Board Update – September 23, 2019 Assessment, Engagement, Masterplanning, and Capital Improvements Plan

Upload: others

Post on 13-Oct-2020

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Assessment, Engagement, Masterplanning, and Capital ......Assessment, Engagement, Masterplanning, and Capital Improvements Plan. LEWISVILLE AREA MASTERPLANNING OVERALL EXISTING CAMPUS

Board Update – September 23, 2019

Assessment, Engagement, Masterplanning, and

Capital Improvements Plan

Page 2: Assessment, Engagement, Masterplanning, and Capital ......Assessment, Engagement, Masterplanning, and Capital Improvements Plan. LEWISVILLE AREA MASTERPLANNING OVERALL EXISTING CAMPUS

LEWISVILLE AREA MASTERPLANNING

OVERALL EXISTING CAMPUS

Page 3: Assessment, Engagement, Masterplanning, and Capital ......Assessment, Engagement, Masterplanning, and Capital Improvements Plan. LEWISVILLE AREA MASTERPLANNING OVERALL EXISTING CAMPUS

DRAFT

New Outdoor Baseball/Softball Toilets

New Baseball Fieldhouse

New Baseball Batting CageNew HOME SIDE Facilities

New Softball Batting Cage

New Team Rooms

New Entry & Ticketing

Expanded Drive and Parking

Expanded Parking

New Service Drive

New District-wide Performing Arts Center

New Classroom Addition

New Addition

LEWISVILLE AREA MASTERPLANNING

Lewisville Elementary School- Add (4) New Classrooms. New Classrooms

accommodate +85 additional students.- Relocate 5th Grade on the Lewisville ES campus.- Site Improvements for Access, Parking, and

Emergency Service Circulation

Lewisville High School- Classroom Additions, Kitchen/Dining Addition.- New Car Pick-up/Drop-off Loop. Additional Parking.- New Visitor Toilets, Team Rooms, Entry and Ticketing

areas at the LHS Stadium- New Fieldhouses, toilets, and batting cages at the

Baseball/Softball fields.

District-wide PAC at Lewisville HS- 1,000-seat theater with fly loft. Include rooms for

Drama, Costume Storage, Scenery, Performer Dressing, and Storage

OVERALL CAMPUS MASTERPLAN

Page 4: Assessment, Engagement, Masterplanning, and Capital ......Assessment, Engagement, Masterplanning, and Capital Improvements Plan. LEWISVILLE AREA MASTERPLANNING OVERALL EXISTING CAMPUS

MAIN ENTRY

RECPT.

MEDIA CENTER

Cla

ssro

om

Win

g

Student Pick-up Drop-off

KITCHEN

ROTC

OVERALL EXISTING FLOOR PLAN

EVENT ENTRY

Existing Condition Considerations:- LHS campus is in the best condition of the three high

schools in the district.- Additional Classroom Space Needed for Growth- Visible and Secure Entry Needed at Front Entry- Remove Classroom Portable on Campus- Storage and Teacher Workrooms Needed- Upgrades to the Interior Finishes Needed

Page 5: Assessment, Engagement, Masterplanning, and Capital ......Assessment, Engagement, Masterplanning, and Capital Improvements Plan. LEWISVILLE AREA MASTERPLANNING OVERALL EXISTING CAMPUS

MAIN ENTRY

EVENT ENTRY

Class Class

Class

Class

Teacher WkRm

Security Vestibule

RECPT.

MEDIA CENTER

Cla

ssro

om

Win

g

Student Pick-up Drop-off Canopy

Outdoor Courts and CTE Work Area

OVERALL FLOOR PLAN

Existing Condition Considerations:- LHS campus is in the best condition of the three high

schools in the district.- Additional Classroom Space Needed for Growth- Visible and Secure Entry Needed at Front Entry- Remove Classroom Portable on Campus- Storage and Teacher Workrooms Needed- Upgrades to the Interior Finishes Needed

New Drive and Parking

New

Faç

ade

Academic Storage

Enlarge and Add Toilets

Security Fencing

Additions and Renovations- New Student Dining with Seating for up to

500 students. New Kitchen.- (6) New Classrooms and Additional Storage.- Convert existing Kitchen and Cafeteria into

(4) New Classrooms, Teacher Work Rooms, Staff Toilets, and Academic Storage.

- Increase Student Enrollment: New Classrooms accommodate +165 additional students (a +40% increase in possible school enrollment).

- Relocate ROTC Program inside of school. Remove Portable Classrooms.

- Add New Secure Entry and “New Look”- Add Covered Entries at Bus and Car Pick-

up/Drop-off Areas

Upgrades and Maintenance- New Interior Finishes (ie. Remove carpet, new flooring,

new paint, etc.)- Correct Damaged Roofing (Leaks) and Complete

Reroofing Project- Upgrade and Reconfigure Reception Area- Add and Improve Landscaping at the school perimeter

Page 6: Assessment, Engagement, Masterplanning, and Capital ......Assessment, Engagement, Masterplanning, and Capital Improvements Plan. LEWISVILLE AREA MASTERPLANNING OVERALL EXISTING CAMPUS

EXISTING FRONT DOOR

Page 7: Assessment, Engagement, Masterplanning, and Capital ......Assessment, Engagement, Masterplanning, and Capital Improvements Plan. LEWISVILLE AREA MASTERPLANNING OVERALL EXISTING CAMPUS

NEW FRONT ENTRY

Page 8: Assessment, Engagement, Masterplanning, and Capital ......Assessment, Engagement, Masterplanning, and Capital Improvements Plan. LEWISVILLE AREA MASTERPLANNING OVERALL EXISTING CAMPUS

NEW FRONT ENTRY

Page 9: Assessment, Engagement, Masterplanning, and Capital ......Assessment, Engagement, Masterplanning, and Capital Improvements Plan. LEWISVILLE AREA MASTERPLANNING OVERALL EXISTING CAMPUS

NEW STUDENT PICK-UP/DROP-OFF

Page 10: Assessment, Engagement, Masterplanning, and Capital ......Assessment, Engagement, Masterplanning, and Capital Improvements Plan. LEWISVILLE AREA MASTERPLANNING OVERALL EXISTING CAMPUS

IMPROVEMENTS at FRONT ENTRY