Transport for LondonLondon Underground
Access
Basic Track Awareness
Issue 5.0
Effective 20 March 2017
MAYOR OF LONDON
Learning information booklet
Introduction
1 Introduction 22 Personalresponsibilities 33 RolesandResponsibilities 44 Thetrackenvironment 95 SigninginatLUpremises 176 Goingonthetrack 187 Depotsandstablingsidings 208 NetworkRail 239 Protection 2610 AccessingthetrackinTrafficHoursandEngineeringHours 2711 Workinginwetweather 2912 Engineer’strainsandmechanisedvehicles 3013 Possessions 3214 Workinginadepotorstablingsiding 3315 Stationplatforms 3516 Protectionwhentrainsandmechanisedvehiclesaremoving 3717 PlaceofSafety 3818 Limitedclearance 4119 Communication 4220 Emergencyaction 4421 Refusaltowork 4622 SigningoutatLUpremises 47
ContentsSection page
3
section1Introduction
1 IntroductionAsanindividualcertificatedBasicTrackAwareness(BTA)youwillbeabletoaccessthetrackunderprotectionwhentrainsormechanisedvehiclesaremoving,andtractioncurrentisswitchedon.
4
sect
ion Roles and responsibilitiesPersonal responsibilities2
2 Personal responsibilitiesYoumustnotgoon,ornearthetrackunlessitisabsolutelynecessary,andyourdutiesrequireyoutodoso.
Ifyourdutiesrequireyoutobeon,ornearthetrack,youmusthavethenecessarypermissiontodoso,and:
• takereasonablecareofyourownhealthandsafety,andthehealthandsafetyofothers
• beawareofanyexpectedhazards
• notinterferewith,ormisuseanysafetyequipment
• knowwhatprotectionarrangementshavebeenmade
• passsafetycriticalmessagesusingthephoneticalphabet
• carryoutlocalinstructionsrelatingtospecificlocations
• useauthorisedwalkwaysandwalkboardswherepossible
• reportincidentsandhazards
• weartheappropriatePersonalProtectiveEquipment(PPE).
TheminimumPPErequirementonLUtrackis:
• sturdyfootwear
• anapprovedhighvisibilitygarment.
5
section3Roles and responsibilities
3 Roles and Responsibilities
3.1 Site Person in Charge (SPC)
3.2 Site Person in Charge - Protecting Workers on the Track (SPC-PWT)
Thedesignatedindividualonsite(bothonandoffthetrack)responsiblefor:
• theworkinprogress
• theworksitediscipline
• theprogrammeofwork
• allplantandmaterials
• firstaidandemergencyprocedures.
A‘sitepersonincharge’armbandiswornontheleftarmabovetheelbow.
AnindividualcertificatedbyLUtosafelymanageworksites,andprovideprotectionforthemselvesandothersin:
• EngineeringHours(PWT-EH)
• TrafficHours(PWT-TH)
• depotsorstablingsidings(PWT-D).
A‘PWT’armbandiswornontherightarmabovetheelbow.
6
sect
ion Roles and responsibilitiesRoles and responsibilities3
3.3 Lookout
3.4 Handsignaller (engineering)
AnindividualcertificatedbyLUtowarnotherswhomightbeexposedtodangerfrommovingtrainsormechanisedvehicles.
A‘lookout’armbandiswornontheleftarmabovetheelbow.
Alookoutmust:
• warnyouofanyapproachingtrainsormechanisedvehicles
• carrythecorrectequipment
• stayinpositionasindicatedbythepersonprovidingprotectionoruntilrelievedbyanotherlookout
• notbedistractedfromlookingoutfortrainsormechanisedvehicles.
AnindividualcertificatedbyLUtocontrolthespeedoftrainsbyhandsignal,flagorhandlamp,ifrequiredbyengineeringwork.
A‘handsignaller(engineering)’armbandiswornontheleftarmabovetheelbow.
Ahandsignaller(engineering)must:
• carrythecorrectequipment
• controlthespeedoftrains
• stayinthepositionasindicatedbythepersonprovidingprotectionoruntilrelievedbyanotherhandsignaller(engineering).
7
section3Roles and responsibilities
3.5 Protecting Workers on the Track – Train Movements (PWT-TM)
3.6 Possession Master (POM)
3.7 Possession Worksite Access Controller (PWAC)
AnindividualcertificatedbyLUtosafelymanageaworksite,andtosuperviseandcontrolthemovementofanengineer’strainormechanisedvehiclewithinaspecifiedareaoranengineer’scurrentareaoraworksiteinapossession.
a‘TrainMovements’armbandiswornontheleftarmabovetheelbow.
AnindividualcertificatedbyLUtotakecontrolofapossession.
A‘PossessionMaster’armbandiswornontheleftarmabovetheelbow.
AnindividualcertificatedbyLUtosafelymanagetheaccessandegressforapossessionworksite.
A‘PWAC’armbandiswornontheleftarmabovetheelbow.
8
sect
ion Roles and responsibilitiesRoles and responsibilities3
3.8 Site Person in Charge – Possession Worksite (SPC-PW)
3.9 Manager of the depot
Anindividualwhocontrolsandmanagesthedaytodayrunningofadepot.
3.10 Track Access Controller (TAC)
AnindividuallicensedbyLUtocontroltheLineClearandLineSafeproceduresduringEngineeringHours.
AnindividualcertificatedbyLUtosafelymanageapossessionworksite,andtosuperviseandcontrolthemovementofanengineer’strainormechanisedvehicle.
A‘PossessionWorksite’armbandiswornontheleftarmabovetheelbow.
9
section3Roles and responsibilities
3.11 Controller
Anysuitablycompetentindividualwhocontrolsthetrainserviceonalinewherepassengertrainsarerunning.
Thecontrolleriscontactedintheeventofanemergency.
10
sect
ion The track environmentThe track environment4
4 The track environmentThetrackenvironmentisdividedintothreeareas:
• LineClear
• LineSafe
• othersections.
4.1 Line Clear area
AllLUtrackinthefollowinglocations:
sub-surfacetunnels
tubetunnels
11
section4The track environment
Shortopensectionsoftrackthatareeitheradjacentto,orbetweentwotunnelsections,andaretreatedasatunnelsection.SomeopensectionscanbeinaLineCleararea.
SidingsinatunnelsectionwheretractioncurrentisswitchedoffinEngineeringHours
AnyworkinaLineClearareamustbecarriedoutduringEngineeringHours.
12
sect
ion The track environmentThe track environment4
4.2 Line Safe area
AllLUtrackinthefollowinglocations:
Trackwherepassengertrainsrunthatarenotclassedasatunnelsectionorothersections
Stablingsidingsinasurfacesection
13
section4The track environment
4.3 Other sections
TherearesometracklocationsthatarenotincludedinLineClearareaorLineSafearea:
Non-electrifiedLUtrack
NetworkRaillines,orLUtrackswheretheapproachsignallingisunderthecontrolofNetworkRail
Depotsandstablingsidingswheretractioncurrentremainsswitchedonatalltimes
14
sect
ion The track environmentThe track environment4
4.4 Track
Youareonornearthetrack,ifyouare:
• withintwometresofanyrail
• onthepermanentway
• onaplatformendramp.
Youarenotonornearthetrack,ifyouare:
• onastationplatform
• inanareaguardedbyaphysicalbarrier.
4.5 Physical barrier
Aphysicalbarrierisusedtoseparateyouoraworksitefromtheoperationalrailway.
Examplesofaphysicalbarrierare:
• netlonfencing
• cablerun
• vortokfencing.
Thelevelpartofaplatformwhichisseparatedfromthepublicareabyabarrier,despitenotbeingforpublicuseispartoftheplatformandnotpartofthetrack.
15
section4The track environment
4.6 Names of tracks
ThefollowingnamesareusedtorefertothetrackonLU:
• northboundandsouthbound
• eastboundandwestbound
• innerandouter
• upanddown
• localandfast
• singleline.
4.7 Track areas
ThefollowingtermsareusedtodefinetrackareasonLU:
Cess-thespacealongsidethepermanentwayextendingtoacablerunorotherboundary
Fourfoot-thespacebetweenthetworunningrailsofoneline
Sixfoot-thespacebetweenonelineandanotherwherethelinesarethenormaldistanceapart
Tenfoot-thespacebetweenonelineandanother,whereawidespaceisprovidedbetweenonepairoflines,wheretherearethreelinesormore.
CessTenfoot
Sixfoot
Fourfoot
Cess Sixfoot
16
sect
ion The track environmentThe track environment4
4.8 Track components
Permanentwaycomponentsandtheirfunction:
• runningrails–thetworailsthetrainwheelsrunon
• negativetractioncurrentrail–highvoltagerailsthatareraisedhigheroninsulatorpots,itisalwayslocatedcentrallybetweentherunningrailsofoneline
• positivetractioncurrentrail–highvoltagerailsthatareraisedhigheroninsulatorpots,locatedontheoutsideofthetworunningrailsofoneline
• sleeper-designedtospreadtheloadofthetrain,canbeconcreteorwood
• baseplatesandchairs-acomponent,fixedtothetopofasleeperwhichsupportsandlocatesarunningrail
• fastenings-acomponentthatsecuresthebaseplates,chairsandinsulatorstoasleeperandalsosecurestherailtothebaseplateorchair
• ballast-materialusedtospreadtheloadfromtheundersideofthesleeperandholdsthetrackinthedesiredlocation.Italsoprovidesdrainageforthetrack.
Insulatorpot
Sleeper
Runningrails
Ballast/Ash
Chair/Baseplate
Cablerun
Positiveconductorrail
Negativeconductorrail
Thecablerunconsistsofpostsrunningalongsidethecesswherecablesareattached.
17
section4The track environment
4.9 Points and crossings
Pointsandcrossingsareusedtotransferatrainfromonetracktoanother.
4.10 Track hazardsThefourmainhazardsonthetrackare:
Trains
Electricity
Slipping
Tripping.
Youcanavoidslippingandtrippingby:
• keepingtheworksitetidy
• payingattentiontowhatyouaredoing
• notcuttingcornerswhenitcomestosafety
• notbeingdistractedfromthetaskathand.
Keepingsafeinvolvesknowingthehazardsandhowtoavoidthem;italsomeanscomplyingwithsafetyrulesandnottakingrisks.
Youmusttakeextracarewhenyouareworkingorwalkingaroundpointsastheycanmovewithoutwarning.
18
sect
ion Going on the trackSigning in at LU premises5
5 Signing in at LU premisesYoumustalwayssigninwhenenteringLUpremises,thisis:
• toallowyouentryontoLUinfrastructure
• sothatyoucanbelocatedintheeventofanevacuation.
Whensigninginyoumustensureyou:
• signthevisitorsbookandthePersonInChargeEvacuationRegister(PICER)
• signthePersonInChargeAccessDocument(PICAD)ifworkinginapossessionworksite
• getavisitorspassorsticker(whichmustmustbewornatalltimes)
• knowwheretheStaffAssemblyPoint(SAP)islocated
• knowtheemergencyprocedureforthatlocation.
Ifyouhavetoaccessastationthatisunstaffedorclosedyouwillhavetomakethenecessaryarrangementstogetsignedin,andcollectanykeysfortherelevantlocation.
19
section6Going on the track
6 Going on the trackWorkonthetrackcantakeplaceineitherTrafficHoursorEngineeringHours.
6.1 Traffic Hours
TrafficHoursstartandfinishatpublishedtractioncurrentswitchingtimes.
Passengertrainsarenormallyrunningandtractioncurrentisswitchedon.
WhenyouholdBTAcertificationyouareallowedonthetrackduringTrafficHours,aslongasyouareunderprotection.
WorkonthetrackinTrafficHoursmustnotmakethetrackunsafefortrainstorun.
6.2 Engineering Hours
Passengertrainsarenotrunningandtractioncurrentisswitchedoff.Howeverengineer’strainsandmechanisedvehiclescanworkduringEngineeringHours,eitherundertheirownpowerinaspecifiedareaorpossessionworksite.
EngineeringHourswillnormallystartandfinishatpublishedtractioncurrentswitchingtimes.
Workonthetrackcanmakethetrackunsafefortrainstorun.
20
sect
ion Going on the trackGoing on the track6 Depots and stabling sidings
IfyoudonothaveanytrackcertificationyoucanonlygoonthetrackduringEngineeringHoursaslongas:
• youareprotectedbyaPWT-EH
• tractioncurrentisswitchedoff
• therearenomovingtrainsormechanisedvehicles(oranytrainormechanisedvehicleintheareaissecured,topreventitfrommoving).
Onsomesectionsoftrackotherrulesapply,theseinclude:
• depotsandsidings(wheretractioncurrentisnormallyalwayson)
• non-electrifiedtrack
• NetworkRailtrack.
Going on the track
21
section7Depots and stabling sidings
7 Depots and stabling sidings
Depotsarelocationswheretrainsarestabledandtractioncurrentisnormallyoncontinuously(somesidingsoperateunderLineClear/LineSafeprocedures).Depotstaffcarryoutgeneraltrainmaintenanceandoverhaulswithinthevariousareasofthedepot.
Depotsandsidingsaredividedintothreeseparateareas:
7.1 Area A
22
sect
ion Depots and stabling sidingsDepots and stabling sidings7
AreaAincludestheshedswith:
• notractioncurrentrailsatgroundlevel
• raisedplatformsforaccesstotheinteriorofatrain,andwheretractioncurrentrailscanbeisolatedlocallyusingswitches
• overheadtrolleyleads.
7.2 Area B
AreaBincludes:
• alltrackwithindepotlimits,butnotincludingarea‘A’
• alltrackoutsideinthedepotyard(excludingarea‘A’)wheretractioncurrentrailsareatgroundlevel
• non–electrifiedtrack
• stablingshedswithtractioncurrentrailsatgroundlevelthatcannotbeisolatedlocally
• washplant.
Youcannotworkinarea‘A’unlessyouhavereceivedtheappropriatetrainingandfamilarisationforthatparticulardepot.
Youcannotworkinarea‘B’unlessyouaresuitablycertificatedandunderprotection.
23
section7Depots and stabling sidings
7.3 Area C
AreaCincludes:
Thetrackoutsideofthedepotlimitswheretractioncurrentisoncontinuouslyanddepotrulesapply.
Tractioncurrentrailsareatgroundlevelandcannotbeisolatedlocally.
7.4 Non-electrified track
Thesearesectionsoftrackwhichdonothavetractioncurrentrailsandarenormallyfoundattheendsofthelines,orwithincertaindepotsandstablingsidings.Duetothenatureoftheselineshavingnotractioncurrentrails,EngineeringHoursdoesnotapply.AttheselocationsTrafficHours/depotprotection,orapossessionisrequiredtoaccessthetrack.
24
sect
ion Network RailNetwork Rail8
8 Network Rail
SomeLUtrainsrunonorneartrack,orthroughstationsownedbyNetworkRail.Theremaybeadditionalhazardsthataffectthesafetyofpersonnelonthetrack.YoumustbecertificatedandcompetenttoNetworkRailstandardsbeforeaccessinganyareaoftheoperationalrailwaywhichisdesignatedasbeingunderNetworkRailrules.
Youmustbebriefedbyyourmanagerorsupervisoronthecertificationrequirementsforthelocation.
25
section8Network Rail
8.1 Overhead Line Equipment
Whenonasectionoftrackwhichisadjacentto,orpassesoverNetworkRaillineselectrifiedby25kv(A.C.)OverheadLineEquipment(OLE),theoverheadlinesandattachmentsmustbetreatedasliveatalltimes.Yourselfandanytoolsandequipmentmustbeaminimumsafedistanceof2.75metresfromtheOLEatalltimes.
8.2 Heathrow Express and London Overground
TheHeathrowExpressandLondonOvergroundlinesuseOLEelectrifiedwith25kv(A.C.).
WhereLU’sinfrastructureisincloseproximityofthesetwolines,measureshavebeentakentoimmunisetheLU’sinfrastructureagainstanyelectricalhazardsthatcouldpossiblyemanatefromtheOLE,thesetaketheformofred,greenandyellowbonds.Warningsignsindicatethe‘immunised’areas.
26
sect
ion Network RailNetwork Rail8 Protection
IfyouhavetogointoanareawhereOLEispresent,youmustbebriefedbyyourmanagerorsupervisoronthenecessarysafetyprocedures.
Ifyoudiscoveradamagedordisconnectedbondyoumust:
• nottouchorremovethebonds
• telltheSPCorpersonprovidingprotection
• warnothersworkinginthearea
• ensurethecontrollerisinformed.
8.3 National grid
AtcertainlocationshighvoltagepowerlinescrossLUinfrastructure.Ifyouseeasectionoftrackobstructedbyafallenpowerline(s),youmust:
• immediatelystopanytrainfromapproaching
• keepaminimumsafedistancefromthepowerline(s)atalltimes
• ensurethecontrollerisinformed.
Network Rail
27
section9Protection
9 ProtectionProtectionisdefinedas:
‘Procedurestomakesurepersonnelonornearthetrackarenotendangeredbymovingtrainsormechanisedvehicles’.
Thisisachievedbymakingsure:
• youmovetoaplaceofsafety,or
• atrainormechanisedvehiclecannotenterorleavea
worksiteinanuncontrolledmanner.
9.1 Method statement and risk assessment
TheSPCwillhaveamethodstatementtodescribehowtheworkwillbedone.Theywillalsohaveariskassessment(s)thatwillidentifyanyhazardsthatcanaffectthehealthandsafetyoftheworkgroup.
Thepersoninchargeoftheworkwillbriefyoubeforetheworkstarts,ontheworkandworksitesafety.
BTAcertificationdoesnotallowyoutoprovideprotectionforyouselforothers,youmustalwaysbeaccompaniedbyapersoncertificatedtoprovideprotection.
28
sect
ion Accessing the track in Traffic Hours and
Engineering HoursAccessing the track in Traffic Hours and Engineering Hours 1010 Accessing the track in Traffic Hours and Engineering Hours
IfyouarerequiredtogoonthetrackinTrafficHoursyoumustbeprotectedbyaPWT-TH.ThePWT-THwilltellthecontrollerthatyouareonthetrack.
IfyouarerequiredtogoonthetrackduringEngineeringHoursyoumustbeprotectedbyaPWT-EH.ThePWT-EHwillbookonwiththeTAC.
ThepersonprovidingprotectionwillcheckthatyouarewearingtheappropriatePPE.
10.1 Accountabilities
WhenyouaregoingonornearthetrackinTrafficHoursorEngineeringHoursyoumust:
• attendbriefingsgivenbythepersonprovidingprotection
• notgoonornearthetrackunlessinstructedthatitissafetodosobythepersonprovidingprotection
• attendanyfurthersafetybriefingsgivenbythepersonprovidingprotection
• leavethetrackwhenandwherethepersonprovidingprotectiontellsyou.
10.2 Safety briefings
ThePWT-THwillnormallygiveyouthreesafetybriefings.
Abriefingisgiven:
• beforetravellingtotheworksite
• attheworksitebeforetheworkstarts
• aftertheworkiscompleted.
29
section10Accessing the track in Traffic Hours and Engineering Hours
ThePWT-EHmustgiveyouasafetybriefingbeforeyougoonthetrack.Theymayalsogiveafurthersafetybriefingdependingontheworksitelocationandthetypeofworkbeingcarriedout.
10.3 Traction current
ThePWT-EHwillcheckthattractioncurrenthasbeenswitchedoffinEngineeringHoursbyusingaCurrentRailIndicatorDevice(CRID)orPermanent-CurrentRailIndicatorDevice(P-CRID)
30
sect
ion Engineer’s trains and mechanised vehiclesWorking in wet weather11
11 Working in wet weatherLUpolicystatesthat‘live’trackmustnotbeworkedonduringperiodsofwetweather.
Periodsofwetweatherarewhenthetrackiswetenoughtoincreasetheriskofelectrocutionandunderfoothazardsarepresent.
TheSPCwilldecideiftheworkcantakeplaceduringwetweather.
31
section12Engineer’s trains and mechanised vehicles
12 Engineer’s trains and mechanised vehicles
Whenanengineer’strainormechanisedvehicleisrequiredtoworkwithtractioncurrentswitchedoffduringEngineeringHours,itmustdosoonlywithinaspecifiedareaorpossessionworksite.
APWT-TMmustbeappointedwhenanengineer’strainormechanisedvehicleisrequiredtoworkin:
• aspecifiedarea
• apossessionworksite.
Whenatrainisrequiredtoworkwithtractioncurrentswitchedon,itcandosowithinthelimitsofanengineerscurrentareaorpossessionworksite.
32
sect
ion Engineer’s trains and mechanised vehiclesEngineer’s trains and mechanised vehicles12 Possessions
12.1 Specified area and engineer’s current area
Aspecifiedareais:
• adesignatedareaoftrackinEngineeringHoursonly
• definedwithlampsanddetonators
• whereanengineer’strain,mechanisedvehicleoron-trackplantcanoperateusingtheirownpower.
Tractioncurrentwillalwaysbeswitchedoffinaspecifiedarea.
Youcannotworkinanengineer’scurrentareabecausetractioncurrentwillalwaysbeswitchedon.
Engineer’s trains and mechanised vehicles
33
section13Possessions
13 PossessionsApossessionisadesignatedareaoftracktakenoutofserviceformajorengineeringwork.Itisunderthecontrolofapossessionmaster,andisprotectedagainstunauthorisedtrains.Itisdefinedbymarkersinthefourfootshowingthelimitsofthepossession.
Inapossession:
• tractioncurrentcanbeswitchedonoroff
• engineer’strainsormechanisedvehiclesmaybeworkingwithinaworksite
• youmustbecertificatedBTAifanengineer’strainormechanisedvehicleiswithinthepossession
• theworkcanspanbothTrafficHoursandEngineeringHours.
TheSPCmustsigninandbebriefedbythePWACaboutthesafetyarangementsfortheworksite.
ThePWACwillissuetheSPCwithacoloureddatestampedwristband,andsufficientwristbandsfortheworkgroup.
WhenworkinginaworksiteinapossessionyouwillbebriefedbytheSPConthesafetyarrangementsfortheworksite.
OncebriefedtheSPCwillgiveyouacoloureddatestampedwristband.Yourwristbandmustbewornforthedurationofthatshift.
34
sect
ion Working in a depot or stabling sidingWorking in a depot or stabling siding14
14 Working in a depot or stabling siding
14.1 On arrival at the depot
Whenarrivingforworkatadepotthatisnotyournormalplaceofwork,youmust:
• besuitablycertificated
• useauthorisedwalkwaystoenterthedepot
• signinattherelevantlocationwithinthedepotorstablingsiding.
14.2 Train hazards in depots
Thereareseveralhazardsrelatingtotrainsindepots,theseinclude:
• bi-directionaltrainsmovementsthatcanapproachfromanydirection
• trainsmovemoreslowly(5,10,15mph)andquietly
• trainscanmoveevenwhenuncoupled,orwithnodriver’scab
• hiddentrainmovementsfrombehindstationarytrains.
Unlessinstructedotherwiseyoumustalwaysusetheauthorisedordesignatedwalkwaysandwalkboardsinthedepot/stablingsidings;thesearemarkedoutwithyellowlines.
35
section14Working in a depot or stabling siding
14.3 Individual responsibilities for going on or near the track in a depot or stabling siding
Whenyouaregoingonornearthetrackwithinadepotorstablingsiding,youmust:
• attendthebriefingsgivenbythepersonprovidingprotection
• notgoonornearthetrackunlessinstructedsafetodosobythepersonprovidingprotection
• attendanyfurthersafetybriefingsgivenbythepersonprovidingprotection
• leavethetrackwhenandwherethepersonprovidingprotectiontellsyou.
Thepersonprovidingprotectionwillnormallygiveyouthreesafetybriefings:
• beforetravellingtotheworksite(platform)
• attheworksitebeforetheworkstarts(pre)
• aftertheworkiscompleted(post).
ThepersonprovidingprotectionwillcheckthatyouarewearingtheappropriatePPE.
36
sect
ion Station platformsStation platforms15
15 Station platformsBeforeanyworkiscarriedoutonastationplatformyoumustconsiderthattrainswillberunningandtractioncurrentwillbeswitchedon.
Youmustfollowtheappropriateprotectionproceduresiftheworkonthestationplatformrequiresyouandanyequipmentormaterialsto:
• infringeovertheplatformedge
• enterthegaugeofapassingtrain.
Thereisnorequirementforstationstafftogivepermissionforplannedworktotakeplaceonplatforms.
37
section15Station platforms
15.1 Working on stations where Network Rail certification is needed
Whenworkingonstationswhichareownedbyotheroperators,whetherornot,LUcertificationandprotectionarevaliddependsonthelocationoftheworksite.
LUrulesforplatformworkingareapplicableatallplarform-traininterfaceswhereLUcertificationapplies,thisisregardlessofthestationinfrastructuremanager.
38
sect
ion Places of safetyProtection when trains and mechanised vehicles
are moving 1616 Protection when trains and mechanised vehicles are moving
WhentrainsormechanisedvehiclesaremovinginTrafficHours,EngineeringHoursorwithinaworksiteinapossession,youmusthaveaminimumof25secondswarningofanapproachingtrain.Thiscanbeachievedbythepersonprovidingprotection:
• providingprotectionwithoutaseparatelookout
• positioningoneormorelookoutstowarnyouofanapproachingtrain.
16.1 When a train or mechanised vehicle approaches
Thepersonprovidingprotectionorlookoutwillwarnyouofanapproachingtrainormechanisedvehiclebyusingone,oracombinationofthefollowingwarningmethods:
• verbal
• hornorwhistle
• touch.
Onrecievingawarningyoumust:
• stopworkandmovetotheagreedplaceofsafety
• whenintheplaceofsafety,acknowledgewarningsgivenbythelookoutandtrainoperatorbyraisingonehandaboveyourhead.
Youmustnotresumeyourtaskafterthetrainhaspassed,untilyouareinstructedtodosobythepersonappointedatthebriefing.Thiswillnormallybethepersonprovidingprotectionorthelookout.
Ifyouarecarryingequipment,putitdownontheground,clearthetrackandbeinaplaceofsafetybeforethetrainpasses.
39
section17Places of safety
17 Place of SafetyAplaceofsafetyisalocationbesidethetrackwhereyoucanstandsafelywhentrainspass.AplaceofsafetymustmeettheminimumdistancerequirementsasshowninRuleBooksupportinformation‘placesofsafety’.Thepersonprovidingprotectionwillbriefyouonthelocationoftheplaceofsafetyaspartofthesafesystemofwork.
Aplaceofsafetymust:
• havelevelgroundtostandandwalkon
• haveareasonablygoodsurfacetowalkon
• notbeliabletocauseslipsandtrips
• allowyoutowalkfacingapproachingtrains(wherepossible)
• bewideenoughforyoutostandorwalkin.
Youmustneverwalkinthe:
• fourfootunlessinstructedbythepersonprovidingprotection
• sixfoot
• tenfootwhenatrain(s)approaches.
17.1 Temporary place of safety in depots and sidings
Inadepotorstablingsidingaplaceofsafetycanbecreatedbythepersonprovidingprotectionforthedurationofthework.
Theplaceofsafetycouldbeinthecessortenfoot.
Thesixfootisneveraplaceofsafety.Ifyoudogetcaughtinthesixfootandtrainsareapproaching,youmustlayfacedown,parallelwiththetrackandclearofanyobstructions.
40
sect
ion Places of safetyPlaces of safety17
17.2 Authorised walking route
Anauthorisedwalkingrouteprovidessafeaccessto,orfromaplaceofwork.Theyareoftenfoundneardepots,sidings,stationsandsignalboxesandvaryinconstruction.
Walking along the track
Tokeepsafewhenwalkingalongthetrack,youmust:
• wearLUapprovedhighvisibilityclothing
• followinstructionsgivenbythepersonprovidingprotection
• walkintheplaceofsafety
• walkfacingoncomingtrafficwherepossible
• stopwalkingandstandsidewayswhiletrainspass.
17.3 Crossing the track
Ifyouneedtocrossthetrack,youmust:
• takethesafestrouteandusewalkboardswhereprovided
• lookineachdirectionformovingtrains
• lookoutforobstructionsandslipperyconditions
• stepovereachrail
• stepontheballast
• notcrossnearanypointsormovingequipment.
Trackcertificationandprotectionwillberequiredwherewalkboardscrossthetrack.
Youmustnotcrossthetrackunlessyouareinstructedtobythepersonprovidingprotection.
41
section17Places of safety
17.4 Carrying loads
Whencarryingloadsonornearthetrackwithtractioncurrentswitchedonyoumust:
• takecare,especiallywhencarryinganythinglargeorawkward
• keeplonglengthsofbaremetalparalleltothetrackwithbothhandsontop
• lookwhereyouaregoing.
Donotcarryanylargeorawkwarditemsacrossthetrackifittakesmorethanonepersontoliftthem.
42
sect
ion CommunicationLimited clearance18
18 Limited clearanceAlimitedclearancesignindicatesalocationbesidesthetrackwhereyoucannotstandsafelywhenatrainpasses.Donotenteranareaoflimitedclearanceunlessinstructedtodosobythepersonprovidingprotection.
Thepersonprovidingprotectionmustconsiderthefollowingbeforewalkingyouthroughanareaoflimitedclearance:
• lengthofthelimitedclearancearea
• availabilityofanyrefuge(s)
• maximumdistancebetweenadjacentrefuges
• capacityofthesmallestrefuge
• numberofstaffinthegroup
• generalvisibility.
Theremustbesufficientsightingtimetogetyouthroughthelimitedclearance.
43
section19Communication
19 CommunicationWhengivingorreceivingmessages,youmustmakesure:
• youusethephoneticalphabetasshownbelow
• youaretalkingtotherightpersonandthatpersonknowswhoyouare
• yourmessageisclear,accurate,andtothepoint
• theyunderstandtheinformationandanyactionthatisrequired
• theyknowhowtomakecontactagain(ifrequired)
• detailsarerecordedinthelogbookornotebook(whereapplicable).
Themessagemuststartby:
• statingwhoyouare
• askingwhoyouaretalkingto
• statingwhereyouare
• statingwhyyouarecalling.
A Alpha Q QuebecB Bravo R RomeoC Charlie S SierraD Delta T TangoE Echo K Kilo U UniformF Foxtrot L Lima V VictorG Golf M Mike W WhiskeyH Hotel N November X X-rayI India O Oscar Y YankeeJ Juliet P Papa Z Zulu
44
sect
ion CommunicationCommunication19 Emergency action
19.1 Using numbers
Whenusingnumbers10andoverinamessageitmustbesaidoneatatime.
Forexample,‘Train123’mustbespokenas‘Trainonetwothree’not‘Trainonehundredandtwentythree’.
Thenumber‘0’mustalwaysbereferredtoas‘zero’.
Whensignals,points,traindescriptionsorlocationshavesimilarnamesornumbers(forexample,signalsA114andA314onadjacentlines),youmusttakegreatcarenottocauseconfusion.
Numbersdonotneedtobequotedseparatelywhenreferringtothetime,forexample,thetime13:17hoursshouldbestatedas‘thirteenseventeen’.
Communication
45
section20Emergency action
20 Emergency actionWhengoingonornearthetrackyoumustknowwhattodoifsomeoneisinjured.
Aseriouslyinjuredpersonmustnotbemoved,unlessleavingthemwheretheyare,wouldplacethemingreaterdangerandcausefurtherinjury.
Ifapersonisseriouslyinjured,youmust:
• stopanyapproachingtrain
• gettractioncurrentswitchedoff,ifrequired
• tellthecontroller,whowillarrangefortheemergencyservicestoattend
• waitforqualifiedmedicalassistancetoarrive.
Ifthepersonprovidingprotectionisinjured:
• allmembersoftheworkgroupshouldimmediatelygototheplaceofsafetyindicatedatthesafetybriefing
• attracttheattentionofthelookout,ifpresent,sothattheycantakeappropriateemergencyaction
• stopanyapproachingtrain,ifthereisnolookoutandusethetrainradiotosummonassistance.Otherwiseuseanyothermeanstosummonassistance
• contactthecontrollerortheDDM,ifinadepot.
Aseriouslyinjuredpersonmustneverbemovedacrossthetrackif:
• tractioncurrentison
• trainmovementsarelikely.
46
sect
ion Emergency actionEmergency action20 Refusal to work
20.1 Moving a casualty off a live traction current rail
Ifyouneedtogetacasualtyoffalivetractioncurrentrail,youmust:
• standonadrysurface
• putonrubbergloves,orcoveryourhandswithdryclothing
• useapieceofdrywoodoraninsulatedtooltorollthepersonoff.
20.2 Stopping a train
Ifyouhavetostopatraininanemergency,standinaplaceofsafetyanduseoneoftheapprovedsignals.
20.3 Emergencies involving Overhead Line Equipment
InanemergencyinvolvingOLE,youmust:
• contacttheLUcontroller
• giveyourlocationandstructurenumber
• statethenatureoftheemergency
• awaitfurtherinstructions.
Waveanythingacrossyourbody
Wavebotharmsaboveyourhead
Emergency action
47
section21Refusal to work
21 Refusal to workEveryonehastherighttorefusetoworkonthegroundsofhealthandsafety,ifaskedto:
• workindangerousconditions
• takeunnecessaryrisks.
IfyouhavetorefusetoworkunderthegroundsofhealthandsafetyanEIRFmustberaisedbyyourlinemanager.
48
sect
ion NotesSigning out at LU premises22
22 Signing out at LU premisesWhenyouhavefinishedworkyoumustsignoutandreturnyourvisitorsbadgeorsticker.IfyoudonotsignoutthevisitorsbookorPICERitwillshowyouasstillonthepremises,resultinginamemberoftheemergencyservicesriskingtheirlifelookingforyou.
Youmustnotsignoutonbehalfofacolleague.