· bs-en 1090-1 :2011 under system 2+ are applied and that the factory production control fulfils...

1

Upload: others

Post on 17-Feb-2020

6 views

Category:

Documents


0 download

TRANSCRIPT

Page 1:  · BS-EN 1090-1 :2011 Under system 2+ are applied and that the factory production control fulfils all the prescribed requirements set out above 1 1-02-2015 This certificate will