    Regional Workshop on Access to Modern Energy Services

    Policies Practices and Knowledge Sharing

    Topic: Participatory Capacity Needs Assessment

    in ECOWAS Member States

    By:

    Frank O. Atta-OwusuSnr. Projects Manager, KITE

    November, 2009, Pullman Hotel, Dakar-Senegal

  • 8/2/2019 CBNA in WA

    2/24

    Outline

    1. Definitions

    2. Introduction

    3. Findings

    4. Articulated Capacity Building Needs

    5. Recommendations

    2

  • 8/2/2019 CBNA in WA

    3/24

    Definitions

    The UNDP defines capacityas the ability of individuals, institutions and societies toperform functions, solve problems, and set and achieve objectives in a sustainable

    manner. Capacity development is thereby the process through which the abilities to

    do so are obtained, strengthened, adapted and maintained over time.

    The UNDP definition of capacity development focuses on three key elements namely:

    Policy and legal frameworks

    Institutional structures and procedures; and

    Human resources, including technical and functional capacity

    A capacity assessment is defined as an analysis of current capacities against desiredfuture capacities, which generates an understanding of capacity assets and needs,which in turn leads to the formulation of capacity development strategies (UNDP,

    2007).

    3

  • 8/2/2019 CBNA in WA

    4/24

    Context

    The Economic Community of West African States (ECOWAS) Commissionand UNDP sponsored country level specific energy access capacitydevelopment needs assessments across the West African region in August,

    2009.

    Objective

    The objective of the Participatory Capacity Building Needs Assessment is to

    identify capacity-building needs of ECOWAS Member states to ensureimproved access to energy services for rural and peri-urban populations forthe attainment of the Millennium Development Goals.

    Stakeholders/participants

    Energy and non energy non energy sector institutions (priority sectors

    identified in the PRSPs of member states) Eg. Health, Agriculture, Education,Water and Sanitation, Communication, etc

    4

  • 8/2/2019 CBNA in WA

    5/24

    Introduction (Cont.)

    Methodology A qualitative approach was used to collect and analyse diverse

    information. Open and closed ended interviews were conductedto collect detail views from energy access stakeholders in the

    Member States

    The survey instrument was developed based on 10-pointfunctional capacity areas relating to access to energy services

    for rural and peri-urban populations:

    Vision,

    Leadership,

    Strategies and programmes

    5

  • 8/2/2019 CBNA in WA

    6/24

    Introduction (Cont.)

    Organisation and sector institutions

    Resources

    Partnerships,

    Commitment and dedication of actors,

    Processes,

    Annual plan of action

    Results for end-users

    6

  • 8/2/2019 CBNA in WA

    7/24

    Key (preliminary) findings

    Member states recovering from war (Liberia and Sierra Leone)has not as yet developed the necessary capacity for enhancingaccess to energy services in rural and peri-urban areas

    Energy planning and service delivery in rural and peri-urbanareas is largely ad hoc in most member states

    Outcome of the capacity needs assessment revealed a greatneed for political commitment, professional capacity andinstitutional reforms to provide enhanced access to energyservices for the rural and peri-urban populations in member

    states.

    7

  • 8/2/2019 CBNA in WA

    8/24

    Key (preliminary) findings (Cont.)

    Respondents were asked to indicate their countrys capacitylevel in respect of the 10-point functional capacity areas

    Using the scale 1-5. Where 1 is defined as, no evidence of

    relevant capacity; 2 anecdotal evidence of capacity; 3 partiallydeveloped capacity; 4 widespread, but not comprehensiveevidence of capacity and 5 fully developed capacity

    The outcome showed that Liberia and Sierra Leone rankedbetween 1-2 on most of the functional capacity areas

    Ghana and Nigeria ranked between 1-4 on most of the

    assessed capacity areas

    8

  • 8/2/2019 CBNA in WA

    9/24

    Key (preliminary) findings (Cont.)

    9

  • 8/2/2019 CBNA in WA

    10/24

    Key (preliminary) findings (Cont.)

    Vision : The future plan on access was not defined in nationaldocuments such as NEPs, PRSPs and other developmentdocuments

    Leadership: The energy ministrys coordination and leadership

    role on access in most of the countries is weak. Lack oftechnical experts, fragmentation of energy functions among

    different MDAs etc

    Strategies and programmes: Capacity geared towardsdesigning sustainable energy strategies and programmes in

    most member states was assessed to be inadequate

    10

  • 8/2/2019 CBNA in WA

    11/24

    Key (preliminary) findings (Cont.)

    Organisation and sector institutions: The assessment revealedthat sector specific institutions and organisations needed forthe design and implementation of energy access programmes

    in rural and peri-urban areas is largely absent in most memberstates

    Resources: In adequate funding and energy professionals was

    identified as a key challenge. Ghana and Nigeria however havelatent capacity that can be harnessed for energy access inrural and peri-urban areas

    11

  • 8/2/2019 CBNA in WA

    12/24

    Key (preliminary) findings (Cont.)

    Partnerships: identified limited numbers of bilateral andmultilateral partners who provide both technical and financialsupport for access to energy services in rural and peri-urban

    areas capacity to engage and negotiate with partners islargely lacking

    Commitment and dedication of actors: Dormant NMGs were

    identified in all the countries. Stakeholders cited lack ofdedicated resources for their activities and the absence of achampion as contributory factors for the absence of aconsultative process on access to energy

    12

  • 8/2/2019 CBNA in WA

    13/24

    Key (preliminary) findings (Cont.)

    Processes: Identified Limited involvement of non energy sectors in theplanning and delivery of services to rural and peri-urban populations. Lackof institutional framework for monitoring and evaluating access programmes

    in most countries

    Annual plan of action: Apart from Ghana and Nigeria, the other 2 countriesdo not have multi/annual year strategic plans on energy

    Results for end-users: available results for end-users shows that that manyhouseholds and public institutions such as clinics, schools, and agriculture

    facilities in the peri-urban and rural areas do not have access to modernenergy services.

    13

  • 8/2/2019 CBNA in WA

    14/24

    Articulated Capacity Building Needs

    14

    Functional Capacity Articulated Needs

    Vision

    Awareness creation among national authorities

    including the legislature on access to energy

    services in rural and peri-urban areas Mainstream access to energy services in

    national development documents such as the

    Poverty Reduction Strategy Paper (PRSP)

    Technical support and capacity building for

    policy formulation

    Stimulation of political commitment on access

    to energy services in rural and peri-urban

  • 8/2/2019 CBNA in WA

    15/24

    Articulated Capacity Building Needs

    15

    Functional Capacity Articulated Needs

    Leadership

    Institutionalizing the national consultative group on

    access to energy services

    Restructure the Energy Division of the Ministry of

    Energy with key technical departments responsible

    for the various energy subsectors

    Enhanced leadership from the Ministry of Energy to

    coordinate activities relating to access to access

    Energy experts to manage the energy division of the

    Ministry of Energy

    Consolidation of the energy subsectors under the

    Ministry of Energy

  • 8/2/2019 CBNA in WA

    16/24

    Articulated Capacity Building Needs

    16

    Functional Capacity Articulated Needs

    Strategies and Programmes

    Technical and institutional support for the

    development of an integrated approach to

    energy service delivery Technical support for the development of

    Strategic National Energy Plan

    Formulate national access programmes for

    rural and peri-urban locations

    Technical support for the development of

    energy master plan for rural and peri-urban

    locations

  • 8/2/2019 CBNA in WA

    17/24

    Articulated Capacity Building Needs

    17

    Functional Capacity Articulated Needs

    Organisation and Sector

    Institutions

    Establish national institutions focusing on

    access to energy services in rural and peri-

    urban areas

    Create a unit in the energy division of the

    ministry to be responsible for access issues in

    rural and peri-urban areas

  • 8/2/2019 CBNA in WA

    18/24

    Articulated Capacity Building Needs

    18

    Functional Capacity Articulated Needs

    Resources

    Training of engineers to exploit the hydro potential

    Rural Energy fund

    Modern energy technology transfer for public and private sectorstakeholders

    Mechanism for self financing access projects

    Introduce innovative approaches in implementing access

    programmes

    Incorporation of energy in sector budgets of energy end-user

    institutions

    Feasibility study on the hydro potential/capacity

    Expose existing engineers/technicians in priority sectors such as

    agriculture and health to modern energy technologies

    Energy resources assessment

    Collaborate with the universities/other technical training

    institutions to produce the manpower needs of the energy sector

    Certification/qualifying scheme for artisans in the energy sector

  • 8/2/2019 CBNA in WA

    19/24

    Articulated Capacity Building Needs

    19

    Functional Capacity Articulated Needs

    Partnership

    Collaboration and partnership with

    both local and international partners on

    access to energy services

    Negotiation skills to effectively engage

    partners

  • 8/2/2019 CBNA in WA

    20/24

    Articulated Capacity Building Needs

    20

    Functional Capacity Articulated Needs

    Processes

    Development of a participatory process for

    energy service planning and delivery

    Capacity building for planning and modelling

    energy services for rural and peri-urban areas

    in Sierra Leone

  • 8/2/2019 CBNA in WA

    21/24

    Articulated Capacity Building Needs

    21

    Functional Capacity Articulated Needs

    Annual Plan of Action

    Annual operational plan on access to energy

    services

    Development of strategic energy plan for

    access to energy services

    Rural Energy Master plan

  • 8/2/2019 CBNA in WA

    22/24

    Articulated Capacity Building Needs

    22

    Functional Capacity Articulated Needs

    Results for End-User and

    Beneficiaries

    Energy needs assessment in rural and peri-

    urban areas

    Ensure availability of energy services for end-

    users and beneficiaries in rural areas

    Productive use of energy services

  • 8/2/2019 CBNA in WA

    23/24

    Recommendations

    Focus on building institutional support for access to energy services for ruraland peri-urban populations in member states

    Focus on strengthening human resources in access institution administrationand management and middle and upper level technical manpowerdevelopment.

    Focus on institutionalizing multi-sector consultation on access by

    establishing National Multisectoral Group on Energy Access that will focuson addressing specific issues of interest to access to energy services in ruraland peri-urban areas.

    23

  • 8/2/2019 CBNA in WA

    24/24

    Thank you

    24