Page 1: BUDD INLET TREATMENT PLANT VULNERABILITY ASSESSMENT

BUDD INLET TREATMENT PLANT

VULNERABILITY ASSESSMENT

ATTRIBUTED TO CLIMATE CHANGE

January 22, 2015

Tyle Zuchowski Capital Planning Manager

Page 2: BUDD INLET TREATMENT PLANT VULNERABILITY ASSESSMENT

OUTLINE • Study Variables • Combined system • Flooding vulnerabilities • Strategies to mitigate • Summary

Page 3: BUDD INLET TREATMENT PLANT VULNERABILITY ASSESSMENT

STRATEGIES

Page 4: BUDD INLET TREATMENT PLANT VULNERABILITY ASSESSMENT

• Sea level rise (low, medium, high) – 0.25, 0.50, 1.83 feet

• High tides (100-year return frequency) • Waves (0.43 feet) • Storm surge and precipitation runoff

VARIABLES

Page 5: BUDD INLET TREATMENT PLANT VULNERABILITY ASSESSMENT

0

5

10

Treatment Plant Sits at 12 to 20 Feet

mean sea level (0) mean tide

range

100-year tide (10.94)

TIDAL ELEVATIONS

UW very high SLR (12.8)

Olympia Flood Model (14.4)

mean low low water (-7.42)

mean low water (-4.36)

Modeled ranges 14.4 to 11.2

mean high high water (7.14) mean high water (6.13)

Feet from mean sea level

15

Page 6: BUDD INLET TREATMENT PLANT VULNERABILITY ASSESSMENT

UW very low sea level rise (11.2 feet)

0.20 feet SLR

Page 7: BUDD INLET TREATMENT PLANT VULNERABILITY ASSESSMENT

UW medium sea level rise (11.4 feet)

0.50 feet SLR

Page 8: BUDD INLET TREATMENT PLANT VULNERABILITY ASSESSMENT

UW very high sea level rise (12.8 feet)

1.83 feet SLR

Page 9: BUDD INLET TREATMENT PLANT VULNERABILITY ASSESSMENT

100-year tidal wave (13.4 feet)

2.00 feet SLR with 0.43 tidal wave

Page 10: BUDD INLET TREATMENT PLANT VULNERABILITY ASSESSMENT

Olympia Flood Model (14.4 feet)

2.0 feet SLR with extreme 100-yr storm runoff

Page 11: BUDD INLET TREATMENT PLANT VULNERABILITY ASSESSMENT

COMBINED STORM/SEWER SYSTEM

351 Acres

Page 12: BUDD INLET TREATMENT PLANT VULNERABILITY ASSESSMENT

FLOW TO LOTT: AVERAGE OVER LAST 8 YEARS

Parameter Flow (MGD)

Base Flow 8.8

Annual Average 11.3

Maximum Monthly Average 15.4

Maximum Day 35.8

Peak Hourly 56.5

Instantaneous 72

Page 13: BUDD INLET TREATMENT PLANT VULNERABILITY ASSESSMENT

POTENTIAL FLOODING

Page 14: BUDD INLET TREATMENT PLANT VULNERABILITY ASSESSMENT

• Utilidor (~0.5 feet) – Electrical equipment – Piping and appurtenances

• Headworks (13 feet) – Influent pumps (-19 feet) – Back up generator(13 feet) – Motor control centers (13 feet)

• Effluent pumping (12.5) – Pumps – Electrical

• Substations – Service entry switchgear (12 feet) – LOTT substations (13.0 to 14.9 feet) – PSE Substation (12 feet)

VULNERABILITIES

Page 15: BUDD INLET TREATMENT PLANT VULNERABILITY ASSESSMENT

PLANT ELEVATIONS

10’

10’

Head Works

West Primaries

Secondary Clarifiers

1st Anoxic

UV Effluent Pump

Station 2nd Anoxic

1st Aeration

14.4’

14.4’

-20’

Page 16: BUDD INLET TREATMENT PLANT VULNERABILITY ASSESSMENT

-20’

HEADWORKS

-2’

Influent Pumps

Influent Motors

The 80 Level

Page 17: BUDD INLET TREATMENT PLANT VULNERABILITY ASSESSMENT

Motor Control Centers

Backup Generators

13’

13’

Page 18: BUDD INLET TREATMENT PLANT VULNERABILITY ASSESSMENT

Backup Generators

13’

Page 19: BUDD INLET TREATMENT PLANT VULNERABILITY ASSESSMENT

Backup Generator Ventilation Fan Grill

13’

Page 20: BUDD INLET TREATMENT PLANT VULNERABILITY ASSESSMENT

EFFLUENT PUMPING

12.5’

12.5’

Page 21: BUDD INLET TREATMENT PLANT VULNERABILITY ASSESSMENT

QUESTIONS?

Service Entry Switch Gear (12 feet)

12’

Page 22: BUDD INLET TREATMENT PLANT VULNERABILITY ASSESSMENT

PSE SUBSTATION (12 FEET)

12’

Page 23: BUDD INLET TREATMENT PLANT VULNERABILITY ASSESSMENT

• Design standards • Raise key electrical infrastructure • Separate combined system • Increase influent/effluent pumping • Develop sandbagging protocols • Continue to coordinate with City

RECOMMENDATIONS

Page 24: BUDD INLET TREATMENT PLANT VULNERABILITY ASSESSMENT

QUESTIONS?