floor and ramps floor as per
Manufacturer's standard as shown on details on drawing
CL05-XC-06, to suit required locations as shown on drawing
CL02-XC-05, as per specification and as per engineer's
instructions
pavement marking
01 Straight arrows 42 No.
02 Straight & curved arrows 5 No.
03 Curved arrows 11 No.
04 Handicapped marking on floor 3 No.
05 Parking lane marking 2170 M
06 White stop line 70 M
07 Pedestrain crossing 122 M
08 Lane marking 910 M
09 White edge line 810 M
10 Dotted ( give way line ) 1010 M
11 Speed control hump including cut & removal of existing wearing 25 M
(0.05m) course & add a new course, tack coat and 0.10m of
bituminous wearing course, ref. 10 detail G
To Collection SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
7 / 67
REVISED PAGE
Date: MAY 2012
-
7/28/2019 CL05 (MAY 2012)
8/67
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL05)
AMOUNT
SRRATEITEM D E S C R I P T I O N QTY UNIT
LANDSCAPING
Trees including pit excavation, stakes and ties, soilplanting mix, mulching, filter membrane and drainage
layer all as details and planting schedule as per detail
P1 on drawing CL05-XL-401
01 T/Af 16 No.
02 T/Fm 32 No.
03 T/Po 2 No.
Shrubs including planting, site excavation as required, soilplanting mix, mulching, filter membrane, screed sloped to
drain and drainage layer all as per details and planting
schedule as per detail P3 on drawing CL05-XL-401
04 S/Hs 107 No.
05 S/Mc 78 No.
06 S/Pav 18 No.
To Collection SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
8 / 67
REVISED PAGE
Date: MAY 2012
-
7/28/2019 CL05 (MAY 2012)
9/67
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL05)
AMOUNT
SRRATEITEM D E S C R I P T I O N QTY UNIT
LANDSCAPING
Ground cover including planting, site excavation asrequired, soil planting mix, mulching, filter membrane,
screed sloped to drain and drainage layer all as per details
and planting schedule as per detail P2, on drawing
CL05-XL-401
01 G/As 1509 No.
02 G/Ggp 1725 No.
03 G/Gr (Y) 493 No.
04 G/Cm (W) 565 No.
Lawn planting, including soil planting mix, filter membrane
and drainage layer, screed sloped to drain all as per details
and planting schedule as per detail P3 on drawing
CL05-XL-401
05 L/Cd 487 M2
To Collection SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
9 / 67
REVISED PAGE
Date: MAY 2012
-
7/28/2019 CL05 (MAY 2012)
10/67
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL05)
AMOUNT
SRRATEITEM D E S C R I P T I O N QTY UNIT
PLUMBING INSTALLATION
WASTE AND DRAINAGE INSTALLATION
Supply, install and testing pipework, UPVC schedule 40, the
work shall include but not limited to fittings, supports, cast
iron pipes on roof for vent with caps, installation, all
associate works and all materials and equipments required
to complete and finish the work according to drawings,
specification and code of practices
01 100 mm dia. 60 M
02 150 mm dia. 315 M
03 200 mm dia. 90 M
Construction work for briks inspection chamber, the work
shall include bit not limited to earth work, plain concrete
for foundation BED, concrete channel at chamber DED with
standard cast iron manhole frame and double cover and all
materials and equipments required to complete and finish
the work according to specifications, drawings and code of
practice
04 Inspection chamber, ref. (IC) 600x600mm 4 No
05 Inspection chamber, ref. (STIC) 600x600mm 6 No
WASTE AND DRAINAGE INSTALLATION
Supply, installation and test drainage pipe work UPVC
schedule 80 the work shall include but not limited to fittings,
supports hangers, excavation, backfilling, cast iron pipes on
roof for vent with caps and all materials and equipment
required to complete and finish the work according to
specifiactions, drawings and code of practice
06 100 mm dia 50 M
Construction work for briks inspection chamber, the work shall
include bit not limited to earth work, plain concrete for
foundation BED, concrete channel at chamber DED with
standard cast iron manhole frame and double cover, UPVCpipework schedule 40 to nearest main sewer manhole and all
materials and equipments required to complete and finish the
work according to specifications, drawings and code of practice
07 Slow down chamber 5 No
To Collection SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
10 / 67
REVISED PAGE
Date: MAY 2012
-
7/28/2019 CL05 (MAY 2012)
11/67
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL05)
AMOUNT
SRRATEITEM D E S C R I P T I O N QTY UNIT
PLUMBING INSTALLATION
Reinforced concrete under ground water tank and pumproom with required capacity proprietary cast iron manhole
covers and frames, including (concrete work & earthwork,
water proofing) internal lining access ladders, pipework
submersible pump, ventilating fans with exhaust and fresh
air pipework, valves, vent pipes and truck fill pipework as
detailed on drawings
01 Fire Water tank 1 No.
MANHOLE AND COVERS
Supply , install, testing and commissioning precast
concrete sewer manholes with standard traffic (heavy duty)
type cast iron manhole covers and frames, access ladders,concrete channel at manhole bed, foundation bed, drop
pipe to manhole where required, all associated earthworks,
damp proofing, and all materals, equipments required to
complete and finish. the work according to specifications
section 02605, 02730, drawings and code of practices
02 Sewer manhole, ref. (MH) 6 No.
03 Sewer manhole, ref. (STMH) 3 No.
Fire WATER INSTALLATION
Supply, install and testing pipework, UPVC Schedule 80 forfire water the work shall include but not limited to
fittings, supports, all associate works and all materials and
equipments required to complete and finish the work
according to drawings, specification and code of practices
04 100 mm dia. 105 M
Supply, installation and test horizontal split case centrifugal
fire pump, including piping network and valving within pump
chamber,complete with all controllers, accessories for
automatic operateion and all associate workks as per code
standard and as scheduled on drawings and specification
05 Ref. FP1 CAP 75 KW electrically driven 1 No
06 Ref. FP2 CAP 75 KW fuel diesel driven 1 No
To Collection SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
11 / 67
REVISED PAGE
Date: MAY 2012
-
7/28/2019 CL05 (MAY 2012)
12/67
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL05)
AMOUNT
SRRATEITEM D E S C R I P T I O N QTY UNIT
FIRE WATER UTILITIES
Supply, installation and test Electrically driven peripheralturbine Jockey pump, including piping network and valving
within pump chamber, complete with all controllers,
accessories for automatic operateion and all associate
workks as per code standard and as scheduled on drawings
and specification
01 Ref. JP CAP 5 KW 1 No
IRRIGATION WATER INSTALLATION
Supply, install and testing pipework, UPVC Schedule 80 for
Irrigataion water the work shall include but not limited to
fittings, supports, all associate works and all materials andequipments required to complete and finish the work
according to drawings, specification and code of practices
02 20 mm dia. 33 M
03 25 mm dia. 110 M
04 32 mm dia. 30 M
05 50 mm dia. 295 M
Accessories
06 Supply and installation irrigation controller as detailed on drwings 1 No.
and as per specifications
07 Supply and install bubbler for shrubs, ground cover and 770 No.
succulents
08 Supply and installation bubbler for trees 135 No.
09 Supply and installation spray lawn sprinkler 16 No.
10 Gate valve W/valve box 25 mm dia., 1 No.
11 Gate valve W/valve box 32 mm dia., 1 No.
12 Gate valve W/valve box 50 mm dia., 6 No.
To Collection SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
12 / 67
REVISED PAGE
Date: MAY 2012
-
7/28/2019 CL05 (MAY 2012)
13/67
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL05)
AMOUNT
SRRATEITEM D E S C R I P T I O N QTY UNIT
Supply and installation remote control valve assembly
including piping complete with valve box, Y-strainer,
accessories and all associated works as detail on drawingand as per specifications section 02810
01 Ref. RCV 20 mm dia. 1 No.
02 Ref. RCV 25 mm dia. 1 No.
03 Ref. RCV 32 mm dia. 1 No.
04 Ref. RCV 50mm dia. 6 No.
To Collection SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
13 / 67
REVISED PAGE
Date: MAY 2012
-
7/28/2019 CL05 (MAY 2012)
14/67
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL05)
AMOUNT
SRRATEITEM D E S C R I P T I O N QTY UNIT
SITE DEVELOPMENT
Collection
Sheet -1
Sheet -2
Sheet -3
Sheet -4
Sheet -5
Sheet -6
Sheet -7
Sheet -8
Sheet -9
Sheet -10
Sheet -11
Sheet -12
Sheet -13
To Bill Summary SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
14 / 67
REVISED PAGE
Date: MAY 2012
-
7/28/2019 CL05 (MAY 2012)
15/67
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL05)
AMOUNT
SRRATEITEM D E S C R I P T I O N QTY UNIT
DIVISION 2 - SITE WORK
SITE GRADING
All additional excavation required for temporary works and
spaces, shoring, dewatering, removal of surplus excavated
materials, support, temporary spoil heaps and general Note
compaction
EXCAVATION AND EARTHWORK
Necessary moving or transportation about the site excavation Note
material including handling to temporary stockpile or ultimate
disposal off site is to be included in the unit rate of excavation
Excavation in natural land consisting of solid rock
formation, cracked rocks, bolders and natural contoured
soil, temporary earthwork supports, dewatering ( if any ) as
per specifications sections 02200
01 Excavation for foundations commencing from existing grade level 73752 M
Backfilling
02 Approved selected imported fill material including compaction in 2300 M
making up levels around and over foundations, beds and the like as
per spec. sections 02200
03 Approved fill material selected from excavated material including M price only
compaction as per specification section 02200
Soil treatment application for termite control
04 To subgrades of slabs and along periphery of building The work 19170 M
shall include all materials and equipments required to complete
and finish the work according to specifications and code of
practice
To Collection SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
15 / 67
REVISED PAGE
Date: MAY 2012
-
7/28/2019 CL05 (MAY 2012)
16/67
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL05)
AMOUNT
SRRATEITEM D E S C R I P T I O N QTY UNIT
DIVISION 2 - SITE WORK
TRAFFIC MARKING DIMENSION
Thermoplastic paint for traffic marking on parking pavement
as detail 11 shown on drawing CL-GA-901 and specification
01 Straight arrows 78 No.
02 Turning arrows 1 No.
03 Parking lane marking 1465 M
04 Handicapped marking on floor 19 No.
05NO ENTRY (text)
3 No.
06 EXIT (text) 3 No.
07 Lane numbers 142 No
To Collection SR
Collection
Sheet - 15
Sheet - 16
To Bill Summary SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
16 / 67
REVISED PAGE
Date: MAY 2012
-
7/28/2019 CL05 (MAY 2012)
17/67
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL05)
AMOUNT
SRRATEITEM D E S C R I P T I O N QTY UNIT
DIVISION 3 - CONCRETE
CONCRETE WORK
CONCRETE TYPES
Include in Unit Rates for concrete of the following types and
locations:
20 Mpa
a) Blinding concrete
b) Catch basins and side walks Note
40 Mpa
a) Footings
b) Columns and R.C. walls
c) Floor and roof slabs, beams, girders, stairs
d) Concrete topping or structural screed
e) Slab on grade
f) water tanks
Water stops including junction accessories are not measured
separately The cost of water stop items are to be included in the
unit rates of the related concrete items
To Collection
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
17 / 67
REVISED PAGE
Date: MAY 2012
-
7/28/2019 CL05 (MAY 2012)
18/67
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL05)
AMOUNT
SRRATEITEM D E S C R I P T I O N QTY UNIT
DIVISION 3 - CONCRETE
Plain insitu concrete, 20 Mpa, cement type Vas per specifications section 03300
01 Screed, 50mm thick 1057 M
02 Blinding beds, 100mm thick 2113 M
Supply and placing Insitu reinforced concrete, 40 Mpa
cement type V including formwork and steel reinforcements
conforming to ASTMA615and A185 and all requiments to
finish the work according to drawings as per specifications
sections 03100, 03200 & 03300 , and code of practice in:
03 Raft foundation various thickening including depression areas, 14300 M
sump pits and elevators pits and electrical cables trench
04 Retaining walls 855 M
05 Reinforced concrete for tanks 521 M3
To Collection
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
18 / 67
REVISED PAGE
Date: MAY 2012
-
7/28/2019 CL05 (MAY 2012)
19/67
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL05)
AMOUNT
SRRATEITEM D E S C R I P T I O N QTY UNIT
DIVISION 3 - CONCRETE
CONCRETE WORK
Supply and placing of Insitu reinforced concrete, 40 Mpa
type I cement including formwork and steel reinforcements
conforming to ASTM A615 and A185 and all requirements to
finish the work according to the drawings,as per
specifications sections 03100, 03200 & 03300,and code of
practice
01 Columns 477 M
02 Shear wall 424 M
03 Beams 71 M
04 Suspended flat slabs, 300mm thickening including drop panel 2718 M
05 Suspended flat slabs, 350mm thickening including drop panel 1531 M
06 Suspended flat slabs, 380mm thickening including drop panel 2565 M
07 Ramps 70 M
08 Stairs including landings 84 M
PRECAST CONCRETE
Precast concrete wheel stopper including dowels, grouting
and accessories for complete installation as per detail 21 on
drawing CL-GA-901 and specification
09 Precast concrete wheel stopper including fixings 375 No.
To Collection SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
19 / 67
REVISED PAGE
Date: MAY 2012
-
7/28/2019 CL05 (MAY 2012)
20/67
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL05)
AMOUNT
SRRATEITEM D E S C R I P T I O N QTY UNIT
DIVISION 3 - CONCRETE
CONCRETE WORK
Sundries
01 Allow for reinforced concrete equipment pads including upstand 17 M
surrounds and anti-vibration accessories as required
02 150mm thick raised slabs, Handicapped`s ramps and curbs to suit 645 M
required areas as per detail 10,14, 20 on drawing CL-GA-901
03 Reinforced concrete electrical cable trench including all associated 48 M
works
To Collection SR
Collection
Sheet - 17
Sheet - 18
Sheet - 19
Sheet - 20
To Bill Summary
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
20 / 67
REVISED PAGE
Date: MAY 2012
-
7/28/2019 CL05 (MAY 2012)
21/67
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL05)
AMOUNT
SRRATEITEM D E S C R I P T I O N QTY UNIT
DIVISION 4 - MASONRY
UNIT MASONRY
Supply and fix concrete masonry blocks in courses with
cement lime mortar including concrete lintels over
openings , horizontal and vertical reinforcement, fixings,
fillers, sealants and grout to complete the work according
to specifications and drawings
01 15 mm thick wall, one hour fire rated 42 M
02 200 mm thick wall 37 M
03 200 mm thick wall, one hour fire rated 308 M
04 200 mm thick wall, two hours fire rated 487 M
05 300 mm thick wall, one hour fire rated 21 M
To Bill Summary SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
21 / 67
REVISED PAGE
Date: MAY 2012
-
7/28/2019 CL05 (MAY 2012)
22/67
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL05)
AMOUNT
SRRATEITEM D E S C R I P T I O N QTY UNIT
DIVISION 5 - METALS
Expansion joint
Supply and install expansion joint cover including
extruded aluminum assembles, fillets, accessories, fixing
and sealants as per drawing CL-GA-902 and according to
specifications
01 Floor to floor cover as per detail no. 1a 2300 M
02 Wall to wall cover as per detail no. 1b 1450 M
03 Wall to wall cover as per detail no. 1e 1705 M
04 Floor to wall cover as per detail no. 1d 750 M
05 Ceiling to ceiling cover as per detail no. 1j 1200 M
06 Wall to ceiling cover as per detail no. 1h 400 M
Steel cover as per details on drawings
07 To suit electrical cable trench 68 M2
08 To suit sump pits at basement 7 No
Supply and install 30mm depth panted galvanized cast iron
gratings including 40x40mm steel angle, medium gauge
galvanized gutter slope to drain and all required for fixing
and finisheng as per detail no.9 on drawing CL-GA-901 and
specificatons
09 To suit required locations 24 M
To Bill Summary SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
22 / 67
REVISED PAGE
Date: MAY 2012
-
7/28/2019 CL05 (MAY 2012)
23/67
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL05)
AMOUNT
SRRATEITEM D E S C R I P T I O N QTY UNIT
DIVISION 7 - THERMAL AND MOISTURE PROTECTION
Water proofing and moisture protection as per specificationsection 07100
01 Membrane waterproofing as per specifications to suit base slab and 30800 M2
retainig walls
02 Protection board to suit base slab and retainig walls 2380 M2
To Bill Summary SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
23 / 67
REVISED PAGE
Date: MAY 2012
-
7/28/2019 CL05 (MAY 2012)
24/67
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL05)
AMOUNT
SRRATEITEM D E S C R I P T I O N QTY UNIT
DIVISION 8-DOORS AND WINDOWS
DOOR SETS
Supply and install all doors to suit masonry openings and Note
approved samples including fixings, decorations, frames,
architrave, hardwares and saddles and all required to complete
and finish the work as detailed on drawing CL-GA-801 and
according to specifications and code of practice
TYPE B : 44mm thick painted hollow metal insulated
door including door grill (where required)
01 Type B1, single leaf door, size 900x2150mm and 45 min. fire rated 7 No.
02 Type B6, double leaves door, leaf size 950x2150mm and 45 min. fire 6 No.
rated
. .
motorized adjustable louvers panel working upon signal from
fire alarm system for generator .
03 Type C1, double leaves door, leaf size 950x2400mm and 45 min. fire 7 No.
rated
04 Type C2, double leaves door, leaf size 1050x2400mm and 45 min. 1 No.
fire rated
WINDOWS
24 mm thick double tempered glazed sliding window tinted
outside clear inside , on powder coated aluminum frame
including all hardware, fixtures, packings, sealants, weather
strippings and the like as described drawing CL-GA-801 to suit
opening and as per specification
05 Ref. W02 3 No
To Bill Summary SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
24 / 67
REVISED PAGE
Date: MAY 2012
-
7/28/2019 CL05 (MAY 2012)
25/67
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL05)
AMOUNT
SRRATEITEM D E S C R I P T I O N QTY UNIT
DIVISION 9 - FINISHES
INTERNAL FINISHES
Flooring including respective types of bounding materials,
concrete screed sub-floor of required thickness, (if any)
accessories for complete installations as per ID drawing
and specification
01 Epoxy paint on cement screed. , ref. EC 368 M
02 Anti carbonation protection epoxy coating for pavement. , ref. AEC 4302 M
03 8mm thk. heavy duty multi component epoxy screed with 352 M
polyurethane base on concrete screed for car ramps,supported withlinear metal strip for non sliding. , ref.HES
04 Multi component epoxy coating on concrete screed for drive way & 8105 Mturns. , ref. MEC
Finishings : walls including metal angle beads and lathing at
junctions of differing backgrounds
05 Cement plaster to suit walls 7630 M
06 Paint on cement plaster ,ref. W01 7630 M
Finishings : ceilings
07 Cement plaster to suit ceiling 15950 M
08 Paint on cement plaster, ref.C01 15950 M
To Collection SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
25 / 67
REVISED PAGE
Date: MAY 2012
-
7/28/2019 CL05 (MAY 2012)
26/67
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL05)
AMOUNT
SRRATEITEM D E S C R I P T I O N QTY UNIT
DIVISION 9 - FINISHES
EXTERNAL FINISHES
Finishing : walls including metal angle beads and lathing at
junctions of differing backgrounds
01 Cement plaster to suit external surface 66 M2
02 External Paint on cement plaster to suit external surface 66 M2
To Collection SR
Collection
Sheet - 25
Sheet - 26
To Bill Summary
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
26 / 67
REVISED PAGE
Date: MAY 2012
-
7/28/2019 CL05 (MAY 2012)
27/67
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL05)
AMOUNT
SRRATEITEM D E S C R I P T I O N QTY UNIT
DIVISION 10 -SPECIALTIES
CORNER & COLUMN GUARD
Corner guards install at 600 high from finish floor heavy duty
rubber guard bumper, including all associated works, as per
detail 18 shown on drawing CL-GA-901 and as specification
01 To suit column location as required 63 No
ALUMINUM LOUVERS SCREEN
Supply and install fixed anodized aluminum sand trap louvers
panels on anodized aluminum frames including finishes and all
associated works to complete and fix the works as per detailson drawing CL-GA-802 and specification
02 Ref. L03, size 3200x2500mm to suit required locations 2 No
03 Ref. L06, size 2300x2500mm to suit required locations 2 No
04 Ref. L07, size 700x450mm to suit required locations 2 No
05 Ref. L08, size 700x400mm to suit required locations 6 No
06 Ref. L09, size 2500x5000mm to suit required locations 1 No
07 Ref. L10, size 1500x1500mm to suit required locations 3 No
To Collection SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
27 / 67
REVISED PAGE
Date: MAY 2012
-
7/28/2019 CL05 (MAY 2012)
28/67
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL05)
AMOUNT
SRRATEITEM D E S C R I P T I O N QTY UNIT
DIVISION 10 -SPECIALTIES
SIGNAGE
Manufacturer's standard indoor signs, letters and plaques
including fixings, finishes, accessories complete as per
interior design drawings CL05-i901 to CL05-i907 and all
required materials and equipments to complete and finish
the works according to specifications, drawings and code of
practice
01 Ref. type S01 18 No
02 Ref. type S02 4 No
03 Ref. type S09 20 No
04 Ref. type S10 30 No
05 Ref. type S11 21 No
06 Ref. type S12 17 No
07 Ref. type S13 3 No
To Collection SR
Collection
Sheet - 27
Sheet - 28
To Bill Summary SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
28 / 67
REVISED PAGE
Date: MAY 2012
-
7/28/2019 CL05 (MAY 2012)
29/67
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL05)
AMOUNT
SRRATEITEM D E S C R I P T I O N QTY UNIT
DIVISION 14 - CONVEYING SYSTEMS
AUTOMATED WASTE COLLECTION SYSTEM
Supply and provide all required to construct, test and operate
automated waste collection system, consisting of the
following items:-
01 Discharge valve room with basement floor including all required 14 No.
works as detailed on drawing no. STM - ITCCP2 - TD - 008.
Contractor shall perform all required coordination with other trade to
ensure proper installation and operation of the complete system to
transport waste from tower chute to pipe networks as shown on
drawings STM - ITCCP2 - TD - 001 to 007 and 015, 016 andaccording to manufacturer's standards and specifications
02 Discharge valve room without basement floor including required 3 No.
earthworks, concrete works for the vacuum room masonry for the
vacuum room and electromechanical works and all required works
as detailed on drawing no. STM - ITCCP2 - TD - 009. Contractor
shall perform all required coordination with other trades to ensure
proper installation and operation of the complete system to
transport waste from tower chute to pipenetworks as shown on
drawings STM - ITCCP2 - TD - 001 to 007 and 015, 016 and
according to manufacturer's standards and specifications
PIPE WORK
Supply and installation of Automated waste collection system
piping. Item shall include the earth works, insulation,
,concentric reducer, puddle flanges ,inspection covers and all
required materials and equipments to complete the transport
pipe line from DV rooms , outdoor load stations and full
vacuum load stations to waste plant
03 508mm under/above ground transport pipe 1070 M
RC MANHOLE
Supply and install cast insitu or precast reinforced concrete
manhole ,the item shall include excavation, backfill
insulation ,inspection cover steel rungs and all required tocomplete the work.
04 RC manhole to suit required location in sitesas shown on drawings 29 No.
STM - ITCCP2 - TD 001 to 016
To Bill Summary SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
29 / 67
REVISED PAGE
Date: MAY 2012
-
7/28/2019 CL05 (MAY 2012)
30/67
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL05)
AMOUNT
SRRATEITEM D E S C R I P T I O N QTY UNIT
DIVISION 15 - MECHANICAL
PLUMBING INSTALLATIONS
WASTE AND DRAINAGE INSTALLATION
Supply, installation and test drainage pipe work UPVC
schedule 40 the work shall include but not limited to fittings,
supports hangers, excavation, backfilling, cast iron pipes on
roof for vent with caps and all materials and equipment
required to complete and finish the work according to
specifiactions, drawings and code of practice
01 32 mm dia 150 M
02 50 mm dia 210 M
03 100 mm dia 490 M
04 150 mm dia 940 M
Accessories
05 Area drain 150mm dia., ref. AD 21 No.
06 Floor drain, 50 mm dia., ref. (FD) 22 No.
07 Parking drain, 150mm dia., ref. PD 57 No.
08 Cleanout, 75 mm dia., ref. (CO) 36 No.
09 Cleanout, 100 mm dia., ref. (CO) 138 No.
To Collection SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
30 / 67
REVISED PAGE
Date: MAY 2012
-
7/28/2019 CL05 (MAY 2012)
31/67
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL05)
AMOUNT
SRRATEITEM D E S C R I P T I O N QTY UNIT
DIVISION 15 - MECHANICAL
PLUMBING INSTALLATIONS
WASTE AND DRAINAGE INSTALLATION
Accessories
01 Floor cleanout 100mm dia., ref. (FCO) 41 No.
02 Floor cleanout 150mm dia., ref. (FCO) 22 No.
03 Gully trap, ref. GT 16 No.
04 Trench drain outlet, 100mm dia., ref. TDO 3 No.
Reinforced concrete gray water tank with required capacityand proprietary medium duty cast iron manhole cover and
frame, including sump pit, submersible pumps, internal
lining, access ladder vent pipework within tank as detailed
on drawing (Concrete work, earthwork & water proofing
measured elsewhere)
05 Gray water tank 10 No
Packaged type variable speed discharge pressure system
Gray water lift pumps, including piping and valves network
within pump chamber, complete with all controllers,
accessories for automatic operation as scheduled on
drawing as per spec. section 15453
06 Gray water lift pumps CAP. 5 KW 5 Set
07 Gray water lift pumps CAP. 6 KW 5 Set
Reinforced concrete sump pit including internal lining,
proprietary galvanized steel manhole cover and frame,
guide bar, lifting chain and all associated works, valves
pipework within sump pit chamber as detailed on drawings
(concrete work & earthwork, waterproofing measured
elsewhere)
08 Sump pit 7 No.
To Collection SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
31 / 67
REVISED PAGE
Date: MAY 2012
-
7/28/2019 CL05 (MAY 2012)
32/67
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL05)
AMOUNT
SRRATEITEM D E S C R I P T I O N QTY UNIT
DIVISION 15 - MECHANICAL
PLUMBING INSTALLATIONS
WASTE AND DRAINAGE INSTALLATION
Submersible pumps (one duty and one stand-by) including
associated valves, pipework, valves controllers and
accessories within sump pit chamber as described on
drawings (sump pit measured separately)
01 Ref. SP1 capacity 1.5 HP 5 Set
02 Ref. SP2 capacity 2 HP 2 Set
Allow for the design, supply and installation of packaged
type waste water treatment plant complete including filter,chemical feeders, air blowers controls, wirings, piping and
all as associated works as per specifications section 02736
and scheduled on drawing
03 Packaged water treatment unit. Cap. 58 m3/day 9 No.
POTABLE WATER INSTALLATION
Supply, installation and test pipework, plypropylene
for potable water the work shall include but not limited
to installation, fittings, insulation for hot pipework,
valves, supports and all materials and equipment
required to complete and finish the work according tospecifications, drawings and code of practice
04 20 mm dia. 835 M
05 25 mm dia. 205 M
06 50 mm dia. 685 M
07 63 mm dia. 165 M
08 100 mm dia. 485 M
To Collection SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
32 / 67
REVISED PAGE
Date: MAY 2012
-
7/28/2019 CL05 (MAY 2012)
33/67
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL05)
AMOUNT
SRRATEITEM D E S C R I P T I O N QTY UNIT
DIVISION 15 - MECHANICAL
PLUMBING INSTALLATIONS
NON-POTABLE WATER INSTALLATION
Supply, installation and test pipework, plypropylene
for non-potable water the work shall include but not limited
to installation, fittings, insulation for hot pipework,
valves, supports and all materials and equipment
required to complete and finish the work according to
specifications, drawings and code of practice
01 50 mm dia. 1585 M
02 63 mm dia. 80 M
03 75 mm dia. 610 M
04 100 mm dia. 505 M
Accessories
05 Water meter assembly 63mm dia., 14 No.
06 Isolating valve, 50 mm dia, ref. (IV) 33 No.
07 Isolating valve, 75 mm dia, ref. (IV) 28 No.
08 Isolating valve, 100 mm dia, ref. (IV) 1 No.
09 IV & CV assembly 100 mm dia., 7 No.
10 Hose bib 20mm dia., ref. (HB) 51 No.
To Collection SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
33 / 67
REVISED PAGE
Date: MAY 2012
-
7/28/2019 CL05 (MAY 2012)
34/67
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL05)
AMOUNT
SRRATEITEM D E S C R I P T I O N QTY UNIT
DIVISION 15 - MECHANICAL
PLUMBING INSTALLATIONS
Packaged type duplex unit discharge pressure system
potable water lift pumps, (one duty & one stand by)
including piping and valves network within pump chamber,
complete with all controllers, accessories for automatic
operation as scheduled on drawing and specification
section 15453
01 Potable water pump CAP. 7.17 KW 6 Set
02 Circulating potable water pump CAP. 0.5 HP 6 Set
Reinforced concrete under ground water tank and pump
room with required capacity and proprietary cast ironmanhole covers and frames, including internal lining
access ladders, pipework submersible pump, ventilating
fans with exhaust and fresh air pipework, valves, vent pipes
and truck fill pipework as detailed on drawings (concrete
work & earthwork, water proofing measured elsewhere)
03 Potable Water tank 6 No.
To Collection SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
34 / 67
REVISED PAGE
Date: MAY 2012
-
7/28/2019 CL05 (MAY 2012)
35/67
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL05)
AMOUNT
SRRATEITEM D E S C R I P T I O N QTY UNIT
DIVISION 15 - MECHANICAL
FIRE WATER UTILITIES
Supply, installation and test Pipework, UPVC class 5
including fittings, trenching, back fill supports system and
all associate works as per code standard
01 25 mm dia. 3155 M
02 32 mm dia. 405 M
03 40 mm dia. 745 M
04 50 mm dia. 405 M
05 100 mm dia. 1725 M
06 150 mm dia. 795 M
07 200 mm dia. 60 M
Accessories
08 Pendent sprinkler head 126 No
09 Upright sprinkler head 1239 No
10 Side wall sprinkler head 14 No
11 100mm Fire departement valve , ref. FDV 31 No
12 Floor control valve assembly 100mm dia., ref. FCVA 3 No
13 Floor control valve assembly 150mm dia., ref. FCVA 7 No
14 Fire department connection, 2 way fire department inlet
connection type with gate and check valve 100mm dia. 2 No
15 Fire department connection, 2 way fire department inlet
connection type with gate and check valve 150mm dia. 3 No
To Collection SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
35 / 67
REVISED PAGE
Date: MAY 2012
-
7/28/2019 CL05 (MAY 2012)
36/67
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL05)
AMOUNT
SRRATEITEM D E S C R I P T I O N QTY UNIT
DIVISION 15 - MECHANICAL
FIRE WATER UTILITIES
Supply, install, testing and commissioning proprietary
integrated fire hose reel and fire extinguisher cabinet the
work shall include but not limited to fire extinguisher, hose
reel nozzle, fixings, isolating valve 40 mm dia., trims and
all associate works and all materials and equipments
required to complete and finish the work according to
drawings, specification and code of practices
01 Ref. FHC 18 No
Supply, install, testing and commissioning portable
multipurpose fire extinguisher the work shall include butnot limited to fixing to wall, all associate works and all
materials and equipments required to complete and finish
the work according to drawings, specification and code of
practices
02 Ref. PFE 3 No
03 Ref. CO2 33 No
CO2 system
Supply, install and test CO2 cylinders including pipe work,
black steel seamless for CO2 fittings, supports valves,
regulators, sleeves, as shown on drawings and as per
specification
04 CO2 cylinders CAP 45 KG 38 No.
05 Control panel 14 No.
06 Remote manual release 14 No.
07 Abort switch 14 No.
08 Alarm bell 14 No.
09 4-port nozzle 14 No.
10 Ioization detector 14 No.
To Collection SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
36 / 67
REVISED PAGE
Date: MAY 2012
-
7/28/2019 CL05 (MAY 2012)
37/67
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL05)
AMOUNT
SRRATEITEM D E S C R I P T I O N QTY UNIT
DIVISION 15 - MECHANICAL
PLUMBING INSTALLATION
DIESEL FUEL STORAGE TANK INSTALLATION
Allow for underground fiberglass diesel fuel storage tank
with required capacity including concrete anti-flotation
pad, heavy duty traffic type manhole ring and cover,
pipework, valves duplex diesel fuel transfer pumps, steel
ladder, pea gravel bed, earthworks, fixings and accessories
all as detailed on drawings
01 Proprietary tank units CAP. 3800 Lit. 3 No.
To Collection SR
Collection
Sheet -29
Sheet -30
Sheet -31
Sheet -32
Sheet -33
Sheet -34
Sheet -35
Sheet -36
Sheet -37
To Bill Summary SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
37 / 67
REVISED PAGE
Date: MAY 2012
-
7/28/2019 CL05 (MAY 2012)
38/67
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL05)
AMOUNT
SRRATEITEM D E S C R I P T I O N QTY UNIT
DIVISION 15B - MECHANICAL
HVAC INSTALLATIONS
CHILLED WATER SYSTEM
Supply, install and test black steel pipework including
fittings thermal insulation, flexible connections and
accessories as per required drawings and specification
sections15050 to 15140 ,15510
01 15 mm dia. 265 M
02 20 mm dia. 70 M
03 25 mm dia. 20 M
04 32 mm dia. 200 M
05 100 mm dia. 810 M
06 150 mm dia. 505 M
07 200 mm dia. 270 M
08 250 mm dia. 120 M
09 350 mm dia. 55 M
10 400 mm dia. 465 M
11 450 mm dia. 15 M
To Collection SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
38 / 67
REVISED PAGE
Date: MAY 2012
-
7/28/2019 CL05 (MAY 2012)
39/67
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL05)
AMOUNT
SRRATEITEM D E S C R I P T I O N QTY UNIT
DIVISION 15B - MECHANICAL
HVAC INSTALLATIONS
CHILLED WATER SYSTEM
Supply and install valve / BTU meter
Butterfly valve
01 Ref. MBFV 400 mm dia., 1 No.
Isolating valve
02 32mm dia., 34 No.
Check valve
03 32mm dia., 17 No.
BTU meter
04 32mm dia., 17 No.
Supply and install heat exchanger including valves and
short length piping as detailed on drawings and as per
specifications
05 Ref. HEX-01 to 05, 1960 KW capacity 5 No.
Supply, install, test and commission, variable speed chilled
water centrifugal inline pumps unit including valves, flexible
connections, Y-striners, mounting and fixing to pads
(measured separately) as detailed on drawing and
specifications
06 Ref. CWP-01 to 05, 52.0 L/S capacity 45 m TDH 5 No.
To Collection SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
39 / 67
REVISED PAGE
Date: MAY 2012
-
7/28/2019 CL05 (MAY 2012)
40/67
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL05)
AMOUNT
SRRATEITEM D E S C R I P T I O N QTY UNIT
DIVISION 15B - MECHANICAL
HVAC INSTALLATIONS
CHILLED WATER SYSTEM
Supply, install and commission, expansion tank as detailed
on drawings and specifications
01 Ref. ET, 1200 liter capacity 1 No.
Supply, install and commission, air separator tank as
detailed on drawings and specifications
02 Ref. AS 1 No.
Supply, install, test and commission, Fan coil units ducted
type including control valves, pressure & temperature,
gauge, Y-strainer mounting and fixing as per drawings and
specifications section 15781
03 Ref. FCU-02, 17.1 KW cooling capacity 2 No.
04 Ref. FCU-03, 3.1 KW cooling capacity 13 No.
05 Ref. FCU-04, 4.3 KW cooling capacity 13 No.
06 Ref. FCU-05, 5.3 KW cooling capacity 4 No.
Supply, install, test and commission DX-ducted split unit
including control, pipes and fixing as per drawing and
specifications
07 Ref. RAC-01, 3.51 KW nominal coollling capacity 51 No.
Supply, install, test and commission, DX-ducted split unit
including control, pipes and fixing as per drawings and
specifications section 15781
08 Ref. FCU-01/ACCU-01 , 4 KW capacity 3 No.
Supply, install, test and commission automatic chemical
dosing unit as detailed on drawings and specifications
09 Ref. ACDU 1 No.
To Collection SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
40 / 67
REVISED PAGE
Date: MAY 2012
-
7/28/2019 CL05 (MAY 2012)
41/67
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL05)
AMOUNT
SRRATEITEM D E S C R I P T I O N QTY UNIT
DIVISION 15B - MECHANICAL
HVAC INSTALLATIONS
Supply, install, test and commission, Ventilating fans as
details on drawings and specifications, section 15860
01 Ref. PEF- 01, 13500/22500 LPS capacity with exh. Duct and 6 No.
CAP.
02 Ref. EF- 01, 85 LPS capacity 3 No.
03 Ref. EF- 02, 60 LPS capacity 3 No.
04 Ref. EF- 03, 1600 LPS capacity 3 No.
05 Ref. EF- 04, 160 LPS capacity 3 No.
06 Ref. EF- 05, 105 LPS capacity 3 No.
07 Ref. EF- 06, 50 LPS capacity 18 No.
08 Ref. BIF-01, 3600 LPS capacity 24 No.
Supply, install, test and commission, Supply air round
ceiling diffusers with opposed blade volume damper
including frame trims & insulated plenum box as detailedon drawing and specification, section 15860
09 Ref. SD1 26 No.
10 Ref. SD2 28 No.
11 Ref. SD3 616 No.
To Collection SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
41 / 67
REVISED PAGE
Date: MAY 2012
-
7/28/2019 CL05 (MAY 2012)
42/67
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL05)
AMOUNT
SRRATEITEM D E S C R I P T I O N QTY UNIT
DIVISION 15B - MECHANICAL
HVAC INSTALLATIONS
Supply, install, test and commission, supply air register as
detailed on drawings and specification
01 Ref. SR 1 / RR1 8 No.
Supply, install, test and commission, Return round louver
face ceiling diffusers as detailed on drawing and
specification
02 Ref. RD1 26 No.
03 Ref. RD2 28 No.
04 Ref. RD3 6 No.
Supply, install, test and commission, door grill as detalied
and specificaitons
05 Ref. DG1 18 No.
06 Ref. DG3 2 No.
Supply, install and test motorized door louver as detailedon drawing and specification
7 No.07 size 950 x 2200 mm
Supply and install Galvanized steel sheet rectangular
ductwork, including supports and volume damper , and bill
mouth opening as per drawings and specification
08 Various gauges 985 Kg
Supply and install Duct insulation
09 Thermal semi-rigid insulation to rectangular ductwork 250 M
Supply, install and test generator exhaust ductwork with
canvass connection
10 To suit generator room 3 No.
To Collection SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
42 / 67
REVISED PAGE
Date: MAY 2012
-
7/28/2019 CL05 (MAY 2012)
43/67
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL05)
AMOUNT
SRRATEITEM D E S C R I P T I O N QTY UNIT
DIVISION 15B - MECHANICAL
HVAC INSTALLATIONS
Supply, install, test and commission, of electric works and
motor control centers MCC C/W weather proof, magnetic
starters, cabinets including power cables, wiring and
conduits and cable trays from the MCC to HVAC equipment,
interlocks, earthing ...etc, all materials and equipments
required to complete and finish the work according to
drawings, specifications and code of practices
01 Ref. MCC- CWP 1 No.
To Collection SR
Collection
Sheet - 38
Sheet - 39
Sheet - 40
Sheet - 41
Sheet - 42
Sheet - 43
To Bill Summary SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
43 / 67
REVISED PAGE
Date: MAY 2012
-
7/28/2019 CL05 (MAY 2012)
44/67
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL05)
AMOUNT
SRRATEITEM D E S C R I P T I O N QTY UNIT
DIVISION 16 - ELECTRICAL
MEDIUM VOLTAGE INSTALLATION
MVSWGR (medium voltage switchgear)
Supply , install , testing and commissioning 13.8 KV, 3 phase,
60 Hz,SF6 MVSWGR with 3 cells (1 inputs +2 outputs)
including all associated works to complete installation as per
drawings and specifications. The contractor shall prepare
sketches and details for approval from SEC and shall make
arrangement and required coordination with supervising
engineer to complete the work
01 M.V Switchgear unit ref (MVSWGR/CL-5) 1 No
RING MAIN UNIT
Only installation, testing and commissioning for 13.8 KV, 3
phase, 60 Hz SF6 ring main unit including all associated
works for complete installation as per drawings and
specifications and required coordination (supply will be by
client)
02 Ring main unit RMU1,2,3.4 4 No
MEDIUM AND LOW VOLTAGE DISTRIBUTION
Supply installation, testing and commissioning of the
following equipment including all accessories and
necessary works required for installation as shown on the
drawings E-701,E201 and as described in specifications
section 16461,16124and and by making arrangiement with
supervising engineer to achieve the work to the best
possible and specifications
03 Dry type transformers , 1000 KVA, 13.8 KV ,400/230V , 3PH, 3 No.60HZ, ref (TR 1,2,4-CL5)
04 Dry type transformers, 1600 KVA, 13.8 KV ,400/230V , 3PH, 60HZ, 1 No.ref (TR 3-CL5)
To Collection SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
44 / 67
REVISED PAGE
Date: MAY 2012
-
7/28/2019 CL05 (MAY 2012)
45/67
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL05)
AMOUNT
SRRATEITEM D E S C R I P T I O N QTY UNIT
DIVISION 16 - ELECTRICAL
MEDIUM VOLTAGE INSTALLATION
Supply , install and test medium voltage copper Cables 15KV/
XLPE/STA/PVC, between medium voltage equipments as
shown on drawings and coordination with other disciplines
shall be conducted during work execution as per technical
specifications, drawings and by making arrangement with
supervising engineer to achieve the work to the best possible
and specifications
01 Medium voltage cable comprising 3 core 70 mm CU / XLPE /STA/ 20 M
PVC, cables route from RMU up to transformers
02 Medium voltage cable comprising 3 core 300 mm CU / XLPE /STA/ 485 M
PVC, cables
Smart Metering System
Supply, installation , testing and commissioning of Smart
Metering System comprising of M-bus master controller
complete with soft ware and bus IP router, including digital
electrical KWH meters, 1 pair twisted cable # 22 AWG type
to TCP/IP net work and all associated works required as
shown on drawing E-501--E520 and as described inspecifications section 16211
To suit Building Smart Metering System with multi -electronic
meter (MEM) and main bus and IP router as required to form a Note
complete and fully operative system to link all project buildings
with the existing data center at phase 1
03 Electronic KWH meters 17 No
04 M-bus master controller complete with software 17 No
05 M-bus IP router 17 No
To Collection SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
45 / 67
REVISED PAGE
Date: MAY 2012
-
7/28/2019 CL05 (MAY 2012)
46/67
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL05)
AMOUNT
SRRATEITEM D E S C R I P T I O N QTY UNIT
DIVISION 16 - ELECTRICAL
MAIN AND SUB-MAIN POWER
Supply and install an Emergency Power Generating Sets
including Generator Control Panel (GCP). In addition to
circuit breakers, pads, supports, controls and daily diesel
fuel storage tank, including all necessary equipment,
accessories and associated works, as shown on drawings
E-701,E201 as described in specifications section 16231,
and by making arrangiement with supervising engineer to
achieve the work to the best possible and specifications
01 Ref. (G1,G3) 550 KVA, 3 phase 4 wire ,400/230V , 60 Hz. 2 No.
02 Ref. (G2) 600 KVA, 3 phase 4 wire ,400/230V , 60 Hz. 1 No.
supply , install, testing and commissioning multicore copper
cable ( XLPE/PVC -1000/600V) in cable tray or cable trench
(measured elsewhere) including junction boxes, connection
for feeders and various power loads as shown on drawings
E-701 and as per specification section 16126 and by makingarrangement with supervising engineer to achieve the workto the best possible specifications
03 (4 C-10 mm ) + 10 mm G/ cable tray 115 M
04 (4 C-16 mm ) + 16 mm G /cable trench 20 M
05 (4 C-25 mm ) + 16 mm G/ cable tray 345 M
06 4 C-35 mm + 16mm G/ cable tray 200 M
07 4 C-50 mm + 25mm G/ cable tray&cable trench 665 M
08 4 C-70 mm + 35mm G/ cable tray 60 M
09 4 C-95 mm + 50mm G/ cable tray&cable trench 265 M
10 4 C-185 mm + 95 mm G/ cable tray&cable trench320
M
11 4 C-240 mm + 120 mm G/ cable tray&cable trench 785 M
12 2(4C-150mm2) + 150 mm G/ cable tray 875 M
13 2(4C-240mm2)/ cable trench 15 M
To Collection SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
46 / 67
REVISED PAGE
Date: MAY 2012
-
7/28/2019 CL05 (MAY 2012)
47/67
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL05)
AMOUNT
SRRATEITEM D E S C R I P T I O N QTY UNIT
DIVISION 16 - ELECTRICAL
supply , install, testing and commissioning multicore coppercable ( XLPE/PVC -1000/600V) in cable tray or cable trench
(measured elsewhere) including junction boxes, connection
for feeders and various power loads as shown on drawings
E-701 and as per specification section 16126 and by makingarrangement with supervising engineer to achieve the workto the best possible specifications
01 3(4X1C-630mm2)/ cable trench 35 MThe length of cables including the cluster-5 cables and cables in Notethe first floor for AP03 & AP04 & AP06 according to No. for each
AP in site
Supply , install , power distribution heavy duty galvanizedsteel cable trays with cover including fixings, supports and all
accessories as shown on drawingsE201--E220 and
coordination & integration with other systems shall be
conducted during work execution as per technical
specifications section 16050 and by making arrangement with
supervising engineer to achieve the work to the best possible
specifications
02 Cable tray 200 mm width 152 M
03 Cable tray 200 mm width for emergency cables 540 M
04 Cable tray 300 mm width 222 M
05 Cable tray 400 mm width 263 M
05 Cable tray 400 mm width for emergency cables 50 M
06 Cable tray 400 mm width double layers 50 M
07 Cable tray 600 mm width 29 M
08 Cable tray 600 mm width double layers 25 M
09 Cable tray 800 mm width 30 M
10 Cable tray 1000 mm width 37 M
11 Covered cable tray 300 mm width for optical fiber cables and 1955 M
primary and secondary networks.
To Collection SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
47 / 67
REVISED PAGE
Date: MAY 2012
-
7/28/2019 CL05 (MAY 2012)
48/67
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL05)
AMOUNT
SRRATEITEM D E S C R I P T I O N QTY UNIT
DIVISION 16 - ELECTRICAL
MAIN AND SUB-MAIN POWER
supply and install reinforced concrete Man / Holes connected
via duct banks, complete with man / hand hole bolted type
metal cover, drain pipe outlet, including trenching and
backfilling for duct banks, conduits for M.V cables in duct
banks, tapes, all as required to suit locations as shown on
drawings drawings E201--E220and as all accessories and
coordination & integration with other systems shall be
conducted during work execution as per technical
specificationssection 16180 and by making arrangement with
supervising engineer to achieve the work to the best
possible specifications
01 Power Man Holes (180018001800 )Ref. MH for power including 4 No
UPVC conduit
02 Power Hand Hole (900900900 ) Ref. HH including UPVC conduit 7 No
03 Comm, Hand Hole (600600600 ) Ref. CHH including UPVC conduit 5 No
Site work
04 Power Man Hole Ref. PHH for power including UPVC conduit 4 No
05 Power Hand Hole (900900900 ) Ref. HH including UPVC conduit 3 No
To Collection SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
48 / 67
REVISED PAGE
Date: MAY 2012
-
7/28/2019 CL05 (MAY 2012)
49/67
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL05)
AMOUNT
SRRATEITEM D E S C R I P T I O N QTY UNIT
DIVISION 16 - ELECTRICAL
MAIN AND SUB-MAIN POWER
Supply , install , testing and commissioning of panel boards
including grounding, circuit breakers, grounding, fixings,
markers and , other functional units and all associated works
as required and shown on drawings E 701,E704 , E201--E220
and coordination & integration with other systems shall be
conducted during work execution as per technical
specificationssection 16442,16410,16415 and by makingarrangement with supervising engineer to achieve the workto the best possible specifications
01 Ref. MDP-P1 1 No.
02 Ref. MDP-P2 1 No.
03 Ref. MDP-P3 1 No.
04 Ref. MDP-P4 1 No.
05 Ref. EMDP-P1 1 No.
06 Ref. EMDP-P2 1 No.
07 Ref. EMDP-P3 1 No.
08 Ref. DP31 12 No.
09 Ref. DP32 12 No.
10 Ref. DP41 2 No.
11 Ref. DP42 2 No.
12 Ref. DP61 3 No.
13 Ref. DP62 3 No.
14Ref. DPSB1
1 No.
15 Ref. DPSB2 1 No.
16 Ref. EDPS3 12 No.
To Collection SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
49 / 67
REVISED PAGE
Date: MAY 2012
-
7/28/2019 CL05 (MAY 2012)
50/67
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL05)
AMOUNT
SRRATEITEM D E S C R I P T I O N QTY UNIT
DIVISION 16 - ELECTRICAL
MAIN AND SUB-MAIN POWER
Supply , install , testing and commissioning of panel boards
including grounding, circuit breakers, grounding, fixings,
markers and , other functional units and all associated works
as required and shown on drawings E 701,E704 , E201--E220
and coordination & integration with other systems shall be
conducted during work execution as per technical
specificationssection 16442,16410,16415 and by makingarrangement with supervising engineer to achieve the workto the best possible specifications
01 Ref. EDPSB1 1 No.
02 Ref. EDPSB2 with interlock and ATS built in 1 No.
03 Ref. EPMSB1A 1 No.
04 Ref. EPMSB2B 1 No.
05 Ref. EPMSB2A with interlock and ATS built in 1 No.
06 Ref. EPMSB2B 1 No.
07 Ref. EDPSB3A 1 No.
09 Ref. EPSB1 1 No.
10 Ref. EPSB2 1 No.
11 Ref. EPSC 12 No.
12 Ref. EPSC1 2 No.
13 Ref. EPSE 3 No.
14 Ref. PPSB1 1 No.
15Ref. PPSB2
1 No.
16 Ref. PPSC 12 No.
17 Ref. PPSC1 2 No.
To Collection SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
50 / 67
REVISED PAGE
Date: MAY 2012
-
7/28/2019 CL05 (MAY 2012)
51/67
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL05)
AMOUNT
SRRATEITEM D E S C R I P T I O N QTY UNIT
DIVISION 16 - ELECTRICAL
MAIN AND SUB-MAIN POWER
Supply , install , testing and commissioning of panel
boards including grounding, circuit breakers, grounding,
fixings, markers and , other functional units and all
associated works as required and shown on drawings E
701,E704 , E201--E220 and coordination & integration with
other systems shall be conducted during work execution as
per technical specificationssection 16442,16410,16415 andby making arrangement with supervising engineer toachieve the work to the best possible specifications
01 Ref. PPSE 3 No.
02 Ref. SLP1A 1 No.
03 Ref. SLPE 6 No.
Pump room
04 Ref. EPP (IP 54 ) 1 No.
To Collection SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
51 / 67
REVISED PAGE
Date: MAY 2012
-
7/28/2019 CL05 (MAY 2012)
52/67
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL05)
AMOUNT
SRRATEITEM D E S C R I P T I O N QTY UNIT
DIVISION 16 - ELECTRICAL
POWER INSTALLATION
The contractor is to insure that all power outlets mounted in Notewet areas and all service outlets for kitchens, bathrooms,laundry and water heaters are to be protected by centralground fault circuit interrupter (GFCI)
Supply , install, testing and commissioning of power and
sockets accessories including all necessary boxes,
faces(according to the engineer approvement ) comprising
cables, conduits, fittings, connections, from the outlets to
Panelboards feeder associated works as required to suit the
locations shown on drawings E201--E220 Coordination with
other disciplines shall be conducted during work executionas per technical specifications, section 16050and by making
arrangiement with supervising engineer to achieve the work
to the best possible specifications
01 Junction box ceiling mounted 34 No.
02 Junction box, wall mounted 77 No.
03 Disconnect switch,non-fused and with pilot light16A, 1P, 230V 14 No.,weatherproof for waste collection equipment
04 Above false ceiling disconnect 20A, 1P, 230V for FCU-03.04,05 33 No.
05 Disconnect switch,non-fusedand with pilot light 20A, 1P, 230V 10 No.,weatherproof for SP-01,02,03,04,05,06&fuel pumps
06 Disconnect switch,non-fused and with pilot light 20A, 1P, 230V 57 No.
for BD3,4,6&FDB1,2,FD3G,FD4G,FD6G&FACP&A/P switcher
07 Disconnect switch, fused and with pilot light 20A, 1P, 230V 54 No., for RAC& RAC-01&FCU-02
08 Disconnect switch, non-fused and with pilot light 20A, 3P, 380V 16 No.,weatherproof for gray& potabole pumps
09 Above false ceiling disconnect 20A, 3P, 400V for BIF-01 24 No.
To Collection SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
52 / 67
REVISED PAGE
Date: MAY 2012
-
7/28/2019 CL05 (MAY 2012)
53/67
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL05)
AMOUNT
SRRATEITEM D E S C R I P T I O N QTY UNIT
DIVISION 16 - ELECTRICAL
POWER INSTALLATION
Supply , install, testing and commissioning of power and
sockets accessories including all necessary boxes,
faces(according to the engineer approvement ) comprising
cables, conduits, fittings, connections, from the outlets to
Panelboards feeder associated works as required to suit the
locations shown on drawings E201--E220 Coordination with
other disciplines shall be conducted during work execution
as per technical specifications, section 16050and by making
arrangiement with supervising engineer to achieve the work
to the best possible specifications
01 Disconnect switch, fused and with pilot light ,32A, 1P, 230V 4 No.
for FCU-01
02 Disconnect switch, non-fused and with pilot light ,50A, 3P,400V 6 No.
for PEF-01
03 Disconnect switch, non-fused and with pilot light ,500A, 3P,400V 1 No.
weatherproof for jocky pump, MCC-CWP
04 Circuit breaker 200A for fire alarm panel (magnetic trip only) 1 No.
05 Motor switch with built -in over load protection (tumbler switch) 32 No
06 For exhust fan outlet 34 No.
07 Single socket outlet, 10A, 230V, grounding type 256 No
08 Single socket outlet, 13A, 230V, grounding type, weatherproof 102 No
09 Single socket outlet, 16A, 230V, grounding type, EF 34 No
10 Single socket outlet, 16A, 230V, grounding type, EF 34 No
11 Duplex socket outlet, 16A, 230V, grounding type 8 No
To Collection SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
53 / 67
REVISED PAGE
Date: MAY 2012
-
7/28/2019 CL05 (MAY 2012)
54/67
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL05)
AMOUNT
SRRATEITEM D E S C R I P T I O N QTY UNIT
DIVISION 16 - ELECTRICAL
POWER INSTALLATION
Supply , install, testing and commissioning of power and
sockets accessories including all necessary boxes,
faces(according to the engineer approvement ) comprising
cables, conduits, fittings, connections, from the outlets to
Panelboards feeder associated works as required to suit the
locations shown on drawings E201--E220 Coordination with
other disciplines shall be conducted during work execution
as per technical specifications, section 16050and by making
arrangiement with supervising engineer to achieve the work
to the best possible specifications
01 Single pole one-way ,one gang switch (13A) 108 No.
02 Single pole one-way ,two gang switch (13A) 20 No.
03 Push button switch 55 No.
Site work
04 Junction box ,floor mounted for site 2 No.
Pump rooms
05 Junction box ceiling mounted 1 No.
06 Disconnect switch, non-fused and with pilot light 20A, 1P,230V 1 No.
weatherproof for sub. pump
07 Disconnect switch, non-fused ,200A, 3P,400V, weatherproof for 1 No.
fire& jockey pump,
08Motor switch with built-in over load protection (tumbler switch), 1 No
weatherproof
09 Single socket outlet, 13A, 230V, grounding type, weatherproof 1 No
10 Single pole one-way ,one gang switch (13A), weatherproof 1 No.
To Collection SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
54 / 67
REVISED PAGE
Date: MAY 2012
-
7/28/2019 CL05 (MAY 2012)
55/67
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL05)
AMOUNT
SRRATEITEM D E S C R I P T I O N QTY UNIT
DIVISION 16 - ELECTRICAL
LIGHTING INSTALLATION
Supply, install , testing and commissioning of lighting
fixture outlets and including conduits, wires and all boxes
belong to Lighting Panelboards and associated works as
required to suit the locations shown on drawings E101--E120
.Coordination with other disciplines shall be conducted
during work execution as per technical specifications,
section 16050 and by making arrangiement with supervising
engineer to achieve the work to the best possible
specifications
01 Lighting fixer outlet 1588 No.
Pump room
02 Lighting fixer outlet 4 No.
To Collection SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
55 / 67
REVISED PAGE
Date: MAY 2012
-
7/28/2019 CL05 (MAY 2012)
56/67
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL05)
AMOUNT
SRRATEITEM D E S C R I P T I O N QTY UNIT
DIVISION 16 - ELECTRICAL
LIGHTING INSTALLATION
Supply ,install, testing and commissioning of lighting
fixture (furnishe with lamp and electronic blast, accessories
and internal wires) mounting accessories.(according to the
engineer approval ) associated works as required to suit the
locations shown on drawings E101--E120 ,GE-E01,GE-E01 and
Coordination with other disciplines shall be conducted
during work execution as per technical specifications,
section 16500 and by making arrangiement with supervising
engineer to achieve the work to the best possible
specifications
01 Type EX ( wall mounted, single sided) 71 No.
02 Type EX ( ceiling mounted, single sided) 47 No.
03 Type F1 522 No.
04 Type F1E 142 No.
05 Type F2 308 No.
06 Type F2E 96 No.
07 Type F7E 130 No.
08 Type F8E 112 No.
09 Type NE 20 No.
10 Type WL3 55 No.
11 Type WL4 8 No.
12 Type WL4E 41 No.
13 Type FT1 flixible tube LED cove light 998 M.
Pump room
14 Type F1E 4 No.
To Collection SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
56 / 67
REVISED PAGE
Date: MAY 2012
-
7/28/2019 CL05 (MAY 2012)
57/67
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL05)
AMOUNT
SRRATEITEM D E S C R I P T I O N QTY UNIT
DIVISION 16 - ELECTRICAL
GROUNDING SYSTEM
Supply, installation , test and commissioning of a grounding
system comprising bare copper conductor to bond the
building's distribution boards and HVAC equipments to the
main ear thing grid of the building. Including necessary
earthwork, buried galvanized steel foundations strips
surrounding the building phosphor bronze test joints &
triangular counter poise and all associated works to suit
grounding resistivity required as shown on drawings
E301--E310 and as described in specifications16452,16453
by making arrangiement with supervising engineer to
achieve the work to the best possible specifications
01 Complete building grounding system network to suit ground 1 Item
resistivity as shown on drawings and specification
02 To suit grounding system for low current system equipment as 1 Item
shown on drawings and specification
03 To suit grounding system for Pump room as shown on drawings 1 Item
and specification
To Collection SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
57 / 67
REVISED PAGE
Date: MAY 2012
-
7/28/2019 CL05 (MAY 2012)
58/67
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL05)
AMOUNT
SRRATEITEM D E S C R I P T I O N QTY UNIT
DIVISION 16 - ELECTRICAL
TELECOMMUNICATION SYSTEM
Supply, installation, testing and commissioning of
telecommunication system commporising of server,
Building distributor with core switch,floor distribution,
data/telephone outlets including cable / wires and conduits
as shown on drawings E- 501--E520 ,E801and as described
in specification section 16715,16720 and by making
arrangiement with supervising engineer to achieve the
work to the best possible specifications
To suit system network equipped with:
01 Building distributor ,ref ( BD3,BD4,BD6) contains main optical 3 No
data patch panel (F.O.P.P)
02 Floor distribution includes( fiber optical patch panel F.O.P.P ,
data switch CAT6 a 1 36 RJ 45 ports and UTP P.P CAT6 a 1
36 ports and blank ),ref FDB1 with UPS 1.5 KVA and 1 No
connected with power supply
03 Floor distribution includes( fiber optical patch panel F.O.P.P ,
data switch CAT6 a 1 48 RJ 45 ports and UTP P.P CAT6 a 1 No.
1248 ports and blank ),ref FDB2 with and connected with
power supply
04 Floor distribution includes( fiber optical patch panel F.O.P.P , 17
data switch CAT6 a 1 24 RJ 45 ports and UTP P.P CAT6 a 2 No.
24 ports and blank ),ref FD3G,FD4G ,FD6G with and
connected with power supply
05 Wall mounted telecommunication outlet 1 port (1data ) , ref. (T0) 27 No.
06 Ceiling mounted telecommunication outlet 1 port (1data ) , 77 No.
ref. (T0)
07 Wall mounted telecommunication outlet 1 port for intercome 17 No.
system
08 Wall mounted telecommunication outlet 1 port (1 Tel ) 38 No.
at 1500 mm A.F.F.L , ref. (T01)
To Collection SR
Project No. J10-13300
ZUHAIR FAYEZ PARTNERSHIP
58 / 67
REVISED PAGE
Date: MAY 2012
-
7/28/2019 CL05 (MAY 2012)
59/67
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR PARKING CLUSTERS (CL05)
AMOUNT
SRRATE