ccisd bond 2014
DESCRIPTION
Architects in February updated Corpus Christi school board members on potential locations for elementary campus construction.TRANSCRIPT
-
NEW ELEMENTARY SCHOOL SITES
BOND 2014
February 9th 2015
-
NEW CCISD ELEMENTARY SCHOOLS BOND 2014
1 LIST OF SCHOOLS / SITES OPTIONS
LOS ENCINOS ELEMENTARY SCHOOL
NEW FACILITY AT EXISTING SITE
CALK & WILSON ELEMENTARY SCHOOL
OPTION 1: EXISTING HAMLIN MIDDLE SCHOOL SITE
OPTION 2: EXISTING WILSON ELEMENTARY SITE
OPTION 3: SOUTH POPE PARK SITE
WINDSOR PARK ELEMENTARY SCHOOL
OPTION 1 LEXINGTON/SOUTH PARK SITE
OPTION 2 - EXISTING WINDSOR PARK SITE
PLEASE NOTE: The following drawings are not meant to represent a complete or final site plan for each site. Layouts are meant to demonstrate the ability of site to accommodate elementary school and support areas. Layout, orientation, and parking are shown to demonstrate adjacencies and access/egress and will be designed and optimized in the future.
-
2 LOS ENCINOS ELEMENTARY SCHOOL ELEMENTARY SCHOOL SITE
NEW CCISD ELEMENTARY SCHOOLS BOND 2014
FRIO ST.
HAC
ALA ST.
DORADO ST.
EXISTING ELEMENTARY SCHOOL SITE
-
3 LOS ENCINOS ELEMENTARY SCHOOL EXISTING ELEMENTARY SCHOOL SITE
NEW CCISD ELEMENTARY SCHOOLS BOND 2014
FRIO ST. HACALA ST.
MISSIO
N D
R.
-
4 LOS ENCINOS ELEMENTARY SCHOOL EXISTING ELEMENTARY SCHOOL SITE
NEW CCISD ELEMENTARY SCHOOLS BOND 2014
PROS: PROTOTYPE FACILITY FITS SITE PREVIOUSLY DEVELOPED SITE
(ADDS LEED POINTS) POSSIBLE RE-USE OF EXISTING
DRIVEWAYS
CONS: MUST RELOCATE STUDENTS
DURING CONSTRUCTION DEMOLITION AHEAD OF
CONSTRUCTION = EXTENDED SCHEDULE
STREET FRONTAGE CURRENTLY ON ONE SIDE ONLY
EXISTING ELEMENTARY SCHOOL SITE
-
CALK - WILSON ELEMENTARY SCHOOL SITE OPTIONS
NEW CCISD ELEMENTARY SCHOOLS BOND 2014
5
SITE OPTION 1
EXISTING HAMLIN MIDDLE SCHOOL SITE
SITE OPTION 2
EXISTING WILSON ELEMENTARY SCHOOL SITE
SITE OPTION 3
SOUTH POPE PARK SITE
-
CALK - WILSON ELEMENTARY SCHOOL SITE OPTION 1 : EXISTING HAMLIN MIDDLE SCHOOL SITE
NEW CCISD ELEMENTARY SCHOOLS BOND 2014
6
HAM
LIN
DR
IVE.
HAMLIN MIDDLE SCHOOL
SOUTH STAPLES ST.
-
CALK - WILSON ELEMENTARY SCHOOL SITE OPTION 1 : EXISTING HAMLIN MIDDLE SCHOOL SITE
NEW CCISD ELEMENTARY SCHOOLS BOND 2014
7
HAMLIN MIDDLE SCHOOL SITE
WILSON ELEMENTARY SCHOOL SITE
-
CALK - WILSON ELEMENTARY SCHOOL SITE OPTION 2 : EXISTING WILSON SITE
NEW CCISD ELEMENTARY SCHOOLS BOND 2014
8
FORT WORTH ST.
NORTH POPE PARK
SOUTH POPE PARK
-
CALK - WILSON ELEMENTARY SCHOOL SITE OPTION 3 : SOUTH POPE PARK SITE
NEW CCISD ELEMENTARY SCHOOLS BOND 2014
9
SOUTH POPE PARK
NORTH POPE PARK
ROBERT WILSON ELEMENTARY SCHOOL
SITE
HAMLIN MIDDLE SCHOOL
CONTIGUOUS POPE PARK
PROPOSED NEW ELEMENTARY SCHOOL SITE
HAMLIN MIDDLE SCHOOL
-
CALK - WILSON ELEMENTARY SCHOOL SITE OPTION 3 : SOUTH POPE PARK SITE
NEW CCISD ELEMENTARY SCHOOLS BOND 2014
10
HAMLIN MIDDLE SCHOOL
HAMLIN MIDDLE SCHOOL
HAMLIN MIDDLE SCHOOL
EXISTING ROBERT WILSON
ELEMENTARY SCHOOL
EXISTING ROBERT WILSON
ELEMENTARY SCHOOL
EXISTING ROBERT WILSON
ELEMENTARY SCHOOL
-
CALK - WILSON ELEMENTARY SCHOOL SITE OPTION 1 VS SITE OPTION 2 VS SITE OPTION 3
NEW CCISD ELEMENTARY SCHOOLS BOND 2014
11
PROS: PROTOTYPE SCHOOL FITS SITE NO RELOCATION OF STUDENTS REQUIRED PREVIOUSLY DEVELOPED SITE ( ADDS LEED
POINTS)
CONS: REQUIRED RELOCATION OF HAMLIN
MS ATHLETIC FIELDS OFF SITE DIFFICULTY FITTING ALL PROTOTYPE
SCHOOL AMENITIES STREET FRONTAGE ON ONE SIDE ONLY CLOSE PROXIMITY TO CCISD HAMLIN
MS
PROS: PROTOTYPE SCHOOL FITS SITE STREET FRONTAGE ON TWO SIDES FOR BETTER ACCESS PREVIOUSLY DEVELOPED SITE (ADDS LEED POINTS) POSSIBLE RE-USE OF EXISTING DRIVEWAYS
CONS: MUST RELOCATE STUDENTS DURING
CONSTRUCTION DEMOLITION AHEAD OF CONSTRUCTION
= EXTENDED SCHEDULE
EXISTING HAMLIN MIDDLE SCHOOL SITE
EXISTING WILSON ELEMENTARY SCHOOL SITE SOUTH POPE PARK SITE
-
WINDSOR PARK ELEMENTARY SCHOOL SITE OPTIONS
NEW CCISD ELEMENTARY SCHOOLS BOND 2014
12
SITE OPTION 1 SITE OPTION 2
EXISTING LEXINGTON ELEMENTARY SCHOOL SITE (+ PART OF SOUTH PARK MS PROPERTY)
EXISTING WINDSOR PARK ELEMENTARY SCHOOL SITE
-
WINDSOR PARK ELEMENTARY SCHOOL SITE OPTION 1 : LEXINGTON ELEMENTARY SCHOOL SITE (+ SOUTH PARK)
NEW CCISD ELEMENTARY SCHOOLS BOND 2014
13
McARDLE RD
SOUTH PARK MIDDLE SCHOOL
-
WINDSOR PARK ELEMENTARY SCHOOL SITE OPTION 2A : EXISTING WINDSOR PARK SITE
NEW CCISD ELEMENTARY SCHOOLS BOND 2014
14
SHERIDAN DR.
S. ALAM
EDA ST.
-
WINDSOR PARK ELEMENTARY SCHOOL SITE OPTION 2B : EXISTING WINDSOR PARK SITE
NEW CCISD ELEMENTARY SCHOOLS BOND 2014
15
S. ALAM
EDA ST.
SHERIDAN DR.
-
WINDSOR PARK ELEMENTARY SCHOOL SITE OPTION 1 VS SITE OPTION 2
NEW CCISD ELEMENTARY SCHOOLS BOND 2014
16
PROS: PROTOTYPE SCHOOL FITS SITE CORNER SITE FOR BETTER VEHICULAR ACCESS PREVIOUSLY DEVELOPED SITE (ADDS LEED POINTS) POSSIBLE RE-USE OF EXISTING DRIVEWAYS
CONS: MUST RELOCATE STUDENTS DURING CONSTRUCTION DEMOLITION AHEAD OF CONSTRUCTION = EXTENDED SCHEDULE
PROS: NO RELOCATION OF STUDENTS REQUIRED PREVIOUSLY DEVELOPED SITE ( ADDS LEED
POINTS)
CONS: ENCROACHES SLIGHLTY ONTO SOUTH PARK
MS PROPERTY SLIGHTLY LONGER DRIVES INCREASE COST
EXISTING LEXINGTON ELEMENTARY SCHOOL SITE EXISTING WINDSOR PARK ELEMENTARY SCHOOL SITE
-
THANK YOU !