Dear Resident CITYLINK TULLA WIDENING: TEMPORARY REMOVAL OF NOISE WALL ON CITYLINK NEAR BENT STREET, NORTH MELBOURNE, AUGUST – SEPTEMBER 2016 We are writing to inform you about temporary changes to a section of existing noise wall on CityLink near Bent Street, as part of the CityLink Tulla Widening project. We will need to remove a section of the existing noise wall, as shown in red on the map below, to undertake road works on CityLink in the safest construction environment possible. A new higher permanent noise wall will be built as soon as the existing noise wall has been removed. The new noise wall will be completed by September 2016. We thank you for your patience and understanding while we complete these important works. Where we will be We will be working on the section of CityLink near Bent Street as shown in red on the map below.

Upload: phamphuc

Post on 12-Feb-2018

218 views

Category:

Documents


2 download

TRANSCRIPT

Dear Resident

CITYLINK TULLA WIDENING: TEMPORARY REMOVAL OF NOISE WALL ON CITYLINK NEAR BENT STREET, NORTH MELBOURNE, AUGUST – SEPTEMBER 2016We are writing to inform you about temporary changes to a section of existing noise wall on CityLink near Bent Street, as part of the CityLink Tulla Widening project. We will need to remove a section of the existing noise wall, as shown in red on the map below, to undertake road works on CityLink in the safest construction environment possible.

A new higher permanent noise wall will be built as soon as the existing noise wall has been removed. The new noise wall will be completed by September 2016.

We thank you for your patience and understanding while we complete these important works.

Where we will beWe will be working on the section of CityLink near Bent Street as shown in red on the map below.

When works will occurWorks to remove the existing noise wall are scheduled to begin Monday 1 August. Construction of the new noise wall will occur once the existing noise wall has been removed, during night time

Bent Street

CityLink

construction hours of 10pm to 4am Sunday to Thursday. These works are expected to be completed by September 2016.

What we are doing Closing lanes on CityLink Removing the existing noise wall using cranes Installing new steel noise wall supports panels onto existing concrete barriers

What you may notice during constructionWhile these works will not impact your property you may notice: Lane closures and traffic management on the freeway Noise from heavy equipment when in use, such as cranes, trucks and site vehicles An increase in traffic noise from CityLink while the new noise wall is being installed Construction personnel working in the area

About the projectAs you may be aware, work on the CityLink Tulla Widening project is underway and involves adding lanes and other measures to improve the flow of traffic across the 24 kilometre section of freeway from the CityLink tunnels to Melbourne Airport. The project will also provide travel time savings per trip between Melbourne Airport and the West Gate Freeway during peak periods.

The project will deliver a safer, more reliable freeway. Generally, an additional lane is being added in each direction, as well as upgrades at key interchanges including Bell Street, Mount Alexander Road/Flemington Road and on the Bolte Bridge to West Gate Freeway entry ramp.

CPB Contractors is the construction contractor for the Bulla Road to Power Street section of the project.

We are committed to keeping residents informed and minimising the inconvenience during construction, while keeping the community and our workers safe at all times. Managing and protecting the environment is also important to us and we are working with local and state government adhering to environmental laws to ensure any impact to the natural ecosystem is minimised.

If you have any questions or concerns regarding this notification, please phone 1300 783 947 and select 1 or email us at [email protected]

Yours sincerely,

Community Relations TeamCPB ContractorsCityLink Tulla Widening: Bulla Road to Power Street