• Space Audit– Started in August 06– Invited all ministries within the church to consider how they
use the building, any limitations it presents and what an ideal building would provide – both now and in the foreseeable future.
Recap Vision for GBCIan Stackhouse March 2006
Focus GroupVision &
Requirements
Developed Vision for GBCIan Stackhouse July 2006
GBC Space Audit
Focus GroupVision &
Requirements
Focus GroupVision &
Requirements
Focus GroupVision &
Requirements
Focus GroupVision &
Requirements
Focus GroupVision &
Requirements
Site options& Constraints
Existing BuildingIssues
GBC PROJECTBRIEF
P r a y e r
Recap
• Open meeting in March 2007– Open to members and non-members to discuss issues
relating to the building and its future
• Project Team– Appointed in June 2007, comprising Ian Stackhouse, Brian
Kirkpatrick, Graham Ball, Bob Manson, Elizabeth Hodkinson, Karen Case-Green & Tim Wears
– Remit to produce a Design Brief based on the space audit and work with architects to present the church with options as to how that brief can be met.
The Brief
FoyerMeeting area
Welcome & CaféReception
MainEntrance
Youth
Sports HallFootball & BasketballVolleyball, Badminton
etc
Pool RoomSofaDVD
Recording studio
Gym
Showers
StudyHomework
Internet
YouthOffice
PODRooms
PODRooms
PODRooms
PODRooms
Student/Gap Year
flats
Coffee
Project Team ‘Terms of Reference’
Building Project Team established to address four key areas:
1. To enlarge the worship space to allow growth whilst still remaining one church.
2. To re-imagine our space to do justice to the whole spectrum of activities i.e. preaching, music, arts, prayer, etc
3. To foster a more integral relationship between the different departments and the way they operate, e.g. between ministry, administration, youth
4. To open up the building so it is more visible and hospitable, more of a public space; for there to be a link between appearance and the message we give.
Appointments
• Interviewed architects and appointed Format Milton
• Appointed Ian Ford as Quantity Surveyor
• Site survey - establish site dimensions and levels
• Flood Risk Assessment - establish what we can & cannot do in relation
to flooding
Options
• Do nothing– Not an option
• Modernise
• Re-use & Extend
• Rebuild
• New build on new site – Against the conviction of the Elders and the membership– Not necessary
Options
• Modernise
– Some work in progress – Furniture, curtains lighting
– Re-fit, decorate, minor changes, no structural changes
– Won’t address design brief or fulfil project team terms of reference
Options• New Build
-basement car park for 34 cars
-large flexible auditorium to seat up to 900
-meeting rooms and admin all on one level
-meets the requirements of the brief
Options• Re-use & Extend
-extended auditorium
-additional floor in games hall
-roof extension to link offices
-reduced parking – 6 spaces
-meets some of the brief
Existing Proposed Extension
Options
• Re-use & Extend alternative- If we leave the auditorium intact and extend &
renovate the building.
- Feasibility Study 2004
- Update costings
Options – Order of Cost
• Modernise
• Re-use - extended auditorium
• Re-use - 2004 Feasibility Scheme
• Rebuild
£500,000
£7,759,394
£4,278,000
£10,000,000