SR No. Description UOM Scope Achived Balance Mar-12 Apr-12 May-12 Jun-12 Jul-12 Aug-12 Sep-12
1 Fabrication
a Rolling of Columns Nos 12 12 0
b Rolling of Stub End Nos 12 12 0
c Pressing of Petals Nos 62 60 2
i Pressing Of RF pad Nos 12 12 0ii Pressing of EP Nos 12 12 0
iii Pressing of IP Nos 12 12 0
iv Pressing Of TP & BP Nos 24 24 0
v Pressing Of TC/BC Nos 2 0 2 2
d Fixing And Welding of Stub End , RF Pad and petals Nos 12 12 0
2 Erection
a Erection of Column with all attachment Nos 12 12 0
b Erection Of EP Petals with Stub End and Rf Pad Nos 12 12 0
c Erection Of IP Nos 12 12 0
d Erection Of BP/TP Nos 24 24 0e Erection of TC& BC Nos 2 0 2 2
3 Welding
a Welding of Columns (formation of Pipe ) Nos 12 12 0
b Welding of Stub end Nos 12 12 0
c Welding OF Ep and IP RMT 240 0 240 240
d Welding of BP and TP RMT 124.8 0 124.8 124.8
e Welding of TC & BC RMT 18 0 18 18
4 NDT before PWHT RMT 382.8 0 382.8 300 64.8 18
5 PWHT LOT 1 0 1 1
6 NDT after PWHT RMT 382.8 0 382.8 382.8
7 Hydrotest LOT 1 0 1 18 Structural Work
a Structural Fabrication MT 21 0 21 10 11
b Structural Erection And Welding MT 21 0 21 5 16
9 Blasting & Painting SQM 713 0 713 713
10 I l ti /Fi fi LOT 1 0 1 1
CLIENT: M/S. BRAHMAPUTRA CRACKER & POLYMER LTD
SPHERE NO 143-TS-03A
LOI No :
BCPL/C&P/6907/T-
171/SK/55 Dated
22.11.10
BRAHMAPUTRA CRACKER & POLYMER PROJECT
COMPLETION SCHEDULE
NAME OF WORK: SPHERE J
PMC: ENGINEERS INDIA LIMITED NAME OF AGENCY: IOT INFRASTRUCTURE AND
-
8/2/2019 Catch Up Plan 2012
2/24
10 I l ti /Fi fi LOT 1 0 1 1
CLIENT: M/S. BRAHMAPUTRA CRACKER & POLYMER LTD
LOI No :
BCPL/C&P/6907/T-171/SK/55 Dated
22.11.10
BRAHMAPUTRA CRACKER & POLYMER PROJECT
COMPLETION SCHEDULE
NAME OF WORK: SPHERE JO
PMC: ENGINEERS INDIA LIMITED NAME OF AGENCY: IOT INFRASTRUCTURE AND
SR No. Description UOM Scope Achived Balance Mar-12 Apr-12 May-12 Jun-12 Jul-12 Aug-12 Sep-12
1 Fabrication
a Rolling of Columns Nos 12 12 0
b Rolling of Stub End Nos 12 7 5 5
c Pressing of Petals Nos 62 40 22
i Pressing Of RF pad Nos 12 12 0
ii Pressing of EP Nos 12 12 0
iii Pressing of IP Nos 12 12 0
iv Pressing Of TP & BP Nos 24 4 20 5 15
v Pressing of TC/BC Nos 2 0 2 2
d Fixing And Welding of Stub End , RF Pad and petals Nos 12 7 5 2 3
2 Erection
a Erection of Column with all attachment Nos 12 12 0
b Erection Of EP Petals with Stub End and Rf Pad Nos 12 7 5 5
c Erection Of IP Nos 12 6 6 6
d Erection Of BP/TP Nos 24 0 24 24
e Erection of TC& BC Nos 2 0 2 2
3 Welding
a Welding of Columns (formation of Pipe ) Nos 12 0 12
b Welding of Stub end Nos 12 7 5 5
c Welding OF Ep and IP RMT 240 0 240 240
d Welding of BP and TP RMT 124.8 0 124.8 24 100.8
e Welding of TC & BC RMT 18 0 18 18
4 NDT before PWHT RMT 382.8 0 382.8 100 282.8
5 PWHT LOT 1 0 1 1
6 NDT after PWHT RMT 382.8 0 382.8 382.8
7 Hydrotest LOT 1 0 1 1
8 Structural Work
a Structural Fabrication MT 21 0 21 10 11
b Structural Erection And Welding MT 21 0 21 11 10
9 Blasting & Painting SQM 713 0 713 713
10 Insulation /Fire proofing LOT 1 0 1 1
SPHERE NO 143-TS-03B
-
8/2/2019 Catch Up Plan 2012
3/24
CLIENT: M/S. BRAHMAPUTRA CRACKER & POLYMER LTD
LOI No :
BCPL/C&P/6907/T-171/SK/55 Dated
22.11.10
BRAHMAPUTRA CRACKER & POLYMER PROJECT
COMPLETION SCHEDULE
NAME OF WORK: SPHERE JO
PMC: ENGINEERS INDIA LIMITED NAME OF AGENCY: IOT INFRASTRUCTURE AND
SR No. Description UOM Scope Achived Balance Mar-12 Apr-12 May-12 Jun-12 Jul-12 Aug-12 Sep-12
1 Fabrication
a Rolling of Columns Nos 12 12 0
b Rolling of Stub End Nos 12 12 0
c Pressing of Petals Nos 62 50 12
i Pressing Of RF pad Nos 12 12 0
ii Pressing of EP Nos 12 12 0
iii Pressing of IP Nos 12 12 0
iv Pressing Of TP & BP Nos 24 14 10 10
v Pressing of TC/BC Nos 2 2 2
d Fixing And Welding of Stub End , RF Pad and petals Nos 12 12 0
2 Erection 0
a Erection of Column with all attachment Nos 12 12 0
b Erection Of EP Petals with Stub End and Rf Pad Nos 12 12 0
c Erection Of IP Nos 12 12 0
d Erection Of BP/TP Nos 24 12 12 12
e Erection of TC& BC Nos 2 2 2
3 Welding 0
a Welding of Columns (formation of Pipe ) Nos 12 12 0
b Welding of Stub end Nos 12 12 0
c Welding OF Ep and IP RMT 240 240 240
d Welding of BP and TP RMT 124.8 124.8 62.4 62.4
e Welding of TC & BC RMT 18 18 9 9
4 NDT before PWHT RMT 382.8 382.8 100 140 62.4 62.4 18
5 PWHT LOT 1 1 1
6 NDT after PWHT RMT 382.8 382.8
7 Hydrotest LOT 1 1
8 Structural Work 0
a Structural Fabrication MT 21 21 10 11
b Structural Erection And Welding MT 21 21 10 11
9 Blasting & Painting SQM 713 713
10 Insulation /Fire proofing LOT 1 1
SPHERE NO 143-TS-03C
-
8/2/2019 Catch Up Plan 2012
4/24
CLIENT: M/S. BRAHMAPUTRA CRACKER & POLYMER LTD
LOI No :
BCPL/C&P/6907/T-171/SK/55 Dated
22.11.10
BRAHMAPUTRA CRACKER & POLYMER PROJECT
COMPLETION SCHEDULE
NAME OF WORK: SPHERE JO
PMC: ENGINEERS INDIA LIMITED NAME OF AGENCY: IOT INFRASTRUCTURE AND
SR No. Description UOM Scope Achived Balance Mar-12 Apr-12 May-12 Jun-12 Jul-12 Aug-12 Sep-12
1 Fabrication
a Rolling of Columns Nos 12 12 0
b Rolling of Stub End Nos 12 12 0
c Pressing of Petals Nos 62 12 50
i Pressing Of RF pad Nos 12 12 0
ii Pressing of EP Nos 12 12 12
iii Pressing of IP Nos 12 12 12
iv Pressing Of TP & BP Nos 24 24 12 12
v Pressing TC & BC Nos 2 2 2
d Fixing And Welding of Stub End , RF Pad and petals Nos 12 12 6 6
2 Erection 0
a Erection of Column with all attachment Nos 12 12 0
b Erection Of EP Petals with Stub End and Rf Pad Nos 12 0 12 6 6
c Erection Of IP Nos 12 0 12 5 5
d Erection Of BP/TP Nos 24 0 24 14 10
e Erection of TC& BC Nos 2 2 2
3 Welding 0
a Welding of Columns (formation of Pipe ) Nos 12 12 0
b Welding of Stub end Nos 12 12 0
c Welding OF Ep and IP RMT 240 240 40 100
d Welding of BP and TP RMT 124.8 124.8 124
e Welding of TC & BC RMT 18 18 18
4 NDT before PWHT RMT 382.8 382.8 82 100 200.8
5 PWHT LOT 1 1 1
6 NDT after PWHT RMT 382.8 382.8 382.8
7 Hydrotest LOT 1 1 1
8 Structural Work 0
a Structural Fabrication MT 21 21 10 11
b Structural Erection And Welding MT 21 21 10 11
9 Blasting & Painting SQM 713 713 713
10 Insulation /Fire proofing LOT 1 1 1
SPHERE NO 143-TS-04
-
8/2/2019 Catch Up Plan 2012
5/24
CLIENT: M/S. BRAHMAPUTRA CRACKER & POLYMER LTD
LOI No :
BCPL/C&P/6907/T-171/SK/55 Dated
22.11.10
BRAHMAPUTRA CRACKER & POLYMER PROJECT
COMPLETION SCHEDULE
NAME OF WORK: SPHERE JO
PMC: ENGINEERS INDIA LIMITED NAME OF AGENCY: IOT INFRASTRUCTURE AND
SR No. Description UOM Scope Achived Balance Mar-12 Apr-12 May-12 Jun-12 Jul-12 Aug-12 Sep-12
1 Fabrication
a Rolling of Columns Nos 16 16
b Rolling of Stub End Nos 16 5 11 11
c Pressing of Petals Nos 82 0 82 0 0 54 26 2 0 0
i Pressing Of RF pad Nos 16 16 16
ii Pressing of EP Nos 16 16 16
iii Pressing of IP Nos 16 16 16
iv Pressing Of TP & BP Nos 32 32 6 26
V Pressing Of TC/BC Nos 2 2 2
d Fixing And Welding of Stub End , RF Pad and petals Nos 16 16 6 10
2 Erection Nos 0
a Erection of Column with all attachment Nos 16 16 0
b Erection Of EP Petals with Stub End and Rf Pad Nos 16 16 3 13
c Erection Of IP Nos 16 16 16
d Erection Of BP/TP Nos 32 32 4 28
e Erection of TC& BC Nos 2 2 2
3 Welding Nos 0
a Welding of Columns (formation of Pipe ) Nos 16 16 0
b Welding of Stub end Nos 16 16 16
c Welding OF Ep and IP RMT 256 256 200 56
d Welding of BP and TP RMT 352 352 176 176
e Welding of TC & BC RMT 18 18 18
4 NDT before PWHT RMT 626 626 126 200 300
5 PWHT LOT 1 1
6 NDT after PWHT RMT 626 626
7 Hydrotest LOT 1 1
8 Structural Work 0
a Structural Fabrication MT 30.53 30.53 15 15.2
b Structural Erection And Welding MT 30.53 30.53
9 Blasting & Painting SQM 2832.5 2832.5
10 Insulation /Fire proofing LOT 1 1
SPHERE NO 143-TS-05A
-
8/2/2019 Catch Up Plan 2012
6/24
CLIENT: M/S. BRAHMAPUTRA CRACKER & POLYMER LTD
LOI No :
BCPL/C&P/6907/T-171/SK/55 Dated
22.11.10
BRAHMAPUTRA CRACKER & POLYMER PROJECT
COMPLETION SCHEDULE
NAME OF WORK: SPHERE JO
PMC: ENGINEERS INDIA LIMITED NAME OF AGENCY: IOT INFRASTRUCTURE AND
SR No. Description UOM Scope Achived Balance Mar-12 Apr-12 May-12 Jun-12 Jul-12 Aug-12 Sep-12
1 Fabrication
a Rolling of Columns Nos 16 16 0
b Rolling of Stub End Nos 16 16 0
c Pressing of Petals Nos 82 40 42
i Pressing Of RF pad Nos 16 16 0
ii Pressing of EP Nos 16 13 3 3
iii Pressing of IP Nos 16 11 5 5
iv Pressing Of TP & BP Nos 32 0 32 32
V Pressing Of TC/BC Nos 2 2 2
d Fixing And Welding of Stub End , RF Pad and petals Nos 16 4 12 12
2 Erection Nos 0
a Erection of Column with all attachment Nos 16 16 0
b Erection Of EP Petals with Stub End and Rf Pad Nos 16 2 14 14
c Erection Of IP Nos 16 4 12 12
d Erection Of BP/TP Nos 32 32 32
e Erection of TC& BC Nos 2 2 2
3 Welding Nos 0
a Welding of Columns (formation of Pipe ) Nos 16 16 0
b Welding of Stub end Nos 16 16 0
c Welding OF Ep and IP RMT 256 256 26 230
d Welding of BP and TP RMT 352 352 200 152
e Welding of TC & BC RMT 18 18 18
4 NDT before PWHT RMT 626 626 300 308 18
5 PWHT LOT 1 1 1
6 NDT after PWHT RMT 626 626 626
7 Hydrotest LOT 1 1 1
8 Structural Work 0
a Structural Fabrication MT 30.5 30.5 15 15.2
b Structural Erection And Welding MT 30.5 30.5 30.5
9 Blasting & Painting SQM 2832.5 2832.5 2832.5
10 Insulation /Fire proofing LOT 1 1
SPHERE NO 143-TS-05B
-
8/2/2019 Catch Up Plan 2012
7/24
CLIENT: M/S. BRAHMAPUTRA CRACKER & POLYMER LTD
LOI No :
BCPL/C&P/6907/T-171/SK/55 Dated
22.11.10
BRAHMAPUTRA CRACKER & POLYMER PROJECT
COMPLETION SCHEDULE
NAME OF WORK: SPHERE JO
PMC: ENGINEERS INDIA LIMITED NAME OF AGENCY: IOT INFRASTRUCTURE AND
SR No. Description UOM Scope Achived Balance Mar-12 Apr-12 May-12 Jun-12 Jul-12 Aug-12 Sep-12
1 Fabrication
a Rolling of Columns Nos 16 16 0
b Rolling of Stub End Nos 16 16 0
c Pressing of Petals Nos 82 28 54
i Pressing Of RF pad Nos 16 15 1 1
ii Pressing of EP Nos 16 7 9 9
iii Pressing of IP Nos 16 6 10 10
iv Pressing Of TP & BP Nos 32 0 32 16 16
V Pressing Of TC/BC Nos 2 2 2
d Fixing And Welding of Stub End , RF Pad and petals Nos 16 2 14 14
2 Erection Nos 0
a Erection of Column with all attachment Nos 16 16 0
b Erection Of EP Petals with Stub End and Rf Pad Nos 16 0 16 4 12
c Erection Of IP Nos 16 16 3 13
d Erection Of BP/TP Nos 32 32 32
e Erection of TC& BC Nos 2 2 2
3 Welding Nos 0
a Welding of Columns (formation of Pipe ) Nos 16 16 0
b Welding of Stub end Nos 16 16 0
c Welding OF Ep and IP RMT 256 256 56 200
d Welding of BP and TP RMT 352 352 52 300
e Welding of TC & BC RMT 18 18 18
4 NDT before PWHT RMT 626 626 126 200 300
5 PWHT LOT 1 1 1
6 NDT after PWHT RMT 626 626 626
7 Hydrotest LOT 1 1 1
8 Structural Work 0
a Structural Fabrication MT 30.5 30.5 15 15.2
b Structural Erection And Welding MT 30.5 30.5 10 20
9 Blasting & Painting SQM 2832.5 2832.5 2832
10 Insulation /Fire proofing LOT 1 1
SPHERE NO 143-TS-05C
-
8/2/2019 Catch Up Plan 2012
8/24
CLIENT: M/S. BRAHMAPUTRA CRACKER & POLYMER LTD
LOI No :
BCPL/C&P/6907/T-171/SK/55 Dated
22.11.10
BRAHMAPUTRA CRACKER & POLYMER PROJECT
COMPLETION SCHEDULE
NAME OF WORK: SPHERE JO
PMC: ENGINEERS INDIA LIMITED NAME OF AGENCY: IOT INFRASTRUCTURE AND
SR No. Description UOM Scope Achived Balance Mar-12 Apr-12 May-12 Jun-12 Jul-12 Aug-12 Sep-12
1 Fabrication
a Rolling of Columns Nos 16 16 0
b Rolling of Stub End Nos 16 16 16
c Pressing of Petals Nos 82 0 82
i Pressing Of RF pad Nos 16 16 16
ii Pressing of EP Nos 16 16 16
iii Pressing of IP Nos 16 16 16
iv Pressing Of TP & BP Nos 32 32 3 29
V Pressing Of TC/BC Nos 2 2 2
d Fixing And Welding of Stub End , RF Pad and petals Nos 16 16 4 8
2 Erection Nos 0
a Erection of Column with all attachment Nos 16 0 16 16
b Erection Of EP Petals with Stub End and Rf Pad Nos 16 16 16
c Erection Of IP Nos 16 16 16
d Erection Of BP/TP Nos 32 32 12 20
e Erection of TC& BC Nos 2 2 2
3 Welding Nos 0
a Welding of Columns (formation of Pipe ) Nos 16 16 0
b Welding of Stub end Nos 16 16 16
c Welding OF Ep and IP RMT 256 256 256
d Welding of BP and TP RMT 352 352 52 300
e Welding of TC & BC RMT 18 18 18
4 NDT before PWHT RMT 626 626 150 200 326
5 PWHT LOT 1 1 1
6 NDT after PWHT RMT 626 626 626
7 Hydrotest LOT 1 1 1
8 Structural Work 0
a Structural Fabrication MT 30.53 30.5 15 15.2
b Structural Erection And Welding MT 30.53 30.5 10
9 Blasting & Painting SQM 2832.5 2832.5
10 Insulation /Fire proofing LOT 1 1
SPHERE NO 143-TS-05D
-
8/2/2019 Catch Up Plan 2012
9/24
CLIENT: M/S. BRAHMAPUTRA CRACKER & POLYMER LTD
LOI No :
BCPL/C&P/6907/T-171/SK/55 Dated
22.11.10
BRAHMAPUTRA CRACKER & POLYMER PROJECT
COMPLETION SCHEDULE
NAME OF WORK: SPHERE JO
PMC: ENGINEERS INDIA LIMITED NAME OF AGENCY: IOT INFRASTRUCTURE AND
SR No. Description UOM Scope Achived Balance Mar-12 Apr-12 May-12 Jun-12 Jul-12 Aug-12 Sep-12
1 Fabrication
a Rolling of Columns Nos 16 16 0
b Rolling of Stub End Nos 16 16 8 8
c Pressing of Petals Nos 66 0 66
i Pressing Of RF pad Nos 16 16 8 8
ii Pressing of EP Nos 16 16 3 13
iii Pressing of IP Nos 0 0
iv Pressing Of TP & BP Nos 32 32 32
V Pressing Of TC/BC Nos 2 2 1 1
d Fixing And Welding of Stub End , RF Pad and petals Nos 16 16 16
2 Erection Nos 0
a Erection of Column with all attachment Nos 16 7 9 9
b Erection Of EP Petals with Stub End and Rf Pad Nos 16 16 16
c Erection Of IP Nos 0 0
d Erection Of BP/TP Nos 32 32 8 24
e Erection of TC& BC Nos 2 2 2
3 Welding Nos 0
a Welding of Columns (formation of Pipe ) Nos 16 16 0
b Welding of Stub end Nos 16 16 16
c Welding OF Ep and IP RMT 128 128 128
d Welding of BP and TP RMT 233.6 233.6 100 133.6
e Welding of TC & BC RMT 18 18 18
4 NDT before PWHT RMT 379.6 379.6 79 279.6
5 PWHT LOT 1 1 1
6 NDT after PWHT RMT 379.6 379.6 379.6
7 Hydrotest LOT 1 1
8 Structural Work 0
a Structural Fabrication MT 30.53 30.5 10 20.5
b Structural Erection And Welding MT 30.53 30.5 20.5
9 Blasting & Painting SQM 2216 2216
10 Insulation /Fire proofing LOT 1 1
SPHERE NO 143-TS-06
-
8/2/2019 Catch Up Plan 2012
10/24
CLIENT: M/S. BRAHMAPUTRA CRACKER & POLYMER LTD
LOI No :
BCPL/C&P/6907/T-171/SK/55 Dated
22.11.10
BRAHMAPUTRA CRACKER & POLYMER PROJECT
COMPLETION SCHEDULE
NAME OF WORK: SPHERE JO
PMC: ENGINEERS INDIA LIMITED NAME OF AGENCY: IOT INFRASTRUCTURE AND
SR No. Description UOM Scope Achived Balance Mar-12 Apr-12 May-12 Jun-12 Jul-12 Aug-12 Sep-12
1 Fabrication
a Rolling of Columns Nos 12 12 12
b Rolling of Stub End Nos 12 12 12
c Pressing of Petals Nos 62 0 62
i Pressing Of RF pad Nos 12 12 12
ii Pressing of EP Nos 12 12 12
iii Pressing of IP Nos 12 12 12
iv Pressing Of TP & BP Nos 24 24 24
V Pressing Of TC/BC Nos 2 2 2
d Fixing And Welding of Stub End , RF Pad and petals Nos 12 12 8 4
2 Erection Nos 0
a Erection of Column with all attachment Nos 12 12 12
b Erection Of EP Petals with Stub End and Rf Pad Nos 12 12 6 6
c Erection Of IP Nos 12 12 5 7
d Erection Of BP/TP Nos 24 24 20 4
e Erection of TC& BC Nos 2 2 2
3 Welding Nos 0
a Welding of Columns (formation of Pipe ) Nos 12 0 12 12
b Welding of Stub end Nos 12 12 12
c Welding OF Ep and IP RMT 94.6 94.6 94.6
d Welding of BP and TP RMT 127.2 127.2 27.2 100
e Welding of TC & BC RMT 18 18 18
4 NDT before PWHT RMT 240 240 94.6 127.2 18
5 PWHT LOT 1 1 1
6 NDT after PWHT RMT 240 240 240
7 Hydrotest LOT 1 1
8 Structural Work 0
a Structural Fabrication MT 21.25 21.3 10 11.3
b Structural Erection And Welding MT 21.25 21.3 15.3
9 Blasting & Painting SQM 564 564
10 Insulation /Fire proofing LOT 1 1
SPHERE NO 143-TS-07
-
8/2/2019 Catch Up Plan 2012
11/24
CLIENT: M/S. BRAHMAPUTRA CRACKER & POLYMER LTD
LOI No :
BCPL/C&P/6907/T-171/SK/55 Dated
22.11.10
BRAHMAPUTRA CRACKER & POLYMER PROJECT
COMPLETION SCHEDULE
NAME OF WORK: SPHERE JO
PMC: ENGINEERS INDIA LIMITED NAME OF AGENCY: IOT INFRASTRUCTURE AND
SR No. Description UOM Scope Achived Balance Mar-12 Apr-12 May-12 Jun-12 Jul-12 Aug-12 Sep-12
1 Fabrication
a Rolling of Columns Nos 12 12 0
b Rolling of Stub End Nos 12 12 0
c Pressing of Petals Nos 50 2 48
i Pressing Of RF pad Nos 12 12 12
ii Pressing of EP Nos 12 2 10 10
iii Pressing of IP Nos 0
iv Pressing Of TP & BP Nos 24 24 12 12
V Pressing Of TC/BC Nos 2 2 2
d Fixing And Welding of Stub End , RF Pad and petals Nos 12 12 6 6
2 Erection Nos 0
a Erection of Column with all attachment Nos 12 12 0
b Erection Of EP Petals with Stub End and Rf Pad Nos 12 12 3 9
c Erection Of IP Nos 0
d Erection Of BP/TP Nos 24 24 12 12
e Erection of TC& BC Nos 2 2 2
3 Welding Nos 0
a Welding of Columns (formation of Pipe ) Nos 12 12 0
b Welding of Stub end Nos 12 12 0
c Welding OF Ep and IP RMT 94.8 94.8 94.8
d Welding of BP and TP RMT 127 127 27 100
e Welding of TC & BC RMT 18 18 18
4 NDT before PWHT RMT 240 240 100 122 18
5 PWHT LOT 1 1 1
6 NDT after PWHT RMT 240 240 240
7 Hydrotest LOT 1 1 1
8 Structural Work 0
a Structural Fabrication MT 21.25 21.3 10 11.3
b Structural Erection And Welding MT 21.25 21.3 10 11.3
9 Blasting & Painting SQM 564 564
10 Insulation /Fire proofing LOT 1 1
SPHERE NO 143-TS-01A
-
8/2/2019 Catch Up Plan 2012
12/24
CLIENT: M/S. BRAHMAPUTRA CRACKER & POLYMER LTD
LOI No :
BCPL/C&P/6907/T-171/SK/55 Dated
22.11.10
BRAHMAPUTRA CRACKER & POLYMER PROJECT
COMPLETION SCHEDULE
NAME OF WORK: SPHERE JO
PMC: ENGINEERS INDIA LIMITED NAME OF AGENCY: IOT INFRASTRUCTURE AND
SR No. Description UOM Scope Achived Balance Mar-12 Apr-12 May-12 Jun-12 Jul-12 Aug-12 Sep-12
1 Fabrication
a Rolling of Columns Nos 12 4 8 8
b Rolling of Stub End Nos 12 12 0
c Pressing of Petals Nos 50 0 50
i Pressing Of RF pad Nos 12 12 12
ii Pressing of EP Nos 12 0 12 12
iii Pressing of IP Nos 0
iv Pressing Of TP & BP Nos 24 24 12 12
V Pressing Of TC/BC Nos 2 2 2
d Fixing And Welding of Stub End , RF Pad and petals Nos 12 12 6 6
2 Erection Nos 0
a Erection of Column with all attachment Nos 12 0 12 12
b Erection Of EP Petals with Stub End and Rf Pad Nos 12 12 3 9
c Erection Of IP Nos 0
d Erection Of BP/TP Nos 24 24 12 12
e Erection of TC& BC Nos 2 2 2
3 Welding Nos 0
a Welding of Columns (formation of Pipe ) Nos 12 12 12
b Welding of Stub end Nos 12 12 12
c Welding OF Ep and IP RMT 94.8 94.8 94.8
d Welding of BP and TP RMT 127 127 27 100
e Welding of TC & BC RMT 18 18 18
4 NDT before PWHT RMT 240 240 100 122 18
5 PWHT LOT 1 1 1
6 NDT after PWHT RMT 240 240 240
7 Hydrotest LOT 1 1
8 Structural Work 0
a Structural Fabrication MT 21.25 21.3 10 11.3
b Structural Erection And Welding MT 21.25 21.3 10
9 Blasting & Painting SQM 564 564
10 Insulation /Fire proofing LOT 1 1
SPHERE NO 143-TS-01B
-
8/2/2019 Catch Up Plan 2012
13/24
Dec-12
Page 13 of 24
-
8/2/2019 Catch Up Plan 2012
14/24
Dec-12
Page 14 of 24
-
8/2/2019 Catch Up Plan 2012
15/24
Dec-12
1
Page 15 of 24
-
8/2/2019 Catch Up Plan 2012
16/24
Dec-12
Page 16 of 24
-
8/2/2019 Catch Up Plan 2012
17/24
Dec-12
0
Page 17 of 24
-
8/2/2019 Catch Up Plan 2012
18/24
Dec-12
Page 18 of 24
-
8/2/2019 Catch Up Plan 2012
19/24
Dec-12
Page 19 of 24
-
8/2/2019 Catch Up Plan 2012
20/24
Dec-12
1
Page 20 of 24
-
8/2/2019 Catch Up Plan 2012
21/24
Dec-12
1
Page 21 of 24
-
8/2/2019 Catch Up Plan 2012
22/24
Dec-12
Page 22 of 24
-
8/2/2019 Catch Up Plan 2012
23/24
Dec-12
Page 23 of 24
-
8/2/2019 Catch Up Plan 2012
24/24
Dec-12
1
Page 24 of 24