Page 1: Campo Wind Project December 6, 2018 6:00 PMdudek.com/campowind/Campo Wind Scoping_Presentation_rev.pdfDecember 6, 2018 6:00 PM LEAD AGENCY: U.S. Department of the Interior, Bureau

SCOPING MEETING

Campo Wind Project

December 6, 2018

6:00 PM

LEAD AGENCY: U.S. Department of the Interior, Bureau of Indian Affairs

Page 2: Campo Wind Project December 6, 2018 6:00 PMdudek.com/campowind/Campo Wind Scoping_Presentation_rev.pdfDecember 6, 2018 6:00 PM LEAD AGENCY: U.S. Department of the Interior, Bureau

WHEN IS NEPA REVIEW REQUIRED?

National Environmental Policy Act (NEPA) review is required prior to taking a major federal action

In this case, the proposed major federal action requested by the Campo Band of Diegueno Mission Indians (Campo Tribe) is approval of a lease of approximately 2,200 acres with TerraGen Development Company, LLC for the purpose of developing a renewable wind energy project

Page 3: Campo Wind Project December 6, 2018 6:00 PMdudek.com/campowind/Campo Wind Scoping_Presentation_rev.pdfDecember 6, 2018 6:00 PM LEAD AGENCY: U.S. Department of the Interior, Bureau

Proposed Action

Yes

Agency

Action

Categorical Exclusion or

Other Exemption?Environmental

Assessment (EA)No

Significant Impacts May

Occur?

Agency

Action

Finding of No Significant

Impact (FONSI)

No

NEPA PROCESS OVERVIEW

Yes

Environmental Impact Statement (EIS)

Required

1) Notice of Intent (NOI)

2) Scoping (includes Public Meeting)

3) Draft EIS

4) Agency/Public Review (includes

Public Meeting)

5) Final EIS

6) Record of Decision (ROD)

Agency

Action

Page 4: Campo Wind Project December 6, 2018 6:00 PMdudek.com/campowind/Campo Wind Scoping_Presentation_rev.pdfDecember 6, 2018 6:00 PM LEAD AGENCY: U.S. Department of the Interior, Bureau

PROPOSED ACTION

Lease approval within San Diego County

The Campo Tribe proposed to lease sovereign lands to TerraGen Development Company, LLC for the purpose of developing a renewable energy (wind) project

▪ 2,200-acre lease area on the Campo Reservation within the eastern portion of San Diego County.

▪ 60, 2.5-4.2 MW Wind Turbines

▪ Approximately 252 MW of wind generated electricity

▪ Generation Tie line to extend off-Reservation to connect to the Sunrise Powerlink

Page 5: Campo Wind Project December 6, 2018 6:00 PMdudek.com/campowind/Campo Wind Scoping_Presentation_rev.pdfDecember 6, 2018 6:00 PM LEAD AGENCY: U.S. Department of the Interior, Bureau

Project Location and Lease Lands

Map is preliminary and may be subject to change

Golden

Acorn

Casino

I-8

Ribbonwood

Road

Old Highway 80

SR-94

BIA-10 /

Church Road

Moon Valley

Road

Miller Valley

Road

Shockey Truck

Trail

Tierra Del Sol Road

Page 6: Campo Wind Project December 6, 2018 6:00 PMdudek.com/campowind/Campo Wind Scoping_Presentation_rev.pdfDecember 6, 2018 6:00 PM LEAD AGENCY: U.S. Department of the Interior, Bureau

EIS PROCESS - Scoping

Notice of Intent (NOI) published in the federal register on November 21, 2018, beginning the scoping process

The NOI and all future NEPA documents will be posted online at http://www.campowind.com

“Scoping” refers to the process by which lead agencies solicit input from the public and interested agencies on the nature and extent of issues and impacts to be addressed in the EIS and the methods by which they will be evaluated

The scope of a document includes the extent of the action, the range of alternatives, and the types of impacts to be evaluated

Page 7: Campo Wind Project December 6, 2018 6:00 PMdudek.com/campowind/Campo Wind Scoping_Presentation_rev.pdfDecember 6, 2018 6:00 PM LEAD AGENCY: U.S. Department of the Interior, Bureau

ISSUES TO BE ANALYZED IN THE EIS Greenhouse Gas Emissions

and Climate Change

Water Resources

Air Quality

Noise

Biological Resources

Cultural Resources

Traffic and Transportation

Land Use

Public Health and Environmental Safety

Public Services and Utilities

Socioeconomics and Environmental Justice

Visual Resources/Aesthetics

Indirect and Cumulative Effects

Page 8: Campo Wind Project December 6, 2018 6:00 PMdudek.com/campowind/Campo Wind Scoping_Presentation_rev.pdfDecember 6, 2018 6:00 PM LEAD AGENCY: U.S. Department of the Interior, Bureau

EIS PROCESS – Scoping Comments

The scoping comment period ends December 21, 2018

The scoping comment period, including this scoping meeting, provides the public with an opportunity to comment on the scope of the upcoming EIS

All scoping comments, whether written or spoken at this meeting, will be considered equally by the BIA

Page 9: Campo Wind Project December 6, 2018 6:00 PMdudek.com/campowind/Campo Wind Scoping_Presentation_rev.pdfDecember 6, 2018 6:00 PM LEAD AGENCY: U.S. Department of the Interior, Bureau

EIS PROCESS – Scoping Report

After the close of the scoping comment period, the BIA will prepare a Scoping Report that summarizes the comments received during the scoping period

Each comment letter received and a transcript of this scoping meeting will be included in the Scoping Report

The BIA will utilize the Scoping Report in preparing a Draft EIS

Page 10: Campo Wind Project December 6, 2018 6:00 PMdudek.com/campowind/Campo Wind Scoping_Presentation_rev.pdfDecember 6, 2018 6:00 PM LEAD AGENCY: U.S. Department of the Interior, Bureau

EIS PROCESS – Draft EIS

The BIA will prepare a Draft EIS that analyzes the environmental impacts of the proposed action along with a reasonable range of alternatives

The Draft EIS will be made available to the public for at least a 45 day review and comment period

Another public meeting will be held during the Draft EIS review and comment period

Page 11: Campo Wind Project December 6, 2018 6:00 PMdudek.com/campowind/Campo Wind Scoping_Presentation_rev.pdfDecember 6, 2018 6:00 PM LEAD AGENCY: U.S. Department of the Interior, Bureau

EIS PROCESS – Final EIS and ROD

After the public review/comment period on the Draft EIS has closed, the BIA will prepare a Final EIS

The Final EIS will include responses to all substantive comments received on the Draft EIS

When completed, the Final EIS will be made available to the public for review

At least 30 days after the publication of the Final EIS, the BIA will issue a Record of Decision (ROD) that includes its decision on whether or not to approve the proposed action

The ROD marks the end of the NEPA process

Page 12: Campo Wind Project December 6, 2018 6:00 PMdudek.com/campowind/Campo Wind Scoping_Presentation_rev.pdfDecember 6, 2018 6:00 PM LEAD AGENCY: U.S. Department of the Interior, Bureau

BIA CONTACT INFORMATIONYou may mail, hand carry, or fax written comments to:

Ms. Amy Dutschke, Regional Director

Bureau of Indian Affairs, Pacific Regional Office

2800 Cottage Way

Sacramento, CA 95825

For further information contact:

Dan Hall, Bureau of Indian Affairs

Phone – (916) 978-6041

Also Visit: http://www.campowind.com

Page 13: Campo Wind Project December 6, 2018 6:00 PMdudek.com/campowind/Campo Wind Scoping_Presentation_rev.pdfDecember 6, 2018 6:00 PM LEAD AGENCY: U.S. Department of the Interior, Bureau

Public Comments

Map is preliminary and may be subject to change

Golden

Acorn

Casino

I-8

Ribbonwood

Road

Old Highway 80

SR-94

BIA-10 /

Church Road

Moon Valley

Road

Miller Valley

Road

Shockey Truck

Trail

Tierra Del Sol Road