Dear Resident SITE INVESTIGATION NIGHT WORKS: TUESDAY 15 MARCH UNTIL FRIDAY 18 MARCH 2016 We are writing to inform you about service location and property boundary survey works that will shortly take place as part of the Webb Dock Access improvements project. As you may be aware, Transurban and the Victorian Government are working together to develop and deliver the $5.5 billion Western Distributor Project, which is now in the planning and development stage. Preliminary work on Webb Dock Access improvements are beginning as the first component of the Western Distributor Project to get underway, with works being undertaken and delivered in conjunction with the CityLink Tulla Widening project, which involves adding lanes and other measures to improve the flow of traffic across the 24 kilometre section of freeway from the CityLink tunnels to Melbourne Airport. Webb Dock Access improvements will include the following works: An upgrade and signal improvements to the Cook Street/Salmon Street intersection and; A new lane from Cook Street to Bolte Bridge ramp, providing direct access to freight heading north A longer and wider exit ramp providing more capacity to enable ramp metering A new ramp being built with a gentler curve to reduce the risk of truck roll overs The works will be undertaken by CPB Contractors – Transurban’s construction contractor on the CityLink Tulla Widening project. What we are doing

Upload: doanhanh

Post on 30-Jan-2018

225 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: citylinktullawidening.vic.gov.aucitylinktullawidening.vic.gov.au/__data/assets/...  · Web viewUsing a small excavator and drill to collect soil samples. Recording the location of

Dear Resident

SITE INVESTIGATION NIGHT WORKS: TUESDAY 15 MARCH UNTIL FRIDAY 18 MARCH 2016

We are writing to inform you about service location and property boundary survey works that will shortly take place as part of the Webb Dock Access improvements project.

As you may be aware, Transurban and the Victorian Government are working together to develop and deliver the $5.5 billion Western Distributor Project, which is now in the planning and development stage.

Preliminary work on Webb Dock Access improvements are beginning as the first component of the Western Distributor Project to get underway, with works being undertaken and delivered in conjunction with the CityLink Tulla Widening project, which involves adding lanes and other measures to improve the flow of traffic across the 24 kilometre section of freeway from the CityLink tunnels to Melbourne Airport.

Webb Dock Access improvements will include the following works:

An upgrade and signal improvements to the Cook Street/Salmon Street intersection and; A new lane from Cook Street to Bolte Bridge ramp, providing direct access to freight heading

north A longer and wider exit ramp providing more capacity to enable ramp metering A new ramp being built with a gentler curve to reduce the risk of truck roll overs

The works will be undertaken by CPB Contractors – Transurban’s construction contractor on the CityLink Tulla Widening project. What we are doingWe will be confirming property boundaries, collecting information about ground conditions and locating underground services in the area. This will involve:

Using a specialised vacuum truck (non-destructive digging truck) to safely uncover underground pipes and services

Using a small excavator and drill to collect soil samples Recording the location of services Backfilling and reinstating our work areas.

Where we will beCook Street Tuesday 15 March until Friday 18 March 2016 as indicated in red on the map below.

Page 2: citylinktullawidening.vic.gov.aucitylinktullawidening.vic.gov.au/__data/assets/...  · Web viewUsing a small excavator and drill to collect soil samples. Recording the location of

When works will occurFrom 7pm to 6am Tuesday 15 March until Friday 18 March 2016.

What to expect Traffic management to safely guide motorists through lane closures A small team of construction personnel at work Noise from the non-destructive digging truck, small excavator, and site vehicles when in

use These works will not impact your services or access to your property.

We are committed to keeping residents and businesses informed and minimising the inconvenience during construction, while keeping the community and our workers safe at all times. Managing and protecting the environment is also important to us and we are working with local and state government adhering to environmental laws to ensure the impact to the natural ecosystem is minimised.

This work may be rescheduled in the event of unsuitable weather or other unavoidable circumstances.

If you have any questions or concerns regarding this notification, please phone 1300 783 947 and select 1 or email us at [email protected]

131 450

Yours sincerely,

Community Relations TeamCPB ContractorsCityLink Tulla Widening: Bulla Road to Power Street