R. Garoby BENE meeting March 17, 2005 PROTON DRIVER ACTIVITIES AT CERN HIP WG and SPSC (Villars) recommendations Next Steps Progress of Linac developments Status of external contributions Planning: Events in 2005 – Joint workshop with H3 & BENE Global planning

Upload: felicity-parker

Post on 18-Jan-2016

215 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: BENE meeting March 17, 2005 R. Garoby PROTON DRIVER ACTIVITIES AT CERN HIP WG and SPSC (Villars) recommendations Next Steps Progress of Linac developments

R. Garoby BENE meetingMarch 17, 2005

PROTON DRIVER ACTIVITIES AT CERN

HIP WG and SPSC (Villars) recommendations Next Steps Progress of Linac developments Status of external contributions Planning:

Events in 2005 – Joint workshop with H3 & BENE Global planning

Page 2: BENE meeting March 17, 2005 R. Garoby PROTON DRIVER ACTIVITIES AT CERN HIP WG and SPSC (Villars) recommendations Next Steps Progress of Linac developments

R.G. 2 17/03/2005

HIP WORKING GROUPAND

SPSC (VILLARS) RECOMMENDATIONS

Page 3: BENE meeting March 17, 2005 R. Garoby PROTON DRIVER ACTIVITIES AT CERN HIP WG and SPSC (Villars) recommendations Next Steps Progress of Linac developments

R.G. 3 17/03/2005

HIP WG: long term alternatives

Present accelerator

Replacement accelerator

Improvement

INTEREST FOR

LHC upgrade

physics beyond CNGS

RIB beyond ISOLDE

Physics with k and

Linac2 Linac450 160 MeVH+ H- + 0 (if alone) 0 (if alone) 0 (if alone)

PSB

2.2 GeV RCS* for HEP

1.4 2.2 GeV10 250 kW

+ 0 (if alone) + 0 (if alone)

2.2 GeV/mMW RCS*1.4 2.2 GeV0.01 4 MW

+++

(super-beam, -beam ?, factory)

+(too short beam

pulse)0 (if alone)

2.2 GeV/50 HzSPL*

1.4 2.2 GeV0.01 4 MW

++++

(super-beam, -beam, factory)

+++ 0 (if alone)

PS

SC PS*/** for HEP26 50 GeVIntensity x 2

++ 0 (if alone) 0 +

5 Hz RCS*/**26 50 GeV0.1 4 MW

++ ++( factory)

0 +++

SPS 1 TeV SC SPS*/**0.45 1 TeVIntensity x2

+++ ? 0 +++

* with brightness x2 ** need new injector(s)

Page 4: BENE meeting March 17, 2005 R. Garoby PROTON DRIVER ACTIVITIES AT CERN HIP WG and SPSC (Villars) recommendations Next Steps Progress of Linac developments

R.G. 4 17/03/2005

SPSC Recommendations (p.62)

● ν physics has noble history at CERN

● ν physics is in a new golden era - CERN beginning again pivotal global role

● CNGS commitment to ~ end of decade vital - 2006 important: COMPASS then CNGS @ end 06 - CNGS crucial up to 2011 (window @ 4.5x1019pot/yr) - CNGS + COMPASS ? multi-turn xtraction

longer running period - no compelling case for extending CNGS beyond 2011 @ realisable pot/yr (< ~ 3x 4.5x1019pot/yr)

Page 5: BENE meeting March 17, 2005 R. Garoby PROTON DRIVER ACTIVITIES AT CERN HIP WG and SPSC (Villars) recommendations Next Steps Progress of Linac developments

R.G. 5 17/03/2005

● Future neutrino facilities offer great promise for fundamental discoveries (such as CP violation) in neutrino physics, and a post-LHC construction window may exist for a facility to be sited at CERN.

● CERN should arrange a budget and personnel to enhance its participation in further developing the physics case and the technologies necessary for the realization of such facilities. This would allow CERN to play a significant role in such projects wherever they are sited.

● A high-power proton driver is a main building block of future projects, and is therefore required.

● A direct superbeam from a 2.2 GeV SPL does not appear to be the most attractive option for a future CERN neutrino experiment as it does not produce a significant advance on T2K.

● We welcome the effort, partly funded by the EU, concerned with the conceptual design of a β-beam. At the same time CERN should support the European neutrino factory initiative in its conceptual design.

SPSC Recommendations (p.63)

Page 6: BENE meeting March 17, 2005 R. Garoby PROTON DRIVER ACTIVITIES AT CERN HIP WG and SPSC (Villars) recommendations Next Steps Progress of Linac developments

R.G. 6 17/03/2005

● fixed target physics at CERN

- > 2011: physics must be vibrant, important, leadingion+ion ≥ 2009 (synergy with LHC) rare flavour ≥ 2009 (synergy with LHC)fundamental physics with p atomshadron structure: GPDs

dynamics: low energy, resonanceν physics: evaluation & R&D @ CERN

p-driver superbeam detectorglobal context NF

All but HI benefit from/require high intensityRCPSB RCPS …

-… if appropriate ?

synergieswith otherscience?SPL?

SPSC Recommendations (p.95)

Page 7: BENE meeting March 17, 2005 R. Garoby PROTON DRIVER ACTIVITIES AT CERN HIP WG and SPSC (Villars) recommendations Next Steps Progress of Linac developments

R.G. 7 17/03/2005

NEXT STEPS

Page 8: BENE meeting March 17, 2005 R. Garoby PROTON DRIVER ACTIVITIES AT CERN HIP WG and SPSC (Villars) recommendations Next Steps Progress of Linac developments

R.G. 8 17/03/2005

Implications of SPSC Villars’s recommendations for the AB department are being sent to the Research Board

Special INTC meeting (Villars – Oct. 2005) new set of recommendations Creation of an accelerator team to elaborate scenarios Accelerator studies in the frame of:

CARE [EU supported Integrated Activity: “Coordinated Accelerator Research in Europe” including networks (BENE: “Beams for European Neutrino Experiments”, H3: “High energy, High intensity, High brightness” accelerators) and the Joint Research Activity HIPPI: “High Intensity Pulsed Proton Injectors”]

LHC upgrade studies EURISOL Design Study [EU supported]

Page 9: BENE meeting March 17, 2005 R. Garoby PROTON DRIVER ACTIVITIES AT CERN HIP WG and SPSC (Villars) recommendations Next Steps Progress of Linac developments

R.G. 9 17/03/2005

Personal comments

In the short/medium term (~ 2010): shortage of proton beams for the approved users (worse if their expected upgrades are taken into account…) and risk with beam loss / hardware activation Need for: implementing improvements as soon as possible arbitration between users…

In the long term = Future of proton accelerators at CERN

LHC will operate until ~ 2020

Consolidation + LHC upgrade

LHC will always be a part-time user of the injector complex

Other physics programmes can be covered if they are compatible with LHC needs. On top of value for science, synergy will be an important parameter.

Page 10: BENE meeting March 17, 2005 R. Garoby PROTON DRIVER ACTIVITIES AT CERN HIP WG and SPSC (Villars) recommendations Next Steps Progress of Linac developments

R.G. 10 17/03/2005

PROGRESS OF LINAC DEVELOPMENTS

Page 11: BENE meeting March 17, 2005 R. Garoby PROTON DRIVER ACTIVITIES AT CERN HIP WG and SPSC (Villars) recommendations Next Steps Progress of Linac developments

R.G. 11 17/03/2005

Three stages are planned:

Stage 1: 3 MeV test place development and test of linac

equipment, beam characterization

Stages

Stage 2: Linac4 New linac replacing the

present injector of the PS Booster (Linac2)

Front-end of the future SPL

improvement of the beams for physics (higher performance and easier operation for LHC, ISOLDE etc.)

Stage 3: SPL New injector for the PS, replacing the PS Booster New physics experiments using a high proton flux

improvement of the beams for physics and possibility of new experiments

Page 12: BENE meeting March 17, 2005 R. Garoby PROTON DRIVER ACTIVITIES AT CERN HIP WG and SPSC (Villars) recommendations Next Steps Progress of Linac developments

R.G. 12 17/03/2005

H- ECR ion source

HV pulsed power supplies for the LEP klystrons

Chopper structure

Bunching cavities

IPHI RFQ

Beam Shapeand

Halo Monitor

H- beam

HV switch unit

Pulser

Computer

X-axis translatorWater cooler x2 channels

H- ECR ion source

HV pulsed power supplies for the LEP klystrons

Chopper structure

Bunching cavities

IPHI RFQ

Beam Shapeand

Halo Monitor

H- beam

HV switch unit

Pulser

Computer

X-axis translatorWater cooler x2 channels

Beam Shapeand

Halo Monitor

H- beam

HV switch unit

Pulser

Computer

X-axis translatorWater cooler x2 channels

H- beam

HV switch unit

Pulser

Computer

X-axis translatorWater cooler x2 channels

In construction. To be operational in 2007.

(RFQ from France,3 MeV chopping line from CERN).

The 3 MeV test stand will become the front-end of Linac4 and SPL

Stage 1: 3 MeV test place

Page 13: BENE meeting March 17, 2005 R. Garoby PROTON DRIVER ACTIVITIES AT CERN HIP WG and SPSC (Villars) recommendations Next Steps Progress of Linac developments

R.G. 13 17/03/2005

REQUEST1. COST ESTIMATE FOR THE 3 MEV TEST PLACE

The preparation of a realistic cost estimate has started in September 2004. After a few iterations to minimize the expenses (e.g. a single klystron will be installed because the RF tests of the accelerating structures for Linac4 will take place in SM18) and to spread them evenly over the years, the outcome is now available (see annexed table). This analysis assumes that the klystron power supply is delivered “free of charge” by India and the third buncher by China.

The resulting figures (kCHF) are summarized in the following table:

o the “Expenses” are the estimated amounts needed. It does not take into account the carry-over from 2004 to 2005 which is unknown today (estimate on January 27: ~ 280 kCHF).

o the “Allocated budget” is what is presently foreseen for the linac developments.

o the “Difference” is the missing amount.

Considering that the present estimate is still an approximation, an additional amount of 400 kCHF per year is requested to allow completing the 3 MeV test for the end of 2007. This will bring the budget for linac developments at the level of 800 kCHF/year during the years 2005-2007. This includes means to pursue with other developments for Linac4 in the course of 2007

2005 2006 2007 Total Expenses 747 854 549 2150 - Allocated budget 400 400 400 1200 Difference 347 454 149 990 + “warning” of additional needs for:

• H- source (mid-2005)• full equipment of Alvarez tank 1 with PMQs (end 2005)

Page 14: BENE meeting March 17, 2005 R. Garoby PROTON DRIVER ACTIVITIES AT CERN HIP WG and SPSC (Villars) recommendations Next Steps Progress of Linac developments

R.G. 14 17/03/2005

H-source RFQ DTL

95 keV 3 MeV 40 MeV 90 MeV 160 MeV

chopper line CCDTL SCL transfer line to PSBLEBT

352 MHz 704 MHz

86 m

View of the assembled DTL

Numbers of ports : - 6 for tuning plungers CF – 100

- 6 for pick – ups CF – 100

- 5 for post – couplers CF – 63

- ? for RF – couplings CF - ?

- ? vacuum system CF - 250

Quadrupole

Bridge Coupler

5.2

Coupling Cells

SCL Cells

Beam

160 MeV Normal-Conducting linac to be built during 2007-2010.

New injector for the CERN booster synchrotron, to improve the beam delivered to the LHC, ease operation, reach the ultimate luminosity, and increase the flux to ISOLDE.

Linac4 (~90m) will be located in an existing experimental hall and will re-use LEP RF equipment

(klystrons etc.).

Stage 2: Linac4

Page 15: BENE meeting March 17, 2005 R. Garoby PROTON DRIVER ACTIVITIES AT CERN HIP WG and SPSC (Villars) recommendations Next Steps Progress of Linac developments

R.G. 15 17/03/2005

4 MW beam power to an RIB and/or a neutrino facility via an accumulator.

high-brightness low-power beam to the LHC via the PS & SPS synchrotrons.

Stage 3: SPL

Ion species H-

Kinetic energy 3.5 GeV

Mean current during the pulse

30 mA

Mean beam power 4 MW

Pulse repetition rate 50 Hz

Pulse duration 0.76 ms

Bunch frequency 352.2 MHz

Duty cycle during the pulse 62 (5/8) %

rms transverse emittances 0.4 mm mrad

Longitudinal rms emittance 0.3 deg MeV

Page 16: BENE meeting March 17, 2005 R. Garoby PROTON DRIVER ACTIVITIES AT CERN HIP WG and SPSC (Villars) recommendations Next Steps Progress of Linac developments

R.G. 16 17/03/2005

IPHI-CERN COLLABORATION

(MEETING January 27 & 28 @ CERN)

Page 17: BENE meeting March 17, 2005 R. Garoby PROTON DRIVER ACTIVITIES AT CERN HIP WG and SPSC (Villars) recommendations Next Steps Progress of Linac developments

R.G. 17 17/03/2005

Agenda & Participants

Jeudi 27 janvier (Bdg.6/2-004) MATIN 11h00 15 mn Introduction générale J.P. Delahaye 11h15 30 mn Etat de la réalisation du bloc d’arrêt faisceau M. Fruneau 11h45 45 mn Compensation de la charge d’espace : récents

développements R. Duperrier

12h30 DEJEUNER

Jeudi 27 janvier (Bdg.6/2-004) APRES MIDI 14h00 25 mn Proton linacs at CERN R. Garoby 14h25 25 mn Etat d’avancement de IPHI P.Y. Beauvais 14h50 20 mn Status of preparation of the 3 MeV test place C. Rossi 15h10 25 mn Mécanique IPHI M. Painchault 15h35 Pause café 15h55 10 mn Tests RF du 1er tronçon O. Piquet (M. Desmons) 16h05 25 mn Nouveau design des entrées RF O. Piquet (M. Desmons) 16h30 30 mn Tests d’étanchéité du 1er tronçon N. Rouvière 17h00 20 mn Beam dynamics in the 3 MeV pre-injector E.Sargsyan (A.Lombardi) 17h20 30 mn Etat d’avancement de la ligne diagnostics P. Ausset

Vendredi 28 janvier (AB Auditorium 1 – Bdg.354/1-001)

MATIN 9h00 15 mn Les moniteurs de position de la ligne

diagnostics M. Solal

9h15 15 mn Résultats des premiers essais du Wire Scanner avec le faisceau SILHI

P. Ausset

9h30 15 mn PUs or transformers in the chopper line ? F. Lenardon 9h45 15 mn Status of BSHM development M. Hori

10h00 15 mn Status & plans for an H- source D. Kuchler 10h15 15 mn Status of bunchers’ development A. Millich 10h30 Pause café 11h00 15 mn Solid-state chopper driver M. Paoluzzi 11h15 15 mn Chopper structure: recent developments F. Caspers 11h30 15 mn Klystrons interlocks and RF controls L. Arnaudon 11h45 15 mn Organisation du transfert d’équipements

IPHI au CERN C. Rossi

12h00 Discussions / approfondissement 12h30 DEJEUNER

CEA-Saclay Pierre-Yves Beauvais Michel Painchault Olivier Piquet (27 only) Michel Desmons Romuald Duperrier (27 only) Vincent Hennion IPN-Orsay: Daniel Gardes Philippe Lavocat (28 only) Alex Mueller Nelly Rouviere Michel Fruneau (27 only) Patrick Ausset Maurice Solal Laurent Vatrinet CERN: L. Arnaudon (28 only) F. Caspers J.P. Delahaye (27 am only) R. Garoby K. Hanke M. Hori D. Kuchler A. Lombardi F. Lenardon A. Millich M. Paoluzzi U. Raich C. Rossi E. Sargsyan R. Scrivens T. Steiner M. Vretenar

Page 18: BENE meeting March 17, 2005 R. Garoby PROTON DRIVER ACTIVITIES AT CERN HIP WG and SPSC (Villars) recommendations Next Steps Progress of Linac developments

R.G. 18 17/03/2005

RFQ construction planning

Nº Nom de la tâche

5 Fabrication du RFQ IPHI6 Lancemment AAPC

7 AAPC en cours

8 passation contrat CSG par le SIS

9 Finalisation plans et C des C

10 Lancement appel d'offres RFQ

11 Appel d'offres en cours

12 Questions complémentaires et formalisation

13 DL de dépôt dossier pour SCCM

14 Commission préparatoire CCM

15 Début de marché si dispense CCM (T0)

16 Ecriture des gammes et essais

17 Fin phase ferme = gamme et essais faits (T1)

18 Usinage tronçon BP série n° 2

19 Brasage du tronçon n° 2

20 Réception du tronçon n° 2 et T2

21 Usinage tronçon n° 3

22 Brasage du tronçon n° 3

23 Usinage tronçon n° 4

24 Brasage du tronçon n° 4

25 Usinage tronçon n° 5

26 Brasage du tronçon n° 5

27 Usinage tronçon n° 6

28 Brasage du tronçon n° 6

29 Fin du marché

24/04

24/04 26/05

30/06 25/07

30/06 12/09

12/09

15/09 31/10

03/11 30/01

11/03

30/03

T0 03/05

04/05 29/09

T1 29/09

30/09 26/01

27/01 23/02

T2 23/02

25/05

26/05 22/06

26/05 27/07

28/07 26/09

28/07 31/10

01/11 28/11

01/11 02/01

03/01 30/01

30/01

F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J2003 2004 2005 2006

Page 19: BENE meeting March 17, 2005 R. Garoby PROTON DRIVER ACTIVITIES AT CERN HIP WG and SPSC (Villars) recommendations Next Steps Progress of Linac developments

R.G. 19 17/03/2005

Main outcome

All talks are on EDMS (document number 554659 ) Planning is tight. Feasible but no margin for drift. Apart from the RFQ, construction of equipment and installation of

the test place in Saclay are progressing satisfyingly. On the CERN side, preparation of hardware is advancing,

although with delay due to priority of LHC in the workshop. Great hopes on the solid-state chopper driver and BSHM.

RFQ construction is on the critical path. CERN brazing workshop will have to braze all sections within 9 months ! First section to be brazed in the middle of March.

Vacuum testing of the existing RFQ section shows weaknesses. Will be repeated in a joint effort bewteen CERN & IN2P3 specialists. Crucial for deciding upon its acceptance at CERN…

Next meeting will be organized by IPNO in September/October. Main item will be the progress with RFQ construction.

Page 20: BENE meeting March 17, 2005 R. Garoby PROTON DRIVER ACTIVITIES AT CERN HIP WG and SPSC (Villars) recommendations Next Steps Progress of Linac developments

R.G. 20 17/03/2005

ISTC PROJECTS

Page 21: BENE meeting March 17, 2005 R. Garoby PROTON DRIVER ACTIVITIES AT CERN HIP WG and SPSC (Villars) recommendations Next Steps Progress of Linac developments

R.G. 21 17/03/2005

ISTC project #2875BINP (Novosibirsk) + VNIITF (Snezinsk)

Development of the technological basis for serial production of CCDTL structures in the energy range of 40-100 MeV for the SPL project.

Feasibility study of effective application of normal conducting SCL structures up to the energy of 150-180 MeV.

Cost: k$ 550 Approval: October 2003 Prototype of CCDTL structure to be delivered at CERN for high power

testing at end 2006. Technological model of SCL structure to be tested in 2006.

Page 22: BENE meeting March 17, 2005 R. Garoby PROTON DRIVER ACTIVITIES AT CERN HIP WG and SPSC (Villars) recommendations Next Steps Progress of Linac developments

R.G. 22 17/03/2005

ITEP (Moscow) + VNIIEF (Sarov)

Development of the technological basis for construction of Alvarez-type accelerating structures for the room-temperature part of the CERN SPL project.

View of the assembled DTL

Numbers of ports : - 6 for tuning plungers CF – 100

- 6 for pick – ups CF – 100

- 5 for post – couplers CF – 63

- ? for RF – couplings CF - ?

- ? vacuum system CF - 250

ISTC project #2888

Cost: k$ 650 Approval date: February 2005 Prototype of DTL structure to be delivered at CERN for high power testing

by the end of 2006. One drift tube complete with Permanent Magnet Quadrupole (PMQ) included

in DTL prototype.

Alv

arez

tan

k

PM

Q

Page 23: BENE meeting March 17, 2005 R. Garoby PROTON DRIVER ACTIVITIES AT CERN HIP WG and SPSC (Villars) recommendations Next Steps Progress of Linac developments

R.G. 23 17/03/2005

IHEP (Protvino) + VNIIEF (Sarov)

Design and manufacture of DTL-RFQ focusing and accelerating structure prototype for a 3-40 MeV H- linac of the SPL project

Cost: k$ 650 Approval date: February 2005 Prototype of RFQ-DTL structure to be delivered at CERN for high power by

the end of 2006.

ISTC project #2889

Page 24: BENE meeting March 17, 2005 R. Garoby PROTON DRIVER ACTIVITIES AT CERN HIP WG and SPSC (Villars) recommendations Next Steps Progress of Linac developments

R.G. 24 17/03/2005

EURISOL DESIGN STUDY(Meeting February 3, Orsay)

Page 25: BENE meeting March 17, 2005 R. Garoby PROTON DRIVER ACTIVITIES AT CERN HIP WG and SPSC (Villars) recommendations Next Steps Progress of Linac developments

R.G. 25 17/03/2005

Coordination Board

AGENDA

1. Introduction by the Project Leader:

a) Status of the Project, the EC Contract and the Consortium Agreement; b) Description of the role of Coordination Board and other bodies of the Consortium.

2. Planning of tasks as agreed in the Annex to the contract. 3. Start-up of the various tasks, including:

i) detailed planning for the year 2005; ii) requirements for financial and human resources.

(15-minute presentation by each task leader**):

Task 1: Management of the EURISOL DS: Project Leader Task 2: Multi-MW Target Station - H. Ravn (CERN) Task 3: Direct Target - J. Lettry (CERN) Task 4: Fission Target - L. Tecchio (INFN-LNL) Task 5: Safety & Radioprotection - D. Ridikas (CEA) Task 6: Heavy Ion Accelerator Design - M-H. Moscatello (GANIL) Task 7: Proton Accelerator Design - A. Facco (INFN-LNL) Task 8: Cryomodule Development - S. Bousson (CNRS/IN2P3) Task 9: Beam Preparation - A. Jokinen (JYV) Task 10: Physics & Instrumentation - R. Page (U. Liverpool) Task 11: Beam Intensity Calculations - K-H. Schmidt/A. Kelic (GSI) Task 12: Beta-Beam Aspects - M. Benedikt (CERN)

4. Synergies with the HIPPI JRA (R. Garoby, 10 minutes)

Synergies with the BENE Network (V. Palladino, 10 minutes).

Page 26: BENE meeting March 17, 2005 R. Garoby PROTON DRIVER ACTIVITIES AT CERN HIP WG and SPSC (Villars) recommendations Next Steps Progress of Linac developments

R.G. 26 17/03/2005

Main outcome

Description “Engineering oriented study”. Total cost: 32 MEuros + 490 m.y EC contribution: 9.16 MEuros + 113 m.y 12 Work Packages 20 participants Starting date: 1/02/2005 – Duration: 4 years

Technical goals (main): CW driver for proton + ions up to q/E0 = 1/3 Targets (Direct & Fission) development Radio-protection Beta-beam (up to 100 MeV/u)

Relevance for us: Overlap on proton driver developments (HIPPI = pulsed!) Welcome contribution to work on targets & beta beams Need for close connection (crossed participation in events) to avoid

duplication and share benefits of developments

Page 27: BENE meeting March 17, 2005 R. Garoby PROTON DRIVER ACTIVITIES AT CERN HIP WG and SPSC (Villars) recommendations Next Steps Progress of Linac developments

R.G. 27 17/03/2005

LINAC PLANNING

Page 28: BENE meeting March 17, 2005 R. Garoby PROTON DRIVER ACTIVITIES AT CERN HIP WG and SPSC (Villars) recommendations Next Steps Progress of Linac developments

R.G. 28 17/03/2005

Jan. Feb. March April May June July Aug. Sept. Oct. Nov. Dec.

CARE & HIPPI

CSC meetings27 & 28 Frascati

Workshop WP22 &3

CERN

Workshop WP313 & 14 INFN-Mi

Workshop WP413 &14

RAL

Workshop WP514 & 15

RAL

HIPPI yearly meeting28 till 30

RAL

CARE yearly meeting23 till 25 CERN

Other workshops

with BENE (CARE)20 till 24 Frascati

with H3 (CARE) ???

High Power SC Linac23 till 25

FNAL

Technical meetings

DTL Task Force10

CERN

CDR-2 team15

CERN

Other collaborations

IPHI-SPL 27 & 28 CERN

??? IPNO

ISTC18 till 22 Sarov & Snezinsk

China ??? Beijing

Miscellaneous

PAC0516 till 20 Knoxville

USA

??? Erice

Events in 2005

Page 29: BENE meeting March 17, 2005 R. Garoby PROTON DRIVER ACTIVITIES AT CERN HIP WG and SPSC (Villars) recommendations Next Steps Progress of Linac developments

R.G. 29 17/03/2005

CERN DG’s talk to the staff on 10/01/2005 (1)

The following strategic orientations are proposed for CERN activities in 2004-2010:

1. to keep the utmost priority for the completion of the LHC project, and strive for a start of operations in the summer of 2007;

2. to fulfil commitments previously made by CERN: CNGS, EGEE;

3. after an in-depth risk analysis review, to mitigate the consequences of failure of old equipment that is necessary for reliable LHC operation. i.e. Consolidation;

4. along the conclusions of SPSC Villars meeting, to prepare for 2006 and beyond a few new fixed target experiments, highly praised for their new physics potential outputs;

5. in line with the new policy by the European Commission for structuring the European Research Area, by promoting the coordination of laboratories in matters of R&D and new infrastructure (FP6 – CARE programme), to launch in the period 2004-2006 different studies in cooperation with other laboratories;

Page 30: BENE meeting March 17, 2005 R. Garoby PROTON DRIVER ACTIVITIES AT CERN HIP WG and SPSC (Villars) recommendations Next Steps Progress of Linac developments

R.G. 30 17/03/2005

Their primary goal would be:

to develop detailed technical solutions for a future LHC luminosity upgrade to be commissioned around 2012-2015;

Definition of the Linac4 (160 MeV-H-), in relation with the European Programme for a High Intensity Pulsed Proton Injector (HIPPI)

Definition of modifications to the magnets in the interaction regions at two crossing points of the LHC beams, linked with the European programme Next European Dipole (NED), aiming at 15 Tesla

Definition of new trackers for the upgrade of the ATLAS and CMS detectors, to withstand a factor 10 higher luminosity.

to keep in touch with other design studies launched in Europe, of EURISOL and neutrino factories;

CERN DG’s talk to the staff on 10/01/2005 (2)

Page 31: BENE meeting March 17, 2005 R. Garoby PROTON DRIVER ACTIVITIES AT CERN HIP WG and SPSC (Villars) recommendations Next Steps Progress of Linac developments

R.G. 31 17/03/2005

Milestones …

7. in 2006-2007, to decide on the implementation of the Linac 4 and any increased R&D programme, depending on new funds made available and on a new HR policy;

8. in 2009-2010, to review and redefine the strategy for CERN activities in the next decade 2011-2020 in the light of the first results from LHC and of progress and results from the previous actions. The possible choices are at present quite open. The future role of CERN will depend on these choices and their effective funding;

CERN DG’s talk to the staff on 10/01/2005 (3)

Page 32: BENE meeting March 17, 2005 R. Garoby PROTON DRIVER ACTIVITIES AT CERN HIP WG and SPSC (Villars) recommendations Next Steps Progress of Linac developments

R.G. 32 17/03/2005

3 MeV test place ready

Linac4 approval

SPL approval

RF tests in SM 18 of prototype structures*

for Linac4

CDR 2

Global planning