assessment, engagement, masterplanning, and capital ......assessment, engagement, masterplanning,...
TRANSCRIPT
Board Update – September 23, 2019
Assessment, Engagement, Masterplanning, and
Capital Improvements Plan
LEWISVILLE AREA MASTERPLANNING
OVERALL EXISTING CAMPUS
DRAFT
New Outdoor Baseball/Softball Toilets
New Baseball Fieldhouse
New Baseball Batting CageNew HOME SIDE Facilities
New Softball Batting Cage
New Team Rooms
New Entry & Ticketing
Expanded Drive and Parking
Expanded Parking
New Service Drive
New District-wide Performing Arts Center
New Classroom Addition
New Addition
LEWISVILLE AREA MASTERPLANNING
Lewisville Elementary School- Add (4) New Classrooms. New Classrooms
accommodate +85 additional students.- Relocate 5th Grade on the Lewisville ES campus.- Site Improvements for Access, Parking, and
Emergency Service Circulation
Lewisville High School- Classroom Additions, Kitchen/Dining Addition.- New Car Pick-up/Drop-off Loop. Additional Parking.- New Visitor Toilets, Team Rooms, Entry and Ticketing
areas at the LHS Stadium- New Fieldhouses, toilets, and batting cages at the
Baseball/Softball fields.
District-wide PAC at Lewisville HS- 1,000-seat theater with fly loft. Include rooms for
Drama, Costume Storage, Scenery, Performer Dressing, and Storage
OVERALL CAMPUS MASTERPLAN
MAIN ENTRY
RECPT.
MEDIA CENTER
Cla
ssro
om
Win
g
Student Pick-up Drop-off
KITCHEN
ROTC
OVERALL EXISTING FLOOR PLAN
EVENT ENTRY
Existing Condition Considerations:- LHS campus is in the best condition of the three high
schools in the district.- Additional Classroom Space Needed for Growth- Visible and Secure Entry Needed at Front Entry- Remove Classroom Portable on Campus- Storage and Teacher Workrooms Needed- Upgrades to the Interior Finishes Needed
MAIN ENTRY
EVENT ENTRY
Class Class
Class
Class
Teacher WkRm
Security Vestibule
RECPT.
MEDIA CENTER
Cla
ssro
om
Win
g
Student Pick-up Drop-off Canopy
Outdoor Courts and CTE Work Area
OVERALL FLOOR PLAN
Existing Condition Considerations:- LHS campus is in the best condition of the three high
schools in the district.- Additional Classroom Space Needed for Growth- Visible and Secure Entry Needed at Front Entry- Remove Classroom Portable on Campus- Storage and Teacher Workrooms Needed- Upgrades to the Interior Finishes Needed
New Drive and Parking
New
Faç
ade
Academic Storage
Enlarge and Add Toilets
Security Fencing
Additions and Renovations- New Student Dining with Seating for up to
500 students. New Kitchen.- (6) New Classrooms and Additional Storage.- Convert existing Kitchen and Cafeteria into
(4) New Classrooms, Teacher Work Rooms, Staff Toilets, and Academic Storage.
- Increase Student Enrollment: New Classrooms accommodate +165 additional students (a +40% increase in possible school enrollment).
- Relocate ROTC Program inside of school. Remove Portable Classrooms.
- Add New Secure Entry and “New Look”- Add Covered Entries at Bus and Car Pick-
up/Drop-off Areas
Upgrades and Maintenance- New Interior Finishes (ie. Remove carpet, new flooring,
new paint, etc.)- Correct Damaged Roofing (Leaks) and Complete
Reroofing Project- Upgrade and Reconfigure Reception Area- Add and Improve Landscaping at the school perimeter
EXISTING FRONT DOOR
NEW FRONT ENTRY
NEW FRONT ENTRY
NEW STUDENT PICK-UP/DROP-OFF
IMPROVEMENTS at FRONT ENTRY