ana sayfaen 12602:2008 + al:2013 under system 2+ are applied and that the factory production control...

2

Upload: others

Post on 27-Aug-2021

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Ana SayfaEN 12602:2008 + Al:2013 under system 2+ are applied and that the factory production control (FPC) fulfils all the prescribed requirements. This certificate was first issued
Page 2: Ana SayfaEN 12602:2008 + Al:2013 under system 2+ are applied and that the factory production control (FPC) fulfils all the prescribed requirements. This certificate was first issued