26
42A02Nweeee 2.5091 FALLON 010 GomiflCD EXPLORATION FASKEN PROJECT NTS: 42-A-10 TIMMINS AREA ONTARIO SUBMITTED FOR ASSESSMENT EASTERN DISTRICT SEPTEMBER 1982 K.N. HENDRY

Upload: others

Post on 06-Feb-2022

4 views

Category:

Documents


0 download

TRANSCRIPT

42A02Nweeee 2.5091 FALLON 010

GomiflCD

EXPLORATIONFASKEN PROJECT

NTS: 42-A-10

TIMMINS AREA

ONTARIO

SUBMITTED FOR ASSESSMENT

EASTERN DISTRICT

SEPTEMBER 1982 K.N. HENDRY

a.seai FALLON 010C

TABLE OF CONTENTS

SUMMARY

INTRODUCTION

EQUIPMENT

DATE REPRESENTATION

GEOLOGY

DISCUSSION OF RESULTS

CONCLUSIONS

l

l

1

2

2

2

2

—Q—

LIST OF PLATES

Plate l Conductor Location Map

Plate 2 Magnetic Survey

Plate 3 Horizontal Loop EM kkk HzPlate k Horizontal Loop EM 1777 Hz

Plate 5 Horizontal Loop EM 3555 Hz

COHINCO LTD.

EXPLORATION ASSESSMENT REPORT EASTERN DISTRICT

NTS: A2-A-10 FASKEN PROJECT

TIMMINS AREA

ONTARIO

AUGUST 1982 K.N. HENDRY

SUMMARY

Magnetic and horizontal loop EM surveys were carried out over this massive sulphide target during April 1982.

A conductor, indicated on several airborne EM surveys was accurately located and determined to consist of two smaller units over a strike length of 1200 meters.

Previous drilling indicated a graphite/massive sulphide source of the anomaly.

INTRODUCTION

This report pertains to the geophysical work carried out on the Fasken project April 5 ~ li, 1982. Cominco personnel D. Laronde, geophysical technician, R. Lavigne, geological technician, R. Holroyd, geophysicist and K. Hendry, Sr. geophysicist were involved in the survey work.

The purpose of the surveys was to define a drill target in this massive sulphide prospect on strike with an existing graphite/massive sulphide intersection.

EQUIPMENT

The prime survey tool was horizontal loop EM. A MaxMSn II with.^-a 100 meter coil separation was used to collect data. Two lines were also surveyed with a 200 meter coil separation (lines ?E and 10E). The basic survey coverage included readings at frequencies of kkk, 1 777 and 3555 hz. The detail lines included the above and 222 hz.

The instrument was later found to be malfunctioning. Symptoms included higher amplitude on the 222 hz frequency than kkk hz. and inverted quadrature profile on Wk h z. over the anomaly.

The instrument can be read to 1^ on both inphase and quadrature.

Magnetic data was collected with two instruments; a Geometrics G-816 and Scintrex MP-2, proton precession magnetometers. Readings were recorded at 25 meter intervals. The diurnal corrections were accomplished by looping to the baseline which had previously been "double run".

The instrument accuracy is +1 nanotesla (gamma). Position and diurnal errors probably limit repeatability to 5 gammas.

DATA PRESENTATION

The HLEM data is presented in profile form at a vertical scale l cm repre sents 10&. The three frequencies are found on individual sheets. The 200 meter coil separation results are found on two sheets with the corresponding 100 meter data for comparison.

The magnetic survey is on one sheet In plan contour form. The contour interval is 100 nano-teslas (gammas).

GEOLOGY

Fasken Township is located south of Nighthawk Lake in an area of low magnetic relief (l" = A mile regional aeromagnetic map). The property is underlain by intermediate to felsic volcanics of the Deloro group, the host stratigraphy for the Kidd Creek mine. The single drill hole available intersected about 100 feet of overburden. Rock types Include rhyolltlc and dacitic breccias.

DISCUSSION OF RESULTS

Several airborne EM and magnetometer surveys have been flown over this area with similar results. An EM conductor was mapped In the SW corner of Fasken Township trending NW-SE. It exhibits good conductivity, limited strike length and occurs within felsic volcanics without a directly associated magnetic anomaly. The surface exploration grid was oriented parallel to the long axis of the conductor.

The ground magnetometer contour map correlates well with the airborne - collected data. Low magnetic relief Is observed to the east end of the grid and in a local area centered between lines 9E and 4E along the baseline. Several anomalous highs were noted trending NS, diagonally cutting the grid between lines 9E and 12E, exhibiting 500 nanotesla (gamma) peaks. The southwest corner of the grid traversed one of the few outcrops on the property, also a topographic high corresponding to a anomalous magnetic high of 500-700 nanoteslas.

The low magnetic relief observed over most of the property Is due to the extensive overburden cover (30 meters near the baseline at line 7E) and felsic volcanics. The anomalous magnetic highs result from more mafic rocks and diabase dykes.

The surface EM results suggest a 500 meter long main conductor (A) with a deeper anomaly (B) on strike about 200 meters to the southeast. Conductor A is shallowest on lines 6E and 7E (26-27 meters), is almost 10 meters thick at lines 6E and exhibits a conductivity-thickness of 22 mhos at 1777 hz. A steep (700 ) northerly dip is calculated for the anomaly. The feature strikes essentially parallel to the baseline.

A gap is observed between "A" and "B", and "B" strikes at a sharper angle to the baseline. The larger depths encountered for B make the Interpre tation less clear but a depth-toatop of k5 to 60 meters was obtained along with high conductivity thickness. Anomaly width and dip are not determined due to an adjacent poor, possibly overburden, conductor.

CONCLUSIONS

A magnetic survey conducted on this property provided Insight into the geological setting but did not "detect" the conductor due to insufficient associated magnetic minerals (pyrrhotite magnetite). The MaxMin HLEM data located the conductor and suggests a possible 2 part feature with an overall length of 1200 meters. Conductivity is good, depth of overburden is 30-50 meters and dips are near vertical.

Diamond drilling carried out in 1971 located 20 meters of a graphitic/ pyritic unit at a depth of about 80 meters below the baseline at approx imately 7+50E.

Submitted by:K.N. Hendry Sr. Geophysici Exploration, E.D

Endorsed by:R.B. Cook Asst. Manager Exploration, E.D.

/ml

48A02NW0006 FALLON 300

1983 08 31

373

2.5091

Mining RecorderMinistry of Natural Resources60 Wilson AvenueTimmins, OntarioP4N 2S7

Dear Sir:

RE: Geophysical (Electromagnetic 4 Magnetometer) Survey on Mining CI alias P 624567 et al In the Township of Fasken.

The Geophysical (Electromagnetic S Magnetometer) Survey assessment work credits as listed with ray Notice of Intent dated August 5, 1983 have been approved as of the above date.

Please Inform the recorded holder of these mining claims and so Indicate on your records.

Yours very truly,

E.F. AndersonDirectorLand Management Branch

Whitney Block, Queen's ParkTooonto, OntarioM7A 1H3Phone: 416/965-1380

R. P1chette:sc

cc: Comlnco Limited Toronto, Ontario

cc: Resident Geologist Timmins, Ontario

Ministry ofNaturalResources

ano

1983 08 05

Your file:

Our file:2.5091

Mr. Will 1am L. GoodMining RecorderMinistry of Natural Resources60 Wilson AvenueTimmins, OntarioP4N 2S7

Dear Sir:

\

Enclosed are two copies of a Notice of Intent with statements listing a reduced rate of assessment work credits to be allowed for a technical survey. Please forward one copy to the recorded holder of the claims and retain the other. In approximately fifteen days from the above date, a final letter of approval of these credits will be sent to you. On receipt of the approval letter, you may then change the work entries on the claim record

sheets.

For further information, if required, please contact Mr. F.W. Matthews at 416/965-1380.

Yours very truly,

E.F. AndersonDirectorLand Management Branch

Whitney Block, Room 6450Queen's ParkToronto, OntarioM7A 1W3Phone: 416/965-1316

R. P1chette:mc

cc: Comlnco Ltd Suite 1700120 Adelaide Street West Toronto, Ontario M5H 1T1

cc: Mr. 6.H. FergusonMining 4 Lands Commissioner Toronto, Ontario

Ends:

Ministry ofNaturalResources

Ontario

Notice of Intent

for Technical Reports

1983 08 03

2.5091

An examination of your survey report indicates that the requirements of The Ontario Mining Act have not been fully met to warrant maximum assessment work credits. This notice is merely a warning that you will not be allowed the number of assessment work days credits that you expected and also that in approximately 15 days from the above date, the mining recorder will be authorized to change the entries on his record sheets to agree with the enclosed statement. Please note that until such time as the recorder actually changes the entry on the record sheet, the status of the claim remains unchanged.

If you are of the opinion that these changes by the mining recorder will jeopardize your claims, you may during the next fifteen days apply to the Mining and Lands Commissioner for an extension of time. Abstracts should be sent with your application.

If the reduced rate of credits does not jeopardize the status of the claims then you need not seek relief from the Mining and Lands Commissioner and this Notice of Intent may be disregarded.

If your survey was submitted and assessed under the "Special Provision-Performance and Coverage" method and you are of the opinion that a re-appraisal under the "Man-days" method would result in the approval of a greater number of days credit per claim, you may, within the said fifteen day period, submit assessment work breakdowns listing the employees names, addresses and the dates and hours they worked. The new work breakdowns should be submitted direct to the Lands Management Branch, Toronto. The report will be re-assessed and a new statement of credits based on actual days worked will be issued.

(82f5t

/r^v Ministry ot Technical Assess iNVl Natural VV/V Resources Work CreditsOntario

ment * 2.5091

Date Mining Recorder's Report of1983 08 05 w**"*. 373

Recorded Holder

COMINCO LTDTownship or Area

FASKEN TOWNSHIP

Type of survey and number of Assessment days credit per claim

Geophysical 20

Electromagnetic dayt

40Magnetometer dayi

Radiometric dayi

Induced polarization , riayt

Other day*

Section 77 (19) See "Mining Claims AsieiMd" column

Rpnlogira! days

Renrhemiral riayt

Man days D Airborne D

Special provision 23 Ground H

O Credits have been reduced because of partial

coverage of claims.

CD Credits have been reduced because of corrections

to work dates and figures of applicant.

Mining Claims Assessed

FOR ELECTROMAGNETIC ONLY:P 624622

624567-68 624571-72 636072 to 74 inclusive

FOR MAGNETOMETER ONLY:P 624622

624567 to 72 inclusive 636072 to 74 inclusive

Special credits under section 77 (16) for the following mining claims

10 DAYS CREDIT, ELECTROMAGNETIC: 20 DAYS CREDIT, MAGNETOMETER

P 624569-70 P 641726-27

No credits have been allowed for the following mining claims

l*] not sufficiently covered by the survey 1 1 Insufficient technical data filed

FOR ELECTROMAGNETIC ONLY:

P 641726-27

3 Mining Recorder may reduce the above credits if necessary in order that the total number of approved assessment days recorded oneh claim does not exceed the maximum allowed as follows: Geophysical 80; Geological 40; Geochemical 40; Section 77(19) GO:

' (83/6)

MinistryolNaturalResources

Ontario

Report of Work(Geophysical, Geological, Geochemical and Expenditures)

The Mining Act

Instructions: Please type or print.— If number of mining claims traversed

exceeds space on this form, attach a list.Note: — Only days credits calculated in the

"Expenditures" section may be enteredin the "Expend. Days Cr." columns.

— Do not use shaded areas below.rype of SurveyU)

Horizontal Loop E.M. and Mag.Township or Area

FaskenClaim Holdar(i)

Cominco Ltd.ector't Licence No.

A 10043

1700-120 Adelaide St.W. Toronto, Ont. M5H 1T1Survey Company

Cominco Employee'sDate of Survey (from Si to)

Day l Mo. j Yr,, 82

Day j Mo, l Yr.

Tot*! Miles of lin* Cut

Name and Address of Author (of Gao-Technlcal report)K.N. Hendry - l83JJigby Rd, Oakville, Ont. L6L 6AB

Credits Requested per Each Claim in Columns at rightSpecial Provisions

For first survey:Enter 40 days. (This includes line cutting)

For each additional survey: using the same grid:

Enter 20 days (for each)

Man Days

Complete reverse side and enter total (s) here

Airborne Credits

Note: Special provisions credits do not apply to Airborne Surveys.

Geophysical

- Electromagnetic

- Magnetometer

- Radiometric

- Other

Geological

Geochemical

Geophysical

- Electromagnetic

- Magnetonlater

- Radiometric

- Other

Geological

Geochemical

Electromagnetic

Magnetometer

Radiometric

Expenditirrer(eKcTua^s"power stri PRing)Type of W ir|t Porformed , ,, ,, ,, rm

ji ;V UJ L li V LPerformed o4Jc^laim(s) li

rv,,,,,,,,,,^,^^.Calc ulation nf.{JKpentftow*-Peyt fltinil'li

Total Expenditures

S H- 15

Days per Claim

20

40

Days per Claim

Days per Claim

Total Days Credits

s

Instructions Total Days Credits may be apportioned at the claim holder's choice. Enter number of days credits per claim selected In columns at right.

Mining Claims Traversed (List in numerical sequence)Mining Claim

Prefix

P

Numb* r

624622624567624568624569624570624571624572641726641727636072636073636074

RECCceporr

Receipt No————————— - ——— ———

Expend. Days Cr.

60

6060

606060

6060606060

60

)RD

29 19

BMMWRMBM

E

12

MMM

Mining ClaimPrefix

ts!iL

it

• *''-:-t' : A * W"

''A:'*'' * " * ~-

X

D

•MMMM 1

Number

FrFfV

OCT1 91981MO LANDS SI

Expand. Jays Cr,

ED•W a

"CTIOf

Total number of mining claims covered by this report of work.

DateSeptember 21/82

For Office Use OnlyTotal Days Cr. Recorded

Date Approved as Recorded Branch

Regional Mining RecorderCertification Verifying Report of Work

l hereby certify that l have a personal and intimate knowledge of the facts set forth in the Report of Work annexed hereto, having performed the work or witnessed same during and/or after its completion and the annexed report i* true.

Nama and Postal Address of Parson Certifying

K.N. Hendry, 183 Digby RoadOakville, Ont. L6L 6AB Date Certified

September 21/82Certified by (Sjtfnatu

1362 (81/9)

Ministry* Geotechnical JSTces Report

Ontario 4k Approval

File

Mining Lands Comments C?

* J

Commenti

To: Geology - Expenditures

L^Aoprovad PH With to ne again with corrections

Commenti

[| Approved [~| W ith to fee again with correctioniDate Signature

l To: Geochemistry

Comments

Approved Q Wish to see again with correctionsDate Signature

l [TO: Mining Lands Section, Room 6462, Whitney Block. (Tel: 5-1380)

Cominco Ltd./Suite 1700,120 Adelaide St. W./Toronto, Ont.. Canada/MSH 1T1 Tel. (416) 869-1850/Telex 06-22912/Cable (Comtor)

Exploration M r - F- w - MatthewsLand Management Branch Room 6** 50 Whitney Block Queen's Park TORONTO, Ont. M7H JW3

July 12, 1983

Dear Mr. Matthews,

RE: YOUR FILE 2.5091

Cominco

As requested In your letter of June 2^th, l am returning herewith the E. M. and Mag maps signed and dated by K.N. Hendry.

R.C. LaRoche Records Technician Exploration, E.D.

RECEIVEDl tt 1983RCL/ijt

MINING LANDS SECTION

Enc.

1983 06 24 2.5091

Coni 1 ne o LtdSuite 1700120 Adelaide Street WestToronto, OntarioMSH lil

Dear Sir:

Rf: Geophysical (Electromagnetic and Magnetometer) Survey submitted on Mining Claims P624567 et al in the Township of Tasken

Fncleoed fire the plans, in duplicate, for the above-mentioned survey. Please neve Mr. Hendry date and sign each map, show the actual readings on the electromagnetic maps and return ell of the maps to this office.

For further Information, please contact Mr. F.W. Matthews fct (416) 965-13BO.

Yours very truly,

F.F. AndersonDirectorland Management Branch

Whitney Block, Room 6450Queen's ParkToronto, OntarioM7A 1W3Phone:(416) 965-1380

D. K1nvig:mc

cc: Mining Recorder Timmins, Ontario

Ministry of Geotechnical Natural ReportResources

Approval

Fit*

Mining Lands Comments

\

^x?G Q

\To: Geophysics

Comment*

Q Approved r^lwith to sea again with corractlontData Signature

To: Geology - ExpendituresCo m man tt

Approved f~l With to taa again with corractioniSlgnatura

To: Geochemistry

Comment!

f~| Approved || With to lee again with correctionsSignature

j [To: Mining Lands Section, Room 6462, Whitney Block. {Tel: 5-1380)

1593(61/10)

1982 10 22 2.5091

Mining RecorderMinistry of Natural Reaources60 Wilton AvenueTinmins, OntarioP4N 2S7

Dear Sir:

We have received reporta and maps for a Geophysical (Electromagnetic and Magnetometer) Survey submitted under Special Proviaiona (credit for Performance and Coverage) on Mining Claims P 636072 at al in the Township of Fasken.

This material will be examined and assessed and a atatement of assessment work credits will be issued*

Yours very truly

B.F. AndersonDirectorLand Management Branch

Whitney Block, Room 6450Queen's ParkToronto, OntarioM7A 1W3Phone: 416/965-1380

DW:sc

cc: Cominco Limited120 Adelaide Street WestStreet 1700Toronto, OntarioMSB 1T1Attn: Mr. K.M. Mendry

Ontario

Ministry of Natural Resources

GEOPHYSICAL - GEOLOGICAL - GEOCHEMICAL TECHNICAL DATA STATEMENT

File.

TO BE ATTACHED AS AN APPENDIX TO TECHNICAL REPORTFACTS SHOWN HERE NEED NOT BE REPEATED IN REPORT

TECHNICAL REPORT MUST CONTAIN INTERPRETATION, CONCLUSIONS

ocr

Type of Survey(s).

Township or Area.

Claim Holder(s)_

Magnetic and E.M.

Survey Company -

Author of Report.

Address of Author.

Covering Dates of Survey.(linecutting to office)

Total Miles of Line r..t *"-05km (15.8km E.M. - 20km Mag)

SPECIAL PROVISIONS CREDITS REQUESTED

ENTER 40 days (includes line cutting) for first survey.

ENTER 20 days for each additional survey using same grid.

Geophysical

Electromagnetic.

Magnetometer...

Radiometric

Other-—————

DAYSper claim

Geological.

Geochemical.

AIRBORNE CREDITS (Special provision credits do not apply to airborne lurveyt)

Magnetometer. .Electromagnetic. . Radiometric

DATE:.

(enter days per claim)

SIGNATURE:Author of Report or Agent

Res. Geol.. .Qualifications.

Previous Surveys File No. Type Date Claim Holder

MINING CLAIMS TRAVERSED List numerically

(prefix) (number).Qr~~~~~~"

j

TOTAL CLAIMS-

GEOPHYSICAL TECHNICAL DATA

GROUND SURVEYS If more than one survey, specify data for each type of survey

388 E.M..Number of Stations 30Q * t he base1 ! ne___________Number of Readings 820 Magnet le

Station interval 50m, 25m, 12.5m_____________Une sparing 'OO"1———-—— Profile scale________________lcm represents 30*______________________

100 gammas (nanoteslasl*, Contour interval.

M

U, Instrument SclntrexMP-2 Geometries 6-816l—hli, ZO^

Accuracy - Scale constant ± ] 9 amma (nanotesla!Diurnal correction method looping to basel l ne whtch was douBle run

Base Station check-in interval (Hours) At the end o1Rasp Station loration and value

Instrument Apex

Coil configuration ___________HLEH

Coil separation _____________^00m

UH-(

H W Z

3•s.SH

W Frequency_____^^. 1777. 3555 HzM

both tnphase and Quadrature

Method: D Fixed transmitter d Shoot back SI In line CD Parallel line

(specify V.L.F. station)Parameters measured____Inphase______Quadrature

Instrument.Scale constant^*

fcjHH Corrections made.

O station value and location .

Elevation accuracy.

INDUCED POLARIZATION

Method CD Time DomainParameters — On time

^ Off tjmpH > — Helay timeH M — I ntegration timeO) W Power

Electrode array.Electrode spacing ———————————————————Tvne of electrode . ..,... ,........ . ——————————

Q Frequency Domain FrequencyRange

SELF POTENTIAL

Instrument__________________________________________— Range. Survey Method __________________________________________.

Corrections made.

RADIOMETRIC

Instrument.Values measured.

Energy windows (levels)_____________________________________' Height of instrument______________________________Background Count.Size of detector————————————-——————^——^^.^——.......—..——....—.Overburden ——————--———^.^^^^^-——.—.———..—^^^^^^——....—.————^.

(type, depth — include outcrop map)

OTHERS (SEISMIC, DRILL WELL LOGGING ETC.)

Type of survey————————————-————-—————^——^——Instrument .—————————^-——————-———————————————Accuracy.—————————^—^———————-—————-——————-——————Parameters measured.

Additional information (for understanding results).

AIRBORNE SURVEYS

Type of survey(s) ——

Instrument(s) —————(specify for each type of survey)

Accuracy———————^—^———^^(specify for each type of survey)

Aircraft used ________________________^^_^__^______.

Sensor altitude-Navigation and flight path recovery method.

Aircraft altitude_______________________________Line Spacing—— Miles flown over total area__________________________.Over claims only.

GEOCHEMICAL SURVEY - PROCEDURE RECORD

Numbers of claims from which samples taken.

Total Number of Samples. Type of Sample.

(Nature of Material)

Average Sample Weight——————— Method of Collection————————

Soil Horizon Sampled- Horizon Development- Sample Depth————-Terrain—^^—^—^

Drainage Development———————————— Estimated Range of Overburden Thickness.

ANALYTICAL METHODS Values expressed in: per cent

p. p. m. p. p. b.

D D D

Cu, Pb,

Others—

Zn, Ni, Co, Ag, Mo, As.-(circle)

Field Analysis (.Extraction Method. Analytical Method- Reagents Used——

Fjeld Laboratory AnalysisNo.{—————————.

SAMPLE PREPARATION(Includes drying, screening, crushing, ashing)

Mesh size of fraction used for analysis,———

Extraction Method. Analytical Method - Reagents Used-™—

Commercial Laboratory (- Name of Laboratory— Extraction Method- Analytical Method —— Reagents Used————

.tests)

.tests)

-tests)

General. General.

ONTARIO

MINISTRY OF NATURAL RESOURCESSURVEYS AND MAPPING BRANCH

M.278ONTARIO

ON MINISTRY OF NATSURVEYS ANP

RESOURCES

PORCUPINE DISTRICT

Scale -

ISSUE

JUN17.BB3

LANGMUIR

|609830|60983I

-.J.______J

663010 '6630M 166301? 1663013 ' 683355— ~ - J. ,- --. -4-——— ——

16 \63009i663DI7 16G3OIC !fc630l5 '663014 '6fc329i 1 6098 36 609837 1 lil i j T l i l LL..-., j -.-.-.4-

1609839 1609838

L ——l— —— -J

(, |66J-167;- — ~ -^-^ - ---L ,-.- — -- "3 T

l 653260 .641742 '

i (^53259 y |i.J3cn5.— —— — — — —' —— —

|B36 079 .636075

P , P ^

V

1986470 1986473 '586474

102-f*

LEGEND

CLE/WER400'Surface r ights reservation around all lakes ^ rivtra.

Le A

OF OCCUPATION RIGHTS

c. 5.

Loc L.O. W/?, o.5 7.0

^-Jw

42A02NW0C06 2.5091 FALLON200

f^

DATE OF ISSUE

JUN16

Minislry of Natural ResourcesTORONTO

lv CL

PORCUPINE: MINING DIVISION

M.280\ : \ RK)

AT'JRAL RESOURCESBRANCH

4-0

TVP LJt^ \VITZ_m TBJWAG.AMI PI^OVl/^CIAU

l 6I08?4 j

, 610520 ' 6108^7 L ^ ^ J ---J/

6/10956 ' 610957 , 610956V .

-eiogss/iefweo j ei^se^ lE^ste^J

. (~~ "* "" *~" "~ ~

641735 .64(756 .54 l 737', 64 l

2.5891 FALLON 210

641737

641736

641725

641735

o o•fo

UJooi

UJo o4-OJ

111oo-4-(O

UJo o+1^^r

1 ^f

UJo o•+1

^-^ IO

UJ

624624

UJo oCOl

UJo o•fO)l

UJo oo

1

u,\0 \o—T

Ulo o

\ T1 B

UJoo•*" JO1

UJ 'o o4-

*^™

UJo o4ini

UJo oi1

UJo o4 1^1

\ 0o\2

1

UJo o42^-1

Ulo o*oCMt

UJo

CM

5N-636079

4N-

3H-

2N-

N-

BL-

SCALE: lin * 20miit*

IS-

2S-

3S-

4S-

5S-

25mlOmhos10 m Width* firn

-5N

-4N

-3N

-IN

-BL

636077

641727-iS

-2S

636076

100

SCALE100 ZOO 300

M E T R C S

400 9OO

42A82NWW86 2.5091 FALLON 220

EASTERN DISTRICTDrawn by:

by DM*

Trac*dby: K. Bby Data FASKEN 'PROJECT

CONDUCTOR LOCATION MAP

ONTARIOScale: i: sooo

N.T.S 42-ADate:

March I982Plate: l

FORM 2IO- K6

6245720/7

6^6073-093

64I727-IS

LEGEND

INSTRUMENT CONTOUR INTERVAL TRUE FIELD VALUE

Scintrex MP-2100 gammas (nanotesla*)Add 59.000 gammas

SCALE

EASTERN DISTRICTrraced by: K p

FASKEN MAGNETIC

PROJECT SURVEY

N.T.S 42-A42A02NW0006 2.5091 FALLON

March 1962

FORM 210- K6

641737

\\ 641725

641736624624

641735

5N-

4N-

3N-

2N-

N-

BL-

ts-

636077

2S-

3S-

4S-

5S

636076

LEGEND

SCALE l in : ZOmiKs

o oo

1-1

63

UJ Oo4-.

-1

i6O75

UJ O O4- OJ

i-J

--^

UJo ofO1 \-A\-

-^ \

UJo o4-

^Jr

UJo o

^ in-i-i

UJo ^ cr

^ 4-to

1-J

^^ \^^0 \

0 V^ \t \i \

\

UJoo00

1-J

Ulooo*

1-1

UJo o4-

o1-J

\ sUJo \ o

L \\

UJo oCVJ

1-J

UJoo4-rOi-1

UJo o4li

UJo o4-IOi.j

UJo o•1-

1-J

UJo o

1-J

', UJ 1 0

oK

\ 51-J., -r"\

UJo o0* ..,

t-J

UJo o4-oCM

1-J

UJo- "O

c\ii-i

-5N

-4N

3N

-2N

-IN

-BL

64I727-IS

-2S

444 Hz IOO metre*

INSTRUMENT •••••••- - . . - -. . -. - . .FREQUENCY----------------'-------..COIL S PACING- ••••- •••••- •••••- - -IN-PHASE (plotted to the left}----- -- - ——— - ——— -OUT-OF-PHASE (plotted to the right) K —— - x-- - PROFILE SCALE----------------- l cm * 10 ^

100

SCALE50O

M E T R E S

2.5091 FALLON 240

Drawn by:Riviitd by Otta

_ 4..

EASTERN DISTRICTTraced by: K BFtoviMd by D*t*

FASKEN PROJECTHORIZONTAL LOOP EM SURVEY

444Hz lOOmc.sONTARIO N.T.S 42-A

Scale: i: 5ooo Date:March 1 982

Plate:

FORM sio- KB

SCALE M n s 20 mile*

641737

641725

5N-636079

4N-

636078*'.'*

3N-

2N-

IN-

BL-

2S-

3S-

4S-

5S

-5N

-4N

-3N

-2N

-IN

-8L

636077

64I727-IS

- 2S

636076

LEGEND

Ma x Win 1C •I777HZ lOOmerres

INSTRUMENT"-- --- - -- --..- - .--FREQUENCY---------------------

COIL SPACING - IN-PHASE (plotted to the left) -———- ——— - OUT-OF-PHAS E (plotted to the right) x-——x———x PROFILE SCALE-" - - - - - - - --- - ----- - lcm * lOVo

100 ieo 200 300 40O 500

METRES

42A92NW0096 2.5C91 FALLON 250

Drawn by:Re vi** d by DO*

EASTERN DISTRICT W 3Traced by: ^ , e

|Dat* FASKEN PROJECT HORIZONTAL LOOP EM SURVEY

1777 H z I00mc.sONTARIO N.T.S42-A

Scale: ; 5ooo Date: March 1982iPlate:

FORM 210- K6

SCALE lin - 2 0 milci

641737

641725

5N-636079

4N-

636-079

641736

641735

O O4O

1

UJoo4

1

UJo o4-

CM 1

UJo o4-rO

UJO O4-

T -

UJo o4

i

UJo

..*cr""^ 4

U)

624624

UJoo4-00 l

UJo o4o*l

UJo oo

1

UJo oi.

1

\ a o

\ i

UJo o4roi

UJo o4

~i~

UJO O4ini

UJ Oo4-(O

1

UJo o4

T

^ o o

\21

UJo o42? ^--

\

UJOO4-O OJi

UJo'O4

OJ

3N-

2N-

IN-

BL

S-

2S

3S

4S-

5S-

636077

-5N

-4N

-3N

-2N

-IN

-BL

636076

641727-is

-2S

L E G E N D

Max Mintt 3555 H z 100 metres

INSTRUMENT --•••- - - - - - - - •FREQUENCY -- -- - -•••••- •••- '•••COIL SPACING .-.- - .............IN-PHASE(plotted to the left) - ——— - ——— - OUT-OF-PHASE(plotfed to the right) x — — x----xPROFILE SCALE • — ""- - - -- - - - - - - - - | C m s I0 0/*

IOO

METRES

500

2.5*91 FALLON 260

Drawn by:R* VIM d by 0*1*

EASTERN DISTRICTTraced by: K B

by DateFASKEN PROJECT

HORIZONTAL LOOP EM SURVEY 3555Hz lOOmc.s

ONTARIO N.T.S 42-AScale: : 5000 Date:

March 1 982Plate:

FORM 2 10- K6