cityarchriver2015 - january 25, 2012 report to the community
TRANSCRIPT
-
8/3/2019 CityArchRiver2015 - January 25, 2012 Report to the Community
1/90
CityArchRiverTERPIECEFRAMING A MODERN MAS 2015
-
8/3/2019 CityArchRiver2015 - January 25, 2012 Report to the Community
2/90
Todays National Parks serve more
purposes and provide greater benefits
than when first envisioned over a
century ago.
Yet they also face threats to their
survival not imagined in the beginning,
and change must be undertaken toensure their relevance in the 21st
century.
The NPS leadership has developed
a Call to Action Plan that expands
the role of the NPS beyond traditionalboundaries and actively engaging
communities. JON JARVIS, DIRECTORNATIONAL PARK SERVICE
CHANGES WITHIN NPS THAT SUPPORT THIS PROJECT
-
8/3/2019 CityArchRiver2015 - January 25, 2012 Report to the Community
3/90
CHANGES WITHIN NPS BECAUSE OF THIS PROJECT
As part of this call to action, the
Designing the Parks program will
be collaborating with Washington
University to develop a podcast in 2012
about the Jefferson National Expansion
Memorial/ CAR 2015 project
Exploring topic of strategic outreachacross the park sites, their adjacent
communities, and a new generation of
potential national park users
-
8/3/2019 CityArchRiver2015 - January 25, 2012 Report to the Community
4/90
NPS VALUE ANALYSIS WORKSHOP
-
8/3/2019 CityArchRiver2015 - January 25, 2012 Report to the Community
5/90
A COLLABORATIVE EFFORT TO SOLVE TRANSPORTATION
-
8/3/2019 CityArchRiver2015 - January 25, 2012 Report to the Community
6/90
-
8/3/2019 CityArchRiver2015 - January 25, 2012 Report to the Community
7/90
-
8/3/2019 CityArchRiver2015 - January 25, 2012 Report to the Community
8/90
THE BOUNDLESSNESS OF THE ARCH EXPERIENCE
-
8/3/2019 CityArchRiver2015 - January 25, 2012 Report to the Community
9/90
PHYSICAL AND PSYCHOLOGICAL BARRIERS
-
8/3/2019 CityArchRiver2015 - January 25, 2012 Report to the Community
10/90
MISSED OPPORTUNITIES
-
8/3/2019 CityArchRiver2015 - January 25, 2012 Report to the Community
11/90
ASPIRATIONS FOR REGIONAL CONNECTIVITY
-
8/3/2019 CityArchRiver2015 - January 25, 2012 Report to the Community
12/90
PLANNING PROCESS WITHIN A UNIQUE PUBLICPRIVATE PARTNERSHIP
-
8/3/2019 CityArchRiver2015 - January 25, 2012 Report to the Community
13/90
TRANSFORM AND ENHANCE THE ARCH EXPERIENCE FOR EVERYONE
NEW ARRIVALEXPERIENCES
NEW REASONS TO ENJOY,
LEARN AND LINGER
NEW ACCESS,EASIER ACCESS
-
8/3/2019 CityArchRiver2015 - January 25, 2012 Report to the Community
14/90
MarketSt.
ChestnutSt.
Wash
ingtonAve.
WalnutSt.
Broadway
4th St.
I-70
NEW ARRIVAL EXPERIENCES ICORRIDOR
-
8/3/2019 CityArchRiver2015 - January 25, 2012 Report to the Community
15/90
BUILD Washington Avenue Ramps
BUILD a new WalnutStreet Bridge
REMOVE Memorial Drive ramps
REMOVE Memorial Bridgesand Cantilevered Lanes
BUILD a park overthe highway
NEW ARRIVAL EXPERIENCES ICORRIDOR
-
8/3/2019 CityArchRiver2015 - January 25, 2012 Report to the Community
16/90
MarketSt.
ChestnutSt.
Wash
ingtonAve.
WalnutSt.
Broadway
4th St.
Old Cathedral
2,000carsper hour
at peak hourson Northbound
Memorial Dr.4
NEW ARRIVAL EXPERIENCESWALNUT STREET BRIDGE
-
8/3/2019 CityArchRiver2015 - January 25, 2012 Report to the Community
17/90
VIEW ACROSS WALNUT STREET BRIDGEEXISTING
-
8/3/2019 CityArchRiver2015 - January 25, 2012 Report to the Community
18/90
VIEW ACROSS NEW WALNUT STREET BRIDGEPROPOSED
-
8/3/2019 CityArchRiver2015 - January 25, 2012 Report to the Community
19/90
MarketSt.
ChestnutSt.
Wash
ingtonAve.
WalnutSt.
Broadway
4th St.
ExistingJNEM
New West Entry
NEW ARRIVAL EXPERIENCESA PARK OVER THE HIGHWAY
-
8/3/2019 CityArchRiver2015 - January 25, 2012 Report to the Community
20/90
FEET OF CONCRETE, NOISE AND HIGHWAY SIGNAGE
-
8/3/2019 CityArchRiver2015 - January 25, 2012 Report to the Community
21/90
MISSED OPPORTUNITIES FOR THE VISITOR EXPERIENCE
-
8/3/2019 CityArchRiver2015 - January 25, 2012 Report to the Community
22/90
A PARK OVER THE HIGHWAY
-
8/3/2019 CityArchRiver2015 - January 25, 2012 Report to the Community
23/90
A PARK OVER THE HIGHWAY
MUSEUM ENTRY
-
8/3/2019 CityArchRiver2015 - January 25, 2012 Report to the Community
24/90
CIRCULATION, DROPOFF AND LOADING AREAS
-
8/3/2019 CityArchRiver2015 - January 25, 2012 Report to the Community
25/90
AREA OF EXCAVATION
BERM ALONG MEMORIAL DRIVEEXISTING
-
8/3/2019 CityArchRiver2015 - January 25, 2012 Report to the Community
26/90
-
8/3/2019 CityArchRiver2015 - January 25, 2012 Report to the Community
27/90
LUTHER ELY SMITH SQUARE AT CHESTNUTEXISTING
-
8/3/2019 CityArchRiver2015 - January 25, 2012 Report to the Community
28/90
A PARK OVER THE HIGHWAYPROPOSED
-
8/3/2019 CityArchRiver2015 - January 25, 2012 Report to the Community
29/90
IMEMORIAL DRIVE CROSSINGEXISTING
-
8/3/2019 CityArchRiver2015 - January 25, 2012 Report to the Community
30/90
A PARK OVER THE HIGHWAYPROPOSED
-
8/3/2019 CityArchRiver2015 - January 25, 2012 Report to the Community
31/90
MUSEUM EXPANSIONWELCOME TO THE MUSEUM
-
8/3/2019 CityArchRiver2015 - January 25, 2012 Report to the Community
32/90
View from New Museum Lobby Looking West
WELCOME TO THE MUSEUM
-
8/3/2019 CityArchRiver2015 - January 25, 2012 Report to the Community
33/90
Light Reflective CeilingExpanded Exhibition Space
WELCOME TO THE MUSEUM
-
8/3/2019 CityArchRiver2015 - January 25, 2012 Report to the Community
34/90
MarketSt.
Che
stnutSt.
WashingtonAve.
WalnutSt.
Broadway
4th St.
REMOVE GARAGE ANDWASHINGTON AVENUE
TERMINUS
NEW ARRIVAL EXPERIENCESWASHINGTONMEMORIAL INTERSECTION
existingJNEMgarage
-
8/3/2019 CityArchRiver2015 - January 25, 2012 Report to the Community
35/90
THE INTERSECTIONS AT EADS AND MLK BRIDGESEXISTING
THIRD
ST
.
EADSBRIDGE
MLKBRIDGE
LACLEDESLANDING
MEMORIAL
DRIVE
CONVENTIONCENTER
EDWARD JONESDOME
WASHINGTONAVENUE
I
I
FIX5-LegIntersection/Flashing Red
REMOVE
Washington AveTerminus
FIXCirculationKnot (Access toNorth cut off)
-
8/3/2019 CityArchRiver2015 - January 25, 2012 Report to the Community
36/90
THE INTERSECTIONS AT EADS AND MLK BRIDGES PROPOSED
I
I
MEMORIAL
DRIVE
CONVENTIONCENTER
EDWARD JONESDOME
WASHINGTONAVENUE
EADSBRIDGE
MLKBRIDGE
LACLEDESLANDING
THIRD
ST
.
BUILDSafer SignalizedIntersection
BUILDWashingtonAvenue Ramps
BUILDNew Accessto North
-
8/3/2019 CityArchRiver2015 - January 25, 2012 Report to the Community
37/90
WASHINGTONMEMORIAL INTERSECTION
EXISTNG PROPOSED
-
8/3/2019 CityArchRiver2015 - January 25, 2012 Report to the Community
38/90
ARRIVAL TO THE ARCH
-
8/3/2019 CityArchRiver2015 - January 25, 2012 Report to the Community
39/90
WASHINGTON AVECORRIDOR
CONVENTIONCENTER
EDWARD JONESDOME
RDSTREET
DOWNTOWNST. LOUIS
ARCHGROUNDS
LKSBLVD
LACLEDES LANDING
R I V E RM I S S I S S I P P I
I
ExistingEads BridgeMetroLink Station
1st + 2nd StreetVehicular Loop
AccessiblePedestrian and
Bikeway Connection(North Gateway)
EADS
BRIDGE
REMOVE THE GARAGEBUILD A NEW NORTH GATEWAY
-
8/3/2019 CityArchRiver2015 - January 25, 2012 Report to the Community
40/90
VIEW FROM GARAGE LOOKING TOWARDS WASHINGTON AVEEXISTING
-
8/3/2019 CityArchRiver2015 - January 25, 2012 Report to the Community
41/90
VIEW OF NEW NORTH GATEWAY LANDSCAPEPROPOSED
-
8/3/2019 CityArchRiver2015 - January 25, 2012 Report to the Community
42/90
DETAIL OF RAISED WALKWAY AND EXPLORERS GARDEN
-
8/3/2019 CityArchRiver2015 - January 25, 2012 Report to the Community
43/90
VIEW LOOKING WEST UP WASHINGTON AVENUEEXISTING
-
8/3/2019 CityArchRiver2015 - January 25, 2012 Report to the Community
44/90
VIEW OF EXPLORERS GARDEN LANDSCAPEPROPOSED
-
8/3/2019 CityArchRiver2015 - January 25, 2012 Report to the Community
45/90
MarketSt.
ChestnutSt.
Was
hingtonAve.
Wa
lnutSt.
Broadway
4th St.
NEW ACCESS, EASIER ACCESS
Aerial Tram
JNEMWest Entry
NorthGateway
WestGateway
GrandStaircaseEast Slopes
CentralRIverfront
East Slopes
OldCathedral
South
Gateway
11 Acres of New Park Space
-
8/3/2019 CityArchRiver2015 - January 25, 2012 Report to the Community
46/90
MarketSt.
ChestnutSt.
Was
hingtonAve.
Wa
lnutSt.
Broadway
4th St.
LEONOR K. SULLIVAN BLVD AND RIVERFRONT BIKEWAY
RiverfrontLink
CentralRIverfront
-
8/3/2019 CityArchRiver2015 - January 25, 2012 Report to the Community
47/90
THE CENTRAL RIVERFRONT
High-frequency flood occurrences canlast up to 2 weeks and pose significant
challenges to utilizing the riverfront
Raising LKS Boulevard approximately 2.5between Chouteau and Biddle will eliminate
60-70% these occurences
-
8/3/2019 CityArchRiver2015 - January 25, 2012 Report to the Community
48/90
CIRCULATION INBOARD
OF OVERLOOKS
RIVERFRONTAMENITIES
THE CENTRAL RIVERFRONTEXISTING
-
8/3/2019 CityArchRiver2015 - January 25, 2012 Report to the Community
49/90
THE CENTRAL RIVERFRONTPROPOSED
-
8/3/2019 CityArchRiver2015 - January 25, 2012 Report to the Community
50/90
Ma
rketSt.
ChestnutSt.
Was
hingtonAve.
Wa
lnutSt.
Broadway
4th St.
AERIAL TRAM CROSSING OF THE MISSISSIPPI
-
8/3/2019 CityArchRiver2015 - January 25, 2012 Report to the Community
51/90
AERIAL TRAM LANDING AT MALCOLM W. MARTIN MEMORIAL PARKPROPOSED
-
8/3/2019 CityArchRiver2015 - January 25, 2012 Report to the Community
52/90
NORTHRIVERFRONTTRAIL
ROUTEEXTENSION TORIVER PARK DRIVE
MCKINLEYBRIDGE TRAIL
EADS BRIDGEMETROLINK
BUILDING FOR REGIONAL CONNECTIVITY
ST. LOUIS
BROOKLYNEAST ST. LOUIS
MALCOLM W.MARTINMEMORIALPARK
ARCHGROUNDS
TUCKER BLVD EXTENSION
MISSISSIPPIRIVER BRIDGE
-
8/3/2019 CityArchRiver2015 - January 25, 2012 Report to the Community
53/90
ROUTECONNECTIONTO TRENDLEY
CONNECTION TOCONFLUENCETRAIL NORTH
EADS BRIDGEMETROLINK
AERIALTRAM CONNECTION
TO MCKINLEY
BRIDGE TRAIL
TUCKER BLVD EXTENSION
ROUTEEXTENSION
CONFLUENCEBIKEWAY
LKS BOULEVARDIMPROVEMENTS
FRONT STREETIMPROVEMENTS
NORTHRIVERFRONT TRAIL
MISSISSIPPIRIVER BRIDGE
MALCOLM W.MARTINMEMORIALPARK
ST. LOUIS
BROOKLYNEAST ST. LOUIS
BUILDING FOR REGIONAL CONNECTIVITY
NEW REASONS TO ENJOY LEARN AND LINGER
-
8/3/2019 CityArchRiver2015 - January 25, 2012 Report to the Community
54/90
WashingtonAve.
Wa
lnutSt.
Broadway
4th St.Ma
rketSt.
ChestnutSt.
NEW REASONS TO ENJOY, LEARN AND LINGER
Old
Courthouse
KienerPlaza
Luther ElySmith Square
East Slopes East Slopes
North PondNorth
GatewaySouth Pond
Over 5 Miles of Accessible Pathways
WEST GATEWAY
-
8/3/2019 CityArchRiver2015 - January 25, 2012 Report to the Community
55/90
WashingtonAve.
Wa
lnutSt.
Broadway
4th St.Ma
rketSt.
ChestnutSt.
WEST GATEWAY
Old
Courthouse
KienerPlaza
Luther ElySmith Square
-
8/3/2019 CityArchRiver2015 - January 25, 2012 Report to the Community
56/90
NEW REASONS TO ENJOY LEARN AND LINGER
-
8/3/2019 CityArchRiver2015 - January 25, 2012 Report to the Community
57/90
NEW REASONS TO ENJOY, LEARN AND LINGER
WEST GATEWAY ALONG MARKET STREET EXISTING
-
8/3/2019 CityArchRiver2015 - January 25, 2012 Report to the Community
58/90
Relocating the Curbline 10to the South Creates a 25 HALLWAYwith Direct Visual Access to the ArchGrounds
25 HALLWAY
Remove the Median
KIENER PLAZA
THE OLD COURTHOUSE
MARKET STREET (60 ROW)
WEST GATEWAY ALONG MARKET STREETEXISTING
-
8/3/2019 CityArchRiver2015 - January 25, 2012 Report to the Community
59/90
KIENER PLAZAEXISTING
-
8/3/2019 CityArchRiver2015 - January 25, 2012 Report to the Community
60/90
KIENER PLAZAPROPOSED
-
8/3/2019 CityArchRiver2015 - January 25, 2012 Report to the Community
61/90
A PARK OVER THE HIGHWAY
-
8/3/2019 CityArchRiver2015 - January 25, 2012 Report to the Community
62/90
A PARK OVER THE HIGHWAY
PROPOSED
PROCESSIONAL WALKS
-
8/3/2019 CityArchRiver2015 - January 25, 2012 Report to the Community
63/90
WashingtonAve.
WalnutSt.
Broadway
4th St.Ma
rketSt.
Ch
estnutSt.
PROCESSIONAL WALKS
EMERALD ASH BORER INFESTATION MAP JANUARY
-
8/3/2019 CityArchRiver2015 - January 25, 2012 Report to the Community
64/90
LEGEND
The Gateway Arch
Initial EAB Detection
Federally Quarantined Areas
EMERALD ASH BORER INFESTATION MAP JANUARY ,
75 Miles Away
PROCESSIONALALLEESEXISTING
-
8/3/2019 CityArchRiver2015 - January 25, 2012 Report to the Community
65/90
PROCESSIONAL ALLEES EXISTING
PROCESSIONALALLEESPROPOSED
-
8/3/2019 CityArchRiver2015 - January 25, 2012 Report to the Community
66/90
PROCESSIONAL ALLEES PROPOSED
REFLECTING PONDS LANDSCAPE
-
8/3/2019 CityArchRiver2015 - January 25, 2012 Report to the Community
67/90
Wa
shingtonAve.
WalnutSt.
Broadway
4th St.MarketSt.
Ch
estnutSt.
REFLECTING PONDS LANDSCAPE
North PondSouth Pond
REFLECTING PONDS LANDSCAPEEXISTING
-
8/3/2019 CityArchRiver2015 - January 25, 2012 Report to the Community
68/90
REFLECTING PONDS LANDSCAPE EXISTING
REFLECTING PONDS LANDSCAPEPROPOSED
-
8/3/2019 CityArchRiver2015 - January 25, 2012 Report to the Community
69/90
REFLECTING PONDS LANDSCAPE PROPOSED
EAST SLOPES
-
8/3/2019 CityArchRiver2015 - January 25, 2012 Report to the Community
70/90
Wa
shingtonAve.
WalnutSt.
Broadway
4th St.MarketSt.
Ch
estnutSt.
EAST SLOPES
EAST SLOPES PASSAGES TO THE RIVERPROPOSED
-
8/3/2019 CityArchRiver2015 - January 25, 2012 Report to the Community
71/90
S S S SS S S
EAST SLOPES PASSAGES TO THE RIVERPROPOSED
-
8/3/2019 CityArchRiver2015 - January 25, 2012 Report to the Community
72/90
-
8/3/2019 CityArchRiver2015 - January 25, 2012 Report to the Community
73/90
UTILIZE THE GRID
-
8/3/2019 CityArchRiver2015 - January 25, 2012 Report to the Community
74/90
TUCKER
BLVD.
EXTENSION
MEMORIALDRIVE
MEMORIALDRIVE
MEMORIAL
DRI VE
TUCKER
BLVD.
EXTENSION
WITH THE NEW MISSISSIPPI
RIVER BRIDGE
CITY ARCH RIVER
EXISTING CONDITIONS
NEW
MISS
ISSIPP
I
RIVE
RBRIDG
E
NEW
MISS
ISSIPP
I
RIVER
BRIDGE
MISSISSIPPI RIVER BRIDGE
-
8/3/2019 CityArchRiver2015 - January 25, 2012 Report to the Community
75/90
MISSISSIPPI RIVER BRIDGE
-
8/3/2019 CityArchRiver2015 - January 25, 2012 Report to the Community
76/90
-
8/3/2019 CityArchRiver2015 - January 25, 2012 Report to the Community
77/90
REGIONAL GREENWAY DISTRICTS
-
8/3/2019 CityArchRiver2015 - January 25, 2012 Report to the Community
78/90
GREAT RIVERS GREENWAY
-
8/3/2019 CityArchRiver2015 - January 25, 2012 Report to the Community
79/90
GREAT RIVERS GREENWAY
-
8/3/2019 CityArchRiver2015 - January 25, 2012 Report to the Community
80/90
IBIDDLE TO WASHINGTON
II WASHINGTON TO POPLAR
III POPLAR TO CHOUTEAU
CHAIN OF ROCKS BRIDGE
MCKINLEYBRIDGE
MARY MEACHUMFREEDOM CROSSING
GATEWAYMALL
DOWNTOWNST. LOUIS
GRG TRAILHEAD
-
8/3/2019 CityArchRiver2015 - January 25, 2012 Report to the Community
81/90
-
8/3/2019 CityArchRiver2015 - January 25, 2012 Report to the Community
82/90
-
8/3/2019 CityArchRiver2015 - January 25, 2012 Report to the Community
83/90
-
8/3/2019 CityArchRiver2015 - January 25, 2012 Report to the Community
84/90
COMPETITION GOALS
-
8/3/2019 CityArchRiver2015 - January 25, 2012 Report to the Community
85/90
ENHANCE the visitor experience and create awelcoming and accessible environment.
DEVELOPa sustainable future.
MITIGATE the impact of transportation systems.
CREATE attractors to promote extended visitationto the Arch, the City and the River.
REINVIGORATE the mission to tell the story ofSt. Louis as the gateway to national expansion.
EMBRACE the Mississippi River and the east bankin Illinois as an integral part of the National Park.
WEAVE connections and transitions from the Cityand the Arch grounds to the River.
HONOR the character defining elements of theNational Historic Landmark.
CATALYZE increased vitality in the St. Louisregion.
CREATE an iconic place for the international icon,the Gateway Arch.
CityArchRiver 2015
-
8/3/2019 CityArchRiver2015 - January 25, 2012 Report to the Community
86/90
-
8/3/2019 CityArchRiver2015 - January 25, 2012 Report to the Community
87/90
CityArchRiver 2015
-
8/3/2019 CityArchRiver2015 - January 25, 2012 Report to the Community
88/90
-
8/3/2019 CityArchRiver2015 - January 25, 2012 Report to the Community
89/90
-
8/3/2019 CityArchRiver2015 - January 25, 2012 Report to the Community
90/90
Visit www.cityarchriver.org for