1TAP Masterplanning kick-off 25 September 2012

TAP TSI Masterplanning

Overview of RU/IM obligations

Masterplanning Kick-offBrussels, 25 September 2012

2TAP Masterplanning kick-off 25 September 2012

The goal of TAP RU/ IM standards is providing interoperability…

TAP RU/ IM functions take into account different stakeholders than TAF, with an overlap on the IM side

Providing passengers with important travel information on all rail journeys

This is different to TAF

Involved actors: - Infrastructure Managers - Passenger RUs - Station Managers

… for Passengers

Railway companies can – with the same standards for domestic and interoperable services -- order train paths- control and manage their train

services- improve passenger information

… for Rail Companies

Station Managers (SMs) in the sense of TAP are entities responsible for passenger information in the stations

SMs and Passenger RUs are actors that fall under TAP and have had limited or no implication by TAF

3TAP Masterplanning kick-off 25 September 2012

TAP RU/ IM functions are close to TAF RU/ IM Communication

Overview of TAP RU/ IM functions

Short Term Path

Requests

Train Preparation

Train Running Info + Forecast

Service Disruption

Very close to TAF

Close to TAF Other TAF functions not relevant1

Close to TAF Involving SMs Other TAF functions not relevant2

Relation to TAF

Close to TAF Triggers further communication

Dialogue between RU and IM to order or modify paths

Info from RU to IM that train is ready/not ready

Info from IM to RU and SM about punctuality

Content

Info from IM to RU/SM that train stopped and continuation is unclear

1) TAF functions for Train Preparation not relevant for TAP: Train Accepted, Train Composition, Train Not Suitable, Train Position, Train at Start

2) TAF functions for Train Running not relevant for TAP: all Enquiries and Enquiry Responses

Functions

4TAP Masterplanning kick-off 25 September 2012

TAP RU/ IM functions are clustered for the MasterplanningDescription in the Regulation and the Implementation Guide

Reference of TAP RU/ IM functions

Short Term Path

Requests

Train Preparation

Train Running Info + Forecast

Service Disruption

chapter 12

chapter 13

chapter 14, 18

RU/IM Implementation Guide1

chapter 15, 18

BP 4.2.17

BP 4.2.14

BP 4.2.15

TAP Regulation

BP 4.2.16

1) The RU/IM IG contains a “Who should read what”-section that is advised to be consulted. All general chapters (Part A and D) should be read for all clusters. The RU/IM Implementation Guide is available at http://tap-tsi.uic.org/IMG/pdf/20120629_tap_ru_im_implementation_guide_v53c.pdf

Reference

5TAP Masterplanning kick-off 25 September 2012

Some TAP RU/ IM functions are new and not relevant for TAF

Additional TAP RU/ IM functions

Change of Track

Train Journey Modified

Passenger information; not relevant for TAF

Relation to TAF

Info from IM to RU/ SM about platform

Info during operation from IM/ RU to SM that train is rerouted, cancelled etc.

Content

Passenger information; not relevant for TAF

Info in stations

Info in vehicles

Passenger information; not relevant for TAF

Passenger information; not relevant for TAF

Info from SM to customer (content only)

Info from RU to passenger (content only)

Functions

6TAP Masterplanning kick-off 25 September 2012

TAP RU/ IM functions are clustered for the MasterplanningDescription in the Regulation and the Implementation Guide

Reference to TAP RU/ IM functions

Change of Track

Train Journey Modified

BP 4.2.12 chapter 17, 19

chapter 16, 19

RU/IM Implementation Guide1

BP 4.2.12

TAP Regulation

1) The RU/IM IG contains a “Who should read what”-section that is advised to be consulted. All general chapters (Part A and D) should be read for all clusters.

Info in stations

Info in vehicles

chapter 19

chapter 19

BP 4.2.12

BP 4.2.13

Reference

7TAP Masterplanning kick-off 25 September 2012

Standard interfaces to allow communication between stakeholdersvia standard data networks

CI

CI CI

CI

Common Reference data. Location-ID Company-ID

IP Network

RU 1 RU 2

IM 1

CI

IM 2CI

SM 1

CI

CUS

illustrativ

CI = Common InterfaceCUS = Commonly Used System

IM = Infrastructure ManagerRU = Railway UndertakingSM= Station Manager

CIRU 3

General architecture of the RU/IM communication

8TAP Masterplanning kick-off 25 September 2012

TAP RU/ IM prerequisites are very close to TAF TSI

Overview of TAP RU/ IM prerequisites

Reference Files

Common Interface

Train Identifiers

Governance

Very close to TAF

CCG CI is available Individual solutions possible1

Phased approach using existing identifiers is developed in collaboration with TAF2

Relation to TAF

Not specified yet

Data on Locations, Countries, Companies

Tools to allow interoperable message exchange

Unambiguous identification for IT applications

Not replacing rail operational numbers

Content

Availability of rules for standards and common elements

1) Companies can implement own solutions conform to the reference CI, allowing the exchange of TAP messages2) Start using TAP messages with existing identifiers, move towards technical identifiers as developed by TAF, partners need to agree

on migration

Functions

9TAP Masterplanning kick-off 25 September 2012

TAP RU/ IM prerequisites are very close to TAF TSI

Reference to TAP RU/ IM prerequisites

Reference Files

Common Interface

Train Identifiers

Governance

chapter 9

chapter 6

chapter 8 and Train ID handbook2)

chapter 23

BP 4.2.19

BP 4.2.21

n/a

n/a

RU/IM Implementation Guide1TAP Regulation

1) The RU/IM IG contains a “Who should read what”-section that is advised to be consulted. All general chapters (Part A and D) should be read for all clusters.

2) The Train ID Handbook is available at http://www.uic.org/IMG/pdf/111122_wg_10_handbook_final.pdf

Reference

10TAP Masterplanning kick-off 25 September 2012

Reference data is technically centrally, but code allocation needs to be organised per country

Questions mainly for Infrastructure Managers and National Contact Points

When will your company/country

– identify the Code Allocation Entity in your country ?

proposed is that the largest IM in a country should execute this role or take care that this role is defined within their country

– be able to populate the reference file ?

– sign up to be registered on Reference File System (CRD) to execute tests ?https://crd.tsi-cc.eu/CRD/onlineUser/signUp.action

11TAP Masterplanning kick-off 25 September 2012

The RU/IM Implementation Guide together with the message catalogue is the main result of Phase One and the base for implementation

12TAP Masterplanning kick-off 25 September 2012

Commercial solutions outside the TAP legal frame are being prepared by some sector organisations

Availability of support from stakeholder groups

Commercial/voluntary support of activities outside the legal TSI frame

Related initiatives such as PCS1 can support IMs and RUs on a voluntary basis

Activities to implement TAP in these initiatives will take place after the final specifications and the ability of users become clear

The reference implementation of the Common Interface is available and can be used. More information: [email protected]

Specifications TAP RU/ IM standards have been finalised

by May 2012; going through CCM now

Usability Ability of companies to use the standards

needs to be known via TAP Masterplan

1) Path Co-ordination System

13TAP Masterplanning kick-off 25 September 2012

Future: Both mandatory RU/ IM work to fulfil the regulation as well as useful work to fulfil stakeholder requirements will start immediatly

Check the external specifications of the reference implementation of the CI (CCG CI). Relevant for TAF and TAP

Clarify stakeholder questions on deliverables

Check/enhance messages for Short Term Path Request for

– Annual Path Requests

– One Stop Shops

– Coach Group (through coaches) Code list maintenance

Create a wagon ordermessage for passenger information

– This is relevant for TAP only

Enhance work on Train Identification (see also previous slide)

– Create technical messages needed for TAF and TAP

– to accommodate passenger specific requirements

Regulation driven Sector driven

Most points are valid forboth TAF and TAP

A common TAP and TAF RU/ IM workstream will deal with these topics.The results will add to the existing baseline/standards.

14TAP Masterplanning kick-off 25 September 2012

Reference documents for RU/IM Communication

The following links host the reference documents for RU/IM communication

RU/IM Implementation Guidehttp://tap-tsi.uic.org/IMG/pdf/20120629_tap_ru_im_implementation_guide_v53c.pdf

Annexes to the RU/IM Implementation Guidehttp://tap-tsi.uic.org/What-s-new,4.html

Train ID handbookhttp://www.uic.org/IMG/pdf/111122_wg_10_handbook_final.pdf

The following links host additional information or orientation from TAF Masterplanning with RU/IM relevance

TAF Masterplan resultshttp://www.era.europa.eu/Document-Register/Documents/TAF-TSI%20Preliminary%20Master%20Plan.pdf

General TAF links and information

http://www.uic.org/spip.php?article446