Data Recorders:JABS Bomb Drop

Casey BirminghamNAWCWDChina Lake, CAFunded by ONR

Approved for Public Release; Distribution is Unlimited

Page 2: Casey Birmingham NAWCWD China Lake, CA...Data Recorders: JABS Bomb Drop Casey Birmingham NAWCWD China Lake, CA Funded by ONR Approved for Public Release; Distribution is Unlimited

Purpose ofJDAM JABS

Joint Direct Attack Munitions (JDAM) Assault Breaching System (JABS)

To clear mines and obstacles to support amphibious assault

Two Environments: Surf and Beach ZonesSystem was effective in Beach Zones, and at up to 3 meters of waterExtended to include “VSW” Zone (Very Shallow Water)

Water depth of 10 to 40 feet

Investigation into what combination of warhead and fuzes was most effective

Page 3: Casey Birmingham NAWCWD China Lake, CA...Data Recorders: JABS Bomb Drop Casey Birmingham NAWCWD China Lake, CA Funded by ONR Approved for Public Release; Distribution is Unlimited

What and How

What is needed for High Effectiveness in VSW

The acceleration levels seen by the bomb on impact into water and sand

How to find these acceleration levelsInstall data recorders that will survive impact and monitor all crucial components

AccelerometersImpact Switches

Page 4: Casey Birmingham NAWCWD China Lake, CA...Data Recorders: JABS Bomb Drop Casey Birmingham NAWCWD China Lake, CA Funded by ONR Approved for Public Release; Distribution is Unlimited

Brief History:The Beginning

1997

• Single channel 16 bit x 32k memory Data Recorder• Memory stored on SRAM, as power is lost, the data is

transferred to EEPROM

Page 5: Casey Birmingham NAWCWD China Lake, CA...Data Recorders: JABS Bomb Drop Casey Birmingham NAWCWD China Lake, CA Funded by ONR Approved for Public Release; Distribution is Unlimited

2005

• 3 channel 16 bit x 32k memory • Same FPGA Package• Memory stored in FRAM memory chips

• 45 year storage life• Two wire trigger

• Write Mode/Read Mode• Save pre-trigger data, write remaining

data

Design Includes Shock Hardened Capacitorsso recorder has power throughout impactregardless of power supply

Page 6: Casey Birmingham NAWCWD China Lake, CA...Data Recorders: JABS Bomb Drop Casey Birmingham NAWCWD China Lake, CA Funded by ONR Approved for Public Release; Distribution is Unlimited

Objective ofJABS Drop Tests

1. Record the accelerations acting on fuzes inside fuzewell of a 2000 lb. JDAM during impact

2. Record Impact Switch Closures during impact, compare to accelerations

Page 7: Casey Birmingham NAWCWD China Lake, CA...Data Recorders: JABS Bomb Drop Casey Birmingham NAWCWD China Lake, CA Funded by ONR Approved for Public Release; Distribution is Unlimited

Redundancy• Two Recorders per Bomb• Two Accelerometers per

Recorder

Recorder Features• Non-Volatile Memory• 100 milliseconds of Pre-trigger

Data• 200 milliseconds of Post-trigger

Data

JABS Flight Drop test:Requirements

Shock Hardened Recorder Pre-flight Confidence Testing

• Temperature cycling• Flight vibration• Shock• Simulated FZU-48 power enable

Data Recorder

* Funded by ONR

Page 8: Casey Birmingham NAWCWD China Lake, CA...Data Recorders: JABS Bomb Drop Casey Birmingham NAWCWD China Lake, CA Funded by ONR Approved for Public Release; Distribution is Unlimited

Drop Environments

First flight drop into simulated Beach Zone

Second flight drop into simulated Surf Zone

10 feet of water, then sand

Page 9: Casey Birmingham NAWCWD China Lake, CA...Data Recorders: JABS Bomb Drop Casey Birmingham NAWCWD China Lake, CA Funded by ONR Approved for Public Release; Distribution is Unlimited

Placement ofRecorders

Aft Fuze Well

Forward Fuze Well

FZU-48

Page 10: Casey Birmingham NAWCWD China Lake, CA...Data Recorders: JABS Bomb Drop Casey Birmingham NAWCWD China Lake, CA Funded by ONR Approved for Public Release; Distribution is Unlimited

JABS DATA RECORDERBZ Block Diagram

Data Channel 1

Data Channel 2

Data Channel 3

PiezoelectricAccelerometer

PiezoresistiveAccelerometer

I 1

I 2

I 3

I 4

Turbine Release

Filter and Pulse limiter Start

Record

200 msecDelay

Stop Record

Shock-Hardened CapacitorsBattery

PackVoltage Converter

FilterFZUPower

Mode &Trigger 1

Trigger 2

FORE and AFT IMPACT SWITCHES

ExternalRecorder

FZU

PowerRegulation

Page 11: Casey Birmingham NAWCWD China Lake, CA...Data Recorders: JABS Bomb Drop Casey Birmingham NAWCWD China Lake, CA Funded by ONR Approved for Public Release; Distribution is Unlimited

Results from Beach Zone

Mixed BagSome positive indicators, some recorder anomalies

Reasonable acceleration Characterization

Page 12: Casey Birmingham NAWCWD China Lake, CA...Data Recorders: JABS Bomb Drop Casey Birmingham NAWCWD China Lake, CA Funded by ONR Approved for Public Release; Distribution is Unlimited

Accelerometer Malfunctioning Power Loss or Reset to the recorder

Results from Beach Zone

• The negative results included:• Unusable Impact Switch closure data• Broken wire causing an accelerometer malfunction• Power loss or reset on one recorder• Non-trigger on one recorder

Page 13: Casey Birmingham NAWCWD China Lake, CA...Data Recorders: JABS Bomb Drop Casey Birmingham NAWCWD China Lake, CA Funded by ONR Approved for Public Release; Distribution is Unlimited

Changes to recorder fromBeach Zone to Surf Zone

Unusable Impact Switch Data:Changed from a resistor divider, to 1 bit digital signal, monitored each line individually.

Recorder No-Trigger:Mass from solder and thick wire gauge resulted in a broken connectorFixed by reducing wire gauge and using less solder. Changed testing procedure to test the connector.

Broken Accelerometer Wire:Fixed by increasing the diameter of thru-hole mount on PCB board. Glued strain relief to mounting structure.

Power Loss or Reset:Could not recreate in lab, redrew printed circuit board layouts to make sure no existing electrical lead problem would occur again. Team concluded that it was a unique event that would most likely not happen again.

Page 14: Casey Birmingham NAWCWD China Lake, CA...Data Recorders: JABS Bomb Drop Casey Birmingham NAWCWD China Lake, CA Funded by ONR Approved for Public Release; Distribution is Unlimited

JABS DATA RECORDERBZ Block Diagram

Data Channel 1

Data Channel 2

Data Channel 3

PiezoelectricAccelerometer2255

PiezoresistiveAccelerometer7270

I 2

I 1

I 3

I 4

TurbineRelease

Filter and Pulse limiter Start

Record

200 msecDelay

Stop Record

Shock-Hardened CapacitorsBattery

PackVoltage Converter

FilterFZUPower

Mode &Trigger 1

Trigger 2

FORE and AFT IMPACT SWITCHES

ExternalRecorder

FZU

PowerRegulation

PiezoelectricAccelerometer3901

1-Bit Digital

Page 15: Casey Birmingham NAWCWD China Lake, CA...Data Recorders: JABS Bomb Drop Casey Birmingham NAWCWD China Lake, CA Funded by ONR Approved for Public Release; Distribution is Unlimited

Results from Surf Zone

Accurate Acceleration DataAll accelerometer records stored similar data and recorded like events

Page 16: Casey Birmingham NAWCWD China Lake, CA...Data Recorders: JABS Bomb Drop Casey Birmingham NAWCWD China Lake, CA Funded by ONR Approved for Public Release; Distribution is Unlimited

Results from Surf Zone

Some anomalies did occur:Protection diodes for Impact Switch record lines shorted. Voltage on trigger line was recorded instead of switch closure.Common trigger line between Nose and Tail recorders on Bomb 1 failed. Recorders triggered independently of each other.Both recorders on Bomb 2 reset around 15 ms after trigger. Impact event was captured, however this reset event was obviously no longer considered unique.

Page 17: Casey Birmingham NAWCWD China Lake, CA...Data Recorders: JABS Bomb Drop Casey Birmingham NAWCWD China Lake, CA Funded by ONR Approved for Public Release; Distribution is Unlimited

Final Conclusions ofFlight Test

First Objective: Record Acceleration LevelsAcceleration records were accurateGood for Modeling and Simulation

Second Objective: Record Impact Switch Closure

Difficulty interpreting results from BZ dropProtection diode failure on SZ drop