aviation - milhouse engineering & construction, inc. › ... › aviation_bifold_final.pdf ·...

4
Aviation Reaching New Heights milhouseinc.com

Upload: others

Post on 07-Jul-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Aviation - Milhouse Engineering & Construction, Inc. › ... › Aviation_Bifold_FINAL.pdf · Our goal is simple: to help aviation clients integrate their systems, reduce costs, and

AviationReaching New Heights

milhouseinc.com

Page 2: Aviation - Milhouse Engineering & Construction, Inc. › ... › Aviation_Bifold_FINAL.pdf · Our goal is simple: to help aviation clients integrate their systems, reduce costs, and

Soaring Ahead

Where others see just another project, we are driven by a desire to be great — for our clients and our communities.

We are more than just engineers. We are advocates for improving the world around us.

Understanding the IndustryFrom security requirements to user experience to design trends, the aviation industry is always changing. Creating a safe and efficient airport requires a dedicated partner who can evolve with the industry. At Milhouse, we ask the hard questions to help find the right solutions. Airport projects are often complex with multiple stakeholders and many engineering challenges. We navigate the maze with you to deliver successful results.

Our Team

At Milhouse, we are driven by the strength of our differences. We are a dedicated, multidisciplinary team of over 200 talented professionals with individuals licensed in multiple states. We bring a palpable enthusiasm to the work we do and the people we do it with, plus a devotion to our communities that's as real as it gets.

Our goal is simple: to help aviation clients integrate their systems, reduce costs, and improve operations in a safe and reliable manner. We deliver superior solutions to complex engineering challenges around the globe.

Our ServicesOur collective design experts, practical experiences, and management skills allow us to meet the specific demands of airside and landside aviation projects including:

CIVIL ENGINEERING

Structural andVault Design

Grading andDrainage

Airfield Geometry

Light Rail

PavementMarkings

UtilitiesRoadwayDesign

MEP ENGINEERING

NavigationalAids

Airfield Lighting and Signage

PowerDistribution

FiberOptics

Air TrafficControl Towers

Site Lighting and Signage

Terminals

Page 3: Aviation - Milhouse Engineering & Construction, Inc. › ... › Aviation_Bifold_FINAL.pdf · Our goal is simple: to help aviation clients integrate their systems, reduce costs, and

ExpertiseMilhouse has a deep understanding of the technical and regulatory issues facing airport owners and airlines today. We leverage this knowledge to help our clients deliver projects that soar.

O'Hare Int'l Airport 9C-27C Runway and Taxiways

DELIVERING EXCELLENCE TO OUR CLIENTS

» American Airlines» Chicago Department of Aviation» Midway International» Dallas Ft. Worth Intl. Airport» O’Hare International Airportrt

» O’Hare Fuel Committee» Peoria International Airport» Hartsfield–Jackson Atlanta International» Downing Peoria International

Challenge: Move existing buildings and taxiways in the midst of an active airport. Solution: Design an 11,245 ft. long by 200 ft. wide carrier runway and parallel taxiways to meet FAA Airplane Design Group VI standards . Because the runway is in the middle of an active airport, construction staging is heavily influenced by aircraft ground operations. Existing utility systems remain operational 24/7 until new utilities are brought online.

DFW Int'l Airport Rehabilitation Runway Status Lights

New O'Hare Int'l Airport Centralized De-Icing Facility and Control Tower

Challenge: Design a fully automatic, advisory system to reduce the number and severity of runway incursions and prevent runway accidents while not interfering with airport operations. Solution: Initially installed in 2008, the deteriorated infrastructure required a complete replacement and upgrade. Our team was able to successfully integrate the latest design and construction standards within the operational constraints of the nation's 4th busiest airport without disrupting service.

Challenge: Centralize and improve efficiency of de-icing operations and stormwater management. Solution: A new centralized facility that eliminates secondary de-icing for planes while improving gate utilization, terminal capacity, runway safety and airfield operations. The control tower features an observation deck and 9 console stations for de-icing operations.

» Istanbul Grand Airport» Memphis International» JFK International » Gary/Chicago International

Page 4: Aviation - Milhouse Engineering & Construction, Inc. › ... › Aviation_Bifold_FINAL.pdf · Our goal is simple: to help aviation clients integrate their systems, reduce costs, and

w

2-2019

» Chicago, IL» Charlotte, NC» Lombard IL» Merrillville, IN» Silver Spring, MD» Ann Arbor, MI» Atlanta, GA» Irving, TX» Newark, NJ» Jamaica, NY

» Architectural Engineering» Civil Engineering» Construction Management» Electrical Engineering» Environmental Engineering» Mechanical Engineering» Planning and Development» Program Management» Structural Engineering

Services

Industries

Offices

milhouseinc.com Address » 333 South Wabash Avenue, Suite 1501, Chicago, Illinois 60604 Office » 312-987-0061 Fax » 312-987-0071

Milhouse is a multidisciplinary engineering firm that delivers creative solutions to complex problems across the globe. Driven by our diverse perspectives, we buck the status quo to pursue a brighter future for the communities we serve.

» Aviation» Facilities» Gas» Heavy Industry» Power» Transportation» Water Resources