automotive scenario overview en de

18
Scenario Overview BP Auto V1.600 A85: APQP - Efficient Project Management with Control Plan

Upload: kaman2012

Post on 01-Dec-2014

24 views

Category:

Documents


4 download

TRANSCRIPT

Page 1: Automotive Scenario Overview en De

Scenario Overview BP Auto V1.600

A85: APQP - Efficient Project Management with Control Plan

Page 2: Automotive Scenario Overview en De

SAP AG 2007, APQP - Efficient Project Management with Control Plan

Scenario – A85 APQP – Efficient Project Management with Control Plan

This scenario is made up of several building blocks containing the preconfiguration required for the APQP – Efficient Project Management with Control Plan scenario. Building blocks can help you to implement the solution and put into production quickly.

To illustrate the scenario presented in this overview document, the business view, the interaction view, and the component view, provide three different perspectives on the business scenario.

Business View

The business view shows the business partners participating in the APQP – Efficient Project Management with Control Plan scenario, the business environment, and the business requirements, and benefits for the parties involved.

Interaction View

The interaction view shows the business landscape, process flow and explains the detailed steps required to carry out the scenario.

Technical View

The technical view shows the key function available in the APQP – Efficient Project Management with Control Plan scenario.

Overview

Page 3: Automotive Scenario Overview en De

SAP AG 2007, APQP - Efficient Project Management with Control Plan

Business View

Page 4: Automotive Scenario Overview en De

SAP AG 2007, APQP - Efficient Project Management with Control Plan

Information Synchronization Solution for OEM and Supplier in SAP BP

Standard template delivered for APQP Different roles and authorizations are pre-defined A control plan is generated, and can be transferred to back-end systems OEM transparency enabled

Customers

Supplier Tier 2

Supplier Tier 1 OEMSupplier Tier 2

A business scenario for APQP project management starts by creating a project following the APQP standard. Roles and authorization should be defined for different parties. Interactive operations between the QM, PM, and engineer at the supplier side are then processed.

A practical control plan should be created during the procedure, and be seamlessly linked to the quality execution system.

The OEM should also have the possibility to check the working procedures and related documentation through a certain system.

SAP Best Practices for Automotive scenario APQP – Efficient Project Management with Control Plan shows the full project management cycle following the APQP standard. Supplier.

Information Synchronization between OEM and Supplier

Page 5: Automotive Scenario Overview en De

SAP AG 2007, APQP - Efficient Project Management with Control Plan

Define type of APQP

Review/ Approval

Review/Approval

ReviewPre-ProductionRelease

ReviewSOP Release

1) Concept

Phase

RFQ / Businesscase

Development Plan

Regulations (Laws, Standards, Objectives)

Continuous Improvement

2) Product Design

Design FMEA

PreliminaryBill of Materials

Specification

Design collaboration

Control Plan(Prototype)

3) ProcessDesign

Process FMEA

Routing creation

Process flow diagram

Statistical processControl (SPC)

Control plan(Model)

4) Validation

Planning and production under real-life conditions

Control plan forseries production and inspection plan

Process audit

Production partapproval process

5) Product Launch

Quality Inspections during Production

Requalificationtests

Processoptimization

A guideline for APQP is included in TS16949 and QS9000, which contains the general requirements on how the supplier should handle a new product development project to meet the customer requirements by planning the product and process quality in advance.

In this scenario, the basic requirements from the APQP manual are included in a project template, for preparing plans and checklists, to ensure that Advanced Product Quality Planning is actually carried out at the supplier.

Advanced Product Quality Planning Phase Approach

Page 6: Automotive Scenario Overview en De

SAP AG 2007, APQP - Efficient Project Management with Control Plan

Supplier

Project Manager Quality Manager Engineer

OEM

New Product Development

Request

Supplier - cProjects

APQP Project

Create Project basedOn APQP template

Resources Planning

Create Project basedOn APQP template

Project Scheduling

Q-Gate Setting

Resources Planning

Project Scheduling

Q-Gate Setting

APQPtemplate

Upload Documents

Concept Design

Maintain Task Status

Upload Documents

Copy/Maintain Checklistand confirm Status

Maintain Task Status Project Evaluation

Q-Gate:Phase Approval

Create/Download/PrintControl Plan

Export Inspection PlanTo R/3Create Collaboration

Complete Project

Copy/Maintain Checklistand confirm Status

Project Evaluation

Q-Gate:Phase Approval

Create/Download/PrintControl Plan

cFolders

APQP Project Folders

Export Inspection PlanTo R/3

Product Design

Concept Design

Design FMEABOM

Control Plan

Monitor

Product Design

Process Design

Validation

Product Launch

Design FMEA, BOM, Control Plan, Process Flow, Diagram, Process FMEA, PPAP Design

Process Design

Validation

Product Launch

Create Collaboration

Complete Project

A85 APQP - Efficient Project Management

Page 7: Automotive Scenario Overview en De

SAP AG 2007, APQP - Efficient Project Management with Control Plan

Interaction View

Page 8: Automotive Scenario Overview en De

SAP AG 2007, APQP - Efficient Project Management with Control Plan

Project Manager Quality Manager Engineer

Create Project base on APQP template

Project Resources Planning

Project Scheduling

Q-Gate Setting

Upload document to project

Maintain Task Status

Copy Checklist from template, maintain checklist and confirm

status

Project Evaluation

Q-Gate: Phase Approval

Download and Print Control Plan

Generate Object (Export Inspection Plan to R/3)

Create Collaboration

Complete Project

Create Control Plan

cFolders

A85 APQP - Efficient Project Management: Process Flow

Page 9: Automotive Scenario Overview en De

SAP AG 2007, APQP - Efficient Project Management with Control Plan

Business Benefits Supplier Business Benefits

Increases the efficiency of the development by involving customers and external business partners in the development process, by accessing all objects directly from within the project

Standardizes the development process by using templates

Web-based access increases the speed of information exchange with internal and external partners

All phases of development projects are supported from concept through to planning and execution to the closing of a project

Create Project base on APQP template

Project Scheduling

Q-Gate Setting

Upload Document to Project

Maintain Task Status

Project Resources Planning

Copy Checklist from template, maintain checklist and confirm status

Step Description:

An APQP Project is created based on the standard template

Resources for the project are planned - roles and authorizations are defined and assigned

Project scheduling

A Q-Gate is set for the Concept Design phase

Standard documents are uploaded into the c-Project system for the project

Status of the template documents are checked and confirmed

A85 APQP - Efficient Project Management: Process Steps 1/3

Page 10: Automotive Scenario Overview en De

SAP AG 2007, APQP - Efficient Project Management with Control Plan

Business Benefits Supplier Business Benefits

Better decision support

Fulfillment of requirements such as QS9000/VDA6.1

The scenario shows how the supplier can easily create a control plan via the tool provided by SAP cProjects

Project Evaluation

Q-Gate: Phase Approval

Create Control Plan

Download and Print Control Plan

Generate Object (Export Inspection Plan to R/3)

Step Description:

Project Evaluation is done by both the project manager and quality manager

Q-Gate is met – project manager creates the approval

Approval is granted by the quality manager

Product design phase is released for execution

Control plan is created by the engineer

The control plan is downloaded as a pdf file

The control plan is transferred to the R/3 system

A85 APQP - Efficient Project Management: Process Steps 2/3

Page 11: Automotive Scenario Overview en De

SAP AG 2007, APQP - Efficient Project Management with Control Plan

Business Benefits Supplier Business Benefits

Full integration between project, documents and cFolders enables direct access to all project-related documents

Integration of control plan and PLM backend system help the supplier raise the project management efficiency as well as quality management in future production.

Complete Project

Generate and Maintain Inspection Plan in R/3

Create Collaboration

Step Description:

An inspection plan is generated automatically in the R/3 system

Project manager approve the phase

Collaboration is created – files during the project execution are transferred to the cFolder’s system

Project complete

A85 APQP - Efficient Project Management: Process Steps 3/3

Page 12: Automotive Scenario Overview en De

SAP AG 2007, APQP - Efficient Project Management with Control Plan

Suppliers & Partners

Customers & Channels

Engineering Procurement Manufacturing Sales & Distribution Customer Service

Time-to-Market

New Product Development and Introduction

Life-cycle Data Management

Supplier Collaboration

Strategic Sourcing

Operational Procurement and Inbound Logistics

Build-to-Order

Supply-to-line

Manufacturing

Enterprise Asset Management

Sales & Marketing

Brand and Customer Management

Vehicle Lifecycle Management

Vehicle Planning & Forecasting

Order-to-Delivery

Customer Service

Warranty Management

Interaction Center

Service Parts Planning

Service Parts Execution

Enterprise Management & SupportAnalytics

Financials

Human Capital Management

Corporate Services

Operations Support

Automotive - OEM - Solution Map

Page 13: Automotive Scenario Overview en De

SAP AG 2007, APQP - Efficient Project Management with Control Plan

Suppliers & Partners

Customer & Channels

Engineering Procurement Manufacturing Sales & Distribution Customer Service

OEM Relationship Management

Collaborative Engineering

Key Account Management

Time-to-Market

New Product Development and Introduction

Life-cycle Data Management

Supplier Collaboration

Strategic Sourcing

Operational Procurement and Inbound Logistics

Make-to-Order/Make-to-Stock

Supply-to-line

Outbound Logistics

Enterprise Asset Management

Manufacturing

Sales Order Management

Demand and Order Scheduling

Order Execution and Receipt Settlement

Customer Service

Warranty Management

Service Parts Planning

Service Parts Execution

Enterprise Management & SupportAnalytics

Financials

Human Capital Management

Corporate Services

Operations Support

Automotive - Supplier - Solution Map

Page 14: Automotive Scenario Overview en De

SAP AG 2007, APQP - Efficient Project Management with Control Plan

Technical View

Page 15: Automotive Scenario Overview en De

SAP AG 2007, APQP - Efficient Project Management with Control Plan

Key Functions of Efficient Project Management

c-Project is used to control the project, especially the pre-BOM phase.

Q-Gate set with complex authorization.

The control plan created in c-Project can be downloaded to a pdf file.

The control plan can be transferred to R/3 system (inspection plan).

cFolders is linked with the cProjects to ensure transparency for the OEM.

A85 APQP – Efficient Project Management: Key Functions

Page 16: Automotive Scenario Overview en De

SAP AG 2007, APQP - Efficient Project Management with Control Plan

cProjects is used to control the project, especially the pre-BOM phase

The template is pre-defined in SAP Best Practices for Automotive

Project Template in c-Project

Page 17: Automotive Scenario Overview en De

SAP AG 2007, APQP - Efficient Project Management with Control Plan

Control Plan created in cProjects can be downloaded as a pdf file

Control Plan created in cProjects can be transferred to the R/3 system

An Inspection Plan in the R/3 system can be automatically generated based on the Control Plan

Control Plan in pdf Format

Page 18: Automotive Scenario Overview en De

SAP AG 2007, APQP - Efficient Project Management with Control Plan

cFolders is linked with cProjects

Related information during the project can be published to the cFolders

The OEM has the possibility to monitor the project remotely

cFolders Linked to the cProjects