centralized sterile product preparation workflow for anywhere health system (ahs)
TRANSCRIPT
Centralized Sterile Product Preparation Workflow for
Anywhere Health System (AHS)
Centralized Sterile Product Preparation Workflow
Purchasing Preparing Testing Storage DistributionCost
Transfers, Audits
Purchasing
Ordering Bulk
Product
• Technician places order• Receive product, set aside
for Central IV technician (CIV) to take to storage space
• CIV Technician unloads- inventories into appropriate area/safe
Preparation
Preparing Products
•Technician gathers supplies based on composite sheet•Technician prints the necessary amount of “IV BATCH” labels from
designated computer to label printer•Technician copies down NDC bulk, manufacturer, lot# and
expiration date on composite sheet•Transfer to ARCOS system for controlled substances
•Technician takes composite sheet and medications into high risk room to prepare
•Pharmacist checks repeater pump (if applicable), products, labels•Run initial product with pharmacist in IV room to validate
run/weight of product•When complete, technician puts initials on the composite sheet
• Sequester date- mark date when passed •Record time to prepare batch•Technician notifies pharmacist when complete•Pharmacist verifies products•Pharmacist checks the accuracy of filled medication and puts
initials on composite sheet
Sterility Testing
Sterility Testing
• Send USP Chapter <71> required amount to external lab for testing
Sequester Products
• Quarantine for 14 days
Confirmation of Sterility
• Document when complete on composite
• Filed for audits & recalls
Distribution
Package for distribution
• Technician verifies LOT to be released to site
• Sell to (CII safe) for controlled substances
• Distribution Record keeping- internally and ARCOS
Cost transfer
• Monthly Spreadsheet sent to finance
Delivery
Delivery• Medical courier picks
up totes at designated time
• Delivers them to hubnext day delivery to site; TPN sites likely same day
Reporting & Auditing
Auditing
• Develop & follow audit procedures- count with each movement of the product for controlled substances
Reporting
• DEA: Quarterly ARCOS- all purchases, preparation, and distribution
• DEA: Year-end reporting• Compounding: monitor batches-
sterility documentation
Inventory/Production
Inventory:
• Surplus supply, site must notify preparation site ~3 weeks before shipment would have been received to adjust quantity.
• In the event of a shortage of supply…• Borrow from another site• Make their own (USP Chapter <797> dating) • Purchase from wholesaler
In the event of a
recall….
• Manufacturer Recall: Sites will be notified if NDC product was used, which LOT to look for/remove
• CIV Recall: same as above, site notified for internal LOT to remove
• Sites need to purchase adequate supply for 14 days minimum
Expiring Products:
• If products will be expiring soon, sites should re-allocate to Main Pharmacy or other AHS site that can use the volume.