cer-ret-032 exemption certificate form - …€¦ · web viewcer-ret-032 v1.0 12/01/2018 appendix...

5
FORM CER-RET-032 V1.0 12/01/2018 Appendix C: EITE activity details Exemption certificate - Electricity use method under the Renewable Energy (Electricity) Act 2000 Purpose of this form This form is to be completed for each additional Emissions-Intensive Trade- Exposed (EITE) activity at the site and lodged in conjunction with the 2018 Application for an exemption certificate (CER-RET-032) under the Renewable Energy (Electricity) Regulations 2001 (the Regulations). Instructions for completing the appendices Please read each part of the appendix carefully, fully answer all the questions, sign where indicated, and attach the required documentation. If there is insufficient space to complete your answer, please provide the answer as an attachment. Please reference and label attachments in a logical manner. Lengthy or large attachments may be provided in electronic format instead of being posted. You can choose to complete this form by: 1. printing the application form and filling it in by hand, or 2. saving the application form and filling in an electronic copy. Note that if you choose the second option, you will also need to print certain sections in order to sign them. V1.0 12/01/2018Appendix C: EITE activity details, Exemption certificate – electricity use method 1 of 5

Upload: others

Post on 30-Aug-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: CER-RET-032 Exemption Certificate form - …€¦ · Web viewCER-RET-032 V1.0 12/01/2018 Appendix C: EITE activity details, Exemption certificate – electricity use method1 of 3

FORM

CER-RET-032V1.0 12/01/2018

Appendix C: EITE activity details Exemption certificate - Electricity use methodunder the Renewable Energy (Electricity) Act 2000

Purpose of this formThis form is to be completed for each additional Emissions-Intensive Trade-Exposed (EITE) activity at the site and lodged in conjunction with the 2018 Application for an exemption certificate (CER-RET-032) under the Renewable Energy (Electricity) Regulations 2001 (the Regulations).

Instructions for completing the appendicesPlease read each part of the appendix carefully, fully answer all the questions, sign where indicated, and attach the required documentation.

If there is insufficient space to complete your answer, please provide the answer as an attachment.

Please reference and label attachments in a logical manner. Lengthy or large attachments may be provided in electronic format instead of being posted.

You can choose to complete this form by:

1. printing the application form and filling it in by hand, or

2. saving the application form and filling in an electronic copy.

Note that if you choose the second option, you will also need to print certain sections in order to sign them.

V1.0 12/01/2018 Appendix C: EITE activity details, Exemption certificate – electricity use method 1 of 4

Page 2: CER-RET-032 Exemption Certificate form - …€¦ · Web viewCER-RET-032 V1.0 12/01/2018 Appendix C: EITE activity details, Exemption certificate – electricity use method1 of 3

CER-RET-032

Pen colours Please use a black or blue pen to write on the form.

Check boxes Mark boxes like this with a ✔ or ✘. When an instruction asks you to ‘tick’ the box, you can use either ✔ or ✘.

Go to Where you see an instruction, Go to question 5, mark the relevant box with a ✔ or ✘and then skip to the question number shown. You do not need to answer the question(s) in between.

Where an instruction has a black double arrow, , go to the next indicated part or section.

Where an instruction has a black single arrow, , go to the next question.

Where an instruction has a black single arrow pointing down, , fill in the field(s) below.

Mandatory questions

If the question is mandatory, required is added to the end of the question.

When a question is mandatory upon certain conditions being met, required if any, is added to the end of the question.

This symbol indicates what to do next.

This symbol indicates additional useful guidance.

This symbol advises that more than one entry may be required and you may need to photocopy or print the section or fill in a duplicate.

This symbol advises that supporting documentation may need to be attached.

Help filling in this form

Guidance for filling in this form is available on the Clean Energy Regulator website 1 .

If you require assistance or have any questions regarding this application process, please contact the Clean Energy Regulator via email at [email protected] or on the general enquiries line on 1300 553 542.

1 http://www.cleanenergyregulator.gov.au/RET/Forms-and-resources/Forms-and-resources-for-industry

V1.0 12/01/2018 Appendix C: EITE activity details, Exemption certificate – electricity use method 2 of 4

Page 3: CER-RET-032 Exemption Certificate form - …€¦ · Web viewCER-RET-032 V1.0 12/01/2018 Appendix C: EITE activity details, Exemption certificate – electricity use method1 of 3

CER-RET-032

Appendix C: EITE activity details In this appendix, you will identify the emissions-intensive trade-exposed (EITE) activity(s) carried out at the site

relating to this application.

You must complete Appendix C for each additional EITE activity in relation to the site.

1. EITE activity details. (required)

Identify the additional EITE activity and its unique code.

Eligible EITE activities are specified in Schedule 6 of the Regulations and summarised in Appendix B: EITE activity summary.

A unique code is allocated to each EITE activity in question 33 of the application form.

Name of EITE activity      

Unique code      

2. EITE activity status. (required)

Is the EITE activity currently carried on at the site?

Yes Go to question 5

No Go to question 3

3. Commencement date. (required if any)

What date is the EITE activity expected to commence at the site?

Day (dd) Month (mm) Year (yyyy)

Date           

4. Licenses, permissions and approvals. (required if any)

State what licenses, permissions or approvals are necessary to carry out the EITE activity at the site and whether they have already been obtained.

Attach copies of any approvals necessary to carry on the EITE activity.

Licenses, permissions and

approval

     

5. How will the EITE activity be carried on at the site? (required)

Describe how the EITE activity will be carried out in the context of total production at the site in 2018, and state how requirements relating to the relevant activity set out in Schedule 6 of the Regulations are met.

If there is insufficient space, please provide additional information in an attachment.

How the EITE activity is

carried on at the site

     

V1.0 12/01/2018 Appendix C: EITE activity details, Exemption certificate – electricity use method 3 of 4

Page 4: CER-RET-032 Exemption Certificate form - …€¦ · Web viewCER-RET-032 V1.0 12/01/2018 Appendix C: EITE activity details, Exemption certificate – electricity use method1 of 3

CER-RET-032

V1.0 12/01/2018 Appendix C: EITE activity details, Exemption certificate – electricity use method 4 of 4